CN206257400U - Oil-cooled tube withholds jointing structure - Google Patents

Oil-cooled tube withholds jointing structure Download PDF

Info

Publication number
CN206257400U
CN206257400U CN201621298838.4U CN201621298838U CN206257400U CN 206257400 U CN206257400 U CN 206257400U CN 201621298838 U CN201621298838 U CN 201621298838U CN 206257400 U CN206257400 U CN 206257400U
Authority
CN
China
Prior art keywords
lining core
withheld
bulge loop
annular groove
withholds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621298838.4U
Other languages
Chinese (zh)
Inventor
吕学兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO SUNSONG CO Ltd
Original Assignee
QINGDAO SUNSONG CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO SUNSONG CO Ltd filed Critical QINGDAO SUNSONG CO Ltd
Priority to CN201621298838.4U priority Critical patent/CN206257400U/en
Application granted granted Critical
Publication of CN206257400U publication Critical patent/CN206257400U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

A kind of oil-cooled tube withholds jointing structure, including lining core and withholds set, and the lining core is metal tube, is withheld in set through withholding the mounting hole that set sets and being inserted into, and the end of the lining core is taper type.The lining core is divided into positioned at the inner segment withheld in set and positioned at the outer section withheld outside set.Multiple annular grooves are arranged at intervals with the inner of the lining core, bulge loop is formed between adjacent annular groove, the edge of bulge loop outer surface both sides is circular arc.The lining core outer wall sets restraining position ring block, and the spacing ring is abutted in withhold and covered on the inwall of mounting hole outer rim.Oil-cooled tube is withheld jointing structure and the interior glue of AEM sebific ducts mitigation deformation rear enclosure can be attached in lining core, and the concaveconvex structure that the annular groove in lining core is formed makes the interior glue of AEM sebific ducts deform therewith, enters into annular groove, and be closely attached on bulge loop outer wall.Concaveconvex structure in lining core is more gentle, big with glue contact area in sebific duct, and edge sets arc transition, can not only prevent glue in sebific duct from crushing, while more frictional force can be produced, increases pulling-out force, improves sebific duct stability maintenance.

Description

Oil-cooled tube withholds jointing structure
Technical field
The utility model is related to a kind of sebific duct connecting assembly part, is that a kind of oil-cooled tube withholds jointing specifically Structure.
Background technology
In the oil cooling pipeline of automobile, AEM sebific duct performances are higher than other properties of rubber, and especially high temperature resistant can reach 150 °, but its particularity has drawback again, and when being connected with metal tube riveted, interior glue is frangible, must ensure pulling-out force, prevents glue Pipe is deviate from from joint.Current sebific duct buckle press joint is provided with jagged groove as the metal tube that bushing is used, and is using AEM When sebific duct makes oil cooling pipe assembly, inner glue layer is more prone to generation and crushes, and draws towing force to decline, and product quality is difficult to ensure that.
Utility model content
The utility model cannot adapt to the requirement of AEM sebific ducts for current sebific duct mouthful crimp head, and existing easily makes AEM glue The problem of glue rupture in pipe, proposes that a kind of oil-cooled tube withholds jointing structure.
Oil-cooled tube of the present utility model withholds jointing structure, including lining core and withholds set, and the lining core is metal tube, It is inserted into through the mounting hole for withholding set setting and is withheld in set, the end of the lining core is taper type.
The lining core is divided into positioned at the inner segment withheld in set and positioned at the outer section withheld outside set.
Multiple annular grooves are arranged at intervals with the inner of the lining core, bulge loop, the bulge loop appearance are formed between adjacent annular groove The edge of face both sides is circular arc;The groove width of the annular groove is more than 1/3rd of the width of bulge loop, less than the two of bulge loop width / mono-;The groove depth of the annular groove is 1/5th of groove width.
The lining core outer wall sets restraining position ring block, and the spacing ring abuts in the inwall for withholding set positioned at mounting hole outer rim On.
The beneficial effects of the utility model are:Oil-cooled tube withholds jointing structure can be relaxed the interior glue of AEM sebific ducts Deformation rear enclosure is attached in lining core, and the concaveconvex structure that the annular groove in lining core is formed makes the interior glue of AEM sebific ducts deform therewith, enters into In annular groove, and closely it is attached on bulge loop outer wall.Concaveconvex structure in lining core is more gentle, big with glue contact area in sebific duct, and And edge sets arc transition, can not only prevent glue in sebific duct from crushing, while more frictional force can be produced, increase is pulled Power, improves sebific duct stability maintenance.
Bulge loop is bigger than annular groove width, it is ensured that have sufficiently large contact area with glue in sebific duct, increases pulling-out force, while annular groove Width and depth glue in sebific duct is farthest entered into annular groove by deformation enough, improve sebific duct and lining core Combination degree.
Brief description of the drawings
Accompanying drawing 1 withholds the structural representation of jointing structure for oil-cooled tube;
Accompanying drawing 2 is the structural representation of bushing.
Specific embodiment
In order to be able to further appreciate that structure of the present utility model, feature and other purposes, in conjunction with appended preferred embodiment Detailed description is as follows, and illustrated preferred embodiment is merely to illustrate the technical solution of the utility model, and non-limiting practicality It is new.
Specific embodiment of the present utility model is as follows:
As shown in Fig. 1 to 2, oil-cooled tube withholds jointing structure including lining core 1 and withholds set 2.
Lining core 1 is metal tube, is inserted into through the mounting hole 3 for withholding the setting of set 2 and withheld in set 2, and the end of lining core 1 is cone Platform shape.
1 point of lining core is positioned at the inner segment withheld in set 2 and positioned at the outer section withheld outside set.
Multiple annular grooves 4 are arranged at intervals with the inner segment of lining core 1, bulge loop 5, the outer surface two of bulge loop 5 are formed between adjacent annular groove 4 The edge of side is circular arc;The groove width of annular groove 4 more than bulge loop 5 width 1/3rd, less than the width of bulge loop 5 two/ One;The groove depth of annular groove 4 is 1/5th of groove width.
The outer wall of lining core 1 set restraining position ring block 6, spacing ring 6 abut in withhold set 2 be located at the outer rim of mounting hole 3 inwall on.
First lining core 1 is inserted into sebific duct 7, due to the internal diameter of the external diameter more than sebific duct 7 of lining core 1, the end of frustum makes Lining core 1 is easily inserted.During insertion, sebific duct 7 gradually struts deformation by lining core 1, then into annular groove 4 in, further out Annular groove 4, is strutted and rubbed with it by bulge loop 5, until by each annular groove 4 and bulge loop 5, on top to spacing ring 6.
Because the external diameter of bulge loop 5 in lining core 1 is identical with the external diameter of lining core 1, the sebific duct 6 at bulge loop 5 keeps strutting shape State, and the sebific duct 7 at annular groove 4 is located at then because deformation bounces back and enters into annular groove 4.Bulge loop 5 is contacted with the internal face of sebific duct 6, And interference fit, with larger frictional force, and bulge loop 5 is wider, and the contact surface with sebific duct 7 is big, and sebific duct 7 is with lining core 1 Inner segment deformation of unevenness, it is difficult to deviate from.Sebific duct 7 does not have sharp structure during inserting, and annular groove 4 is also with the intersection of bulge loop 5 Circular arc, deformation transition is gentle, and rubber tube inner wall is difficult to breakage, it is ensured that assembly quality.
The depth of annular groove 4 can allow the retraction of sebific duct 7, and cling to the bottom land of annular groove 4, support sebific duct 7, it is to avoid sebific duct 7 flexible differences are larger, prevent from being ruptured at the dilatation of sebific duct 7.
Then set 2 will be withheld to be inserted in from the other end of lining core 1, until it is pushed up onto spacing ring 6.Total is put into and is withheld On machine, set 2 will be withheld and withhold deformation, the part for withholding the depression of set 2 is alignd with annular groove 4, and sebific duct 7 is located at into the part in annular groove 4 It is locked in annular groove 4, installation is withheld in completion.

Claims (1)

1. a kind of oil-cooled tube withholds jointing structure, including lining core (1) and withholds set (2), it is characterised in that the lining core (1) it is metal tube, is inserted into through the mounting hole (3) for withholding set (2) setting and withheld in set (2), the end of the lining core (1) is Taper type,
The lining core (1) is divided into positioned at the inner segment withheld in set (2) and positioned at the outer section withheld outside set,
Multiple annular grooves (4) are arranged at intervals with the inner segment of the lining core (1), bulge loop (5) is formed between adjacent annular groove (4), it is described The edge of bulge loop (5) outer surface both sides is circular arc;The groove width of the annular groove (4) is more than 1/3rd of the width of bulge loop (5), Less than 1/2nd of bulge loop (5) width;The groove depth of the annular groove (4) is 1/5th of groove width;
Lining core (1) outer wall sets restraining position ring block (6), and the spacing ring (6) abuts in withholds set (2) positioned at mounting hole (3) On the inwall of outer rim.
CN201621298838.4U 2016-11-30 2016-11-30 Oil-cooled tube withholds jointing structure Active CN206257400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621298838.4U CN206257400U (en) 2016-11-30 2016-11-30 Oil-cooled tube withholds jointing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621298838.4U CN206257400U (en) 2016-11-30 2016-11-30 Oil-cooled tube withholds jointing structure

Publications (1)

Publication Number Publication Date
CN206257400U true CN206257400U (en) 2017-06-16

Family

ID=59027657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621298838.4U Active CN206257400U (en) 2016-11-30 2016-11-30 Oil-cooled tube withholds jointing structure

Country Status (1)

Country Link
CN (1) CN206257400U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109473944A (en) * 2018-03-09 2019-03-15 东阳市光明电力建设有限公司 A kind of cable connection structure and connection method convenient for detection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109473944A (en) * 2018-03-09 2019-03-15 东阳市光明电力建设有限公司 A kind of cable connection structure and connection method convenient for detection

Similar Documents

Publication Publication Date Title
CN206257400U (en) Oil-cooled tube withholds jointing structure
CN103775774A (en) Direct-push connecting pipe joint
CN203009503U (en) Self-expanding rubber plug
CN202215875U (en) Fast and easy push-type joint
CN206504055U (en) Seal for pipe joints plug
CN204141098U (en) A kind of ductile iron pipe anchoring interface
CN211908288U (en) Power cable pipe plugging device
CN202070889U (en) Device with steel wire check ring assembled in longhole
CN202213196U (en) Pipe orifice chamfering device
CN206785826U (en) A kind of silica gel sealing Self-locking screw
CN217192136U (en) Expansion type protective cover
CN206206349U (en) A kind of outer urgent expansion bolt
CN204042356U (en) Self-locking connection set and parasol base linkage structure
CN211951748U (en) Adapter for surge-proof valve
CN204941443U (en) One easily bores bridging plug
CN203784410U (en) Abruption valve
CN203297805U (en) Embedded type high-pressure petroleum conveying pipeline
CN204339733U (en) Bolts assemblies assembly
CN215371439U (en) Flat welding backing ring flange with free end having strength
CN209262243U (en) A kind of non-porous sealing-plug of rubber of high intensity
CN202560749U (en) Bolt for automobile
CN203426438U (en) Positioning steel ladle drain steel shell
CN206617681U (en) Reduced pipe
CN202571048U (en) Improved pulled expansion head
CN202213198U (en) Simple pipe expander

Legal Events

Date Code Title Description
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Lv Xuebing

Inventor after: Yu Mingfeng

Inventor before: Lv Xuebing

CB03 Change of inventor or designer information