CN206256677U CN201621362393.1U CN201621362393U CN206256677U CN 206256677 U CN206256677 U CN 206256677U CN 201621362393 U CN201621362393 U CN 201621362393U CN 206256677 U CN206256677 U CN 206256677U
Authority
CN
China
Prior art keywords
cladding
batten
building template
production equipment
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621362393.1U
Other languages
Chinese (zh)
Inventor
向勇
向圆媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU HUXIONGDI BUILDING MATERIALS Co Ltd
Original Assignee
CHENGDU HUXIONGDI BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU HUXIONGDI BUILDING MATERIALS Co Ltd filed Critical CHENGDU HUXIONGDI BUILDING MATERIALS Co Ltd
Priority to CN201621362393.1U priority Critical patent/CN206256677U/en
Application granted granted Critical
Publication of CN206256677U publication Critical patent/CN206256677U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laminated Bodies (AREA)

Abstract

The utility model discloses a kind of production equipment of building template, including the first delivery track, the first cladding area is disposed with first delivery track, buffering area, second cladding area, 3rd cladding area and the mould for heating cure, first cladding area is provided with the multiple first cladding devices for being coated respectively to every batten being arranged side by side on the first delivery track, setting buffers have resin coating apparatus, second cladding area is provided with the second cladding device coated to the batten side by side through the first cladding area using the fibre reinforced materials for being saturated with resin, 3rd cladding area is provided with the 3rd cladding device coated to the batten side by side through the second cladding area using textile, mould is set on the 3rd the first delivery track coated after device along conveying direction.It is additionally arranged the cladding device of the textiles such as last parcel non-woven fabrics in the production equipment of building template, it is to avoid glass fabric has fiber to expose during long-term use, the problem easily pricked the hand and influence building template to use for a long time.

Description

A kind of production equipment of building template
Technical field
The utility model is related to building consumptive material field, in particular to a kind of production equipment of building template.
Background technology
Building template is the formwork and support of concreting shaping, is more valuable in building trade and consumption is very big Goods and materials.Preferable building template must be possessed low cost, light weight, do not absorb water and the technology such as indeformable after being used for multiple times Feature.Now, it is in industry to use glued board more, also there is small part to use lightweight batten and glass and resin-bonded, using thermosetting Method production building template.Building template light weight, low cost and the good waterproof performance produced using glass and resin-bonded, The requirement of high intensity can be met simultaneously.
But, above-mentioned building template surface cure is into fiberglass, and fiberglass in use can be due to having after impaired Fiber exposes, very difficult to handle to be unfavorable for using for a long time.Additionally, the rate of resin absorption used in this technical process is relatively low, and table Face finish is not high.
Utility model content
The purpose of this utility model is to provide a kind of production equipment of building template, in overall parcel glass fibre The batten of cloth wraps up the textiles such as non-woven fabrics again on the whole, it is to avoid having fiber to expose in use causes to prick the hand, and influence is built The problem that building mould is used for a long time, also improves the finish on building template surface simultaneously.
What embodiment of the present utility model was realized in:
A kind of production equipment of building template, including the first delivery track, first is disposed with the first delivery track Cladding area, buffering area, the second cladding area, the 3rd cladding area and the mould for heating cure, the first cladding area is provided with For being coated respectively to every batten being arranged side by side on the first delivery track multiple first coats device, setting buffers There are resin coating apparatus, the second cladding area is provided with and uses the fibre reinforced materials for being saturated with resin to coating area side by side through first The second cladding device that batten is coated, the 3rd cladding area is provided with to be entered using textile to the batten side by side through the second cladding area 3rd cladding device of row cladding, mould is set on the 3rd the first delivery track coated after device along conveying direction.
In the utility model preferred embodiment, above-mentioned first cladding device, the second cladding device and the 3rd cladding device are wrapped Include rotating shaft and the lapping being sheathed in rotating shaft.
In the utility model preferred embodiment, the covering material of above-mentioned 3rd cladding device is to be saturated with the weaving of resin Product.
In the utility model preferred embodiment, above-mentioned textile is geotextiles or non-woven fabrics.
In the utility model preferred embodiment, the lapping of above-mentioned first cladding device is geotextiles, non-woven fabrics, glass Glass fiber cloth, carbon cloth or boron fibre cloth.
In the utility model preferred embodiment, the lapping of above-mentioned second cladding device is glass fabric, carbon fibre Dimension cloth or boron fibre cloth.
In the utility model preferred embodiment, each first cladding device corresponds to a batten, and each first bag Covering device includes a cladding end, and the cladding end of two neighboring first cladding device is staggered front to back setting along conveying direction.
In the utility model preferred embodiment, the first cladding area is provided with multipair batten guide rail, each pair batten A guide rail piece batten of correspondence, each pair batten guide rail is set on the first delivery track near cladding end.
In the utility model preferred embodiment, the production equipment of above-mentioned building template also includes being the first delivery track The hauling machine of transmission power is provided, hauling machine is arranged on the first delivery track after mould along conveying direction.
In the utility model preferred embodiment, the production equipment of above-mentioned building template also includes carrying out shaped article The cutting machine of cutting.
The beneficial effect of the utility model embodiment is:The first first cladding device is to every in the production process of building template Root batten is coated, and batten is integrally adhered to each other by resin coating apparatus, and then the second cladding device is whole to batten Body cladding is saturated with the glass fabric of resin, increases batten overall rigidity and hardness, and last 3rd cladding device is whole to batten The body cladding textile such as non-woven fabrics, it is to avoid glass fabric has fiber to expose during long-term use, easily pricks the hand and shadow Ring the permanent problem for using of building template.The service life of building template is significantly improved, while also increasing the table of building template Face finish.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, below will be to be used needed for embodiment Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also Other related accompanying drawings are obtained with according to these accompanying drawings.
The structural representation of the coating unit of the building template that Fig. 1 is provided for the utility model first embodiment;
First viewing angle constructions of the production equipment of the building template that Fig. 2 is provided for the utility model first embodiment are illustrated Figure;
Second viewing angle constructions of the production equipment of the building template that Fig. 3 is provided for the utility model first embodiment are illustrated Figure;
The structural representation at the cladding end that Fig. 4 is provided for the utility model first embodiment;
The structural representation of the first cladding device that Fig. 5 is provided for the utility model first embodiment;
The structural representation of the batten guide rail that Fig. 6 is provided for the utility model first embodiment;
First viewing angle constructions of the production equipment of the building template that Fig. 7 is provided for the utility model second embodiment are illustrated Figure;
Second viewing angle constructions of the production equipment of the building template that Fig. 8 is provided for the utility model second embodiment are illustrated Figure;
The structural representation in the batten storehouse that Fig. 9 is provided for the utility model second embodiment.
Icon:The coating unit of 100a- building templates;The production equipment of 100b- building templates;100c- building templates Production equipment;110- battens storehouse;112- CD outlets;120- battens;The delivery tracks of 130- second;The delivery tracks of 140- first; The disk rollers of 132- first;The disk rollers of 142- second;150- first coats area;151- first coats device;152- rotating shafts;154- first is coated Material;156- coats end;1562- coats end entrance;1564- coats the side wing;1566- connection ends;1568- coats end main body; 1569- coats passage;158- batten guide rails;160- buffering areas;162- resin coating apparatus;170- second coats area;171- Second cladding device;Rotating shaft on 172- first;The lower rotary shafts of 176- first;The covering materials of 177- second;Glue groove on 174- first;178- First time glue groove;The pressure rollers of 175- first;180- the 3rd coats area;181- the 3rd coats device;Rotating shaft on 182- second;186- second Lower rotary shaft;Glue groove on 184- second;The covering materials of 187- the 3rd;Second time glue groove of 188-;The pressure rollers of 185- second;190- shaping moulds Tool;1901- transfer passages;192- hauling machines;194- cutting machines.
Specific embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Accompanying drawing in type embodiment, is clearly and completely described, it is clear that retouched to the technical scheme in the utility model embodiment The embodiment stated is a part of embodiment of the utility model, rather than whole embodiments.Generally described in accompanying drawing herein and The component of the utility model embodiment for showing can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiment of the present utility model below to providing in the accompanying drawings is not intended to limit requirement The scope of the present utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it need not be further defined and explained in subsequent accompanying drawing.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", D score, " vertical ", " level ", The orientation or position relationship of the instructions such as " interior ", " outward " are that, based on orientation shown in the drawings or position relationship, or the practicality is new Orientation or position relationship that type product is usually put when using, are for only for ease of description the utility model and simplify description, and Be not indicate or imply meaning device or element must have specific orientation, with specific azimuth configuration and operation, therefore It is not intended that to limitation of the present utility model.Additionally, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and It is not intended that indicating or implying relative importance.
Additionally, the term such as term " level ", " vertical ", " pendency " is not offered as requiring part abswolute level or pendency, and Can be to be slightly tilted.It is not the expression structure if " level " refers to only its direction with respect to more level for " vertical " Must be fully horizontal, and can be to be slightly tilted.
In description of the present utility model, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " sets Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, Or be integrally connected;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to by intermediary It is indirectly connected to, can is two connections of element internal.For the ordinary skill in the art, can be managed with concrete condition Solve concrete meaning of the above-mentioned term in the utility model.
First embodiment
Fig. 1 to Fig. 3 is refer to, the present embodiment provides a kind of production equipment 100b of building template, and it includes building template Coating unit 100a, mould 190 and hauling machine 192.Mould 190 is arranged at the bag of building template along conveying direction On the first delivery track 140 after coating device 100a, hauling machine 192 is that the first delivery track 140 provides conveying power.
The coating unit 100a of building template, it includes the first delivery track 140, is set successively on the first delivery track 140 It is equipped with the first cladding area 150, cladding area 180 of the cladding of buffering area 160, second area 170 and the 3rd.First cladding area 150 is provided with For being coated respectively to the every batten 120 conveyed on the first delivery track 140 multiple first coats device 151, buffering Area 160 is provided with resin coating apparatus 162, and the second cladding area 170 is provided with and uses the glass fabric for being saturated with resin to side by side The second cladding device 171 that batten is coated, the 3rd cladding area 180 is provided with batten side by side is coated using textile 3rd cladding device 181.Include lapping, this reality on the first cladding cladding cladding device 181 of device 171 and the 3rd of device 151, second Apply the lapping in example and be respectively the first covering material 154, the second covering material 177 and the 3rd covering material 187.
Incorporated by reference to Fig. 2 and Fig. 3, the first cladding area 150 is fixedly installed multiple first and coats device 151, the first cladding device 151 For being coated respectively to the every batten 120 on the first delivery track 140.First cladding device 151 includes rotating shaft 152 With the first covering material 154 being sheathed in rotating shaft 152, the width of the first covering material 154 will be cut into the week with batten 120 Adaptable width long.The first covering material 154 can be glass fabric or textile in the present embodiment, such as geotextiles, Non-woven fabrics etc..The two first adjacent spaced settings in cladding end 156 of cladding device 151.Preferably, the first cladding device 151 Cladding end 156 be three row, adjacent two claddings spaced setting in end 156, three adjacent cladding ends 156 are located at respectively Different row, same multiple first coats the set-up mode of the rotating shaft 152 of device 151 and the set-up mode phase at corresponding cladding end 156 Together.
Fig. 4 is refer to, cladding end main body 1568 is trapezium structure wide at the top and narrow at the bottom, and cladding end main body 1568 both sides are provided with The cladding side wing 1564, the cladding side wing 1564 is rectangle tabular structure.Cladding end main body 1568 is solid by connection end 1566 Due on the production equipment 100b of building template.The cladding end 156 of each the first cladding device 151 includes cladding end entrance 1562nd, cladding end main body 1568, cladding the side wing 1564 and connection end 1566.Cladding end entrance 1562 is higher than cladding end main body 1568 curved-surface structure, and cladding end entrance 1562 two ends are all connected to cladding end main body 1568.
First covering material 154 passes through cladding end entrance 1562, along cladding end main body 1568 and the cladding side wing 1564 Shape near batten 120 direction move.Incorporated by reference to Fig. 5, the cladding process with existing coating unit is identical, batten 120 insert from the entrance of cladding passage 1569, and the surrounding size of the shape and batten 120 that coat passage 1569 is adapted.Specifically Ground, the surrounding size of batten 120 refers to width and batten 120 side along its length of the upper and lower surface of batten 120 The size of thickness.As batten 120 is moved forward along conveying direction, the first covering material 154 is by the upper and lower surface of batten 120 Cladding.
Fig. 6 is refer to, is fixedly installed on the position near each cladding end 156 corresponding first cladding area 150 A pair of batten guide rails 158, piece batten 120 of correspondence of each pair batten guide rail 158, each pair batten guide rail 158 is defeated first Send and set near cladding end 156 on track 140.Batten guide rail 158 is made up of iron plate, is arranged at the both sides of batten 120, and high In the thickness certain distance of batten 120, for controlling walking for batten 120, it is ensured that batten 120 can preferably be transported to correspondence First cladding device 151 cladding end 156.
Referring again to Fig. 2 and Fig. 3, buffering area 160 is provided with resin coating apparatus 162, and resin coating apparatus 162 are used for The overall coated with resins formed to the batten 120 coated by first cladding 151 pairs of every battens 120 of device, makes many simultaneously The overall structure that the batten 120 of row is formed is saturated with resin, and during by buffering area 160, resin immerses many battens 120 Gap in, and be coated on the surrounding of batten 120, and then the entirety of many battens 120 is adhered to each other.Area is coated first 150 pairs of every battens 120 are overall again after being coated to be saturated with resin, increases absorptivity of the batten 120 to resin, so that The entirety of batten 120 adheres to each other.Preferably, to make the overall adhesion of batten 120 more abundant, and the absorption of resin is increased Rate, can just carry out the coating of resin when buffering area 160 is had just enter into.
Second cladding area 170 includes the second cladding device 171, and the second cladding device 171 includes being separately positioned on the first conveyor track Above and below road 140 first on the lower rotary shaft 176 of rotating shaft 172 and first, the lower rotary shaft of rotating shaft 172 and first on first The second covering material 177 is arranged with 176.The first gluing is respectively arranged with above and below the first delivery track 140 Groove 174 and first time glue groove 178.It is contained with for being impregnated with the second cladding material in glue groove 174 and first time glue groove 178 on first The resin of material 177.Second covering material 177 is glass fabric, carbon cloth or boron fibre cloth, needs to use first before parcel The second covering material of resin impregnated 177 in upper glue groove 174 and first time glue groove 178.In the batten 120 by buffering area 160 Cladding on the whole be saturated with the glass fabric of resin, can to a greater extent increase overall firm by solidifying to form fiberglass Property and hardness, to adapt to the requirement of production, the surface smoothness of building template is also increased simultaneously.
The structure that second cladding device 171 is located above and below the first delivery track 140 is similar, with the first delivery track The structure of the second cladding device 171 is introduced as a example by the structure of 140 top.As shown in Fig. 2 respectively in the first delivery track 140 Above and below be fixed with the first pressure roller 175, overall with batten 120 is moved to the 3rd cladding area 180, is arranged on batten The first pressure roller 175 above and below in the of 120 makes the glass fabric for being saturated with resin be covered in batten 120 on the whole.
3rd cladding area 180 includes the 3rd cladding device 181, and the 3rd cladding device 181 includes being separately positioned on the first conveyor track Above and below road 140 second on the lower rotary shaft 186 of rotating shaft 182 and second, the lower rotary shaft of rotating shaft 182 and second on second The 3rd covering material 187 is arranged with 186.The second gluing is respectively arranged with above and below the first delivery track 140 Groove 184 and second time glue groove 188.It is contained with for being impregnated with the 3rd cladding material in glue groove 184 and second time glue groove 188 on second The resin of material 187, the 3rd covering material 187 is textile.
Preferably, the 3rd covering material 187 is geotextiles or non-woven fabrics, and uses the He of glue groove 184 on second before parcel Resin impregnated non-woven fabrics in second time glue groove 188.Non-woven fabrics can not also be impregnated with resin in other embodiments, you can reach The purpose of non-woven fabrics is wrapped up in the present embodiment.In the non-woven fabrics energy of cladding on the whole of the batten 120 by the second cladding area 170 Enough avoiding building template from having fiber to expose in use causes to prick the hand, so as to significantly increase the use longevity of building template Life.
The structure that 3rd cladding device 181 is located above and below the first delivery track 140 is similar, with the first delivery track The structure of the 3rd cladding device 181 is introduced as a example by the structure of 140 top.As shown in Fig. 2 in the top of the first delivery track 140 The second pressure roller 185 is respectively and fixedly provided with lower section, overall with batten 120 is moved along conveying direction, is arranged on the top of batten 120 The second pressure roller 185 with lower section makes the glass fabric for being saturated with resin be covered in batten 120 on the whole.
If the resin for using needs the high temperature can be solidified, the production equipment 100b of building template can also include into Pattern tool 190, mould 190 is used to carry out heating cure, mould 190 to the resin and covering material on batten side by side It is arranged on the first delivery track 140 after the 3rd cladding device 181 along conveying direction.Batten 120 side by side passes through three guarantees The transfer passage 1901 for entering mould 190 behind area 180 is covered, transfer passage 1901 is adapted with the shape of batten 120 side by side, And the width of transfer passage 1901 can be according to the width adjusting of batten 120 side by side.Along its length two of batten 120 side by side Side is coated during by transfer passage 1901 by the second covering material 177 and the 3rd covering material 187.
Preferably, mould 190 includes preheating zone, heating region and curing area, and three regions connect three temperature respectively Control circuit.Preferably, preheating zone temperature is about 100 degree, and heating region temperature is 120-150 degree, and curing area temperature is 100-120 Spend, and the temperature of regional can be adjusted according to the solidification temperature using resin.
The production equipment 100b of building template also includes being provided for the first delivery track 140 hauling machine 192 of transmission power, Batten is the colliery carries tubing of hauling machine 192 side by side, and hauling machine 192 is arranged at after the mould 190 along conveying direction.It is preferred that Ground hauling machine 192 is roller type hauling machine or caterpillar tractor.
The production equipment 100b of the building template in the present embodiment also includes cutting the shaped article through hauling machine 192 The cutting machine 194 for cutting.Because batten 120 used in the present embodiment is width and consistency of thickness, and the irregular batten of length, Enter first coat area 150 before, manually by the irregular plank of length along the first delivery track 140 conveying direction side by side It is put into, is fixed being in along two battens adjacent before and after conveying direction, such as by the way of nail is hammered into.Therefore, should The building template produced with the production equipment 100b of building template in the present embodiment needs cleaved machine 194 to be cut Into required size.
Batten 120 used in the present embodiment can be solid wood material, or glued board, cellular board, cystosepiment Or MDF etc., these sheet materials are reprocessed.In addition, the first cladding area 150, second coats area in other embodiments 170 and the 3rd cladding area 180 can also for multiple, multilayer coating structure is carried out to batten side by side, to adapt to the requirement of technique.
The production equipment 100b of the building template in present embodiment uninterruptedly can be produced continuously, it is adaptable to which length is not advised Plank then, the requirement low degree to material, and without the lapping used in three cladding devices is cut, similarly Production process is reduced, is suitable to industrialization running.
Second embodiment
Fig. 7 and Fig. 8 is refer to, a kind of production equipment 100c of building template is present embodiments provided, with first embodiment Difference be the present embodiment include first embodiment in be the first delivery track 140 provide power hauling machine The power mode of movement of 192, i.e. the first delivery track 140 is different.In addition, the production equipment 100c of building template includes above-mentioned building The coating unit 100a of building mould and the second delivery track 130, are provided with the batten being arranged side by side on the second delivery track 130 Storehouse 110.
Incorporated by reference to Fig. 9, the batten 120 in the production equipment 100c of this building template is automatically continuously defeated by batten storehouse 110 Send.The length direction in batten storehouse 110 is parallel with the conveying direction of the second delivery track 130.The size of batten 120 is length × width × thickness=1000mm × 50mm × 10mm, and the size in each batten storehouse 110 be length×width×height= 1100mm×60mm×400mm.Batten storehouse 110 is made of the steel plate of thickness 3mm, therefore the span width in batten storehouse 110 is 54mm, slightly More than the length that the length of the width of batten 120, and batten storehouse 110 is also slightly larger than batten 120, can in a batten storehouse 110 Hold multiple battens 120.In other embodiments, the size in the size of batten 120 and batten storehouse 110 is alternatively other satisfactions The size of technological requirement.
Batten storehouse 110 is arranged at the second delivery track 130, and batten storehouse 110 is provided with CD outlet 112, each batten storehouse 110 CD outlet 112 be located at the first delivery track 140 input, and CD outlet 112 height for batten 120 thickness 1.3- 1.5 times, it is ensured that an only batten 120 is exported every time.The batten 120 of output transports defeated into first along the second delivery track 130 Track 140 is sent, the batten for exporting the top of batten 120 drops to the bottom of batten storehouse 110 under gravity.The wood being arranged side by side Bar storehouse 110 is such as above-mentioned course of conveying, many battens 120 that output is arranged side by side.
Second delivery track 130 is identical with the conveying direction of the first delivery track 140, and the second delivery track 130 is defeated Go out end to be connected with the input of the first delivery track 140.The transporting velocity of the second delivery track 130 is more than the first delivery track 140 transporting velocity, can specifically be adjusted by variable-frequency motor active transfer and realized.To make batten 120 by first Resin is sufficiently infiltrated when cladding area 150, cladding area 180 of the cladding of buffering area 160, second area the 170, the 3rd, increases resin Absorptivity.
Preferably, the second delivery track 130 includes multiple first disk rollers 132 being arranged in order along conveying direction, and first is defeated Sending track 140 includes multipair second disk roller 142 for being arranged in order along conveying direction and being oppositely arranged up and down.Batten 120 is from batten The frictional force that storehouse 110 is rotated by first disk roller 132 of the second delivery track 130 first sends into the first delivery track 140, first Batten 120 is sent into the first cladding area 150 by the extrusion rolling that delivery track 140 passes through the second disk roller 142 being oppositely arranged.Separately Outward, the mode of movement of the first delivery track 140 and the second delivery track 130 is not limited only to the mode of movement in the present embodiment.
The present embodiment includes batten storehouse 110, is suitable for being produced with the batten of rule the device of building template, batten used Length is adapted with the length of product building template, this production equipment high degree of automation, but also has weak point, every time in a row Batten by one coat area after covering material is cut, be easy to subsequent production.
In sum, the first cladding device 151 pairs in the coating unit and production equipment of the utility model building template is every Root batten 120 coated after overall coated with resins again, increased absorptivity of the batten 120 to resin, batten 120 can be made Preferably adhere to;Second cladding device 171 coats the glass fabric or carbon for being saturated with resin in the overall structure that batten 120 is formed The fibre reinforced materials such as fiber cloth, overall rigidity and hardness can be to a greater extent increased by solidifying to form fiberglass, with Adapt to the requirement of production;3rd cladding device 181 coats the textiles such as non-woven fabrics in the overall structure that batten 120 is formed can be kept away Exempt from building template and there is fiber to expose in use to cause to prick the hand, so as to significantly increase the service life of building template;Into Pattern tool 190 adjusts the temperature of regional according to the solidification temperature of resin, to realize the integral solidifying to building template.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of production equipment of building template, it is characterised in that including the first delivery track, on first delivery track according to It is secondary be provided with the first cladding area, buffering area, second cladding area, the 3rd cladding area and the mould for heating cure, it is described First cladding area is provided with the multiple for being coated respectively to every batten being arranged side by side on first delivery track First cladding device, the setting buffers have resin coating apparatus, and the second cladding area is provided with and uses the fibre for being saturated with resin The second cladding device that dimension reinforcing material is coated to the batten side by side through the described first cladding area, the 3rd cladding area is set There is the 3rd cladding device coated to the batten side by side through the described second cladding area using textile, the mould is along defeated On first delivery track after sending direction to be arranged at the 3rd cladding device.
2. the production equipment of building template according to claim 1, it is characterised in that the first cladding device, described the The lapping that two cladding devices and the 3rd cladding device include rotating shaft and be sheathed in the rotating shaft.
3. the production equipment of building template according to claim 2, it is characterised in that the cladding material of the 3rd cladding device Expect to be saturated with the textile of resin.
4. the production equipment of building template according to claim 3, it is characterised in that the textile is geotextiles or nothing Spin cloth.
5. the production equipment of building template according to claim 2, it is characterised in that the parcel material of the first cladding device Expect to be geotextiles, non-woven fabrics, glass fabric, carbon cloth or boron fibre cloth.
6. the production equipment of building template according to claim 2, it is characterised in that the parcel material of the second cladding device Expect to be glass fabric, carbon cloth or boron fibre cloth.
7. the production equipment of the building template according to any one of claim 1-6, it is characterised in that each described first Cladding device corresponds to a batten, and each described first cladding device includes a cladding end, two neighboring described the The cladding end of one cladding device is staggered front to back setting along conveying direction.
8. the production equipment of building template according to claim 7, it is characterised in that be provided with the described first cladding area Multipair batten guide rail, a piece batten of batten guide rail correspondence described in each pair, batten guide rail described in each pair is described the Set near the cladding end on one delivery track.
9. the production equipment of building template according to claim 7, it is characterised in that the production equipment of the building template Also include for first delivery track provide transmit power hauling machine, the hauling machine along conveying direction be arranged at it is described into On first delivery track after pattern tool.
10. the production equipment of the building template according to any one of claim 7, it is characterised in that the building template Production equipment also include the cutting machine that is cut to shaped article.
CN201621362393.1U 2016-12-13 2016-12-13 A kind of production equipment of building template Expired - Fee Related CN206256677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621362393.1U CN206256677U (en) 2016-12-13 2016-12-13 A kind of production equipment of building template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621362393.1U CN206256677U (en) 2016-12-13 2016-12-13 A kind of production equipment of building template

Publications (1)

Publication Number Publication Date
CN206256677U true CN206256677U (en) 2017-06-16

Family

ID=59028362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621362393.1U Expired - Fee Related CN206256677U (en) 2016-12-13 2016-12-13 A kind of production equipment of building template

Country Status (1)

Country Link
CN (1) CN206256677U (en)

Similar Documents

Publication Publication Date Title
CN109927165B (en) High-speed production line and production process in fiber gypsum board
US3448489A (en) Apparatus for forming elongated articles from fiber reinforced plastic materials
CN107362951B (en) Gluing method of soundproof cotton gluing machine
CN206665026U (en) A kind of sheet material covering film system
CN102535019B (en) Composite and continuous cross-stacking production system for no-woven cloth
CN105829044B (en) Immersion tool and the method with the continuous impregnating reinforcing fiber material of plastic material
CN103978548B (en) Reinforcing glass fibrous plaster automatic assembly line
CN108274556A (en) Automatic contacting face machine
CN103707611B (en) Hollow composite flat plate production device
CN203157150U (en) Automatic production line device for composite boards
US4294655A (en) Method and apparatus for forming fiberglass mats
CN206256677U (en) A kind of production equipment of building template
CN104859161B (en) A kind of continuous producing method and equipment of glass-fiber-fabric cladding batten match-place template
CN206015240U (en) A kind of glass fibre continuous felt production system
CN102886812A (en) System for producing coal ash insulation board
CN207326776U (en) A kind of abrasive band gluing sand embedding equipment
US3214311A (en) Process for manufacturing lightweight building slabs
CN211194232U (en) Compound production line of regeneration carbon fiber flitch
CN108529307A (en) A kind of straight line pendulum cotton device producing rock wool
CN101831813A (en) Processing equipment of longitude and latitude overlapping non-weaving composite material
CN203449458U (en) Reinforced glass fiber gypsum board automatic production line
CN211495601U (en) Automatic deviation-rectifying conveying device for paperboards
CN208247230U (en) Unidirectional preimpregnation composite production device
CN106519274A (en) Production method of novel prepreg material used for glue joint
CN105644121A (en) Manufacturing equipment for composite deck of ship

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170616