CN206247899U - The convenient cooling tower repaired - Google Patents
The convenient cooling tower repaired Download PDFInfo
- Publication number
- CN206247899U CN206247899U CN201621186999.4U CN201621186999U CN206247899U CN 206247899 U CN206247899 U CN 206247899U CN 201621186999 U CN201621186999 U CN 201621186999U CN 206247899 U CN206247899 U CN 206247899U
- Authority
- CN
- China
- Prior art keywords
- cooling tower
- repaired
- housing
- opened
- service openings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of convenient cooling tower repaired, including housing, base, water distribution unit and heat exchange unit;The heat exchange unit includes air inlet, chimney fan, the hydraulic turbine being placed in the chimney fan and the suction impeller that heat exchange filler is opened on the housing, and the suction impeller is fixed on the hydraulic turbine;The housing sidewall is provided with a maintenance operating assembly, and the maintenance operation component includes being opened in the service openings of the housing sidewall, the folding panel for being turned on and off the service openings and can make the folding panel with respect to the active connection that housing spins upside down.The utility model can by open the folding panel come for maintenance personal into being repaired to inside in cooling tower, without suction impeller is removed from cooling tower top after repaired again, operate more easy, raising operating efficiency.
Description
Technical field
The utility model belongs to cooler field, more particularly, to a kind of convenient cooling tower repaired.
Background technology
Now, the use of cooling tower is very frequent, is mainly useful for the circularly cooling of some central air-conditioning.It is existing
Cooling tower rotated typically by motor-driven fan, so as to by extraneous air suction cooling tower, absorption needs refrigeration
High-temperature water in temperature after be then exhausted from the external world, complete refrigeration.But when being safeguarded to cooling tower inside, clear up personnel
Needs can just be entered in cooling tower after suction impeller will be removed on the top air outlet of cooling tower and repaired, after maintenance is finished
Suction impeller is loaded onto again, time during operation is more long, workload is big, and maintenance efficiency is low.
Utility model content
The utility model is in order to overcome the deficiencies in the prior art, there is provided a kind of maintenance operation is easy, the side of high working efficiency
Just the cooling tower repaired.
To achieve these goals, the utility model uses following technical scheme:A kind of convenient cooling tower repaired, including
Housing, base, water distribution unit and heat exchange unit;The heat exchange unit is opened on the housing including heat exchange filler
Air inlet, chimney fan, the hydraulic turbine being placed in the chimney fan and suction impeller, the suction impeller are fixed on the water wheels
Machine;The housing sidewall is provided with a maintenance operating assembly, and the maintenance operation component includes being opened in the maintenance of the housing sidewall
Opening, the folding panel for being turned on and off the service openings and the activity that the folding panel spun upside down with respect to housing can be made
Connector.Housing sidepiece is provided with service openings in the utility model, by folding panel can to the service openings carry out open and
Close, it is necessary to be entered to inside cooling tower from the service openings by when repairing, without being removed to suction impeller, operation is simple
Just;And the top without climbing to cooling tower enters, and can directly enter in sidepiece, eliminates the operation of climbing, more pacifies
Entirely;Active connection causes that the folding panel can be overturn with respect to housing, and quickly service openings are opened, and operation is more
Quickly.
Further, the active connection include two connection rings located at the folding upper panel, be opened in it is described
The open slot of service openings upper position and being fixedly arranged on can be engaged with the connection ring in the open slot with zygostyle, the company
Connect ring it is movable be sheathed on it is described with zygostyle.
Further, also it is used to for the folding panel to be limited in the locking for closing the service openings position including one
Part;Locking piece can be protected effectively by the folding panel locking in the position of closure service openings when cooling tower need not be repaired
Card service openings are closed, and prevent the water sprayed on water distributor from being spilt from service openings.
Further, the locking piece includes being rotationally connected with two control blades of the folding panel lower end, opens up
Correspond to the card division of the service openings lower position in the bayonet socket of the control blade lower end and located at the housing;The card division
A triangular cut that clamping is engaged with the bayonet socket is provided with away from the service openings side.
Further, the length with zygostyle is slightly less than the length of the open slot, between two connection ring away from
From less than the length with zygostyle.
Further, the air inlet is removably connected with an Inlet Network.
Further, the water distribution unit includes that central inlet pipe, at least two are communicated in the cloth of the central inlet pipe
Water pipe and gap are opened in the hole for water spraying of the water distributor lower surface.
Further, the housing bottom connects a water leg, the water leg by a return pipe be communicated to it is described in
Centre water inlet pipe;The water in water leg is effectively back in central inlet pipe by return pipe so that the water in cooling tower is obtained
To recycling, water resource, energy-conserving and environment-protective are saved.
In sum, the utility model has advantages below:This cooling tower parts are few, can be by opening the folding face
Plate come for maintenance personal into being repaired to inside in cooling tower, without suction impeller is removed from cooling tower top after enter again
Row maintenance, operates more easy, raising operating efficiency.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is partial schematic diagram of the present utility model.
Fig. 3 is partial schematic diagram of the present utility model two.
Specific embodiment
In order that those skilled in the art are better understood from the utility model scheme, below in conjunction with the utility model reality
The accompanying drawing in example is applied, clear, complete description is carried out to the technical scheme in the utility model embodiment.
As Figure 1-3, a kind of convenient cooling tower repaired, including housing 1, base 2, water distribution unit and heat exchange list
Unit;Water distribution unit is communicated in the water distributor 32 of the central inlet pipe 31 including central inlet pipe 31, at least two and gap is opened
Located at the hole for water spraying 33 of the lower surface of the water distributor 32;The heat exchange unit includes heat exchange filler 41, air inlet, chimney fan
42nd, the hydraulic turbine and suction impeller;Specifically, the heat exchange filler 41 is placed in the housing 1, it is preferred that be additionally provided with one
Filler support 411, the support casing is on the central inlet pipe;The inner walls are provided with annular stop flange 11, described
Filler is placed on defining flange, and filler is placed on described filler frame;Filler is effectively prevented by stuffing frame to sinking, all the time
Keep filler to be located at the air inlet top or corresponding to air inlet position, ensure the wind by air inlet entrance all effective in filler
Come in contact;The air inlet is opened in the sidepiece of the housing 1 corresponding to the position of described filler 41, and air inlet side wall is opened up
There is an annular slot, an Inlet Network 9 is removably connected on the annular slot;The chimney fan 42 is fixedly connected on the housing
1 top, both are interconnected, and the air outlet is formed at the end of the chimney fan 42, for the wind in cooling tower to be expelled to
It is extraneous;In order to prevent dust from entering in cooling tower, we are provided with a dust guard in the air outlet position, the dust guard bag
Include the Air Filter 101 in the chimney fan, be formed at the outer circumferential side of Air Filter 101 four clamping blocks and located at it is described go out
The buckling groove being engaged with the clamping block of air duct inwall;And then the anti-wind net is detachable with respect to chimney fan, can be changed;
The hydraulic turbine 43 and suction impeller 44 are placed in the chimney fan 42, and the suction impeller 44 is fixed on the hydraulic turbine
43。
Further, the side wall of the housing 1 is provided with a maintenance operating assembly, the maintenance operation component include service openings,
Folding panel 51, active connection and locking piece;The service openings are opened in the side wall of the housing 1, the folding panel
51 are used to be turned on and off the service openings, and the active connection makes the folding panel 51 be spun upside down with respect to housing 1, described
Locking piece is used to for the folding panel 51 to be limited in the closure service openings position;When needing that cooling tower inside is tieed up
When repairing, the folding panel can be opened, and then open service openings so that operating personnel can be entered to inside cooling tower;Tool
Body, the active connection includes two connection rings 52, open slot 53 and with zygostyle 54, and two connection ring 52 is located at described
The top of folding panel 51, the open slot 53 is opened in the service openings upper position, described to be fixedly arranged on this with zygostyle 54 and open
Can be engaged with the connection ring 52 in mouth groove 53;Preferably, the length with zygostyle 54 is slightly less than the open slot 53
The distance between length, described two connection ring 52 are less than the length with zygostyle 54;The locking piece includes two control blades
61st, bayonet socket 62 and card division 63, the two control blade 61 are rotationally connected with the lower end of folding panel 51, the bayonet socket 62
The lower end of control blade 61 is opened in, the card division 63 corresponds to the service openings lower position located at the housing 1;It is preferred that
, the card division 63 is provided with a triangular cut that clamping is engaged with the bayonet socket 62 away from the service openings side.
The housing bottom connects a water leg 7, and the water leg 7 is located between the housing 1 and base 2;Preferably, institute
State in water leg and be provided with a filter chamber 811 corresponding to the return pipe junction, the filter chamber top is provided with a screen pack 812,
The screen pack effectively prevents rubbish from being piled up on top to be obliquely installed, and effectively prevents screen pack from blocking;The return pipe 71
One end is communicated in the bottom of water leg 7, and the other end is communicated in the central inlet pipe, and then the water of water leg 7 is introduced into water
Recycled in turbine;Preferably, the return pipe 71 is provided with a pressure piece 72, and the pressure piece 72 is used for water leg
Water in 7 is introduced in the hydraulic turbine by return pipe 71;Specifically, the pressure piece 72 is set to pressure intake pump;For convenience
Air Filter on air outlet is changed, we are provided with a cat ladder 12 in the housing sidepiece, the cat ladder end is fixed on
The chimney fan sidepiece, cat ladder bottom is fixed on the housing sidewall bottom;Further, also including an annular anti-leakage cover 13,
The housing corresponds to service openings outside and is provided with circle bonding hook cloth, and the anti-leakage cover 13 is removably connected to the bonding
On hook cloth, effectively prevent water from being spilt by the gap between service openings and folding panel, and anti-leakage cover can be changed.
Obviously, described embodiment is only a part of embodiment of the present utility model, rather than whole embodiments.
Based on the embodiment in the utility model, what those of ordinary skill in the art were obtained under the premise of creative work is not made
Every other embodiment, should all belong to the scope of the utility model protection.
Claims (8)
1. a kind of convenient cooling tower repaired, including housing(1), base(2), water distribution unit and heat exchange unit;The heat is handed over
Changing unit includes heat exchange filler(41), be opened in the housing(1)On air inlet, chimney fan(42), be placed in the air-out
Cylinder(42)The interior hydraulic turbine(43)And suction impeller(44), the suction impeller(44)It is fixed on the hydraulic turbine(43);It is special
Levy and be:The housing(1)Side wall is provided with a maintenance operating assembly, and the maintenance operation component includes being opened in the housing(1)
The service openings of side wall, the folding panel for being turned on and off the service openings(51)With can make the folding panel(51)Relatively
Housing(1)The active connection for spinning upside down.
2. the cooling tower that convenience according to claim 1 is repaired, it is characterised in that:The active connection includes being located at institute
State folding panel(51)Two connection rings on top(52), be opened in the open slot of the service openings upper position(53)And it is fixed
In the open slot(53)It is interior can be with the connection ring(52)Be engaged with zygostyle(54), the connection ring(52)It is movable to be arranged
In described with zygostyle(54)On.
3. the cooling tower that convenience according to claim 1 is repaired, it is characterised in that:Also include that one is used for the folding face
Plate(51)It is limited in the locking piece for closing the service openings position.
4. the cooling tower that convenience according to claim 3 is repaired, it is characterised in that:The locking piece includes being rotatably connected
In the folding panel(51)Two control blades of lower end(61), be opened in the control blade(61)The bayonet socket of lower end(62)And set
In the housing(1)Corresponding to the card division of the service openings lower position(63);The card division(63)Opened away from the maintenance
Mouth side is provided with one with the bayonet socket(62)It is engaged the triangular cut of clamping.
5. the cooling tower that convenience according to claim 2 is repaired, it is characterised in that:It is described with zygostyle(54)Length it is smaller
In the open slot(53)Length, two connection ring(52)The distance between match somebody with somebody zygostyle less than described(54)Length.
6. the cooling tower that convenience according to claim 1 is repaired, it is characterised in that:The air inlet is removably connected with one
Inlet Network(9).
7. the cooling tower that convenience according to claim 1 is repaired, it is characterised in that:The water distribution unit includes central inlet
Pipe(31), at least two be communicated in the central inlet pipe(31)Water distributor(32)And gap is opened in the water distributor(32)
The hole for water spraying of lower surface(33).
8. the cooling tower that convenience according to claim 7 is repaired, it is characterised in that:The housing(1)Bottom connection one collects
Tank(7), the water leg(7)By a return pipe(71)It is communicated to the central inlet pipe(31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621186999.4U CN206247899U (en) | 2016-10-28 | 2016-10-28 | The convenient cooling tower repaired |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621186999.4U CN206247899U (en) | 2016-10-28 | 2016-10-28 | The convenient cooling tower repaired |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206247899U true CN206247899U (en) | 2017-06-13 |
Family
ID=58997082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621186999.4U Expired - Fee Related CN206247899U (en) | 2016-10-28 | 2016-10-28 | The convenient cooling tower repaired |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206247899U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110285688A (en) * | 2019-06-22 | 2019-09-27 | 徐州华正铸业有限公司 | A kind of quick detachable clean motor cooling tower |
CN112577134A (en) * | 2020-11-25 | 2021-03-30 | 深圳市兴元环境工程有限公司 | Central air conditioning chilled water storage system |
-
2016
- 2016-10-28 CN CN201621186999.4U patent/CN206247899U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110285688A (en) * | 2019-06-22 | 2019-09-27 | 徐州华正铸业有限公司 | A kind of quick detachable clean motor cooling tower |
CN112577134A (en) * | 2020-11-25 | 2021-03-30 | 深圳市兴元环境工程有限公司 | Central air conditioning chilled water storage system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206247899U (en) | The convenient cooling tower repaired | |
CN206412686U (en) | A kind of circulating dedusting cooling top cover of box-type substation | |
CN212479459U (en) | Wind power detection device of wind driven generator | |
CN212618925U (en) | Movable air cooler | |
CN206729090U (en) | A kind of black tea process equipment | |
CN210386785U (en) | Integrative device of cotton gloves washing stoving | |
CN210345742U (en) | Ventilation system for tire production workshop | |
CN212215022U (en) | Smelting pot cooling environmental protection dust collecting equipment | |
CN110822597B (en) | Cooling type indoor air exchange fan for factory building | |
CN211885450U (en) | Energy-saving environment-friendly efficient recovery distillation device | |
CN212063053U (en) | Capacitor box with dehumidification waterproof function | |
CN208522563U (en) | A kind of unmanned plane power motor dust guard | |
CN207938414U (en) | A kind of dry-type transformer protecting crust | |
CN206482528U (en) | It is a kind of to improve the dust catcher of filter efficiency | |
CN206601053U (en) | Energy-saving cooling tower | |
CN206707946U (en) | A kind of ventilation cooling system of wind-power engine room | |
CN207166939U (en) | High-power high-frequency emitter air-line system | |
CN212902253U (en) | Boiling dryer | |
CN209221727U (en) | A kind of efficient exhaust blower of dedusting | |
CN204880534U (en) | Cold and hot wind of factory building exchange wind gap and wind channel | |
CN218656028U (en) | Sliding plate water gap rotary dust suction device | |
CN207849644U (en) | A kind of dismountable ceiling mounting type fresh air ventilator | |
CN217584773U (en) | Suspended ceiling type total heat exchanger group | |
CN209696506U (en) | A kind of dust-removal cloth-bag suitable for asphalt mixing building | |
CN213396107U (en) | Cooling device of equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170613 Termination date: 20181028 |