CN206233222U - The jet thrust of system is cleaved for vacuum preloading air pressure - Google Patents

The jet thrust of system is cleaved for vacuum preloading air pressure Download PDF

Info

Publication number
CN206233222U
CN206233222U CN201621275619.4U CN201621275619U CN206233222U CN 206233222 U CN206233222 U CN 206233222U CN 201621275619 U CN201621275619 U CN 201621275619U CN 206233222 U CN206233222 U CN 206233222U
Authority
CN
China
Prior art keywords
jet thrust
main body
air pressure
vacuum preloading
cleaved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621275619.4U
Other languages
Chinese (zh)
Inventor
雷华阳
王铁英
冯双喜
祁子洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201621275619.4U priority Critical patent/CN206233222U/en
Application granted granted Critical
Publication of CN206233222U publication Critical patent/CN206233222U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of jet thrust that system is cleaved for vacuum preloading air pressure of the utility model, crossover sub 2 including jet thrust main body 1 and for main body 1 to be connected with air injection pipe 3, the front end of described jet thrust main body 1 is taper, hole 4 is distributed in jet thrust main body 1, described crossover sub 2 is oblate cylindricality, and centre is offered for accommodating the through hole that air injection pipe 3 passes through, and side perimeters are placed with multiple circular holes, circular hole is used for through shank of bolt 5, and the front end of each shank of bolt 5 is fixedly connected with baffler.The utility model has the advantages that efficiency high.

Description

The jet thrust of system is cleaved for vacuum preloading air pressure
Technical field
The utility model is related to be cleaved for vacuum preloading air pressure the jet thrust of system.
Background technology
The consolidation effect of Vacuum Preloading Method for Consolidation of Soft Soil Foundation, depends primarily on the vacuum and vertical drainage under vacuum diaphragm The regularity of distribution of the negative pressure in system.Influenceed by well resistance, the negative pore pressure of vertical drainage system has certain decay along depth direction, Many experts have done substantial amounts of experimental study for reinforcement depth, and Li little He (2002) is proposed in god at for 22m, soft soil foundation Sedimentation is almost nil, changes without sedimentation in below depth 17m;Wei Bo (2003) uses vacuum-heap to river in Zhejiang Province-Tai-temperature highway Soil sample before and after load combined precompressed soft soil foundation is analyzed, and consolidation effect is obvious in the range of depth 10m, 18m It is following without consolidation effect., for vacuum preloading soft soil foundation, reinforcement depth is often only at 0~8 meter for cycle (2008).
In addition, vacuum method consolidation time is long, and settlement after construction is big, often influences the duration of construction, increases engineering Cost.《Vacuum preloading technical regulation》(JTS 147-2-2009) points out consolidation of soft ground improved by vacuum preloading degree 80% need to be reached.A large amount of engineerings are to meet this requirement, and the pumpdown time is more long.For example, Liu Hanlong (2006) for Hangzhoupro-gold- Thoroughfare highway carries out vacuum pre-press reinforcing and lasts 8 months.It is pre- that Sun Liqiang et al. (2010) Tianjin Binhai barged-in fill carries out vacuum Pressure, the pumpdown time is up to 275 days.
Air pressure splitting combined vacuum ground preloading deep layer weak soil is proposed to solve the limitation of vacuum preloading, Liu Songyu et al. Ground.Mainly by single hole pipe toward gas injection in soil so that the soil body is cleaved, and substantial amounts of crackle, and deep layer are produced in the soil body The osmotic pressure of the soil body becomes big, accelerates the water of the soil body to be discharged from drainage system.
Although although single hole pipe inflating method can to a certain extent solve the consolidation effect of deep layer weak soil, existing many innings It is sex-limited, mainly show following two aspects
(1) service behaviour aspect:Single hole pipe insufflation is only locally producing certain effect, it is difficult to be produced in larger scope Raw influence, in work progress, when single hole pipe insertion depth is larger, often causes that pipe is blocked by weak soil, leads to not note Gas, consolidation effect is poor, and drain bar silting problem not can solve still.
(2) economic and practical aspect:Single hole pipe gas injection coverage is smaller, it is necessary to substantial amounts of plastic draining board, increases engineering Budget.
Utility model content
Regarding to the issue above, the purpose of this utility model is to overcome the deficiencies in the prior art, is produced with reference to weak soil crack damage Life is managed and Technical Characteristics of Mild Clay, there is provided one kind can make with process is simple and true suitable for deep layer soft soil foundation (more than 10 meters) Empty precompressed air pressure cleaves the jet thrust of system.The utility model can improve deep soft soil foundation permeability, accelerate deep layer weak soil Ground pore pressure dissipates, and accelerates consolidation rate, shortens consolidation time, effectively controls settlement after construction.Technical side of the present utility model Case is as follows:
It is a kind of for vacuum preloading air pressure cleave system jet thrust, including jet thrust main body 1 and for by main body 1 with note The crossover sub 2 that tracheae 3 is connected, it is characterised in that the front end of described jet thrust main body 1 is taper, in jet thrust main body 1 Upper distribution hole 4, described crossover sub 2 is oblate cylindricality, and centre is offered for accommodating the through hole that air injection pipe 3 passes through, Side perimeters are placed with multiple circular holes, and circular hole is used for through shank of bolt 5, and the front end of each shank of bolt 5 is fixedly connected with baffler.
The utility model can well solve deep layer soft soil foundation vacuum preconsolidation due to using above technical method Effect is poor, drain bar silting the problems such as, there is advantages below compared with single hole pipe gas injection:
(1) facilitate air injection pipe to insert deep layer soft soil foundation, the mouth of pipe should not be blocked, in work progress, gas injection radiation scope adds Greatly, consolidation effect substantially, different tube diameters air injection pipe can be conveniently selected by crossover sub, reduce construction costs.
(2) the material selection stainless steel of the shower nozzle, crossover sub at shower nozzle is applied to the air injection pipe in various apertures, can be with The mouth of pipe with the injecting gas boosting at scene is seamlessly connected, it is not necessary to complicated processing, easy for installation.
Brief description of the drawings
Fig. 1 is the overall structure figure of the jet thrust for vacuum preloading air pressure splitting system of the present utility model.
Fig. 2 is the jet thrust schematic three dimensional views that system is cleaved for vacuum preloading air pressure of the present utility model
Label declaration in figure:1 jet thrust main body;2 crossover subs;3 air injection pipes;4 a diameter of 10mm holes;5 shanks of bolt;6 Nut.
Specific embodiment
The utility model is illustrated with reference to the accompanying drawings and examples.
Referring to Fig. 1 and Fig. 2, the utility model provides a kind of jet thrust that system is cleaved for vacuum preloading air pressure, specifically Including jet thrust main body 1, crossover sub 2, air injection pipe 3, it is necessary to by jet thrust master during vacuum method treatment deep layer soft soil foundation Body 1 is connected to form shower nozzle entirety with crossover sub 2, and a diameter of 10mm cavities 4 are provided with shower nozzle 1, is then connected with air injection pipe 3; The crossover sub 2 of the jet thrust of vacuum preloading air pressure splitting system, is tightened by the shank of bolt 5 of nut 6, and the front portion of shank of bolt 5 is consolidated Surely baffler (being not drawn into figure) is connected with, the purpose of board clamping air injection pipe 3 is intercepted so as to reach.
Due to the simplicity and the standard universal of all parts of structure, air pressure splitting effect and other mechanics of the device Effect can be analyzed demonstration conveniently by existing business finite element analysis software, such that it is able to facilitate engineering technology people According to different actual requirement of engineering, flexibly selection different type stainless steel air pressure splitting shower nozzle optimizes design to member.

Claims (1)

1. it is a kind of for vacuum preloading air pressure cleave system jet thrust, including jet thrust main body (1) and for by main body (1) with The crossover sub (2) that air injection pipe (3) is connected, it is characterised in that the front end of described jet thrust main body (1) is taper, in spray Hole (4) is distributed on gas head main body (1), described crossover sub (2) is oblate cylindricality, and centre is offered for accommodating gas injection The through hole that pipe (3) passes through, side perimeters are placed with multiple circular holes, and circular hole is used for through shank of bolt (5), each shank of bolt (5) Front end is fixedly connected with baffler.
CN201621275619.4U 2016-11-25 2016-11-25 The jet thrust of system is cleaved for vacuum preloading air pressure Withdrawn - After Issue CN206233222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621275619.4U CN206233222U (en) 2016-11-25 2016-11-25 The jet thrust of system is cleaved for vacuum preloading air pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621275619.4U CN206233222U (en) 2016-11-25 2016-11-25 The jet thrust of system is cleaved for vacuum preloading air pressure

Publications (1)

Publication Number Publication Date
CN206233222U true CN206233222U (en) 2017-06-09

Family

ID=58980071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621275619.4U Withdrawn - After Issue CN206233222U (en) 2016-11-25 2016-11-25 The jet thrust of system is cleaved for vacuum preloading air pressure

Country Status (1)

Country Link
CN (1) CN206233222U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436685A (en) * 2016-11-25 2017-02-22 天津大学 Gas spraying head for vacuum pre-loading gas pressure splitting system
CN107806079A (en) * 2017-09-28 2018-03-16 无锡厚发自动化设备有限公司 A kind of reinforced soft soil ground device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436685A (en) * 2016-11-25 2017-02-22 天津大学 Gas spraying head for vacuum pre-loading gas pressure splitting system
CN106436685B (en) * 2016-11-25 2019-02-15 天津大学 Jet thrust for vacuum preloading air pressure splitting system
CN107806079A (en) * 2017-09-28 2018-03-16 无锡厚发自动化设备有限公司 A kind of reinforced soft soil ground device

Similar Documents

Publication Publication Date Title
CN102707034B (en) Indoor model testing device and testing method employing air-pressure splitting vacuum preloading method
CN103435245B (en) In-situ chemical conditioning and vacuum preloading reduction method and conditioning device for landfill sludge
CN108518232A (en) The anti-rock burst method for protecting support of single-track railway tunnel of corresponding different rock burst intensity grades
CN206233222U (en) The jet thrust of system is cleaved for vacuum preloading air pressure
CN205475195U (en) Bloated joint vacuum preloading ground processing apparatus of bandlet side
CN102776877B (en) Stepped vacuum drainage consolidation method for ultra-soft soil foundation
CN206139640U (en) Soil circulation prosthetic devices
CN101575855A (en) Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN203499698U (en) Advanced curtain grouting system applied to underground engineering construction
CN106436685B (en) Jet thrust for vacuum preloading air pressure splitting system
CN103437338B (en) Reinforcing dredger fill foundation construction method combining drainage well and air pressure splitting
CN209353381U (en) A kind of grouting behind shaft or drift lining steel plate for sealing water structure
CN203498848U (en) Light-weight well point downcast pipe hole forming device
CN217270125U (en) Ultrahigh-pressure soil body jet cutting grouting device
CN201723251U (en) Vertical shaft water intercepting and guiding device
CN203475411U (en) Structure for reinforcing dredger fill soil foundations by drainage wells combined with air pressure splitting
CN104452827B (en) A kind of processing method at Concrete Dam spring
CN209323528U (en) A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure
CN204283447U (en) Biliquid rollback fracture grouting system
CN101812838B (en) Foundation reinforcement method based on curing agent and bucket foundation suction technique
CN107778029B (en) Concrete curing method for buried pipe in structure
CN208749141U (en) A kind of diaphram wall the top of a wall quickly abolishes structure
CN103485357B (en) A kind of Application of light well point precipitation pipe hole-forming device and method thereof
CN102052517A (en) Horizontal connecting system for regional underground vertical pipes and connecting construction method thereof
CN203545861U (en) In-situ chemical conditioning device for landfill library sludge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170609

Effective date of abandoning: 20190215

AV01 Patent right actively abandoned