CN206226013U - A kind of Distributed Multi sampling Short-Term Power Load Forecasting System - Google Patents

A kind of Distributed Multi sampling Short-Term Power Load Forecasting System Download PDF

Info

Publication number
CN206226013U
CN206226013U CN201621289364.7U CN201621289364U CN206226013U CN 206226013 U CN206226013 U CN 206226013U CN 201621289364 U CN201621289364 U CN 201621289364U CN 206226013 U CN206226013 U CN 206226013U
Authority
CN
China
Prior art keywords
circuit
power
communication signal
downstream
distributed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621289364.7U
Other languages
Chinese (zh)
Inventor
周明龙
程晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Technical College of Mechanical and Electrical Engineering
Original Assignee
Anhui Technical College of Mechanical and Electrical Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Technical College of Mechanical and Electrical Engineering filed Critical Anhui Technical College of Mechanical and Electrical Engineering
Priority to CN201621289364.7U priority Critical patent/CN206226013U/en
Application granted granted Critical
Publication of CN206226013U publication Critical patent/CN206226013U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Distributed Multi sampling Short-Term Power Load Forecasting System, including grid power circuit and communication signal circuit;The upstream end of the communication signal circuit and the grid power circuit is provided with an output power controlling organization, the downstream of the grid power circuit is provided with several load supplying branch line circuits, the junction of each described load supplying branch line circuit and the grid power circuit is provided with a distributed terminator mechanism for monitoring, and several distributed terminator mechanism for monitoring are all connected with the downstream of the communication signal circuit;The output power controlling organization includes data processor and timing node maker, and the data processor and the timing node maker are all connected with the upstream end of the communication signal circuit, and the data processor connects the timing node maker.Uniformity of the sampled data of various location on timing node is ensured, so as to ensure short-term electric load prediction precision of analysis.

Description

A kind of Distributed Multi sampling Short-Term Power Load Forecasting System
Technical field
The utility model is related to a kind of load prediction engineering device technique field of power-system short-term, particularly a kind of distributed Multi-point sampling Short-Term Power Load Forecasting System.
Background technology
In view of the development of modern industry, the popularization of automation equipment device, urban power consumption also increasing year by year, therefore, Load prediction more and more highlights its importance.Load prediction is that power plant generated energy planning and transformer station formulate distribution electricity consumption plan Indispensable Consideration, on the premise of modern electric development is very fast, correct system operatio and plan very must Will.The method of work for manipulating whole system is the target of power system allotment, allows system to provide high-quality electric energy, it is determined that System can save operation and safety, and can have stronger self-healing ability.It is from known user's request, the spy of load Property, these factors such as power network development, social condition set about, dissect past load value, pre- is made to the following load value for needing Survey.By the predicted value for obtaining, autotelic various methods can be used, during as the control, the increase low ebb that carry out power consumption Electrical equipment, the technology etc. using heat-storage and cold-storage, change electric energy power consumption distribution in time, the electricity that power consumption side is needed from Peak times of power consumption reduce, transfer or improve the low power consumption phase power consumption, for strengthen electric grid operating economy and can By property.
The unit capacity for newly increasing can be also reduced in the system of plan, the fund in terms of power planning construction is reduced and is thrown Enter, the power supply fund of anticipation is reduced with this.Increase the precision of load prediction, contribute to preferably saving coal to use, save stone The use of oil and gas, required fund is generated electricity simultaneously reducing, and decreases the discharge of pernicious gas, is that environmental protection cause is made Contribution.Draft accurate rational power network layout plan.Accurate load prediction, the generator in scheduling system that can be saved Start and stoppage in transit, safeguards system being capable of the lasting operations of health, the unwanted rotation idle capacity of reduction, the feasible maintenance of formulation Scheme, social production and people's life is stablized is carried out, and reliably reduces the fund of electrical energy production, additional income and feedback The dynamics of society.Short-Term Power Load Forecasting System of the prior art generally needs the electrical load to multiple various locations Power carries out sampling analysis, but the sampled data of various location has certain error on timing node, so that easily Influence short-term electric load prediction precision of analysis.
The content of the invention
In order to overcome the deficiencies in the prior art, the utility model provides a kind of Distributed Multi sampling short-term electric load Forecasting system, when the electrical load power to multiple various locations carries out sampling analysis, it can be ensured that various location Uniformity of the sampled data on timing node, so as to ensure short-term electric load prediction precision of analysis.
The utility model solves the technical scheme that its technical problem used:
A kind of Distributed Multi sampling Short-Term Power Load Forecasting System, including for being powered the grid power of conveying Circuit and the communication signal circuit for carrying out signal transmission, the communication signal line parallel set in the grid power circuit Put, the communication signal circuit and the grid power circuit include upstream end and downstream;The communication signal circuit and The upstream end of the grid power circuit is provided with an output power controlling organization, and the downstream of the grid power circuit sets Several load supplying branch line circuits are equipped with, the junction of each described load supplying branch line circuit and the grid power circuit A distributed terminator mechanism for monitoring is provided with, several described distributed terminator mechanism for monitoring are all connected with the communication signal line The downstream on road;The output power controlling organization includes data processor and timing node maker, the data processor With the upstream end that the timing node maker is all connected with the communication signal circuit, the data processor connection time Node generator.
Used as the further improvement of above-mentioned technical proposal, the output power controlling organization also includes power controller, institute State the upstream end that power controller is arranged at the grid power circuit, and the power controller and timing node generation Device is connected in parallel the data processor.
Used as the further improvement of above-mentioned technical proposal, each described distributed terminator mechanism for monitoring includes an electric current electricity Pressure monitor, signal coder, a network timer, the Current Voltage monitor and the network timer are in parallel The signal coder is connected, and the signal coder and the network timer are all connected with the communication signal circuit You Duan.
As the further improvement of above-mentioned technical proposal, the Signal coding of each distributed terminator mechanism for monitoring Connected by a signal projector between the downstream of device and the communication signal circuit, each described distributed terminator monitoring Connected by a signal receiver between the downstream of the network timer of mechanism and the communication signal circuit.
Compared with prior art, the beneficial effects of the utility model are:
A kind of Distributed Multi sampling Short-Term Power Load Forecasting System provided by the utility model, to multiple different When electrical load power at position carries out sampling analysis, it can be ensured that the sampled data of various location is on timing node Uniformity, so as to ensure short-term electric load prediction precision of analysis.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is a kind of structural representation of Distributed Multi sampling Short-Term Power Load Forecasting System described in the utility model Figure.
Specific embodiment
Reference picture 1, Fig. 1 is one structural representation of specific embodiment of the utility model.
As shown in figure 1, a kind of Distributed Multi sampling Short-Term Power Load Forecasting System, including for being powered conveying Grid power circuit 10 and the communication signal circuit 20 for carrying out signal transmission, the communication signal circuit 20 is parallel to institute State grid power circuit 10 to set, the communication signal circuit 20 and the grid power circuit 10 include upstream end and downstream End;The upstream end of the communication signal circuit 20 and the grid power circuit 10 is provided with an output power controlling organization 30, the downstream of the grid power circuit 10 is provided with several load supplying branch line circuits 11, each described load supplying The junction of branch line circuit 11 and the grid power circuit 10 is provided with a distributed terminator mechanism for monitoring 40, several institutes State the downstream that distributed terminator mechanism for monitoring 40 is all connected with the communication signal circuit 20;The output power controlling organization 30 Including data processor 31 and timing node maker 32, the data processor 31 and the timing node maker 32 connect The upstream end of the communication signal circuit 20 is connect, the data processor 31 connects the timing node maker 32.
Specifically, the output power controlling organization 30 also includes power controller 33, and the power controller 33 is set It is connected in parallel in the upstream end of the grid power circuit 10, and the power controller 33 and the timing node maker 32 The data processor 31.Each described distributed terminator mechanism for monitoring 40 includes 41, letter of a Current Voltage monitor Number 42, network timer 43 of encoder, the Current Voltage monitor 41 and the network timer 43 are connected in parallel institute Signal coder 42 is stated, and the signal coder 42 and the network timer 43 are all connected with the communication signal circuit 20 Downstream.Under the signal coder 42 of each distributed terminator mechanism for monitoring 40 and the communication signal circuit 20 Trip is connected between end by a signal projector 45, the network timer of each distributed terminator mechanism for monitoring 40 Connected by a signal receiver 44 between 43 and the downstream of the communication signal circuit 20.
The timing node maker 32 generates unified network node and is then transferred to the data processor 31, and leads to Cross the communication signal circuit 20 to transmit to each network timer 43, so that it is guaranteed that the sampled data of various location is in the time Uniformity on node, so as to ensure short-term electric load prediction precision of analysis.
Above to it is of the present utility model it is preferable implementation illustrated, certainly, the utility model can also use with The different form of above-mentioned implementation method, those of ordinary skill in the art are made on the premise of without prejudice to the utility model spirit Equivalent conversion or it is corresponding change, should all belong in protection domain of the present utility model.

Claims (4)

1. a kind of Distributed Multi sampling Short-Term Power Load Forecasting System, it is characterised in that:Including for being powered conveying Grid power circuit and the communication signal circuit for carrying out signal transmission, the communication signal line parallel is in the power network Power circuit is set, and the communication signal circuit and the grid power circuit include upstream end and downstream;The communication The upstream end of signal line and the grid power circuit is provided with an output power controlling organization, the grid power circuit Downstream be provided with several load supplying branch line circuits, each load supplying branch line circuit and the electric network power line The junction on road is provided with a distributed terminator mechanism for monitoring, and several described distributed terminator mechanism for monitoring are all connected with described The downstream of communication signal circuit;The output power controlling organization includes data processor and timing node maker, described Data processor and the timing node maker are all connected with the upstream end of the communication signal circuit, and the data processor connects Connect the timing node maker.
2. a kind of Distributed Multi sampling Short-Term Power Load Forecasting System according to claim 1, it is characterised in that:Institute Stating output power controlling organization also includes power controller, and the power controller is arranged at the upstream of the grid power circuit End, and the power controller and the timing node maker are connected in parallel the data processor.
3. a kind of Distributed Multi sampling Short-Term Power Load Forecasting System according to claim 1, it is characterised in that:Often The individual distributed terminator mechanism for monitoring includes Current Voltage monitor, signal coder, a network timer, The Current Voltage monitor and the network timer are connected in parallel the signal coder, and the signal coder and institute State the downstream that network timer is all connected with the communication signal circuit.
4. a kind of Distributed Multi sampling Short-Term Power Load Forecasting System according to claim 3, it is characterised in that:Often Pass through one between the signal coder of the individual distributed terminator mechanism for monitoring and the downstream of the communication signal circuit Individual signal projector connection, the network timer of each distributed terminator mechanism for monitoring and the communication signal circuit Downstream between connected by signal receiver.
CN201621289364.7U 2016-11-29 2016-11-29 A kind of Distributed Multi sampling Short-Term Power Load Forecasting System Expired - Fee Related CN206226013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621289364.7U CN206226013U (en) 2016-11-29 2016-11-29 A kind of Distributed Multi sampling Short-Term Power Load Forecasting System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621289364.7U CN206226013U (en) 2016-11-29 2016-11-29 A kind of Distributed Multi sampling Short-Term Power Load Forecasting System

Publications (1)

Publication Number Publication Date
CN206226013U true CN206226013U (en) 2017-06-06

Family

ID=58786276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621289364.7U Expired - Fee Related CN206226013U (en) 2016-11-29 2016-11-29 A kind of Distributed Multi sampling Short-Term Power Load Forecasting System

Country Status (1)

Country Link
CN (1) CN206226013U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107359609A (en) * 2017-07-05 2017-11-17 许昌许继昌龙电能科技股份有限公司 The monitoring method and device of abnormal voltage in power system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107359609A (en) * 2017-07-05 2017-11-17 许昌许继昌龙电能科技股份有限公司 The monitoring method and device of abnormal voltage in power system
CN107359609B (en) * 2017-07-05 2018-06-05 许昌许继昌龙电能科技股份有限公司 The monitoring method and device of abnormal voltage in electric system

Similar Documents

Publication Publication Date Title
CN103187735A (en) Bidirectional intelligent gateway device for distributed new energy grid connection
CN207337640U (en) A kind of Internet of Things gas meter, flow meter system based on dual network transmission mode
CN103630784A (en) Online monitoring system for power distribution transformers
CN103400205A (en) System and method for managing energy efficiency of power distribution network on basis of reactive optimized coordination control
CN103997125A (en) Energy-saving optimization dispatching system of multi-source power distribution network
CN201955410U (en) Remote online arrester monitoring device
CN102638096A (en) Wireless monitoring system based on General Packet Radio Service (GPRS) for distributing transformer
CN206226013U (en) A kind of Distributed Multi sampling Short-Term Power Load Forecasting System
CN103824124A (en) Energy-saving potential assessment method for power grid company
CN211180055U (en) Power failure and restoration analysis and emergency repair management system
CN201075176Y (en) Energy management system
CN206211518U (en) A kind of photovoltaic case becomes uses comprehensive monitoring protection system
CN101729342B (en) Realization method of real-time memory calculation data structure of mixed mobile power system
CN202330583U (en) Pure inductive load power evaluation system of alternating current/direct current/alternating current traction converter
CN105223417A (en) A kind of wireless data transmission type intelligent electric meter
CN206180695U (en) Net DTU device is joined in marriage to measurement type
CN105529824A (en) Intelligent power grid information system
CN205139998U (en) Regional power grid economic dispatch system based on time -of -use tariffs
Zhan et al. Real-time active power control method of regional power grid considering wind power fluctuations under cps framework
CN106655176A (en) Online loop closing decision method and system for power distribution network
CN103178619B (en) APF (accurate position finder), SVG (static var generator) control device for realizing 3G (the third generation telecommunication) monitoring
CN206332451U (en) A kind of high stability load estimation sampling electricity input system
CN201780503U (en) Transformer economical running control system
CN203326717U (en) Intelligent integrated power supply system
CN107301606A (en) A kind of energy management monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20181129