CN206224898U - A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating - Google Patents

A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating Download PDF

Info

Publication number
CN206224898U
CN206224898U CN201621043303.2U CN201621043303U CN206224898U CN 206224898 U CN206224898 U CN 206224898U CN 201621043303 U CN201621043303 U CN 201621043303U CN 206224898 U CN206224898 U CN 206224898U
Authority
CN
China
Prior art keywords
stayed
cantilever
model
lifting
cable bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621043303.2U
Other languages
Chinese (zh)
Inventor
陈艳茹
杨勃
蒋平江
叶超
罗建华
曾绍武
赵欢
段运
李涛涛
罗永康
闫利康
刘丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Railway Institute
Original Assignee
Shaanxi Railway Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Railway Institute filed Critical Shaanxi Railway Institute
Priority to CN201621043303.2U priority Critical patent/CN206224898U/en
Application granted granted Critical
Publication of CN206224898U publication Critical patent/CN206224898U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to teaching demonstration device field, is related to a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating, and it includes Stayed Cable Bridge body Model, lifting portion model, beam section model;Stayed Cable Bridge body Model includes king-tower, girder, track and suspension cable;King-tower is curved surface queen post portal structures, and on king-tower, on girder, the two ends of suspension cable are fixedly connected two track layings main beam supporting with king-tower and girder respectively;Lifting portion model includes cantilever, lifting motor, lifting rope, lifting cross beam, electromagnet and translation motor;Cantilever is integrally assumed diamond in shape, and cantilever is slidably disposed on track, and lifting motor is fixedly installed on cantilever.The utility model can intuitively demonstrate stayed-cable bridge cantilever assembly process;Control to apparatus for demonstrating is completed by controller, and demonstration manipulation is more convenient.

Description

A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating
Technical field
The utility model belongs to teaching demonstration device field, is related to a kind of stayed-cable bridge cantilever assembly process teaching demonstration dress Put.
Background technology
The cable-stayed bridge application of current large span is more and more, wherein to account for 70% using the cable-stayed bridge that free cantilever erection is constructed More than.
The work progress of free cantilever erection is more complicated, when instructing student, if making student using dynamic model Intuitively recognize the work progress of free cantilever erection, can greatly improve results of learning.
At present, in the market does not have the dynamic model of stayed-cable bridge cantilever assembling construction process.
Utility model content
To solve the above problems, the purpose of this utility model is to provide a kind of stayed-cable bridge cantilever assembly process teaching demonstration Device, can intuitively demonstrate stayed-cable bridge cantilever assembly process.
The detailed technology scheme that the utility model is taken is:A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating, its Including Stayed Cable Bridge body Model, lifting portion model, beam section model and controller;Stayed Cable Bridge body Model include king-tower, girder, Track and suspension cable;King-tower is curved surface queen post portal structures, and on king-tower, two track layings are in girder for main beam supporting On, the two ends of suspension cable are fixedly connected with king-tower and girder respectively;Lifting portion model includes cantilever, lifting motor, hoisting rope Rope, lifting cross beam, electromagnet and translation motor;Cantilever is integrally assumed diamond in shape, and cantilever is slidably disposed on track, on cantilever Lifting motor is fixedly installed, the one ends wound of rope is lifted on the rotary output of lifting motor, the another of rope is lifted End is fixedly connected with lifting cross beam, and electromagnet is fixedly installed on lifting cross beam, and translation motor sets in orbit, translation motor One end be connected with cantilever;The inlet part that magnetic material is made, the position of inlet part and electromagnetism are fixedly installed on beam section model The position of iron matches;Beam section model is arranged on Stayed Cable Bridge body Model lower section;Lifting motor, electromagnet and translation motor are equal It is electrically connected with controller.
Further, it is provided with jack on beam section model, one end of suspension cable is fixedly installed plug.
Further, the also dolly including being electrically connected with controller.When carrying out stayed-cable bridge cantilever assembly process demonstration, can To control dolly that beam section model is moved into desired position under Stayed Cable Bridge body Model, so as to be more nearly with actual conditions.
Further, controller includes remote control module and remote control.Remote control can be by radio with remote control module Signal or wire transmission remote signal, demonstration manipulation are more convenient.
Further, king-tower, girder and beam section model are lucite and are made.
Further, cantilever is made up of bamboo wood.
Compared with prior art, the utility model has the advantages that:1st, stayed-cable bridge cantilever can intuitively be demonstrated Assembled process;2nd, the control to apparatus for demonstrating is completed by controller, and demonstration manipulation is more convenient.
Brief description of the drawings
Fig. 1 is a kind of schematic perspective view of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating in the utility model.Fig. 1 Middle dolly is not drawn into.
Fig. 2 is a kind of schematic side view of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating in the utility model.
Fig. 3 is a kind of electrical principle block diagram of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating in the utility model.
Stayed Cable Bridge body Model 1;King-tower 11;Girder 12;Track 13;Suspension cable 14;Lifting portion model 2;Cantilever 21;Lifting Motor 22;Lifting rope 23;Lifting cross beam 24;Electromagnet 25;Translation motor 26;Beam section model 3;Inlet part 31;Jack 32;It is small Car 33;Controller 4.
Specific embodiment
Fig. 1-Fig. 3 is referred to, it is necessary to illustrate, for convenience of description, the number of the suspension cable 14 in accompanying drawing 1 and accompanying drawing 2 It is one to measure, and the quantity of suspension cable 14 is usually one or more in the model of actual fabrication, therefore in accompanying drawing 1 and accompanying drawing 2 The quantity of shown suspension cable 14 is not construed as to limitation of the present utility model.
The utility model is a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating, it include Stayed Cable Bridge body Model 1, Lifting portion model 2, beam section model 3 and controller 4.
Stayed Cable Bridge body Model 1 includes king-tower 11, girder 12, track 13 and suspension cable 14;King-tower 11 is curved surface twin columns Formula portal structures, girder 12 is erected on king-tower 11, and two tracks 13 are laid on girder 12, the two ends of suspension cable 14 respectively with King-tower 11 and girder 12 are fixedly connected.
Lifting portion model 2 includes cantilever 21, lifting motor 22, lifting rope 23, lifting cross beam 24, electromagnet 25 and puts down Move motor 26;Cantilever 21 is overall to be assumed diamond in shape, and cantilever 21 is slidably disposed on track 13, and lifting is fixedly installed on cantilever 21 Motor 22, lifts the one ends wound of rope 23 on the rotary output of lifting motor 22, lifts the other end of rope 23 and hangs Dress crossbeam 24 is fixedly connected, and electromagnet 25 is fixedly installed on lifting cross beam 24, and translation motor 26 is arranged on track 13, translation One end of motor 26 is connected with cantilever 21.
The inlet part 31 that magnetic material (such as iron, stainless steel etc.) is made, inlet part 31 are fixedly installed on beam section model 3 Position match with the position of electromagnet 25;Beam section model 3 is arranged on the lower section of Stayed Cable Bridge body Model 1.
Lifting motor 22, electromagnet 25 and translation motor 26 are electrically connected with controller 4.
A kind of operation principle of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating in the utility model is:Carry out oblique pull Before the demonstration of bridge free cantilever erection process, by beam section model 3 and the placement of Stayed Cable Bridge body Model 1 time on the table, and by beam section mould Type 3 is adjusted to desired position (in the range of i.e. cantilever 21 can be lifted).
When carrying out stayed-cable bridge cantilever assembly process demonstration, translation motor 26 is controlled to rotate and mobile by controller 4, by putting down Move motor 26 and promote the translation of cantilever 21 until electromagnet 25 is just to inlet part 31;Lifting motor 22 is controlled to rotate by controller 4 Extend lifting rope 23, the lifting traction lifting cross beam 24 of rope 23 declines, until the electricity being fixedly installed on lifting cross beam 24 Magnet 25 is contacted with inlet part 31;Then electromagnet 25 is powered by controller 4 produces magnetic force to hold inlet part 31;By control The control lifting rotation of motor 22 of device processed 4 shortens lifting rope 23, and the lifting traction lifting cross beam 24 of rope 23 rises, until beam section Model 3 is concordant with girder 12;Control translation motor 26 to rotate and mobile by controller 4, cantilever 21 is pulled by translation motor 26 Translation is until beam section model 3 is contacted with girder 12;Beam section model 3 is connected with king-tower 11 by suspension cable 14, such as beam section mould The plug insertion that jack 32, one end of suspension cable 14 are fixedly installed plug (accompanying drawing is not drawn into), suspension cable 14 is provided with type 3 Jack 32, so as to can realize being connected beam section model 3 with king-tower 11 by suspension cable 14;By suspension cable 14 by beam section model 3 After being connected with king-tower 11, power off electromagnet 25 so as to decontrol inlet part 31 by controller 4, stayed-cable bridge cantilever assembly process is drilled Show end.
In sum, a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating in the utility model, can be intuitively Demonstration stayed-cable bridge cantilever assembly process;And the control to apparatus for demonstrating is completed by controller 4, manipulation side is demonstrated Just.
A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating in the utility model, can also include and controller 4 The dolly 33 of electric connection.When carrying out stayed-cable bridge cantilever assembly process demonstration, dolly 33 can be controlled to move to beam section model 3 1 time desired position of Stayed Cable Bridge body Model, so as to be more nearly with actual stayed-cable bridge cantilever assembly process.
Controller 4 can include remote control module and remote control.Remote control can be by radio signal with remote control module Or wire transmission remote signal, demonstration manipulates more convenient.
King-tower 11, girder 12 and beam section model 3 can be lucite and be made.
Cantilever 21 can be made up of bamboo wood.
It is to be appreciated that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear", "left", "right", " vertical ", " water It is flat ", " top ", " bottom ", " interior ", the orientation of the instruction such as " outward " or position relationship be based on orientation shown in the drawings or position relationship, Only it is, for ease of the description present invention and simplified description, must have rather than the device or element for indicating or inferring meaning specific Orientation, it is specific azimuth configuration and operation, thus it is not intended that limitation to present invention protection content.
Specific embodiment above is only the preferred embodiment of this creation, is not used to limit this creation, all in this wound Any modification, equivalent substitution and improvements for being done etc. within the spirit and principle of work, should be included in this creation protection domain it It is interior.

Claims (6)

1. a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating, it is characterised in that:Including Stayed Cable Bridge body Model (1), hang Dress portion model (2), beam section model (3) and controller (4);Stayed Cable Bridge body Model (1) including king-tower (11), girder (12), Track (13) and suspension cable (14);King-tower (11) is curved surface queen post portal structures, and girder (12) is erected on king-tower (11), Two track (13) is laid on girder (12), and the two ends of suspension cable (14) are fixed with king-tower (11) and girder (12) respectively to be connected Connect;Lifting portion model (2) includes cantilever (21), lifting motor (22), lifting rope (23), lifting cross beam (24), electromagnet And translation motor (26) (25);Cantilever (21) is integrally assumed diamond in shape, and cantilever (21) is slidably disposed on track (13), cantilever (21) lifting motor (22) is fixedly installed on, the one ends wound of lifting rope (23) is lifting the rotary output of motor (22) On, the other end of lifting rope (23) is fixedly connected with lifting cross beam (24), and electromagnet (25) is fixedly installed on lifting cross beam (24) on, translation motor (26) is arranged on track (13), and one end of translation motor (26) is connected with cantilever (21);Beam section model (3) inlet part (31) that magnetic material is made, the position of inlet part (31) and the position phase of electromagnet (25) are fixedly installed on Matching;Beam section model (3) is arranged on Stayed Cable Bridge body Model (1) lower section;Lifting motor (22), electromagnet (25) and translation electricity Machine (26) is electrically connected with controller (4).
2. a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating as claimed in claim 1, it is characterised in that:Beam section model (3) jack (32) is provided with;One end of suspension cable (14) is fixedly installed plug.
3. a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating as claimed in claim 1, it is characterised in that:Also include with The dolly (33) that controller (4) is electrically connected with.
4. a kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating as claimed in claim 1, it is characterised in that:Controller (4) including remote control module and remote control.
5. a kind of assembled process teaching apparatus for demonstrating of stayed-cable bridge cantilever as described in claim 1-4 is any, it is characterised in that:It is main Tower (11), girder (12) and beam section model (3) are lucite and are made.
6. a kind of assembled process teaching apparatus for demonstrating of stayed-cable bridge cantilever as described in claim 1-4 is any, it is characterised in that:It is outstanding Arm (21) is made up of bamboo wood.
CN201621043303.2U 2016-08-30 2016-08-30 A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating Expired - Fee Related CN206224898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621043303.2U CN206224898U (en) 2016-08-30 2016-08-30 A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621043303.2U CN206224898U (en) 2016-08-30 2016-08-30 A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating

Publications (1)

Publication Number Publication Date
CN206224898U true CN206224898U (en) 2017-06-06

Family

ID=58783043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621043303.2U Expired - Fee Related CN206224898U (en) 2016-08-30 2016-08-30 A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating

Country Status (1)

Country Link
CN (1) CN206224898U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110031247A (en) * 2019-05-09 2019-07-19 华东交通大学 Bridge incremental launching imitative experimental appliance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110031247A (en) * 2019-05-09 2019-07-19 华东交通大学 Bridge incremental launching imitative experimental appliance

Similar Documents

Publication Publication Date Title
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN105442932A (en) Power grid pole burying device and construction method
CN206224898U (en) A kind of stayed-cable bridge cantilever assembly process teaching apparatus for demonstrating
CN207303796U (en) One kind is used for electric power apparatus examination Portable lifting device
CN201000412Y (en) Building project bearing beam load test device
CN109761160B (en) Electric power screen cabinet migration device
CN205640141U (en) Projection frame is used in portable international economics and trade teaching
CN104818995B (en) A kind of method of assembled confined concrete bow member
CN203241594U (en) Pneumatic lifting device for buried type optical cable cross-connecting box
CN208486176U (en) It is a kind of for a point dedicated inspection vehicle for secondary formula bridge
CN206422458U (en) A kind of tubular busbar post insulator overhaul platform
CN205355673U (en) High -speed railway of not stopping transport across device's span beam rotary mechanism
CN206233673U (en) A kind of herringbone holding pole standing device
CN201961968U (en) Hoisting frame for chemical equipment overhaul
CN204384737U (en) A kind of hoist frame of improvement
CN206827893U (en) Generating set silencing case mounting tool
CN203951100U (en) Portable down conductor lifting device
CN204343778U (en) A kind of line bar
CN104849013B (en) Vehicle impact testing dummy neck calibration facility
CN204089028U (en) A kind of electric power transmission cable falsework device
CN203626267U (en) Building roof lifting device
CN206672724U (en) A kind of self-locking device under non-natural movement locus for insulator chain
CN203151000U (en) A spider robot walking on power transmission lines
CN206574379U (en) One kind fluting cut and cover method pipeline construction MEASUREMENT TEACHING model
CN206328063U (en) Large scale prefabricated part hoisting running device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20180830