CN206224474U - Power plant's open diversion canal water conservancy diversion heat-proof device - Google Patents

Power plant's open diversion canal water conservancy diversion heat-proof device Download PDF

Info

Publication number
CN206224474U
CN206224474U CN201620923721.4U CN201620923721U CN206224474U CN 206224474 U CN206224474 U CN 206224474U CN 201620923721 U CN201620923721 U CN 201620923721U CN 206224474 U CN206224474 U CN 206224474U
Authority
CN
China
Prior art keywords
open
flat board
water
power plant
diversion canal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620923721.4U
Other languages
Chinese (zh)
Inventor
杨志
龙国庆
唐刚
刘辉
毛卫兵
李波
何小华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201620923721.4U priority Critical patent/CN206224474U/en
Application granted granted Critical
Publication of CN206224474U publication Critical patent/CN206224474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a kind of power plant's open diversion canal water conservancy diversion heat-proof device, including folded plate type deflector and plate deflector, folded plate type deflector includes the first hang plate and the first flat board, first hang plate one end is arranged on open channel porch, the other end is connected with the first flat board, and the first hang plate and the first flat board side are each attached on the side wall of open diversion canal;Plate deflector is arranged on open channel outlet and water inlet rectification box junction, including the second flat board, and the side of the second flat board is fixed on the side wall of open diversion canal.The utility model can effectively reduce the temperature rise that solar radiation in open diversion canal course of conveying brings on water body to be influenceed, and reduces power plant cooling water water intaking temperature, the efficiency of generating set is improved, with economic benefit and application and popularization value very high.

Description

Power plant's open diversion canal water conservancy diversion heat-proof device
Technical field
The utility model is related to power plant's direct-flow water supply system research field, more particularly to a kind of power plant's open diversion canal water conservancy diversion every Thermal.
Background technology
Fire, the main of nuclear power plant are main steam turbine condenser and subsidiary engine cooling water with water, and it is complete that its water consumption accounts for power plant More than the 90% of station-service water.This water consumption is very big, such as one condenser and subsidiary engine of the conventional fired power generating unit of 1000MW Cooling water inflow about 25~30m3/s.If 4 units are installed by power plant, the water withdrawal from water source is up to 100~120m3/s;One The turbine condenser and subsidiary engine cooling water of the CPR1000 nuclear power generating sets of 1000MW, the water consumption about 50 of nuclear island essential service water ~60m3/s.If 4 homotype units are installed by nuclear power plant, total water withdrawal will be up to 200~240m3/s.Meet so substantial amounts of taking Water consumption, the water that must have abundance as the surface water body at water source is available for taking, and water quality and water temperature must also are fulfilled for using water It is required that.
The construction experiences of current thermal power plant show, if power plant is located near the surface water bodies such as river, river, lake, sea, have preferably Take, the surface water of drainage condition and abundance is available for taking, the water quality of water body, water temperature are satisfied by during with water requirement, using once The direct-flow water supply system of boosting is both economical, and water flows back to natural water body again through power plant after, flows back to the water water removal of natural water body Outside temperature rise, do not polluted by other.
Direct-flow water supply system is the condenser type of cooling generally used in border on the sea power plant, using the electricity of direct-flow water supply system Factory, when the range of stage at water source is small, water level is with plant area absolute altitude when differing less, and water is generally guided to plant area using open diversion canal, Every correspondence position of unit sets pump works and is supplied water to every machine respectively before main building.Open diversion canal scheme is hindered with its waterpower The advantage that power is small, initial cost is saved, operating cost is low, has obtained application widely in border on the sea power plant.Such open diversion canal Cemented rock or placed rockfill structure are generally used, slope coefficient m uses 1.0~1.5, and base slope takes certain slope or using flat Slope.
Its water supply flow is generally:Intake (box culvert) → open diversion canal → water inlet rectification box → forebay → circulation Pump house → circulating water pressure main pipe → condenser → siphonic water-collecting well → recirculated water drainage channel → surface water channel and discharge outlet.
To get the low-temperature cooling water of marine site deep layer, water intaking form is drawn generally by the way of box culvert down-the-hole takes deeply Water open channel needs to extend to marine site remote position, and it is left that the length according to engineering experience open diversion canal is usually 1000m~2000m It is right.In subtropical zone, summer temperature on average is higher, and the temperature rise using Three-dimensional Hydrodynamic simulation softward to open channel carries out three Dimensional Simulation of Air Motion, it is possible to find under solar radiation, water temperature is presented obvious lamination to open channel, surface temperature is higher and bottom Layer temperature is relatively low, and the water at low temperature that diversion box culvert is got will carry out blending with high-temperature water in flow process, cause bottom circulating water Temperature rise, if directly cooled down using the water in open diversion canal, it will influence power plant cooling water water temperature, eventually affects generating The efficiency of unit.
With the data instance of certain million fired power generating unit field data of having gone into operation in Guangdong Province, to Three-dimensional simulation software In heat transfer model parameter be corrected after, counted for the annual recirculated water temperature rise month by month of each engineering of the South China coastal Calculate, draw water at low temperature by after solar radiation, each moon water temperature temperature rise value of open diversion canal end water circulating pump import is at 0.10 DEG C ~0.50 DEG C or so.The water temperature that cooling water causes in open diversion canal after solar radiation is raised, and will directly influence generator The design power of group, by taking the supporting open diversion canal of the thermal power generation unit of 4 1000MW ultra supercriticals as an example, the temperature rise will be led The operation back pressure increase about 0.03~0.13kPa (being varied from according to each month temperature difference) of Turbo-generator Set is caused, so that Exerting oneself for generating set will reduce about 0.02%~0.08%, i.e., actual year generated output reduces by 4,400,000~35,200,000 kW.h, If by the unit price consideration of 0.62 yuan/kW.h of rate for incorporation into the power network, if using the sun in open diversion canal scheme consideration cooling water course of conveying Radiation-induced water temperature is raised, and about 283~21,820,000 yuan of economic benefit will be lost every year.
Therefore, how research ensures that the cooling water that open diversion canal is quoted will not be influenceed by solar radiation, further improves The generated output in power plant, with important Research Significance.
Utility model content
The purpose of this utility model is the shortcoming and deficiency for overcoming prior art, there is provided a kind of power plant's open diversion canal water conservancy diversion Heat-proof device, the device is bright to diversion to reduce solar radiation by being respectively provided with before and after open diversion canal a water conservancy diversion thermal insulation board The influence of water temperature in canal, avoids cooling water from heating up as far as possible.
The purpose of this utility model is realized by following technical scheme:Power plant's open diversion canal water conservancy diversion heat-proof device, including Folded plate type deflector and plate deflector, the folded plate type deflector include the first hang plate and the first flat board, and first inclines Plate one end is arranged on open channel porch, and the other end is connected with the first flat board, and first hang plate and the first flat board side are solid It is scheduled on the side wall of open diversion canal;The plate deflector is arranged on open channel outlet and water inlet rectification box junction, including Second flat board, the side of the second flat board is fixed on the side wall of open diversion canal.
Preferably, the angle of inclination β of first hang plate≤(180- α)+arctan (i), wherein α represents open diversion canal Base slope turning angle, i represents open diversion canal hydraulic slope, and unit is h/m.
Preferably, the height H2 of the first flat board upper surface≤97%* open diversion canals design low tide highly.By Numerical-Mode Intend, highly can at utmost avoid the water at low temperature that diversion box culvert is got to be mixed in flow process with high-temperature water using this Mix.
Preferably, the second flat board edge flows to length E≤rectification box overall width+2.0m.
Preferably, top mark+1.0m high in the height H≤rectification box of the second flat board upper surface.
Specifically, the width of the second flat board=open channel bottom width+(deflector absolute altitude-open channel bottom absolute altitude) × tan- 1(θ), its Middle θ is angle between deflector and open channel mask.
The utility model compared with prior art, has the following advantages that and beneficial effect:
1st, the utility model is provided with folded plate type deflector in the porch of open diversion canal, so that open channel porch open channel Top layer and the layering of bottom fluidised form are obvious, and top layer water delivery flow velocity is small, and bottom water flow velocity is big, forms " undercurrent " fluidised form, and table is reduced as far as possible Layer carries out blending with bottom water in flow process.
2nd, the utility model is exported in open channel and is provided with plate deflector with water inlet rectification box junction, so as to ensure Circulating pump room water inlet rectification box can get bottom water, it is to avoid get top layer high-temperature water, therefore can ensure power plant cooling water water Temperature is not influenceed by solar radiation, improves the efficiency of generating set.
3rd, each key design parameter of folded plate type deflector and plate deflector passes through three-dimensional in the utility model Fluid calculation software is modeled, and is then obtained by numerical simulation, can obtain corresponding parameter based on different structures, calculates Accurately, it is easy to promote.
4th, compared to traditional open diversion canal system, the utility model is by setting power plant's heat-insulated dress of open diversion canal water conservancy diversion Put, can effectively reduce the temperature rise that solar radiation in open diversion canal course of conveying brings on water body influences, and calculates the final electricity of display Factory's cooling water water intaking temperature reduces about 0.08 DEG C~0.30 DEG C (month by month), so as to reduce the operation back of the body of Turbo-generator Set Pressure, increased the year generated output of generating set, with the open diversion canal that the thermal power generation unit of 4 1000MW ultra supercriticals is supporting As a example by, the initial outlay of water conservancy diversion thermal insulation board is about 2,000,000 yuan, and the economic benefit brought every year is about 6,000,000 yuan, economic benefit Highly significant.
Brief description of the drawings
The overall structure diagram of Tu1Shi the present embodiment power plant open diversion canal water conservancy diversion heat-proof device.
Fig. 2 is the overlooking the structure diagram of the present embodiment folded plate type air deflector.
Fig. 3 is A-A cross-section structure principle schematics in Fig. 2.
Fig. 4 (a) is the overlooking the structure diagram of the plate air deflector of the present embodiment.
Fig. 4 (b) is C-C cross-section structure principle schematics in Fig. 4 (a).
Specific embodiment
The utility model is described in further detail with reference to embodiment and accompanying drawing, but implementation of the present utility model Mode not limited to this.
Embodiment 1
The present embodiment is by obtaining the design parameter of current open diversion canal, including base slope turning angle, design low tide are high Degree, open diversion canal transverse parameters, open diversion canal hydraulic slope;Obtain the design parameter of current rectification box, including width, interior top Absolute altitude;Obtain current waters parameter, the solar radiation temperature rise value in such as unit length waters;Using hydrodynamics software through excessive The optimization of amount calculates the concrete structure for proposing power plant's open diversion canal water conservancy diversion heat-proof device described in the present embodiment.The present embodiment water conservancy diversion Thermal insulation board is intake by being arranged on the folded plate type deflector of open channel entrance (after diversion box culvert variable slope segment) and being arranged on circulating pump room Rectification box upper limb, the plate deflector in open channel exit are combined.Below in conjunction with the accompanying drawings, two structures are carried out specifically Explanation.
Referring to Fig. 2, Fig. 3, the present embodiment folded plate type deflector includes the first hang plate and the first flat board, the first hang plate one End is arranged on open channel porch, and the other end is connected with the first flat board, and first hang plate and the first flat board side are each attached to On the side wall of open diversion canal.
A, B, C, α, β, H1, H2 are the main technologic parameters of water conservancy diversion thermal insulation board in figure.Each key parameter basis for selecting:
1st, the height H2 of the first flat board upper surface≤97%* open diversion canals design low tide highly.
2nd, the angle of inclination β of the first hang plate≤(180- α)+arctan (i), wherein α represent that open diversion canal base slope is transferred Angle, i represents open diversion canal hydraulic slope, and unit is h/m.
3rd, the length A of the width C of the first hang plate and the first flat board, the length B of the first hang plate and the first flat board, three By the open channel fluidised form three dimensional fluid mechanics optimization method based on CFD software or the open channel temperature rise based on DHI MIKE3 softwares Field Three-dimensional Numerical Simulation Method optimization is calculated and determined.
4th, structural mechanics calculating method of the thickness of the first hang plate and the first flat board based on ANSYS FLUENT softwares is obtained.
Referring to Fig. 4 (a), Fig. 4 (b), the plate deflector of the present embodiment includes the second flat board, and the side of the second flat board is fixed On the side wall of open diversion canal.
E, H, F are the main technologic parameters of water conservancy diversion thermal insulation board in figure.Each key parameter basis for selecting:
1st, the second flat board edge flows to length E≤rectification box overall width+2.0m.
2nd, top mark+1.0m high in the height H≤rectification box of the second flat board upper surface.
3rd, the width (namely flowing vertically to width) of the second flat board determines according to open diversion canal cross section characteristic.It is specific to calculate Method is:The width of the second flat board=open channel bottom width+(deflector absolute altitude-open channel bottom absolute altitude) × tan- 1(θ), wherein θ are to lead Angle between stream plate and open channel mask.
After folded plate type deflector and plate deflector is set, open channel top layer and the layering of bottom fluidised form are obvious, and top layer is defeated Water flow velocity is small, and bottom water flow velocity is big, forms " undercurrent " fluidised form.After open channel forms undercurrent, 80% comes from bottom water at low temperature with undercurrent Form is conveyed, and only 20% bottom water at low temperature is conveyed with top layer.
Above-described embodiment is the utility model preferably implementation method, but implementation method of the present utility model is not by above-mentioned The limitation of embodiment, it is other it is any without departing from the change made under Spirit Essence of the present utility model and principle, modify, replace Generation, combination, simplification, should be equivalent substitute mode, be included within protection domain of the present utility model.

Claims (6)

1. power plant's open diversion canal water conservancy diversion heat-proof device, it is characterised in that described including folded plate type deflector and plate deflector Folded plate type deflector includes the first hang plate and the first flat board, and first hang plate one end is arranged on open channel porch, the other end with First flat board is connected, and first hang plate and the first flat board side are each attached on the side wall of open diversion canal;It is described plate Deflector is arranged on open channel outlet and water inlet rectification box junction, including the second flat board, and the side of the second flat board is fixed on draws On the side wall of water open channel.
2. power plant's open diversion canal water conservancy diversion heat-proof device according to claim 1, it is characterised in that first hang plate Angle of inclination β≤(180- α)+arctan (i), wherein α represent open diversion canal base slope turning angle, and i represents open diversion canal waterpower Gradient, unit is h/m.
3. power plant's open diversion canal water conservancy diversion heat-proof device according to claim 1, it is characterised in that the first flat board upper surface Height H2≤97%* open diversion canals design low tide is highly.
4. power plant's open diversion canal water conservancy diversion heat-proof device according to claim 1, it is characterised in that second flat board is along stream To length E≤rectification box overall width+2.0m.
5. power plant's open diversion canal water conservancy diversion heat-proof device according to claim 1, it is characterised in that the second flat board upper table Top mark+1.0m high in the height H≤rectification box in face.
6. power plant's open diversion canal water conservancy diversion heat-proof device according to claim 1, it is characterised in that the width of the second flat board= Open channel bottom width+(deflector absolute altitude-open channel bottom absolute altitude) × tan- 1(θ), wherein θ are angle between deflector and open channel mask.
CN201620923721.4U 2016-08-23 2016-08-23 Power plant's open diversion canal water conservancy diversion heat-proof device Active CN206224474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620923721.4U CN206224474U (en) 2016-08-23 2016-08-23 Power plant's open diversion canal water conservancy diversion heat-proof device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620923721.4U CN206224474U (en) 2016-08-23 2016-08-23 Power plant's open diversion canal water conservancy diversion heat-proof device

Publications (1)

Publication Number Publication Date
CN206224474U true CN206224474U (en) 2017-06-06

Family

ID=58780992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620923721.4U Active CN206224474U (en) 2016-08-23 2016-08-23 Power plant's open diversion canal water conservancy diversion heat-proof device

Country Status (1)

Country Link
CN (1) CN206224474U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106227980A (en) * 2016-08-23 2016-12-14 中国能源建设集团广东省电力设计研究院有限公司 Power plant's open diversion canal water conservancy diversion heat ray filter and method for designing thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106227980A (en) * 2016-08-23 2016-12-14 中国能源建设集团广东省电力设计研究院有限公司 Power plant's open diversion canal water conservancy diversion heat ray filter and method for designing thereof
CN106227980B (en) * 2016-08-23 2023-06-23 中国能源建设集团广东省电力设计研究院有限公司 Diversion and heat insulation device for diversion open channel of power plant and design method thereof

Similar Documents

Publication Publication Date Title
CN103206331A (en) Low-head efficient shaft-extension tubular pump turbine and blades thereof
JP2016502635A (en) Thermal energy storage system with combined heating and cooling machine and method of using the thermal energy storage system
CN106227980A (en) Power plant's open diversion canal water conservancy diversion heat ray filter and method for designing thereof
CN109457671A (en) Water delivery engineering scene water complementation water pumping system
CN103344130A (en) Circulating water power generating system of hyperbolic cooling tower
CN207211811U (en) A kind of ecological, environmental protective building
Hunt et al. Dams with head increaser effect: Harnessing potential and kinetic power from rivers with large head and flow variation
CN206224474U (en) Power plant's open diversion canal water conservancy diversion heat-proof device
CN102644581A (en) Subsystem debugging method for un-commissioned circulating water system of firepower generator set
CN201358449Y (en) Circulating tube type hydropower station
CN208253697U (en) A kind of geothermal heating operating system of accumulation of heat and multistage terminal user's combined heat
CN108425350A (en) A kind of one-way fashion tidal power station and electricity-generating method for increasing water-head and continuously generating electricity
TWM632392U (en) Water tank power generation system built on a slopeland
CN205742065U (en) A kind of plain tract water quality promotes system
KR102086304B1 (en) Hybrid Water Generator Device and Water Quality Improvement System
CN105890434B (en) A kind of power plant cycle water cooling system, cooling means and application
CN207598414U (en) Tide and flow magnitude electricity generation system
CN204080938U (en) There is the siphonic water-collecting well of hot water return passage
CN204080939U (en) A kind of siphonic water-collecting well
CN210031983U (en) Clean water basin suction well system
CN203515932U (en) Once-through cooling unit drained water complementary energy utilizing system
CN205655418U (en) Be suitable for high -rise building's multi -user ground source heat pump air condition system based on public water pump
CN113154355A (en) Efficient hydrophobic utilization method for boiler air heater of thermal power plant
CN202532584U (en) Waste heat supply circulating water system
CN216894713U (en) Cooling circulating water return potential energy power generation system of pot-type calcining furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant