CN206223168U - Construction wall plastering plane real-time monitor - Google Patents
Construction wall plastering plane real-time monitor Download PDFInfo
- Publication number
- CN206223168U CN206223168U CN201621342478.3U CN201621342478U CN206223168U CN 206223168 U CN206223168 U CN 206223168U CN 201621342478 U CN201621342478 U CN 201621342478U CN 206223168 U CN206223168 U CN 206223168U
- Authority
- CN
- China
- Prior art keywords
- red
- green
- screw
- rotating disk
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
A kind of construction wall plastering plane real-time monitor,It includes upper lid and bottom seat,It is characterized in that being provided with window on upper lid,Driving gear rotating disk and band tooth rotating disk are provided with base,Driving gear rotating disk and band tooth rotating disk are engaged and pivoted relative to base,Driving gear rotating disk is driven by micromachine,Green laser transmitting tube is fixedly installed on band tooth rotating disk,Red laser transmitting tube and riser,Speculum and speculum under red under green are respectively arranged with the two sides of riser,Screw mandrel and screw are provided with the left side wall of riser,Green upper reflector is fixedly installed on screw,The green laser that green laser transmitting tube sends sequentially passed through and projected from window after speculum and green upper reflector reflection under green,It is same on the right side wall of riser that screw mandrel and screw are set,Anti- mirror in red is fixedly installed on screw,The red laser that red laser transmitting tube sends sequentially passed through and projected from window after speculum and red upper reflector reflection under red.
Description
Technical field
The utility model is related to construction wall plastering construction leveling unit, more particularly to a kind of construction wall
Face is plastered plane real-time monitor.
Background technology
Present various inner wall of building faces are plastered main or lean on skilled worker's manual operations, want to reach wall plastering technology
Standard, the practice that workman must have several years is tempered, is commonly called as big work, and skilled worker's total number of persons is declining now, old
Dry motionless, young new hand is not eager to learn, find it difficult to learn, be reluctant to learn, it is necessary at least more than 2 years arduous is put into practice, tempers diligently,
Can finish apprenticeship, be a technical requirements work post higher
《Unified standard for constructional quality》In it can be seen that plasterer technical requirements it is very high, 2m square
Planar interior surfaces flatness be not more than 4mm, some regions it is every all over thickness preferably in 5 ~ 7mm, error in 3mm, during construction it is complete with
Soon, feel, experience, new hand is constantly stopped work, is detected whether with 2m square tubes oneself long exceeded, and place high is scalped,
Low place is mended again, arduous to put into practice, temper just finish apprenticeship diligently, be skilled cook also often plaster it is exceeded,
Simply a face wall has 2,3 small areas exceeded, but because the time is long, and first half metope is somewhat stiff again place high
Scalp, low place is mended again and beats that scar is levelling just relatively hard more time-consuming, low local to mend its firmness again also poor
A bit, the wall plastering of general 25 squares of one side, the time that skilled cook need to spend more half an hour is super to repair 2,3 small areas
Target place, young new hand just more needs to spend more several times to more than ten times of time to repair, so the new hand of youth is really not
It is easily mastered this gate technique.
Utility model content
The utility model in view of the shortcomings of the prior art, proposes a kind of construction wall plastering plane real-time monitoring
Instrument.
The technical scheme that the utility model is used is:A kind of construction wall plastering plane real-time monitor, it
Including upper lid and bottom seat, it is characterized in that being provided with window on upper lid, micromachine, driving gear rotating disk are provided with base
With band tooth rotating disk, driving gear rotating disk and band tooth rotating disk are engaged and pivoted relative to base, and driving gear rotating disk is by micromachine
Drive, riser, green laser transmitting tube, red laser transmitting tube and button cell, button are fixedly installed on band tooth rotating disk
Battery is electrically connected with green laser transmitting tube and red laser transmitting tube, is reflected in the case where the two sides of riser are respectively arranged with green
Mirror and red lower speculum, are provided with screw mandrel and screw on the left side wall of riser, are fixedly installed on screw in green and reflected
Mirror, the green laser that green laser transmitting tube sends is sequentially passed through under green after speculum and green upper reflector reflection from window
Project, it is same on the right side wall of riser that screw mandrel and screw are set, anti-mirror, red laser in red are fixedly installed on screw
The red laser that transmitting tube sends sequentially passed through and projected from window after speculum and red upper reflector reflection under red.
The specific feature of this programme also has because wall fix thousand pound needed for plaster when on wall, may not be with wall
Body plane is vertical, so being provided with hollow support base on base, support base inner surface setting is the cambered surface of indent, in support
The spherical set coordinated with cambered surface is provided with seat.
Spherical set is spliced by two panels liner plate, and the inner surface of spherical set is the face of cylinder, and the outer surface of spherical set is interception
Face, is provided with lifting scale axle in spherical set, and lifting scale axle is lifted and rotated relative to base, realizes base relative to wall
Identity distance from regulation.
Strip level meter is provided with upper lid, the lower plane of base can be made perpendicular to the ground.Also bottom can be made with pendant line
The lower plane of seat is perpendicular to the ground, and tapped through hole is provided with base, and fastening screw is provided with tapped through hole, tightens tight
Gu key screw base and lifting scale shaft locking.Adjustment is finished and tightens fastening screw base and lifting scale shaft locking with hand,
It is perpendicular to the ground to ensure base lower plane, it is threadedly coupled between lifting scale axle and the wall fix bar with tip.When used for
All trades and professions need it is levelling, survey flat occasion, such as ground tiling, when equipment is installed if change the outfit on A-frame, be placed on ground
Upper use, without the wall fix bar with tip.
The wall fix bar with tip, lifting scale axle and the wall with tip are provided with the bottom surface of lifting scale axle
It is threadedly coupled between fix bar.
Riser side is provided with graduation mark, is adjusted according to scale between red upper reflector and green upper reflector
Difference in height.
The beneficial effects of the utility model are:LASER Discharge Tube design and installation two, red, a green, just
Red, the green two-layer ray the seen sector optical plane that a naked eyes can be seen, optical plane spacing 3mm can be formed again(Spacing is adjustable), work
People is plastered from distal end is smeared, and when green is invisible, expression is plastered highly up to standard, is not also seen when red, and expression is plastered
It is highly exceeded, can be just easily mastered when such workman plasters plaster it is highly up to standard, it is faster than having detected exceeded afterwards to correct again
Victory is convenient, time saving and energy saving, hence it is evident that to improve plaster efficiency and quality.Simple structure is safe and reliable, and it is each that it applies also for each row
Industry needs occasion levelling, that survey is flat, such as ground tiling, installation equipment, market sales counter arrangement.The utility model be exactly in order to
Solve this problem and invent, it can irradiate a fan-shaped plan more than 90 degree, be plastered needed for first it is fixed on
One jiao of metope, height of being plastered needed for adjustment every time, such as required the height 10mm that plasters, height error 3mm, i.e., required height of plastering
It is exactly up to standard qualified between 8.5mm to 11.5mm, laser wires of the present utility model just get one on metope and are higher than
The people of existing metope 11.5mm can red ray fan-shaped plan soon, another green ray higher than existing metope 8.5mm fans
Shape plane, new hand just can at any time see whether the ash just smeared is up to standard, and workman plasters from distal end is smeared, when green is seen when plastering
Disappear, expression is plastered highly up to standard, is not also seen when red, expression is plastered highly exceeded, Gao Liao, low is directly seen
See, correct at any time, ash be it is wet be easy to amendment, being lived without often stopping, it is exceeded to be detected whether with 2m square tubes oneself long again,
Correct efficient and convenient again than having detected exceeded afterwards, it is time saving and energy saving, hence it is evident that to improve plaster efficiency and quality.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram.Fig. 2 is that internal structure is illustrated after the utility model takes away lid
Figure.Fig. 3 is the top view of Fig. 2.Fig. 4 is the left view of Fig. 2.Fig. 5 be base in the utility model, lifting scale axle and
The sectional view of the wall fix bar with tip.Fig. 6 is the structural representation of spherical set.Fig. 7 is band tooth rotating disk in the utility model
And each parts mount position schematic diagram on band tooth rotating disk.Fig. 8 is I portions amplification view in Fig. 7.Fig. 9 is the utility model
Luminance schematic diagram during construction.
In figure:Wall fix bars of the 1- with tip;2- bases;3- windows;Covered on 4-;5- strip level meters;6- liftings are carved
Degree axle;7- fastening screws;8- band tooth rotating disks;9- driving gear rotating disks;The spherical sets of 10-;11- green laser transmitting tubes;12- is red
LASER Discharge Tube;13- efficient mini batteries;14- green upper reflectors;The lower speculum of 15- greens;16- connecting bolts;17- stands
Plate;18- red upper reflectors;The red lower speculums of 19-;20- support bases;21- micromachines;22- button cells;23- screw mandrels;
24- level meters;25- micromachine fixed mounts.
Specific embodiment
As shown in figure 1, a kind of construction wall plastering plane real-time monitor, it includes upper lid 4 and base 2,
Window 3 is provided with upper lid 4, Fig. 2 is that the utility model takes away internal structure schematic diagram after lid.Fig. 3 is the vertical view of Fig. 2
Figure.Fig. 4 is the left view of Fig. 2.As shown in Figure 2,3, 4, driving gear rotating disk 9 and band tooth rotating disk 8 are provided with base 2,
Driving gear rotating disk 9 and band tooth rotating disk 8 are engaged and pivoted relative to base 2, and driving gear rotating disk 9 is driven by micromachine 21,
Micromachine 21 is powered by efficient mini battery 13, and is fixed on base 2 with micromachine fixed mount, in band tooth rotating disk
Green laser transmitting tube 11, red laser transmitting tube 12, riser 17 and button cell 22, button cell 22 are fixedly installed on 8
Electrically connected with green laser transmitting tube 11 and red laser transmitting tube 12, two LASER Discharge Tubes parallel to base 2 lower plane,
The two sides of riser 17 are respectively arranged with speculum 15 and red lower speculum 19, green upper reflector 14, under green under green
Speculum 15, red upper reflector 18 and red lower speculum 19 are all arranged in 45 ° of angles with the lower plane of base 2, so protected
Laser that two LASER Discharge Tubes send is demonstrate,proved parallel to the lower plane of base 2, the He of screw mandrel 23 is provided with the left side wall of riser 17
Screw, is fixedly installed green upper reflector 14 on screw, and the green laser that green laser transmitting tube 11 sends sequentially passes through green
Speculum 15 and green upper reflector 14 are projected after reflecting from window 3 under color, same on the right side wall of riser 17 to set screw mandrel
23 and screw, anti-mirror 18 in red is fixedly installed on screw, the red laser that red laser transmitting tube 12 sends is passed through successively
Projected from window 21 after crossing red lower speculum 15 and the red reflection of upper reflector 14.
As shown in figure 5, the wall fix bar 1 with tip is provided with the bottom surface of lifting scale axle 6, lifting scale axle 6
It is threadedly coupled by connecting bolt 16 between the wall fix bar 1 with tip.Because wall fixes thousand pounds wall of being plastered into needed for
When on body, may not be vertical with wall plane, so being provided with hollow support base 20, table in support base 20 on base 2
Face is set to the cambered surface of indent, and the spherical set 10 coordinated with cambered surface is provided with support base 20.Fig. 6 is that the structure of spherical set is shown
It is intended to.As shown in fig. 6, spherical set 10 is spliced by two panels liner plate, the inner surface of spherical set 10 is the face of cylinder, spherical set 10
Outer surface is truncated-spherical, and lifting scale axle 6 is provided with spherical set 10, and lifting scale axle 6 is lifted and turned relative to base 2
It is dynamic, regulation of the base 2 relative to metope distance is realized, strip level meter 5 is respectively arranged with the side end face and side of upper lid 4,
Make the lower plane of base 2 perpendicular to the ground according to the adjustment of strip level meter 5, it is also possible to which pendant line makes the lower plane of base and ground
Face is vertical, and tapped through hole is provided with base 2, and fastening screw 7 is provided with tapped through hole, tightens fastening screw 7 bottom of
Seat 2 is locked with lifting scale axle 6, perpendicular to the ground to ensure the lower plane of base 2(Only need perpendicular to the ground).It is each when used for each row
Industry need it is levelling, survey flat occasion, such as ground tiling, when equipment is installed if change the outfit on A-frame, put and use on the ground, no
With the wall fix bar 1 with tip, make the lower plane of base 2 parallel to the ground according to the adjustment of level meter 24.
As shown in FIG. 7 and 8, button cell 22 is powered for two LASER Discharge Tubes, the light beam that red laser transmitting tube 12 sends
After speculum under red 19 and red upper reflector 18 reflect outside, green laser hair are irradiated to from the left window 3 of upper lid 4
Pipe 11 is penetrated by being irradiated to outside from the left window 3 of upper lid 4 after the reflection of the lower speculum 15 of green and green upper reflector 14, shape
Into visible red, green two light.Green upper reflector 14, the lower speculum 15 of green, red upper reflector 18 and red are lower anti-
Penetrate mirror 19 all to be arranged in 45 ° of angles with the lower plane of base 2, the laser that so two LASER Discharge Tubes of guarantee send is parallel to base
2 lower plane, the nut structure of screw mandrel 23 on riser 17 is used to adjust the height of red upper reflector 18 and green upper reflector 14
Degree, graduation mark is provided with the side of riser 17, and lid 4 turns screw mandrel 23 according to graduation mark to adjust red upper reflector 18 in opening
And the difference in height between green upper reflector 14.Micromachine after being so powered drives driving gear rotating disk 9 and band tooth rotating disk 8
Quick rotation, drives the quick rotations such as LASER Discharge Tube, speculum, and reserved window 3 projects laser on upper lid 4, makes laser
Ray forms 210 ° of angle>α>90 ° enable red, green laser rays to form red, the green two-layer ray the seen formation that a naked eyes are seen
Fan-shaped optical plane, optical plane spacing 3mm(Spacing is adjustable), as shown in figure 9, workman plasters from distal end is smeared, when green covering of the fan is seen
Disappear, expression is plastered highly up to standard, and when red covering of the fan is not seen yet, expression is plastered highly exceeded, and such workman smears
Can be just easily mastered when grey plaster it is highly up to standard.
Claims (7)
1. a kind of construction wall plastering plane real-time monitor, it includes upper lid and bottom seat, it is characterized in that on upper lid
Window is provided with, micromachine, driving gear rotating disk and band tooth rotating disk are provided with base, driving gear rotating disk and band tooth turn
Disk is engaged and pivoted relative to base, and driving gear rotating disk is driven by micromachine, and riser is fixedly installed on band tooth rotating disk,
Green laser transmitting tube, red laser transmitting tube and button cell, button cell are sent out with green laser transmitting tube and red laser
Pipe electrical connection is penetrated, speculum and speculum under red under green is respectively arranged with the two sides of riser, in the left side wall of riser
On be provided with screw mandrel and screw, green upper reflector, the green laser that green laser transmitting tube sends are fixedly installed on screw
Sequentially pass through and projected from window after speculum and green upper reflector reflection under green, it is same on the right side wall of riser that silk is set
Bar and screw, are fixedly installed anti-mirror in red on screw, and the red laser that red laser transmitting tube sends sequentially passes through red
Projected from window after speculum and red upper reflector reflection under color.
2. construction according to claim 1 wall plastering plane real-time monitor, it is characterized in that being set on base
Hollow support base is equipped with, support base inner surface setting is the cambered surface of indent, and the ball coordinated with cambered surface is provided with support base
Shape set, is provided with lifting scale axle in spherical set, and lifting scale axle is lifted and rotated relative to base.
3. construction according to claim 2 wall plastering plane real-time monitor, it is characterized in that spherical set is by two
Piece liner plate is spliced, and the inner surface of spherical set is the face of cylinder, and the outer surface of spherical set is truncated-spherical.
4. construction according to claim 1 wall plastering plane real-time monitor, it is characterized in that being set on upper lid
It is equipped with level meter.
5. construction according to claim 2 wall plastering plane real-time monitor, it is characterized in that being set on base
Tapped through hole is equipped with, fastening screw is provided with tapped through hole, tighten fastening screw base and lifting scale shaft locking.
6. construction according to claim 2 wall plastering plane real-time monitor, it is characterized in that in lifting scale
The wall fix bar with tip is provided with the bottom surface of axle, screw thread connects between lifting scale axle and the wall fix bar with tip
Connect.
7. construction according to claim 1 wall plastering plane real-time monitor, it is characterized in that in riser side
It is provided with graduation mark.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621342478.3U CN206223168U (en) | 2016-12-08 | 2016-12-08 | Construction wall plastering plane real-time monitor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621342478.3U CN206223168U (en) | 2016-12-08 | 2016-12-08 | Construction wall plastering plane real-time monitor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206223168U true CN206223168U (en) | 2017-06-06 |
Family
ID=58784816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621342478.3U Withdrawn - After Issue CN206223168U (en) | 2016-12-08 | 2016-12-08 | Construction wall plastering plane real-time monitor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206223168U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106441247A (en) * | 2016-12-08 | 2017-02-22 | 潘文玥 | Wall-surface plastered plane real-time monitoring instrument for building construction |
-
2016
- 2016-12-08 CN CN201621342478.3U patent/CN206223168U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106441247A (en) * | 2016-12-08 | 2017-02-22 | 潘文玥 | Wall-surface plastered plane real-time monitoring instrument for building construction |
CN106441247B (en) * | 2016-12-08 | 2018-08-03 | 潘文玥 | Construction wall plastering plane real-time monitor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206223168U (en) | Construction wall plastering plane real-time monitor | |
CN106401029B (en) | A kind of wall board connector, panel structure and construction method | |
WO2018032773A1 (en) | Atrium barrier handrail structure with hidden lamplight and installation process | |
CN106441247B (en) | Construction wall plastering plane real-time monitor | |
US20130145704A1 (en) | Window installation assembly and method to install windows | |
CN104110815B (en) | Courtyard machine and courtyard machine side plate thereof | |
CN204252475U (en) | Magnetic-type floor panel assembly | |
CN210302162U (en) | Sand pool structure of job site fire control is built in room | |
CN209799109U (en) | Curtain wall mounting structure capable of achieving different angles | |
CN203546897U (en) | Semi-football-shaped steel structure house | |
CN212271251U (en) | Heated board concatenation anchor clamps | |
CN206319536U (en) | A kind of wooden facing hanging plate decorating structure for being easy to construct | |
CN218205782U (en) | Plastering machine for building construction | |
CN110439117A (en) | Dismountable box light steel structure house | |
CN109457978A (en) | The installation method of the steel skirting of bright bolt decoration | |
CN105804411A (en) | A heat preservation and decoration integrated board installing process | |
CN211504041U (en) | Building detection auxiliary device | |
CN211313251U (en) | Plastering machine for building | |
CN111321868A (en) | Indoor raised floor structure | |
CN220247486U (en) | Height positioning device for passive window installation | |
CN212405762U (en) | Ball-hinged roof glass system capable of rotating in limited manner | |
CN212453508U (en) | Door frame correction frame | |
CN103485446B (en) | Arc channel-section steel reverse side adhesive film type partition wall and construction technology | |
CN208088874U (en) | Deviation correcting device | |
CN114718255B (en) | Socket type connection resin tile house structure based on light steel structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170606 Effective date of abandoning: 20180803 |
|
AV01 | Patent right actively abandoned |