CN206221306U - Improved continuous casting secondary cooling zone arranges steam blower fan - Google Patents

Improved continuous casting secondary cooling zone arranges steam blower fan Download PDF

Info

Publication number
CN206221306U
CN206221306U CN201621175140.3U CN201621175140U CN206221306U CN 206221306 U CN206221306 U CN 206221306U CN 201621175140 U CN201621175140 U CN 201621175140U CN 206221306 U CN206221306 U CN 206221306U
Authority
CN
China
Prior art keywords
blower fan
settling tank
continuous casting
cooling zone
secondary cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621175140.3U
Other languages
Chinese (zh)
Inventor
王建新
张冬
王萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201621175140.3U priority Critical patent/CN206221306U/en
Application granted granted Critical
Publication of CN206221306U publication Critical patent/CN206221306U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jet Pumps And Other Pumps (AREA)

Abstract

The utility model belongs to the improvement that caster two cold arranges vapour system structure, particularly a kind of improved continuous casting secondary cooling zone row steam blower fan, it is included in the blast pipe connected on the air inlet of blower fan, settling tank is connected in the outlet of the horizontal air intake bottom of the tube of blower fan, drainpipe is set on the tank wall of precipitation upper box part, manhole is set on the side wall of settling tank, sealing maintenance door is installed with by bolt on manhole.The utility model is rational in infrastructure, can solve the ponding in fan casing, when checking sediment case, attendant station easily can clean out the bits of the inside on the ground, scarfing cinder operation in fan casing need not entered, the amount of labour of workman is being greatly decreased, eliminated safe hidden trouble.

Description

Improved continuous casting secondary cooling zone arranges steam blower fan
Technical field
The utility model belongs to the improvement that caster two cold arranges vapour system structure, and particularly a kind of improved continuous casting is secondary Arrange steam blower fan in cooling zone.
Background technology
Caster two cold row's vapour system is main by equipment such as row's jet chimney, manual modulation valve, row's steam blower fan units Composition.
The steam that molten steel is produced in two cold houses is mainly extracted out and is discharged into outdoor by continuous casting two cold blower fan, makes crystallizer week Enclose gap and be in negative pressure or slight positive pressure state, to avoid overflowing the sight line of the excessive influence operating personnel of quantity of steam.
The water smoke that nozzle is ejected in process of production is inhaled into two cold smoke evacuation systems together with the steam in two cold houses In system;In the two cold smoke evacuation systems that the debris such as the covering slag for being spilt in conticaster casting process and small cold steel are drawn into simultaneously. In certain hour, a large amount of accumulated slags in fan casing bottom and certain ponding are caused, and block blower fan drainpipe.Last substantial amounts of steam Arranged in air by two cold chimneys, freezed in winter is very serious around chimney, there is larger potential safety hazard.
Blower fan inspection hole must be removed within every 2 months, attendant enters into the product of cleaning bottom of shell in fan casing Slag and dirt, and clear up the drainpipe of fan casing bottom.As cleaning not in time can fan impeller cause certain infringement, and And there is larger potential safety hazard into working in fan casing in attendant.
Utility model content
The purpose of this utility model is to provide a kind of improved continuous casting secondary cooling zone row steam blower fan, and its structure is closed Reason, can solve the ponding in fan casing, and when checking sediment case, attendant station on the ground can easily by the inside Bits are cleaned out, it is not necessary to entering scarfing cinder operation in fan casing, the amount of labour of workman is greatly decreased, eliminating safety hidden Suffer from.
What the purpose of this utility model was realized in:A kind of improved continuous casting secondary cooling zone row steam blower fan, including The blast pipe connected on the air inlet of blower fan, settling tank is connected in the outlet of the horizontal air intake bottom of the tube of blower fan, heavy Drainpipe is set on the tank wall of shallow lake upper box part, manhole is set on the side wall of settling tank, bolt is passed through on manhole Sealing maintenance door is installed.
Principle of the present utility model is in horizontal fan blast pipe(φ1500mm)Bottom, with steel plate made one it is long 1.1 meters, wide 1 meter, 0.8 meter high of rectangle sediment case, and install drainpipe additional in about 2/3 position of sediment case height.
Using effect:
After installing sediment case additional, original is deposited in the bits of the fan casing bottom overwhelming majority and is all deposited in sediment case, airduct Condensed water also mainly carries out draining by the drainpipe above sediment case, and the ponding in fan casing is resolved.Periodically will The manhole of sediment case is opened, and attendant station easily can clean out the bits of the inside on the ground, it is not necessary to Scarfing cinder operation in into fan casing, is greatly reduced the amount of labour of worker, also eliminates potential safety hazard.
The utility model is rational in infrastructure, solves the ponding in fan casing, and when checking sediment case, attendant stands on ground Easily the bits of the inside can be cleaned out on face, it is not necessary to entering scarfing cinder operation in fan casing, be greatly reduced The amount of labour of workman, eliminates potential safety hazard.
Brief description of the drawings
The utility model is further described below in conjunction with accompanying drawing, Fig. 1 illustrates for the utility model front view structure Figure.
Specific embodiment
A kind of improved continuous casting secondary cooling zone row steam blower fan, as shown in figure 1, be included on the air inlet of blower fan 1 connecting The blast pipe 2 for connecing, is connected to settling tank 3, in the tank wall on the top of settling tank 3 in the outlet of the bottom of horizontal blast pipe 2 of blower fan 1 On drainpipe 4 is set, manhole is set on the side wall of settling tank 3, on manhole by bolt be installed with sealing inspection Repair door.The condensed water discharge pipe 5 being connected with the bottom of shell of blower fan 1 in the drainpipe 4 of the connection of settling tank 3 is connected.In settling tank 3 Bottom supporting leg 6 is set.

Claims (3)

1. a kind of improved continuous casting secondary cooling zone row steam blower fan, is included in the blast pipe connected on the air inlet of blower fan (1) (2), it is characterized in that:Settling tank (3) is connected in the outlet of horizontal blast pipe (2) bottom of blower fan (1), in settling tank (3) Drainpipe (4) is set on the tank wall on top, manhole is set on the side wall of settling tank (3), spiral shell is passed through on manhole Bolt is installed with sealing maintenance door.
2. improved continuous casting secondary cooling zone according to claim 1 arranges steam blower fan, it is characterized in that:In settling tank (3) The condensed water discharge pipe (5) that the drainpipe (4) of connection is connected with blower fan (1) bottom of shell is connected.
3. improved continuous casting secondary cooling zone according to claim 1 arranges steam blower fan, it is characterized in that:In settling tank (3) Bottom supporting leg (6) is set.
CN201621175140.3U 2016-10-27 2016-10-27 Improved continuous casting secondary cooling zone arranges steam blower fan Expired - Fee Related CN206221306U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621175140.3U CN206221306U (en) 2016-10-27 2016-10-27 Improved continuous casting secondary cooling zone arranges steam blower fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621175140.3U CN206221306U (en) 2016-10-27 2016-10-27 Improved continuous casting secondary cooling zone arranges steam blower fan

Publications (1)

Publication Number Publication Date
CN206221306U true CN206221306U (en) 2017-06-06

Family

ID=58789632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621175140.3U Expired - Fee Related CN206221306U (en) 2016-10-27 2016-10-27 Improved continuous casting secondary cooling zone arranges steam blower fan

Country Status (1)

Country Link
CN (1) CN206221306U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812705A (en) * 2018-12-29 2019-05-28 北京建筑大学 Energy saving and environment friendly caster two cold room steam discharging device and method
CN114576185A (en) * 2022-03-05 2022-06-03 新疆八一钢铁股份有限公司 Method for prolonging service life of secondary air cooler of slab caster

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812705A (en) * 2018-12-29 2019-05-28 北京建筑大学 Energy saving and environment friendly caster two cold room steam discharging device and method
CN114576185A (en) * 2022-03-05 2022-06-03 新疆八一钢铁股份有限公司 Method for prolonging service life of secondary air cooler of slab caster

Similar Documents

Publication Publication Date Title
CN102534073B (en) Steam condensation tower for a granulation installation
CN204543857U (en) A kind of multi-functional dust falling device
CN206221306U (en) Improved continuous casting secondary cooling zone arranges steam blower fan
CN103422880B (en) Rock gangway fully mechanized workface dust pelletizing system
CN106237707A (en) Dry coke quenching seal water system draining self-purging and circulation utilization method
CN104325408B (en) Spray dust collector for construction environment of refractory brick processing machine
CN107314702B (en) Mine ventilation air methane heat-taking device and control method
CN105569721A (en) Air-spray linkage type annular jetting dust-removal system for mining
CN205269300U (en) Water smoke formula barbecue fume purification device
CN108837657A (en) A kind of spray water mist deduster
CN201139987Y (en) Clinker water impurity filter
CN205730740U (en) A kind of gas soot processing device
CN213433176U (en) Anti-blocking structure of pipeline
CN204703946U (en) But a kind of coal mine gas extraction pipeline that is used for filters ignition system
CN207253953U (en) It is electrolysed aluminium melting furnace and holding furnace smoke eliminator
CN107990148B (en) Novel gas pipeline siphon drainage device and method
CN201267749Y (en) High-efficient energy-saving water-saving emission-reducing washing tower
CN208652582U (en) A kind of domestic waste incineration chimney
CN208501860U (en) A kind of prefabricated pumping plant of fully automatic integral
CN220309952U (en) Detachable and washable air exhaust and oil removal device
CN202152350U (en) Steam recovery device for slag granulation
CN205832876U (en) A kind of waste gas from smelting furnace high-efficiency cyclone spray governing system
CN209549030U (en) The water mist dust-removing equipment of blast furnace iron notch
CN218910252U (en) Coke oven gas treatment device
CN204676111U (en) A kind of sack cleaner for converter dry dust-removal system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20171027