CN206219939U - The quick paving slab of lightweight composite materials - Google Patents

The quick paving slab of lightweight composite materials Download PDF

Info

Publication number
CN206219939U
CN206219939U CN201621239977.XU CN201621239977U CN206219939U CN 206219939 U CN206219939 U CN 206219939U CN 201621239977 U CN201621239977 U CN 201621239977U CN 206219939 U CN206219939 U CN 206219939U
Authority
CN
China
Prior art keywords
lightweight
lightweight panel
composite materials
paving slab
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621239977.XU
Other languages
Chinese (zh)
Inventor
彭来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Nai Si Engineering Co Ltd
Original Assignee
Tianjin Nai Si Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Nai Si Engineering Co Ltd filed Critical Tianjin Nai Si Engineering Co Ltd
Priority to CN201621239977.XU priority Critical patent/CN206219939U/en
Application granted granted Critical
Publication of CN206219939U publication Critical patent/CN206219939U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of quick paving slab of lightweight composite materials, including lightweight panel, and the lightweight panel upper surface is provided with anti-skidding raised line, and the lightweight panel surface spraying is provided with cured film, is connected by flexible connection structure between adjacent lightweight panel.The quick paving slab of lightweight composite materials described in the utility model has the advantage that:Panel weight is light, be easily attached, reusable, and 23 people can complete connection and laying work, and sheet material can in advance connect rear entrucking and be transported to construction site directly to be laid, and speed of application is fast, construction quality is guaranteed.

Description

The quick paving slab of lightweight composite materials
Technical field
The utility model belongs to road construction building materials technology field, is quickly paved the way more particularly, to a kind of lightweight composite materials Plate.
Background technology
In all kinds of accident rescues, workmen is frequently necessary to carry out repairing dimension into more remote or muddy area Shield, it is large-scale to safeguard that recovery vehicle cannot be introduced on this these non-paved road, as accident rescue in a significant obstacle because Element, in order to solve the problem, the most frequently used means are the quick road surfaces of laying, and existing quick paving slab has that weight is big, connection Mode is single, and multi-user collaborative operation is needed during laying, limits the laying speed of through street and uses scope.
The content of the invention
In view of this, the utility model is directed to a kind of quick paving slab of lightweight composite materials, existing quick to solve The technical problems such as weight big, connected mode is single, operation inconvenience that paving slab is present.
To reach above-mentioned purpose, what the technical solution of the utility model was realized in:
A kind of quick paving slab of lightweight composite materials, including lightweight panel, the lightweight panel surface spraying are provided with firmly Change film, be connected by flexible connection structure between adjacent lightweight panel.
Further, the flexible connection structure includes being arranged on the connecting hole at lightweight panel edge, is set in the connecting hole The button that be stuck in and cannot pass through in connecting hole is equipped with, connects chain is connected through connecting hole with the button, adjacent lightweight panel leads to Button is crossed to be connected with connects chain.
Further, the connects chain is provided with installing tache.
Further, the flexible connection structure includes being arranged on the connecting hole at lightweight panel edge, is set in the connecting hole The button that be stuck in and cannot pass through in connecting hole is equipped with, connecting rope is connected through connecting hole with the button, adjacent lightweight panel leads to Button is crossed to be connected with connecting rope.
Further, the flexible connection structure includes being arranged on the connecting hole at lightweight panel edge, and adjacent lightweight panel leads to The connects chain for crossing closure is connected, wherein, at least one installing tache is included in the connects chain of the closure.
Further, the lightweight panel is provided with the recess of hiding connects chain in connection hole.
Further, the both sides of the lightweight panel are provided with crimping.
Further, the both sides of the lightweight panel are provided with jack, and the jack is provided with guide mark.
Further, the guide is masked as guiding flag.
Further, the lightweight panel stress surface is rectangle, and the length of the lightweight panel is 3-8 meters, described light The width of scutum body is 1-1.5 meters, and the thickness of the lightweight panel is 20-50 centimetres.
Further, the joint face of the adjacent lightweight panel is provided with cooperation boss.
Relative to prior art, the quick paving slab of lightweight composite materials described in the utility model has the advantage that:Plate Material is lightweight, be easily attached, reusable, and 2-3 people can complete connection and laying work, and sheet material is filled after can connecting in advance Car is transported to construction site and directly lays, and speed of application is fast, construction quality is guaranteed.
Brief description of the drawings
The accompanying drawing for constituting a part of the present utility model is used for providing being further understood to of the present utility model, and this practicality is new The schematic description and description of type is used to explain the utility model, does not constitute to improper restriction of the present utility model. In accompanying drawing:
Fig. 1 is the schematic diagram of the quick paving slab of lightweight composite materials described in the utility model embodiment;
Fig. 2 is the side view of the quick paving slab of lightweight composite materials described in the utility model embodiment;
Fig. 3 is the anti-skidding raised line schematic diagram of the quick paving slab of lightweight composite materials described in the utility model embodiment;
Fig. 4 is the flexible connection structure schematic diagram of the quick paving slab of lightweight composite materials described in the utility model embodiment;
Fig. 5 is the flexible connection structure schematic diagram of the quick paving slab of lightweight composite materials described in the utility model embodiment.
Description of reference numerals:
10- lightweight panels;The anti-skidding raised lines of 11-;12- jacks;13- cured films;14- crimpings;15- connecting holes;16- buttons; 17- connects chains;18- installing taches.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the utility model can To be mutually combined.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score, The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " are Based on orientation shown in the drawings or position relationship, it is for only for ease of description the utility model and simplifies description, rather than instruction Or imply that the device or element of meaning with specific orientation, with specific azimuth configuration and operation, therefore must not be understood that It is to limitation of the present utility model.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating Or imply relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined Feature can express or implicitly include one or more this feature.In description of the present utility model, unless separately It is described, " multiple " is meant that two or more.
, it is necessary to explanation, unless otherwise clearly defined and limited, term " is pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly Connection;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Can be two connections of element internal.For the ordinary skill in the art, can be by concrete condition understanding State concrete meaning of the term in the utility model.
1-3 and describe the utility model in detail in conjunction with the embodiments below with reference to the accompanying drawings.
The utility model provides a kind of quick paving slab of lightweight composite materials, as shown in figure 1, including lightweight panel 10, institute State the surface spraying of lightweight panel 10 and be provided with cured film 13, be connected by flexible connection structure between adjacent lightweight panel 10.
Lightweight panel 10 can reduce the overall weight of paving slab, lighter weight paving slab can not only reduce product into Originally, cost of transportation, and the laying in muddy or shallow water area is more applicable for, the bearing capacity of lightweight panel 10 is limited, so The bearing capacity of lightweight panel 10 is improved in the surface spraying cured film 13 of lightweight panel 10;
The material of usually used lightweight panel 10 can be flexible polymer plate, and the material of cured film 13 can select tempering Film, such as LINE-X coating.
Lightweight panel 10 is connected by flexible connection structure, can be in factory or company according to engineering design, connection in advance Good lightweight panel 10, the lightweight panel 10 that will be connected is folded and is placed in transport vehicle, is directly laid after being transported to construction site Use, this designs significant increase laying speed, meanwhile, laying quality is also guaranteed.Lightweight panel 10 can be by 2-3 people Connection and laying work are completed, manpower use cost is reduced.
As shown in figure 3, the flexible connection structure includes being arranged on the connecting hole 15 at the edge of lightweight panel 10, the connecting hole The button 16 that be stuck in and cannot pass through in connecting hole 15 is provided with 15, connects chain 17 is connected through connecting hole 15 with the button 16 Connect, adjacent lightweight panel 10 is connected by button 16 with connects chain 17.
The connects chain 17 is provided with installing tache 18.
The flexible connection structure includes being arranged on the connecting hole 15 at the edge of lightweight panel 10, is provided with the connecting hole 15 The button 16 that cannot pass through in connecting hole 15 is stuck in, connecting rope is connected through connecting hole 15 with the button 16, adjacent thistle board Body 10 is connected by button 16 with connecting rope.
The flexible connection structure includes being arranged on the connecting hole 15 at the edge of lightweight panel 10, and adjacent lightweight panel 10 is by closing The connects chain 17 of conjunction is connected, wherein, at least one installing tache 18 is included in the connects chain 17 of the closure.
Not prior to above two connected mode, flexible connection structure purpose is to realize adjacent lightweight panel to flexible connection structure 10 firm connection, while simultaneously ensureing that adjacent lightweight panel 10 is folded when placing without destruction attachment structure, not by attachment structure Influence.
The lightweight panel 10 is provided with the recess of hiding connects chain 17 at connecting hole 15, is folded in lightweight panel 10 and stacked When connects chain 17 can hide and be placed in recess, it is to avoid lightweight panel 10 is inclined or collapsed during multiple-level stack.
As shown in Fig. 2 the both sides of the lightweight panel 10 are provided with crimping 14, crimping 14 can be laid on mud in this paving slab During muddy or regional shallow water, part paving slab is immersed in the water, but crimping 14 is exposed on the water surface because height is higher, vehicle traveling When by crimping 14 observe width of roadway so as to ensure safety traffic.
The both sides of the lightweight panel 10 are provided with jack 12, and the jack is provided with guide mark.
The guide is masked as guiding flag.It is by vehicle when guiding flag to ensure that piece paving slab is immersed in below the water surface Guide is paved the way Board position.
The stress surface of the lightweight panel 10 is rectangle, and the length of the lightweight panel 10 is 3-8 meters, the lightweight panel 10 width is 1-1.5 meters, and the thickness of the lightweight panel 10 is 20-50 centimetres, and every piece of paving slab load-bearing is heavy more than 30 tons Amount is at 25 kilograms or so, and lightweight panel 10 can increased or decrease size according to customer demand.
The joint face of the adjacent lightweight panel 10 is provided with cooperation boss, and adjacent cooperation boss helps adjacent after laying Lightweight panel 10 preferably card with together with, increase be connected firmly degree with avoid the vehicle from causing lightweight panel 10 askew after passing through Tiltedly.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the utility model, it is all at this Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (10)

1. the quick paving slab of lightweight composite materials, including lightweight panel, the lightweight panel upper surface is provided with anti-skidding raised line, and it is special Levy and be:The lightweight panel surface spraying is provided with cured film, is connected by flexible connection structure between adjacent lightweight panel.
2. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The flexible connection structure includes The connecting hole at lightweight panel edge is arranged on, the button that be stuck in and cannot pass through in connecting hole is provided with the connecting hole, connected Chain is connected through connecting hole with the button, and adjacent lightweight panel is connected by button with connects chain.
3. the quick paving slab of lightweight composite materials according to claim 2, it is characterised in that:The connects chain is provided with peace Dress button.
4. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The flexible connection structure includes The connecting hole at lightweight panel edge is arranged on, the button that be stuck in and cannot pass through in connecting hole is provided with the connecting hole, connected Rope is connected through connecting hole with the button, and adjacent lightweight panel is connected by button with connecting rope.
5. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The flexible connection structure includes The connecting hole at lightweight panel edge is arranged on, adjacent lightweight panel is connected by the connects chain for closing, wherein, the company of the closure At least one installing tache is included in chain link.
6. the quick paving slab of lightweight composite materials according to claim 2, it is characterised in that:The lightweight panel is in connection The recess of hiding connects chain is provided with hole.
7. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The both sides of the lightweight panel It is provided with crimping.
8. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The both sides of the lightweight panel Jack is provided with, the jack is provided with guide mark.
9. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The lightweight panel stress surface It is rectangle, the length of the lightweight panel is 3-8 meters, the width of the lightweight panel is 1-1.5 meters, the lightweight panel Thickness is 20-50 centimetres.
10. the quick paving slab of lightweight composite materials according to claim 1, it is characterised in that:The adjacent lightweight panel Joint face be provided with cooperation boss.
CN201621239977.XU 2016-11-18 2016-11-18 The quick paving slab of lightweight composite materials Expired - Fee Related CN206219939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621239977.XU CN206219939U (en) 2016-11-18 2016-11-18 The quick paving slab of lightweight composite materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621239977.XU CN206219939U (en) 2016-11-18 2016-11-18 The quick paving slab of lightweight composite materials

Publications (1)

Publication Number Publication Date
CN206219939U true CN206219939U (en) 2017-06-06

Family

ID=58789793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621239977.XU Expired - Fee Related CN206219939U (en) 2016-11-18 2016-11-18 The quick paving slab of lightweight composite materials

Country Status (1)

Country Link
CN (1) CN206219939U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330766A (en) * 2018-03-18 2018-07-27 中铁十九局集团第三工程有限公司 A kind of muddy road surface composite light mat plate
CN108729320A (en) * 2018-07-23 2018-11-02 山东众甫新材料有限公司 A kind of mining tunnel road deck and preparation, method for paving

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330766A (en) * 2018-03-18 2018-07-27 中铁十九局集团第三工程有限公司 A kind of muddy road surface composite light mat plate
CN108729320A (en) * 2018-07-23 2018-11-02 山东众甫新材料有限公司 A kind of mining tunnel road deck and preparation, method for paving

Similar Documents

Publication Publication Date Title
CN206219939U (en) The quick paving slab of lightweight composite materials
US20160222611A1 (en) Pedestrian barrier and barrier system
TW201620474A (en) Portable slope
CN107893387A (en) It is easy to the current novel intelligent deceleration strip of non-motor vehicle
CN208685489U (en) A kind of slidingtype spacer bar
CN200952108Y (en) Vehicle temporary paving
CN101435270B (en) High layer post subsection butt-joint operating method
CN105908623A (en) Expansion and contraction device with lower supporting platform
CN204212054U (en) Check and construction operation platform at the bottom of a kind of removable row's formula flexible pier continuous girder bridge bridge
CN102619159B (en) Overbridge for enabling vehicles to go straight
CN210420929U (en) Trestle sight induction equipment
CN206902530U (en) A kind of tunnel trestle
CN205421110U (en) Modular highway guardrail
CN206954159U (en) A kind of protection means for automobile
KR20090067826A (en) Safety cone a mode foldable
JP7017927B2 (en) Steel bridge widening erection equipment and steel bridge widening erection method
CN206070253U (en) A kind of track plates structure for being easy to splice
CN202865728U (en) Overbridge for straight traveling of vehicles
CN201169922Y (en) Safety device of high layer posts subsection butt-joint operation
CN104129434B (en) There is the lorry of full aluminum vehicle frame
CN205874949U (en) Landing stage device based on from walking
CN219930599U (en) Roadbed box for construction of temporary road or operation platform
CN218989770U (en) Temporary steel plate road structure
CN218843785U (en) Overhanging type discharging platform
CN205654377U (en) Excavation roadway trackless rubber -tyred car keeps away dangerous platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606