CN206216364U - A kind of steel pipe blanking device - Google Patents
A kind of steel pipe blanking device Download PDFInfo
- Publication number
- CN206216364U CN206216364U CN201621235736.8U CN201621235736U CN206216364U CN 206216364 U CN206216364 U CN 206216364U CN 201621235736 U CN201621235736 U CN 201621235736U CN 206216364 U CN206216364 U CN 206216364U
- Authority
- CN
- China
- Prior art keywords
- controller
- steel pipe
- module
- blanking device
- dolly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
The utility model discloses a kind of steel pipe blanking device, including support body and alignment means, the support body is provided with blanking bench, and the lateral edges of blanking bench one are provided with V-type bin, the V-type bin edge is used to dock storing frame, and the alignment means are made up of dolly, pushing plate and control system.The utility model provides a kind of steel pipe blanking device, can reduce noise when steel pipe falls, it is to avoid steel pipe sharp impacts are caused to damage or deformed, it is ensured that the quality of fished pipe.The alignment work after steel pipe blanking can be automatically performed simultaneously, labor strength is substantially reduced, and improves operating efficiency.Can directly be transported after blanking, without loading again.
Description
Technical field
The utility model is related to a kind of production equipment, more particularly to a kind of steel pipe blanking device for factory.
Background technology
The storing area of blanking rack and the drop of operational outfit are very big in the prior art, and the storing area of blanking rack is fallen under steel pipe
The inevitable bottom for clashing into storing area, is easy to cause the deformation of steel pipe during bottom.And be typically by the steel pipe after blanking
Production tube, the loss caused in blanking process are unless it is obvious that otherwise will directly pack shipment, there is the fished pipe day of damage
Enter in related application field afterwards, it is easy to which construction quality is adversely affected.
And for example the U of CN 205166517 the utility model discloses a kind of steel pipe blanking device include lowering or hoisting gear, base,
Workbench, driving lever and stripper;The base is located at lowering or hoisting gear lower section;The workbench be located at the lowering or hoisting gear and
Between the base, it is connected with the base;The driving lever is horizontally disposed, is rotated with the lowering or hoisting gear and is connected;The driving lever
Transition face is provided near described stripper one end above, when lowering or hoisting gear is lifted up, for promoting stripper to move;It is described
Driving lever lower section is provided with scotch, it is ensured that driving lever holding level when the lowering or hoisting gear is lifted up is fixed;The discharging
Part is located between the driving lever and the workbench, is slidably connected with the base, and the stripper is away from the workbench
One end is provided with roller, and the one end near the workbench is provided with charging ram.Although above-mentioned utility model can solve the problem that makes to process
Steel pipe in time, effectively depart from station from horizontal direction, it is ensured that the continuity of processing work, but steel can be reduced
Noise when pipe falls, without abrasion of the steel pipe in discharging is reduced, does not have effective alignment means, and workman obtains manual alignment.
Utility model content
The utility model is to realize that the technical scheme that its purpose is taken is as follows:
A kind of steel pipe blanking device, including support body and alignment means, it is characterised in that the support body is provided with blanking bench,
The lateral edges of blanking bench one are provided with V-type bin, and the V-type bin edge is used to docking storing frame, the alignment means by dolly, push away
Dynamic plate and control system composition;
Preferably, the storing frame is provided with least 6 grooves, arrange it is into a line and it is adjacent 2 apart from equal, it is described every
Individual groove both sides are provided with gim peg, and the gim peg of both sides fixes the two ends of snub rope, the exterior bottom of storing frame two point respectively
Be not provided with 4 rollers, side by side it is into a line and it is adjacent 2 apart from equal, described each roller top is designed with brace groove
Damping spring, damping spring is 8, and fixed block is also set up on each roller, and the locked fixation of roller is prevented from being moved in operation;
Preferably, roller is provided between two adjacent grooves on the storing frame, the rotating shaft at roller two ends is fixed respectively
On the framework of groove bottom;One end of the storing frame is provided with baffle plate, and the other end is near fixed case;
Preferably, the V-type bin is at least 10, side by side it is into a line and it is adjacent 2 apart from equal, described each V
Moulding mixture frame one end is fixed in the rotary shaft of blanking bench side edge lower part;
Preferably, the face of inclining of the blanking bench is with the horizontal 10 degree of angles.
Preferably, the control system is made up of gravity sensor and controller, and the controller includes contrast module, place
Reason module, communication module and receiver module, contrast module are sequentially connected processing module, communication module, also including with communication module
The receiver module of wireless connections, the controller is 2, respectively controller one and controller two, the controller one it is right
It is arranged in fixed case than module one, processing module one and communication module one, the contrast module two, processing module of controller two
Two and communication module two be arranged on fixed case in, the gravity sensor be arranged on fixed case top in, at the top of fixed case
Gravity sensor is parallel with groove inner bottom part, and the gravity sensor connects contrast module one and contrast module two respectively, described
The receiver module one of controller one is 2, is separately mounted in dolly and control cabinet, and the receiver module two of controller two is 2,
It is separately mounted in dolly and control cabinet, the processing module one is connected with processing module two, the controller two includes treating
Machine pattern and mode of operation, the timing of processing module two of the controller two interrogate the processing module one of controller one, if hair
Existing processing module one breaks down, then proceed work by the alternative controls one of the controller two, if it find that treatment mould
The normal work of block one, then be in standby mode by the controller two;
Preferably, the V-type bin 5 connects lower section correspondence cylinder 6 by rotary shaft, and cylinder 6 is at least 10, each gas
Cylinder 6 is fixed on the lateral edges of support body 3 one with the horizontal 45 degree of angles, and all cylinders are by the controlling switch on control cabinet 10
With controller control;
Preferably, the dolly connects pushing plate by expansion bracket, and expansion bracket cross sectional shape is rectangle, the car top
It is provided with alarm;
Preferably, the dolly is moved by controller control trolley idler wheels along guide rail, and described guide rail one end is fixed on
Determine on case, the other end is provided with baffle plate;
Preferably, described support body one end is provided with control cabinet.
The beneficial effects of the utility model:Noise when steel pipe falls can be reduced, it is to avoid sharp impacts during steel pipe blanking
Cause to damage or deform, it is ensured that the quality of fished pipe.Simple to operate, labor strength is substantially reduced, can be automatically complete
Into the alignment work after steel pipe blanking, operating efficiency is improved, can directly be transported after blanking, without loading again.
Brief description of the drawings
Fig. 1 is a kind of steel pipe blanking schematic device of the utility model;
Fig. 2 is the partial schematic diagram of the utility model Fig. 1;
Fig. 3 is the utility model control system block diagram;
In figure:
1st, storing frame 2, steel pipe 3, support body
4th, blanking bench 5, V-type bin 6, cylinder
7th, snub rope 8, damping spring 9, roller
10th, control cabinet 11, fixed block 12, roller
13rd, baffle plate 14, guide rail 15, trolley idler wheels
16th, pushing plate 17, dolly 18, framework
19th, groove 20, gim peg 210, gravity sensor
22nd, fixed case 23, alarm 211, contrast module one
212nd, processing module 1, communication module 1, receiver module one
215th, controller 1, contrast module 2 312, processing module two
313rd, communication module 2 314, receiver module 2 315, controller two
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, with reference to embodiments, to this
Utility model is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain this practicality
It is new, it is not used to limit the utility model.
Fig. 2 is the partial schematic diagram of Fig. 1, and Fig. 3 is the control system block diagram of Fig. 1;
As shown in figure 1, a kind of steel pipe blanking device of the utility model, including support body 3 and alignment means, on the support body 3
Blanking bench 4 is provided with, the lateral edges of blanking bench 4 one are provided with V-type bin 5, and V-type bin 5 connects lower section correspondence cylinder 6 by rotary shaft,
Cylinder 6 is at least 10, and each cylinder 6 is fixed on the lateral edges of support body 3 one, all cylinders with the horizontal 45 degree of angles
Controlled by the controlling switch on control cabinet 10 and controller;The edge of V-type bin 5 is used to dock storing frame 1, on storing frame 1
Be provided with least 6 grooves 19, arrange it is into a line and adjacent 2 described each both sides of groove 19 are provided with gim peg 20 apart from equal,
The gim peg of both sides fixes the two ends of snub rope 7 respectively, and 1 liang of exterior bottom of the storing frame is respectively equipped with 4 rollers 9, side by side
It is into a line and it is adjacent 2 apart from equal, described each roller top is designed with the damping spring 8 of brace groove 19, damping bullet
Spring 8 is 8, and fixed block is also set up on each roller, the locked fixation of roller 9 is prevented from being moved in operation, two on the storing frame 1
Roller 12 is provided between individual adjacent groove 19, the rotating shaft at the two ends of roller 12 is separately fixed on the framework 18 of the bottom of groove 19,
One end of the storing frame 1 is provided with baffle plate 13, and the other end is near fixed case 22.The alignment means are by dolly 17, pushing plate 16
With control system composition, by expansion bracket connection pushing plate 16, expansion bracket cross sectional shape is rectangle to dolly 17, and the dolly 17 is pushed up
Portion is provided with alarm 23;The dolly 17 is moved by trolley idler wheels 15 along guide rail 14, and the one end of the guide rail 14 is fixed on
Determine on case 22, the other end is provided with block.The receiver module 1 of the controller 1 is 2, is separately mounted to dolly 17
In control cabinet 10, the receiver module 2 314 of controller 2 315 is 2, is separately mounted in dolly 17 and control cabinet 10.
As shown in Fig. 2 the contrast module 1 of the controller 1, processing module 1 and communication module 1
In fixed case 22, the contrast module 2 311 of controller 2 315, processing module 2 312 and communication module 2 313 are installed
In fixed case 22.
As shown in figure 3, the control system is made up of gravity sensor 210 and controller, the controller includes contrast
Module, processing module, communication module and receiver module, contrast module are sequentially connected processing module, communication module, also including with it is logical
Believe the receiver module of module wireless connections, the controller is 2, respectively controller 1 and controller 2 315.
Embodiment:
As illustrated, in dropping into the V-type bin 8 on support body 3 after steel pipe discharging by blanking bench 4, pressing control cabinet 10
On cylinder controlling switch, all cylinders retracts drive corresponding one end of V-type bin 8 downwards, and steel pipe 2 is rolled from V-type bin 8
Under, when reaching the snub rope 7 on groove 19, snub rope 7 starts effect, its gravity for carrying steel pipe 2, and in the work of natural resiliency
Stretch certain length to buffer the impulse force that steel pipe 2 falls with lower.Such structure not only can guarantee that steel pipe be booked after stability,
A cushioning effect is also functioned to, damage will not be reproduced into and deformed, it is ensured that the quality of fished pipe.
During 2 whereabouts 19 inner bottom part of groove of steel pipe, exterior bottom damping spring 8 can play a cushioning effect, while reducing
The noise that steel pipe 2 is produced when being collided with groove 19 inner bottom part, reduces the loss of steel pipe, suitably largely uses in the factory.
The control system is made up of gravity sensor 210 and controller, and the controller includes contrast module, treatment mould
Block, communication module and receiver module, contrast module are sequentially connected processing module, communication module, also including wireless with communication module
The receiver module of contact, the controller is 2, respectively controller 1 and controller 2 315, the controller 1
Contrast module 1, processing module 1 and communication module 1 be arranged in fixed case 22, controller 2 315 it is right
It is arranged in fixed case 22 than module 2 311, processing module 2 312 and communication module 2 313, the gravity sensor 210 is pacified
In the top of fixed case 22, the gravity sensor 210 at the top of fixed case 22 is parallel with the inner bottom part of groove 19, the gravity-feed tank
Device 210 is answered to connect contrast module 1 and contrast module 2 311 respectively, the receiver module 1 of the controller 1 is 2
It is individual, it is separately mounted in dolly 17 and control cabinet 10, the receiver module 2 314 of controller 2 315 is 2, is separately mounted to small
In car 17 and control cabinet 10, the processing module 1 is connected with processing module 2 312, and the controller 2 315 includes treating
Machine pattern and mode of operation, the timing of processing module 2 312 of the controller 2 315 interrogate the processing module of controller 1
1, if it find that processing module 1 breaks down, then by the alternative controls 1 of the controller 2 315 continue into
Row work, if it find that the normal work of processing module 1, then be in standby mode, 2 controls by the controller 2 315
Device cooperates, and when a controller failure, another controller substitutes its work, improves the reliability of system, realizes certainly
Dynamicization is controlled.
Fallen under steel pipe 2 when on the inner bottom part gravity sensor 210 of groove 19, gravity sensor 210 will place with thereon
The weight of steel pipe 2 is recorded and sends contrast module 1 to, the information that contrast module 1 transmits gravity sensor 210 with it is defeated
The reduced parameter (reduced parameter is the weight and no weight when steel pipe 2 is piled) for entering is contrasted, and weight is found after parameter comparison
Amount parameter is changed and feeds back to processing module 1, and information is issued nothing by the control of processing module 1 communication module 1
The receiver module 1 of line contact, receiver module 1 sends control signal to dolly 17 again makes dolly start working.It is small
In-car motor is started working, and motor driven gear group is rotated, gear set drive trolley idler wheels 15 make dolly 17 along guide rail 14 to
The direction of storing frame 1 is moved, when moving to 22 side bottom block of fixed case, not in movement, while controlling the expansion bracket on dolly
Start back and forth stretch drive pushing plate 16 move back and forth, every whereabouts steel pipe 2 under the promotion of pushing plate 16 along roller 12
Motion, makes the one end of steel pipe 2 reach baffle plate 13, not in motion in the presence of baffle plate 13, so that steel pipe 2 is automatic in storing frame 1
Alignment, improves operating efficiency.
When not having steel pipe on storing frame 1, gravity sensor 210 will be in holding state.When the steel pipe on storing frame 1 is put
Man Shi, gravity sensor 210 now the weight of steel pipe 2 will be recorded and send contrast module 1 to, and contrast module 1 will weight
The information that power inductor is transmitted is carried out with the reduced parameter (reduced parameter is the weight and no weight when steel pipe 2 is piled) of input
Contrast, finds that weight parameter does not change after parameter comparison, feed back to processing module 1, and processing module 1 is controlled
Communication module 1 is issued the receiver module 1 of wireless connections by information, and receiver module 1 again transmits control signal
To dolly 17, the expansion bracket small in-car of retraction on dolly 17, expansion bracket is set to be stopped operation after retracting and control alarm 23 to report
Alert, alarm illustrates the work of workman's steel pipe blanking to complete.Receiver module 1 sends control signal to cylinder control again simultaneously
Switch stretches out all cylinders, V-type bin 8 is blocked steel pipe 2 and does not allow it to fall.Only need to the switching cylinder in operation control box
The blanking of steel pipe can be just completed, labor strength is greatly reduced, and production efficiency is greatly improved.
After the completion of steel pipe blanking, fixed block on roller 9 is opened, roller 9 can just be rolled, and storing frame 1 can be as fortune
Defeated instrument, in steel pipe transmission to next operation.Steel pipe need not be loaded again, in case steel pipe is loaded to steel pipe again
Loss, suitably largely uses in the factory.
Outside above-described embodiment, the utility model can also have other embodiment.All use equivalents or equivalent transformation
The technical scheme of formation, all falls within protection domain of the present utility model.
Claims (10)
1. a kind of steel pipe blanking device, including support body (3) and alignment means, it is characterised in that the support body (3) is provided with blanking
Platform (4), the lateral edges of blanking bench (4) are provided with V-type bin (5), and V-type bin (5) edge is used to dock storing frame (1), institute
Alignment means are stated to be made up of dolly (17), pushing plate (16) and control system.
2. a kind of steel pipe blanking device according to claim 1, it is characterised in that:The storing frame (1) is provided with least 6
Individual groove (19), arrange it is into a line and it is adjacent 2 apart from equal, described each groove (19) both sides are provided with gim peg (20), two
The gim peg of side fixes the two ends of snub rope (7) respectively, and the exterior bottom of the storing frame (1) two is respectively equipped with 4 rollers (9),
Side by side it is into a line and it is adjacent 2 apart from equal, described each roller top is designed with the damping spring of brace groove (19)
(8), damping spring (8) is 8, and fixed block is also set up on each roller, and roller (9) locked fixation is prevented from being moved in operation.
3. a kind of steel pipe blanking device according to claim 1 and 2, it is characterised in that:Upper two phases of storing frame (1)
Roller (12) is provided between adjacent groove (19), the rotating shaft at roller (12) two ends is separately fixed at the framework of groove (19) bottom
(18) on;One end of the storing frame (1) is provided with baffle plate (13), and the other end is near fixed case (22).
4. a kind of steel pipe blanking device according to claim 1, it is characterised in that:The V-type bin (5) is at least 10
It is individual, side by side it is into a line and it is adjacent 2 apart from equal, described each V-type bin (5) one end is fixed on the side of blanking bench (4)
In the rotary shaft of edge bottom.
5. a kind of steel pipe blanking device according to claim 1, it is characterised in that:Incline face and the water of the blanking bench (4)
Plane is into 10 degree of angles.
6. a kind of steel pipe blanking device according to claim 1, it is characterised in that:The control system is by gravity sensor
(210) constituted with controller, the controller includes contrast module, processing module, communication module and receiver module, contrast mould
Block is sequentially connected processing module, communication module, and also including the receiver module with communication module wireless connections, the controller is 2
It is individual, respectively controller one (215) and controller two (315), the contrast module one (211) of the controller one (215), treatment
Module one (212) and communication module one (213) are interior installed in fixed case (22), the contrast module two of controller two (315)
(311), processing module two (312) and communication module two (313) are interior installed in fixed case (22), the gravity sensor (210)
In the top of fixed case (22), the gravity sensor (210) at the top of fixed case (22) is parallel with groove (19) inner bottom part,
The gravity sensor (210) connects contrast module one (211) and contrast module two (311), the controller one (215) respectively
Receiver module one (214) be 2, be separately mounted in dolly (17) and control cabinet (10), the reception mould of controller two (315)
Block two (314) is 2, is separately mounted in dolly (17) and control cabinet (10), the processing module one (212) and processing module
Two (312) are connected, and the controller two (315) includes standby mode and mode of operation, the treatment of the controller two (315)
Module two (312) regularly interrogates the processing module one (212) of controller one (215), if it find that processing module one (212) occurs
Failure, then proceed work, if it find that processing module one by the alternative controls one (215) of the controller two (315)
(212) normal work, then by the controller two (315) in standby mode.
7. a kind of steel pipe blanking device according to claim 1 or 4, it is characterised in that:The V-type bin (5) is by turning
Moving axis connection lower section correspondence cylinder (6), cylinder (6) is at least 10, and each cylinder (6) is with the horizontal 45 degree of angles and solid
It is scheduled on the lateral edges of support body (3), all cylinders are controlled by the controlling switch on control cabinet (10) and controller.
8. a kind of steel pipe blanking device according to claim 1, it is characterised in that:The dolly (17) is by expansion bracket
Connection pushing plate (16), expansion bracket cross sectional shape is rectangle, and dolly (17) top is provided with alarm (23).
9. a kind of steel pipe blanking device according to claim 1 or 8, it is characterised in that:The dolly (17) is by dolly
Roller (15) is mobile along guide rail (14), and described guide rail (14) one end is fixed on fixed case (22), and the other end is provided with block.
10. a kind of steel pipe blanking device according to claim 1, it is characterised in that:Described support body (3) one end is provided with control
Case (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621235736.8U CN206216364U (en) | 2016-11-18 | 2016-11-18 | A kind of steel pipe blanking device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621235736.8U CN206216364U (en) | 2016-11-18 | 2016-11-18 | A kind of steel pipe blanking device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206216364U true CN206216364U (en) | 2017-06-06 |
Family
ID=58789763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621235736.8U Withdrawn - After Issue CN206216364U (en) | 2016-11-18 | 2016-11-18 | A kind of steel pipe blanking device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206216364U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106514415A (en) * | 2016-11-18 | 2017-03-22 | 张家港市圣鼎源制管有限公司 | Discharging device for steel pipes |
-
2016
- 2016-11-18 CN CN201621235736.8U patent/CN206216364U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106514415A (en) * | 2016-11-18 | 2017-03-22 | 张家港市圣鼎源制管有限公司 | Discharging device for steel pipes |
CN106514415B (en) * | 2016-11-18 | 2019-05-21 | 张家港市圣鼎源制管有限公司 | A kind of steel pipe blanking device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106514415A (en) | Discharging device for steel pipes | |
CN203003583U (en) | Loading and unloading device for bar material processing | |
CN104325553B (en) | A kind of heat insulation building block automatic assembly line | |
CN201980846U (en) | Air turnover hoisting tool used for sleeper mold | |
CN203497761U (en) | Bridge-type stacker | |
CN206216364U (en) | A kind of steel pipe blanking device | |
CN206417585U (en) | A kind of material frame recycling storage feed device | |
CN102133715A (en) | Automatic feeding system | |
CN106429957B (en) | New Type of Hydraulic tank car handling apparatus | |
CN102009858A (en) | Large-tonnage hydraulic flat dumper | |
CN205294338U (en) | Automatic distributing device of bulk material warehouse all standing formula | |
CN218289681U (en) | Integrated intelligent crawler full-moving car loader | |
CN201808132U (en) | Transferring and curing kiln of concrete building blocks | |
CN213793456U (en) | Vertical blanking device for cold-rolled ribbed steel bar production line | |
CN1843872A (en) | Apparatus for dumping residue of anode block | |
CN202912425U (en) | Large-tonnage hydraulic flat plate self-unloader | |
CN202066367U (en) | Elevator of sintering machine | |
CN201909538U (en) | Shuttle-type cloth cleaning device used for belt-type air-draft sintering machine | |
CN105540266B (en) | Overturn traversing integral type stacking machine | |
CN104229499A (en) | Bidirectional belt loader of covered truck | |
CN209366968U (en) | A kind of sandstone storage feed bin | |
KR101230470B1 (en) | Reclaimer system | |
CN206779874U (en) | A kind of oil pump assy assembly system | |
CN104986531B (en) | A kind of production line of heat insulation building block | |
CN201626706U (en) | Front/rear axle conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170606 Effective date of abandoning: 20190521 |