CN206205270U - Perforation rib pull bar constraint rectangular steel-tube concrete column - Google Patents
Perforation rib pull bar constraint rectangular steel-tube concrete column Download PDFInfo
- Publication number
- CN206205270U CN206205270U CN201620196537.4U CN201620196537U CN206205270U CN 206205270 U CN206205270 U CN 206205270U CN 201620196537 U CN201620196537 U CN 201620196537U CN 206205270 U CN206205270 U CN 206205270U
- Authority
- CN
- China
- Prior art keywords
- pull bar
- steel pipe
- ribbed stiffener
- steel
- rectangular steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses one kind perforation rib pull bar constraint rectangular steel-tube concrete column, including ribbed stiffener, pull bar, rectangular steel pipe, concrete.The ribbed stiffener is strip-form steel plate, and its thickness is identical with thickness of steel pipe.The ribbed stiffener upper connecting rod answers perforate through place, and hole size be able to pass through pull bar.The ribbed stiffener is evenly arranged on steel pipe pars intramuralis periphery, and vertical steel tube wall is installed using welding method.The pull bar uses common pull bar or reinforcing bar, passes perpendicularly through the tube wall of rectangular steel pipe, and along pillar height side long, short side is with appropriate spacing interlaced arrangement.The tie rod end is with steel pipe walls using welding or bolt connection.Ribbed stiffener is mutually coordinated with binding bar in the utility model, the bond-slip between steel pipe walls and concrete can be delayed, alleviate the local buckling of steel pipe walls, improve the lateral rigidity of steel pipe walls, the ability and the effect of contraction to core concrete of its resistance local buckling are lifted, so as to improve the bearing capacity and ductility of rectangular steel-tube concrete column.
Description
Technical field
The utility model is related to building structure technology field, more particularly to a kind of rectangle steel using rib pull bar constraint of perforating
Pipe concrete column.
Background technology
Rectangular steel-tube concrete column has the incomparable distinctive feature of circular steel tube concrete post, such as steel in engineer applied
The pipe connection with beam easy to make is easily processed, easy construction, be easy to meet the relative development in architectural plane requirement, section and inertia
Square is big, the advantages of be suitable as bending component, had attracted increasing attention in engineering practice.
For concrete-filled rectangular steel tube, because steel pipe is concentrated mainly on corner to core concrete effect of contraction, on four sides
Middle part effect of contraction there's almost no, so steel pipe is much smaller than round steel pipe coagulation to the overall effect of restraint of core concrete
Soil, its bearing capacity is much lower compared with circular steel tube concrete.Rectangular steel pipe section side long is weak to the effect of contraction of core concrete
In short side, and steel pipe side shorter edge long is more easy to local buckling.
The lateral rigidity of rectangular steel-tube concrete column steel plate is effectively improved, delays the bonding between steel pipe walls and concrete
Sliding, can lift the ability and the effect of contraction to core concrete of its resistance local buckling, reinforcing steel pipe and concrete
Integraty, so as to improve bearing capacity and ductility.
Rectangular Cft Columns With Binding Bars post is using the horizontal water of setting on longitudinal cross section at spacing intervals
The design form of flat binding bar.The advantage of this form is bar connection, and bilateral greatly strengthen to core coagulation to drawing
The hoop constraint of soil, so that it is constraint weak spot to improve between the bearing capacity of steel core concrete column, but binding bar vertical, horizontal,
Avoid the generation of these position local bucklings, operative constraint of the comprehensive formation to core concrete, it is necessary to which encryption constraint is drawn
Bar arranges that drilling is excessive, and pull bar consumption is big.
Another way is that the form for setting ribbed stiffener in steel pipe periphery midpoint is strengthened concrete-filled rectangular steel tube.It is this
The outer deformability of form ribbed stiffener containment surfaces is weak, and the loading later stage is easily caused disengaging with concrete binding failure, to delay or preventing
Only the deformation of middle side edge is, it is necessary to larger stiffness ratio of stiffener to panel, consumes steel more.And, ribbed stiffener fails to be formed to core
The hoop constraint of concrete, lateral confinement power is weaker than being connected to drawing for binding bar, although can to a certain extent delay local bending
Bent generation, but it is limited to improve the bearing capacity of rectangular steel-tube concrete column.
The content of the invention
For the shortcoming and deficiency that overcome prior art to exist, the intensity of steel is made full use of, delay or avoid peripheral steel
The longitudinally, laterally local buckling problem of plate, forms the one of the hoop constraint to core concrete, enhancing steel pipe and concrete
Property, so that the axle pressure of rectangular steel-tube concrete column, bias bearing capacity, anti-seismic performance are improved, the utility model proposes one
The mentality of designing and construction method for improving rectangular steel-tube concrete column lateral rigidity are planted, that is, rib pull bar constraint rectangular steel pipe of perforating is mixed
Solidifying earth pillar.
Perforation rib pull bar constraint rectangular steel-tube concrete column integraty reinforcement technique is by the perforate on ribbed stiffener, constraint
Pull bar is perforated and mistake, connection(Welding or bolt connection)In in steel pipe walls, effective effect of contraction is formed to perforate ribbed stiffener, entered
And slow down the local buckling of steel pipe walls.This design constrains the point-like of binding bar in binding bar rectangular steel-tube concrete column
Become the wire constraint of ribbed stiffener, be not required to encrypt binding bar, excessive perforate can be prevented effectively from steel pipe walls.With second side
Formula is compared, and the setting of binding bar forms larger hoop constraint effect to steel pipe walls, it is not necessary to firm using larger floor
Degree ratio, can effectively delay the bond-slip between steel pipe walls and concrete.
The utility model is adopted the following technical scheme that:
Perforation rib pull bar constraint rectangular steel-tube concrete column, including rectangular steel pipe, concrete, ribbed stiffener, pull bar.It is described to add
Strength rib is strip-form steel plate, and its thickness is identical with thickness of steel pipe.The ribbed stiffener upper connecting rod answers perforate, the size in hole through position
Pull bar be able to be passed through.The ribbed stiffener is evenly arranged on steel pipe pars intramuralis periphery, is connected using welding method perpendicular to steel pipe walls
Connect.The pull bar uses common pull bar or reinforcing bar, passes perpendicularly through the side long of rectangular steel pipe, and short side is handed over along pillar height with appropriate spacing
Mistake arrangement.The tie rod end is such as perforate plug welding mode, second from welding with the first connected mode of steel pipe walls
Connected mode is to carry out mantle fiber treatment with thread cutter for steel bar in tie rod end, is connected by screw bolts through steel pipe walls tapping.
The beneficial effects of the utility model:
(1) perforate ribbed stiffener and binding bar are combined closely, and few steel using amount is increased do not increase difficulty of construction, shadow again
In the case of ringing construction speed, the effect of contraction of continuous effective is formed in whole height in four middle side edges of steel pipe walls, improved
Side constraint ability, delays or avoids the sliding between steel pipe and concrete, and the bullet between binding bar is slowed down to greatest extent
Plastic buckling, makes rectangular steel pipe significantly be strengthened with the integraty of concrete.(2) premise of structural safety is being met
Under, can to large extent with relatively thin steel plate thickness, less rib width of putting more energy into, the integraty of enhancing steel pipe and concrete is real
Intensity now higher, rigidity and ductility.(3) restraining force for wearing pull bar will be uniformly transferred to steel plate by ribbed stiffener, make pull bar
Point-like constraint be changed into wire constraint, it is to avoid stress concentration, steel pipe to the effect of contraction of core concrete relative to simple plus
If the rectangular steel-tube concrete column of binding bar is more continuous and uniform, relative to the rectangular steel pipe coagulation for adding ribbed stiffener merely
Earth pillar more can effectively reduce the integraty of steel quantity consumption, enhancing steel pipe and concrete., along along short transverse, ribbed stiffener is along section for pull bar
Length direction is split steel plate, reduces the depth-width ratio and flakiness ratio of steel plate, so that its half buckle wavelength subtracts significantly
It is small.For peripheral steel plate, pull bar constraint ribbed stiffener provides strong sidewise restraint, prevents the flexing that steel plate is too early, favorably
In its intensity of performance, meanwhile, steel plate constrains core concrete again with pull bar as fulcrum with its bending rigidity, makes concrete multi-shaft
It is pressurized and improves its intensity.(5) component is easy to be connected with other steel members of surrounding, can give full play to steel plate and concrete
Two kinds of mechanical properties of material, not only improve and undertake vertical load, are conducive to undertaking horizontal loading again.
Brief description of the drawings
Fig. 1 is front elevation view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is the A-A profiles of Fig. 1, Fig. 2;
Fig. 4 is the front elevation view of special case of the present utility model, i.e. square steel tube concrete column;
Fig. 5 is the side view of special case of the present utility model, i.e. square steel tube concrete column;
Fig. 6 is the A-A profiles of Fig. 4, Fig. 5.
Shown in figure:The perforate ribbed stiffener 3- sections short side that 1- pull bars are set with steel pipe walls tie point 2- sections long side direction
The ribbed stiffener position of opening 7- concrete of the perforate ribbed stiffener 4- pull bar 5- steel pipe 6- rectangular steel-tube concrete columns that direction is set
The perforate ribbed stiffener that different directions length of side direction is set is represented for square steel tube concrete column, 2,3.
With reference to embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not
It is limited to this.
Specific embodiment
Embodiment
One kind perforation rib pull bar constraint rectangular steel-tube concrete column, including section long side direction set perforate ribbed stiffener 2,
Perforate ribbed stiffener 3, pull bar 4, rectangular steel pipe 5, concrete seven that section short side direction is set.The perforate ribbed stiffener is strip-form
Steel plate, its thickness is identical with the wall thickness of steel pipe 5.The perforate ribbed stiffener upper connecting rod answers the size in perforate, hole be able to wear through position 6
Cross pull bar 4.The perforate ribbed stiffener is evenly arranged in the tube wall interior periphery of steel pipe 5, and welding method is used perpendicular to the tube wall of steel pipe 5
Connection.The pull bar 4 uses common pull bar or reinforcing bar, passes perpendicularly through the tube wall of rectangular steel pipe 5, along column section side long, short side with
Appropriate spacing interlaced arrangement.The tie rod end is, from welding, such as to perforate with the first connected mode of steel pipe walls tie point 1
The modes such as plug welding, second connected mode is to carry out mantle fiber treatment with thread cutter for steel bar in tie rod end, through steel pipe walls perforate
Place is connected by screw bolts.
Embodiment 1
It is a kind of perforate rib pull bar constraint rectangular steel-tube concrete column making step be:
(1)Intensity, size, the position of rectangular steel pipe, pull bar and perforate ribbed stiffener are determined according to design drawing requirement;
(2)Make rectangular steel pipe 5, perforate ribbed stiffener, the pull bar 4 of rectangular steel-tube concrete column;
(3)The position of measurement and positioning pull bar 4, bores in the pull bar 4 of the rectangular steel pipe of steel core concrete column through position 1
Hole;
(4)Perforate ribbed stiffener is welded on rectangle steel tube wall using welding manner method;
(5)Pull bar 4 is arranged in the hole that has been drilled of rectangular steel pipe through perforate ribbed stiffener, using perforation plug welding connection or
Bolt connection;
(6)Concrete casting is entered in rectangular steel pipe, is conserved by construction requirement.
Above-described embodiment is the utility model preferably implementation method, but implementation method of the present utility model is not by described
The limitation of embodiment, it is other it is any without departing from the change made under Spirit Essence of the present utility model and principle, modify, replace
Generation, combination, simplification, should be equivalent substitute mode, be included within protection domain of the present utility model.
Claims (6)
1. a kind of perforation rib pull bar constrains rectangular steel-tube concrete column, it is characterised in that including rectangular steel pipe, concrete, perforate
Ribbed stiffener, pull bar, the ribbed stiffener are evenly arranged on steel pipe pars intramuralis periphery, are pacified using welding method perpendicular to steel pipe walls
Dress, the pull bar passes through ribbed stiffener osseotomy site, and along pillar height side long, short side is with appropriate spacing interlaced arrangement.
2. a kind of perforation rib pull bar according to claim 1 constrains rectangular steel-tube concrete column, it is characterised in that described to add
Strength rib is strip-form steel plate, and its thickness is identical with thickness of steel pipe.
3. a kind of perforation rib pull bar according to claim 1 constrains rectangular steel-tube concrete column, it is characterised in that described to open
Position perforate is passed through in pull bar on the ribbed stiffener of hole, the size in hole be able to pass through pull bar.
4. a kind of perforation rib pull bar constraint rectangular steel-tube concrete column according to claim 1, it is characterised in that it is described about
Beam pull bar uses common pull bar or reinforcing bar, passes perpendicularly through the tube wall of perforate ribbed stiffener and steel pipe, and along pillar height side long, short side is with appropriate
Spacing interlaced arrangement, tie rod end is connected with steel pipe walls.
5. a kind of perforation rib pull bar according to claim 4 constrains rectangular steel-tube concrete column, it is characterised in that the drawing
Boom end selects welding with the first connected mode of steel pipe walls.
6. a kind of perforation rib pull bar according to claim 4 constrains rectangular steel-tube concrete column, it is characterised in that the drawing
Boom end is connected by screw bolts with second connected mode of steel pipe walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620196537.4U CN206205270U (en) | 2016-03-15 | 2016-03-15 | Perforation rib pull bar constraint rectangular steel-tube concrete column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620196537.4U CN206205270U (en) | 2016-03-15 | 2016-03-15 | Perforation rib pull bar constraint rectangular steel-tube concrete column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206205270U true CN206205270U (en) | 2017-05-31 |
Family
ID=58754954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620196537.4U Expired - Fee Related CN206205270U (en) | 2016-03-15 | 2016-03-15 | Perforation rib pull bar constraint rectangular steel-tube concrete column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206205270U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049755A (en) * | 2016-03-15 | 2016-10-26 | 河南理工大学 | Rectangular concrete-filled steel tube column restrained by rib-perforating pull bars |
CN107237453A (en) * | 2017-07-20 | 2017-10-10 | 殷诗宝 | A kind of concrete filled steel tube coupled column |
CN108979189A (en) * | 2018-08-01 | 2018-12-11 | 苏州穹力机械科技有限公司 | Beam column built from concrete combination ruggedized construction |
-
2016
- 2016-03-15 CN CN201620196537.4U patent/CN206205270U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049755A (en) * | 2016-03-15 | 2016-10-26 | 河南理工大学 | Rectangular concrete-filled steel tube column restrained by rib-perforating pull bars |
CN107237453A (en) * | 2017-07-20 | 2017-10-10 | 殷诗宝 | A kind of concrete filled steel tube coupled column |
CN108979189A (en) * | 2018-08-01 | 2018-12-11 | 苏州穹力机械科技有限公司 | Beam column built from concrete combination ruggedized construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206090967U (en) | Perforation rib pull rod restraint double -layer steel plate concrete shear force wall | |
CN107227808A (en) | A kind of buckling-restrained steel plate shear force wall system of full assembled | |
CN103061453B (en) | Double-perforated steel plate-concrete combined coupling beam | |
CN206233626U (en) | Perforation rib pull bar constraint rectangular steel pipe outsourcing self-compacting concrete reinforced column | |
CN105064503A (en) | Steel tube and core tube mixed structure | |
CN106049720A (en) | Punched rib and pull rod constraint double-layer steel plate concrete shear wall | |
CN206205270U (en) | Perforation rib pull bar constraint rectangular steel-tube concrete column | |
CN201367654Y (en) | Combined shear wall of steel tube concrete, steel plate with holes and concrete | |
CN101435233B (en) | Steel tube concrete - punching steel plate - concrete combined shear wall and manufacturing method thereof | |
CN106049755A (en) | Rectangular concrete-filled steel tube column restrained by rib-perforating pull bars | |
CN108360901A (en) | Novel low layer assembled wallboard structure energy dissipating bolt joint | |
CN103485443A (en) | Window-shaped-steel-plate concrete shear wall and manufacturing method thereof | |
CN107447901A (en) | Anti-seismic prefabricated floor and floor antidetonation splicing construction | |
CN205712590U (en) | A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post | |
CN201433512Y (en) | Special-shaped steel pipe concrete column stiffened through combination of steel plates and reinforcing steel bars | |
CN206941865U (en) | A kind of power consumption assembled combined steel plate shearing force wall with damper | |
CN106088639A (en) | Perforation rib pull bar constraint rectangular steel pipe outsourcing self-compacting concrete reinforces RC post | |
CN206693403U (en) | A kind of steel core concrete column and connected mode | |
CN207392209U (en) | Lattice column batten plate with grid | |
CN207079628U (en) | A kind of open pore steel plate steel reinforced concrete assembling rectangle piping lane section | |
CN203559502U (en) | Window-shaped steel plate concrete shear wall | |
CN105350642B (en) | The cap of one kind connection " rice " type Cast-in-place concrete beam | |
CN204645318U (en) | A kind of overlaid plate type shear wall | |
CN106836556A (en) | A kind of composite reinforcing steel bar cage truss support shear wall | |
CN203034879U (en) | Casing refuge bin structure of existing masonry structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170531 Termination date: 20190315 |
|
CF01 | Termination of patent right due to non-payment of annual fee |