CN206194330U - Building engineering management bid device - Google Patents
Building engineering management bid device Download PDFInfo
- Publication number
- CN206194330U CN206194330U CN201621304662.9U CN201621304662U CN206194330U CN 206194330 U CN206194330 U CN 206194330U CN 201621304662 U CN201621304662 U CN 201621304662U CN 206194330 U CN206194330 U CN 206194330U
- Authority
- CN
- China
- Prior art keywords
- support body
- lamp box
- clipboard
- sheet frame
- host computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Drawing Aids And Blackboards (AREA)
Abstract
The utility model discloses a building engineering management bid device, including support body, sign fence, computer and sheet frame, buffer spring is installed to the below of support body, and buffer spring's bottom is fixed with the universal wheel, be provided with the lamp house on the support body, the internally mounted of lamp house has the fluorescent tube, the below of lamp house is fixed with the slide rail, computer's the left and right sides is all installed supplementary track and is changeed the pearl, and assists orbital inside to be fixed with and change the pearl, the effect of the convenient multifunctional horizontal discharger is beneficial in that, install the clipboard on the sheet frame. This building engineering management bid device adopts the liftable clipboard of similar teaching blackboard, can spur the clipboard according to actual user of service's user demand, and the practicality is high, is equipped with lamp house and sign fence, can show the concrete name of project for bidding, is equipped with buffer spring, runs into the circumstances of jolting and also can not damage, make it can be better serve bid user of service, make things convenient for the convenient operation of submitting a tender more.
Description
Technical field
The utility model is related to construction management equipment technical field, specially a kind of construction management bid dress
Put.
Background technology
Building construction is the inevitable outcome of socio-economic development, with the continuous quickening of Process of Urbanization Construction paces, for building
The demand for building construction is also increasing therewith, construction management demand also progressively increasing, and then for construction management
Device requirement be continuously increased, by bid device as a example by, be the outfit of benign competition, the nowadays bid of commercial type
Device species is various, pattern is different, but also there is more or less weak point influence and use, such as using similar religion
Learn the liftable clipboard of blackboard, it is impossible to which the use demand according to actually used personnel is pulled to clipboard, and practicality is received
To limitation, lamp box and label column are not provided with, it is impossible to show the specific name of project for bidding, be not provided with buffer spring, run into
Situation of jolting easily causes damage etc. to device, it is impossible to meet the demand for using.
In order to solve the problems of in the market, it is badly in need of improving the technology of bid device at present, enables preferably
Bid user of service is served, more facilitating easily carries out bid operation.
Utility model content
The purpose of this utility model is to provide a kind of construction management bid device, with solving above-mentioned background technology
What is proposed can not be pulled to clipboard according to the use demand of actually used personnel, easily cause device to damage in movement
The problems such as.
To achieve the above object, the utility model provides following technical scheme:A kind of construction management bid device, bag
Support body, label column, host computer and sheet frame are included, buffer spring is installed below the support body, and the bottom of buffer spring is consolidated
Surely there is universal wheel, lamp box is provided with the support body, the label column is connected with lamp box, and the inside of the lamp box is provided with lamp
Pipe, is fixed with slide rail below the lamp box, the host computer is connected by fastener with slide rail, on the host computer
Display screen is provided with, the left and right sides of the host computer is mounted on Auxiliary Track and ball, and the inside of Auxiliary Track is consolidated
Surely there is ball, the sheet frame is connected by circulator with support body, and sheet frame is provided with below lamp box, installed on the sheet frame
There is clipboard.
Preferably, the front material of the lamp box is clear glass.
Preferably, the moveable distance range of the host computer is 0-50cm.
Preferably, the rotatable angular range of the circulator is 0-180 °.
Preferably, the clipboard is liftable structure, and tow sides are and can write material.
Compared with prior art, the beneficial effects of the utility model are:Construction management bid device is using similar
The liftable clipboard of blackboard for education, can pull, practicality according to the use demand of actually used personnel to clipboard
Compare high, be provided with lamp box and label column, the specific name of project for bidding can be shown, be provided with buffer spring, run into the situation of jolting
Also device will not be caused to damage, enables preferably to serve bid user of service, more facilitated and easily submitted a tender
Operation.
Brief description of the drawings
Fig. 1 is the utility model structure front schematic view;
Fig. 2 is the utility model texture edge schematic diagram.
In figure:1st, support body, 2, Auxiliary Track, 3, ball, 4, buffer spring, 5, universal wheel, 6, lamp box, 7, label column, 8,
Slide rail, 9, host computer, 10, display screen, 11, sheet frame, 12, circulator, 13, clipboard, 14, fluorescent tube, 15, fastener.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of construction management bid device, including
Support body 1, Auxiliary Track 2, ball 3, buffer spring 4, universal wheel 5, lamp box 6, label column 7, slide rail 8, host computer 9, display screen
10th, sheet frame 11, circulator 12, clipboard 13, fluorescent tube 14 and fastener 15, the lower section of support body 1 are provided with buffer spring 4, and slow
The bottom for rushing spring 4 is fixed with universal wheel 5, and the situation of jolting is run into moving process will not also be caused to damage to device, protection
Performance is stronger, and lamp box 6 is provided with support body 1, and the front material of lamp box 6 is clear glass, coordinates label column 7 to have project for bidding
Body title is posted, and is opened fluorescent tube 14 and is illuminated, and can show the specific name of project for bidding, and decorative effect is relatively good, label
Column 7 is connected with lamp box 6, and the inside of lamp box 6 is provided with fluorescent tube 14, and the lower section of lamp box 6 is fixed with slide rail 8, and host computer 9 passes through
Fastener 15 is connected with slide rail 8, and the moveable distance range of host computer 9 is 0-50cm, can be according to actually used demand
The height of display screen 10 is adjusted, convenient use personnel carry out the report of file and preferably check bid rule on the display screen 10
The file of meter is delineated, display screen 10 is provided with host computer 9, the left and right sides of host computer 9 is mounted on the He of Auxiliary Track 2
Ball 3, and the inside of Auxiliary Track 2 is fixed with ball 3, the cooperation host computer 9 that can more stablize moves operation, plate
Frame 11 is connected by circulator 12 with support body 1, and the lower section of lamp box 6 is provided with sheet frame 11, the rotatable angle of circulator 12
Scope is 0-180 °, can be turned to sheet frame 11, and clipboard 13 is provided with sheet frame 11, and clipboard 13 is liftable structure,
And tow sides are and can write material, using the liftable clipboard 13 of similar blackboard for education, can be according to actual user
The use demand of member is pulled to clipboard, and practicality is higher, and rotating 180 ° by circulator 12 can also be write
Operation, enables preferably to serve bid user of service, and more facilitating easily carries out bid operation.
Operation principle:When using construction management bid device, device is connected into power supply, by printed throwing
Mark project name paper is attached on label column 7, opens fluorescent tube 14, illuminates word, then unclamps fastener 15, at the slide rail 8 on
Lower mobile host computer 9 arrives suitable position, and the Auxiliary Track 2 and ball 3 of both sides coordinate movement to use, more smooth, open
Display screen 10, can show bidding plans content by display screen 10, when blotter is taken down notes or introduces details, can be in clipboard
Write on 13, clipboard 13 is lifting blackboard, it is to avoid height less user be difficult with, here it is architectural engineering
The whole process of management bid device work.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out various changes in the case where principle of the present utility model and spirit is not departed from, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of construction management bid device, including support body (1), label column (7), host computer (9) and sheet frame (11), its
It is characterised by:Buffer spring (4) is installed below the support body (1), and the bottom of buffer spring (4) is fixed with universal wheel
(5) lamp box (6), is provided with the support body (1), the label column (7) is connected with lamp box (6), the inside of the lamp box (6)
Fluorescent tube (14) is installed, slide rail (8) is fixed with below the lamp box (6), the host computer (9) by fastener (15) with
Slide rail (8) is connected, and display screen (10) is provided with the host computer (9), and the left and right sides of the host computer (9) is pacified
Inside equipped with Auxiliary Track (2) and ball (3), and Auxiliary Track (2) is fixed with ball (3), and the sheet frame (11) is by rotation
Turn device (12) to be connected with support body (1), and sheet frame (11) is provided with below lamp box (6), book is installed on the sheet frame (11)
Write plate (13).
2. a kind of construction management bid device according to claim 1, it is characterised in that:The lamp box (6) is just
Facestock matter is clear glass.
3. a kind of construction management bid device according to claim 1, it is characterised in that:The host computer (9)
Moveable distance range is 0-50cm.
4. a kind of construction management bid device according to claim 1, it is characterised in that:The circulator (12) can
The angular range of rotation is 0-180 °.
5. a kind of construction management bid device according to claim 1, it is characterised in that:The clipboard (13) is
Liftable structure, and tow sides are and can write material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304662.9U CN206194330U (en) | 2016-11-24 | 2016-11-24 | Building engineering management bid device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304662.9U CN206194330U (en) | 2016-11-24 | 2016-11-24 | Building engineering management bid device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206194330U true CN206194330U (en) | 2017-05-24 |
Family
ID=58723237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621304662.9U Expired - Fee Related CN206194330U (en) | 2016-11-24 | 2016-11-24 | Building engineering management bid device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206194330U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108078294A (en) * | 2018-01-26 | 2018-05-29 | 周口师范学院 | Modern Education Technology display platform |
CN108230961A (en) * | 2018-01-18 | 2018-06-29 | 牡丹江师范学院 | A kind of higher education puts on display plate with fast installation combined type careers guidance |
-
2016
- 2016-11-24 CN CN201621304662.9U patent/CN206194330U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108230961A (en) * | 2018-01-18 | 2018-06-29 | 牡丹江师范学院 | A kind of higher education puts on display plate with fast installation combined type careers guidance |
CN108078294A (en) * | 2018-01-26 | 2018-05-29 | 周口师范学院 | Modern Education Technology display platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206021666U (en) | A kind of special advertisement design works exhibiting device of Advertisement teaching | |
CN203126247U (en) | Multimedia classroom blackboard | |
CN206194330U (en) | Building engineering management bid device | |
CN102117553A (en) | Electronic display and writing device of interactive teaching system | |
CN207257181U (en) | A kind of dustless projection blackboard | |
CN204354656U (en) | A kind of rotary education blackboard | |
CN204194404U (en) | A kind of contactless polaroid dedusting mechanism | |
CN205247646U (en) | Mathematics teaching board | |
CN206357875U (en) | One kind automation blackboard | |
CN210174469U (en) | Information technology teaching tool | |
CN205318686U (en) | Elementary teaching assistance board of english | |
CN206217436U (en) | A kind of mobile English teaching blackboard | |
CN211375936U (en) | English training device | |
CN205104101U (en) | English teaching show appearance | |
CN204322834U (en) | The pad pasting that writes of fine definition | |
CN206774111U (en) | A kind of construction management progress display plate | |
CN205809840U (en) | A kind of multifunctional intellectual interactive electric whiteboard | |
CN208130450U (en) | A kind of football training accuracy test device | |
CN205487199U (en) | Parking area sign | |
CN204382945U (en) | For the panel combination of novel environment friendly magnetic full visual angle blackboard | |
CN204236072U (en) | Exempt from the environmental protection of wiping type to write screen | |
CN204322835U (en) | Dustless Water-free environment-friendlyurinal Luminous blackboard | |
CN206363701U (en) | A kind of novel and multifunctional advertising lamp box making apparatus | |
CN205028484U (en) | Multimedia device for english teaching | |
CN201629073U (en) | Physical throwing demonstration instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 Termination date: 20201124 |