CN206192362U - Can be used to construct displacement monitoring and settlement monitoring's sign - Google Patents
Can be used to construct displacement monitoring and settlement monitoring's sign Download PDFInfo
- Publication number
- CN206192362U CN206192362U CN201621235317.4U CN201621235317U CN206192362U CN 206192362 U CN206192362 U CN 206192362U CN 201621235317 U CN201621235317 U CN 201621235317U CN 206192362 U CN206192362 U CN 206192362U
- Authority
- CN
- China
- Prior art keywords
- monitoring
- settlement monitoring
- mark
- settlement
- mobile jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model discloses a can be used to construct displacement monitoring and settlement monitoring's sign, mobile jib, settlement monitoring pole can change moving mirror head rod, clamping screw and fixation nut including maring, the bottom that marks the mobile jib is the threaded lead screw, and there is the settlement monitoring pole of a top rounding at the middle part, the camera lens pole passes through clamping screw and fixation nut to be installed and is maring the mobile jib top, can 360 degrees rotations, and the long and thin end of moving mirror head rod can be changeed and standard size prism sign can be installed. The utility model relates to a can be used to construct displacement monitoring and settlement monitoring's sign makes simple process, can set up according to the engineering needs, can be according to the building after burying underground, slope retaining structure, fill out extra large engineering closing levee, the installation of dam dam foundation construction situation, once the construction buries underground and to be used for displacement monitoring and settlement monitoring after the installation simultaneously, the loaded down with trivial details of monitoring of substep installation displacement and settlement monitoring sign reduce, displacement monitoring and settlement monitoring's the preparation degree of difficulty and cost is reduced, the efficiency of work is improved.
Description
Technical field
The utility model is related to a kind of marker post for measuring, and specifically, is related to one kind to can be used for building displacement and supervises
Survey the mark with settlement monitoring.
Background technology
At present, it is required for same stepping in building, slope retaining structure, reclamation embankment, dam foundation work progress
Row displacement monitoring and settlement monitoring work, and displacement monitoring and settlement monitoring work before starting and be required for displacement monitoring mark and sedimentation
Monitoring mark.But, many displacement monitorings and settlement monitoring mark are separately buried, it is necessary to construction and installation at twice, take now
It is more long, manpower, time and materials high cost.Angle is fixed after the completion of particularly displacement monitoring mark is embedded, it is impossible to according to building
Thing, slope retaining structure, reclamation embankment, dam foundation are highly adjusted accordingly, can not be according to monitoring site and control
System point position relative position carries out angle adjustment.So made troubles to observation work, repeatedly it is embedded also increase work economy into
This, influences displacement monitoring and settlement monitoring job schedule.
Utility model content
The utility model is precisely in order to the one kind for solving above-mentioned technical problem and designing can be used for building displacement monitoring and sink
The mark of monitoring drops.
The utility model solves the technical scheme that its technical problem used:
A kind of mark that can be used for building displacement monitoring and settlement monitoring, including mark mobile jib, settlement monitoring bar are rotatable
Camera lens bar, standing screw and fixing nut;The bottom for indicating mobile jib is threaded screw mandrel, and there is the heavy of top rounding at middle part
Drop monitoring rod;Camera lens bar is arranged on mark mobile jib top by standing screw and fixing nut, can 360 degree of rotations, rotatable mirror
Head rod elongated end can install standard size prism mark.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, its mark mobile jib is stainless steel solid bar,
Length is 15cm to 20cm.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, the settlement monitoring pole length of its top rounding
For 5cm to 10cm.
The beneficial effects of the utility model are that a kind of building displacement monitoring and mark of settlement monitoring of can be used for can be used
Standardized technique is made, and buries process is simple, and displacement monitoring and settlement monitoring can be simultaneously used for after an Embedment and installation, is dropped
Low displacement monitors making, the installation difficulty with settlement monitoring mark, saves human and material resources cost, improves operating efficiency.By adjusting
The horizontal level of rotatable mirror head rod and the vertical position of prism are saved, the angle of displacement monitoring mark can be adjusted according to requirement of engineering
Degree, can be according to building, slope retaining structure, reclamation embankment, dam foundation highly after embedded, it is to avoid position is consolidated
Surely the trouble brought, improves operating efficiency.Meanwhile, to carry and easy to connect, quick construction, maintenance work are simple.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model structure top view.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
As illustrated in fig. 1 and 2, a kind of mark that can be used for building displacement monitoring and settlement monitoring of the utility model, including mark
Will mobile jib 1, the rotatable mirror head rod 4 of settlement monitoring bar 2, standing screw 5 and fixing nut 6;The bottom for indicating mobile jib 1 is threaded
Screw mandrel 3, middle part have one top rounding settlement monitoring bar 2;Camera lens bar 4 is arranged on by standing screw 5 and fixing nut 6
Mark mobile jib 1 top, can 360 degree rotate, the elongated end of rotatable mirror head rod 4 can install standard size prism mark.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, mark mobile jib 1 is stainless steel solid bar, long
Spend for 15cm to 20cm.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, the length of settlement monitoring bar 2 of top rounding
For 5cm to 10cm.
Need to start displacement monitoring and sedimentation in building, slope retaining structure, reclamation embankment, dam foundation construction
During monitoring, design determine point position drilling, will fix rotatable mirror head rod 4 mark mobile jib 1 insert drilling in, and
The settlement monitoring bar 2 of top rounding is kept vertically, afterwards with cement or anchoring adhesive fixed signal mobile jib 1.The jail of mobile jib to be indicated 1
Gu after, you can worked with carrying out displacement monitoring and settlement monitoring.Before monitoring starts, prism is fixedly attached to rotatable mirror
On head rod 4, according to building, slope retaining structure, reclamation embankment, dam foundation Height Adjustment horizontal direction angle and perpendicular
Straight orientation angle, afterwards by adjusting, tightening standing screw 5 and fixing nut 6, makes prism just to control point direction.
By combining height, the angle of monitoring site and control point point position before observation, displacement monitoring mark is adjusted flexibly
Angle direction set, can preferably meet displacement monitoring requirements of one's work, not only manufacture craft is simple, and according to highway
Roadbed, reclamation embankment, dam foundation site operation situation, horizontal direction and vertical direction adjustment rotatable mirror head rod 4.
The utility model is not limited to above-mentioned preferred forms, anyone drawn under enlightenment of the present utility model its
Product as his any and the utility model is same or like, all falls within protection domain of the present utility model.
Claims (3)
1. it is a kind of can be used for building displacement monitoring and settlement monitoring mark, including mark mobile jib (1), settlement monitoring bar (2) can
Rotate camera lens bar (4), standing screw (5) and fixing nut (6);It is characterized in that:The bottom of mark mobile jib (1) is threaded
There is a settlement monitoring bar (2) for top rounding at screw mandrel (3), middle part;Camera lens bar (4) is by standing screw (5) and fixing nut
(6) installed in mark mobile jib (1) top, can 360 degree rotate, rotatable mirror head rod (4) elongated end can install standard size rib
Mirror mark.
2. it is according to claim 1 it is a kind of can be used for building displacement monitoring and settlement monitoring mark, it is characterised in that:Mark
Will mobile jib (1) is stainless steel solid bar, and length is 15cm to 20cm.
3. it is according to claim 1 it is a kind of can be used for building displacement monitoring and settlement monitoring mark, it is characterised in that:Top
Settlement monitoring bar (2) length of portion's rounding is 5cm to 10cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621235317.4U CN206192362U (en) | 2016-11-18 | 2016-11-18 | Can be used to construct displacement monitoring and settlement monitoring's sign |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621235317.4U CN206192362U (en) | 2016-11-18 | 2016-11-18 | Can be used to construct displacement monitoring and settlement monitoring's sign |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206192362U true CN206192362U (en) | 2017-05-24 |
Family
ID=58726604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621235317.4U Active CN206192362U (en) | 2016-11-18 | 2016-11-18 | Can be used to construct displacement monitoring and settlement monitoring's sign |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206192362U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114152240A (en) * | 2021-11-16 | 2022-03-08 | 中航勘察设计研究院有限公司 | Settlement observation mark structure |
-
2016
- 2016-11-18 CN CN201621235317.4U patent/CN206192362U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114152240A (en) * | 2021-11-16 | 2022-03-08 | 中航勘察设计研究院有限公司 | Settlement observation mark structure |
CN114152240B (en) * | 2021-11-16 | 2023-08-01 | 中航勘察设计研究院有限公司 | Sedimentation observation mark structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204040056U (en) | A kind of location and installation support of pre-embedded anchoring bolts | |
CN101838998B (en) | Prestressed anchor cable pile sliding wall along river road shoulder and construction method thereof | |
CN202090437U (en) | Adjustable steel column socle device | |
CN203403438U (en) | Inspection well cover with protective construction die ring | |
CN108331385A (en) | Prefabricated rod structure and its construction method are cheated in a kind of inspection | |
CN204151820U (en) | Stone bolt location and installation support | |
CN104897143A (en) | Cylinder forced centering observation pillar and embedment method thereof | |
CN206192362U (en) | Can be used to construct displacement monitoring and settlement monitoring's sign | |
CN105804110A (en) | Construction method of foundation bolts of railway contact net and mounting bracket | |
CN106988339B (en) | Sandy gravel stratum piping lane construction technology | |
CN108560369B (en) | Lofting construction method for high-speed loop curved surface paving | |
CN212477455U (en) | Pre-buried positioner of bridge suspension cable anchor cylinder | |
CN203383332U (en) | Adjustable positioning structure with two positioning plates for embedded bolts | |
CN205421321U (en) | Precast reinforced concrete base | |
CN201538969U (en) | Precast concrete board forming die | |
CN112095485A (en) | Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof | |
CN104047228B (en) | The prepared hole die of bridge stone bolt | |
CN208183782U (en) | A kind of fixed device of the foundation bolt of contact net basic | |
CN204059200U (en) | Bridge High-pier construction verticality automatic control structure | |
RU110761U1 (en) | ROAD SIGN | |
CN213742373U (en) | A scale for concrete thickness, elevation and roughness control | |
CN204531575U (en) | Cement pole Reinforcement Reinforced Concrete Structure | |
CN204000641U (en) | A kind of large-scale pier stud concrete vertical reinforcement locating rack | |
CN209011589U (en) | A kind of pinner anchor hole accurate positioning fixture with adjustment height conduit | |
CN209669702U (en) | A kind of auxiliary device being accurately positioned bearing pad stone prepared screw-bolt hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 570226 Room 403, building 25, Jinshan community, 88 Haiken Road, Longhua District, Haikou City, Hainan Province Patentee after: Hainan Ruicheng Space Engineering Technology Co.,Ltd. Address before: 570226 Room 403, building 25, Jinshan community, 88 Haiken Road, Longhua District, Haikou City, Hainan Province Patentee before: HAINAN TAIBO GEOGRAPHY INFORMATION TECHNOLOGY Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |