CN206192362U - Can be used to construct displacement monitoring and settlement monitoring's sign - Google Patents

Can be used to construct displacement monitoring and settlement monitoring's sign Download PDF

Info

Publication number
CN206192362U
CN206192362U CN201621235317.4U CN201621235317U CN206192362U CN 206192362 U CN206192362 U CN 206192362U CN 201621235317 U CN201621235317 U CN 201621235317U CN 206192362 U CN206192362 U CN 206192362U
Authority
CN
China
Prior art keywords
monitoring
settlement monitoring
mark
settlement
mobile jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621235317.4U
Other languages
Chinese (zh)
Inventor
陈承乙
谢小长
杨路松
代坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Ruicheng Space Engineering Technology Co.,Ltd.
Original Assignee
Hainan Tebo Geographical Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Tebo Geographical Mdt Infotech Ltd filed Critical Hainan Tebo Geographical Mdt Infotech Ltd
Priority to CN201621235317.4U priority Critical patent/CN206192362U/en
Application granted granted Critical
Publication of CN206192362U publication Critical patent/CN206192362U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a can be used to construct displacement monitoring and settlement monitoring's sign, mobile jib, settlement monitoring pole can change moving mirror head rod, clamping screw and fixation nut including maring, the bottom that marks the mobile jib is the threaded lead screw, and there is the settlement monitoring pole of a top rounding at the middle part, the camera lens pole passes through clamping screw and fixation nut to be installed and is maring the mobile jib top, can 360 degrees rotations, and the long and thin end of moving mirror head rod can be changeed and standard size prism sign can be installed. The utility model relates to a can be used to construct displacement monitoring and settlement monitoring's sign makes simple process, can set up according to the engineering needs, can be according to the building after burying underground, slope retaining structure, fill out extra large engineering closing levee, the installation of dam dam foundation construction situation, once the construction buries underground and to be used for displacement monitoring and settlement monitoring after the installation simultaneously, the loaded down with trivial details of monitoring of substep installation displacement and settlement monitoring sign reduce, displacement monitoring and settlement monitoring's the preparation degree of difficulty and cost is reduced, the efficiency of work is improved.

Description

A kind of mark that can be used for building displacement monitoring and settlement monitoring
Technical field
The utility model is related to a kind of marker post for measuring, and specifically, is related to one kind to can be used for building displacement and supervises Survey the mark with settlement monitoring.
Background technology
At present, it is required for same stepping in building, slope retaining structure, reclamation embankment, dam foundation work progress Row displacement monitoring and settlement monitoring work, and displacement monitoring and settlement monitoring work before starting and be required for displacement monitoring mark and sedimentation Monitoring mark.But, many displacement monitorings and settlement monitoring mark are separately buried, it is necessary to construction and installation at twice, take now It is more long, manpower, time and materials high cost.Angle is fixed after the completion of particularly displacement monitoring mark is embedded, it is impossible to according to building Thing, slope retaining structure, reclamation embankment, dam foundation are highly adjusted accordingly, can not be according to monitoring site and control System point position relative position carries out angle adjustment.So made troubles to observation work, repeatedly it is embedded also increase work economy into This, influences displacement monitoring and settlement monitoring job schedule.
Utility model content
The utility model is precisely in order to the one kind for solving above-mentioned technical problem and designing can be used for building displacement monitoring and sink The mark of monitoring drops.
The utility model solves the technical scheme that its technical problem used:
A kind of mark that can be used for building displacement monitoring and settlement monitoring, including mark mobile jib, settlement monitoring bar are rotatable Camera lens bar, standing screw and fixing nut;The bottom for indicating mobile jib is threaded screw mandrel, and there is the heavy of top rounding at middle part Drop monitoring rod;Camera lens bar is arranged on mark mobile jib top by standing screw and fixing nut, can 360 degree of rotations, rotatable mirror Head rod elongated end can install standard size prism mark.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, its mark mobile jib is stainless steel solid bar, Length is 15cm to 20cm.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, the settlement monitoring pole length of its top rounding For 5cm to 10cm.
The beneficial effects of the utility model are that a kind of building displacement monitoring and mark of settlement monitoring of can be used for can be used Standardized technique is made, and buries process is simple, and displacement monitoring and settlement monitoring can be simultaneously used for after an Embedment and installation, is dropped Low displacement monitors making, the installation difficulty with settlement monitoring mark, saves human and material resources cost, improves operating efficiency.By adjusting The horizontal level of rotatable mirror head rod and the vertical position of prism are saved, the angle of displacement monitoring mark can be adjusted according to requirement of engineering Degree, can be according to building, slope retaining structure, reclamation embankment, dam foundation highly after embedded, it is to avoid position is consolidated Surely the trouble brought, improves operating efficiency.Meanwhile, to carry and easy to connect, quick construction, maintenance work are simple.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model structure top view.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
As illustrated in fig. 1 and 2, a kind of mark that can be used for building displacement monitoring and settlement monitoring of the utility model, including mark Will mobile jib 1, the rotatable mirror head rod 4 of settlement monitoring bar 2, standing screw 5 and fixing nut 6;The bottom for indicating mobile jib 1 is threaded Screw mandrel 3, middle part have one top rounding settlement monitoring bar 2;Camera lens bar 4 is arranged on by standing screw 5 and fixing nut 6 Mark mobile jib 1 top, can 360 degree rotate, the elongated end of rotatable mirror head rod 4 can install standard size prism mark.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, mark mobile jib 1 is stainless steel solid bar, long Spend for 15cm to 20cm.
A kind of mark that can be used for building displacement monitoring and settlement monitoring, the length of settlement monitoring bar 2 of top rounding For 5cm to 10cm.
Need to start displacement monitoring and sedimentation in building, slope retaining structure, reclamation embankment, dam foundation construction During monitoring, design determine point position drilling, will fix rotatable mirror head rod 4 mark mobile jib 1 insert drilling in, and The settlement monitoring bar 2 of top rounding is kept vertically, afterwards with cement or anchoring adhesive fixed signal mobile jib 1.The jail of mobile jib to be indicated 1 Gu after, you can worked with carrying out displacement monitoring and settlement monitoring.Before monitoring starts, prism is fixedly attached to rotatable mirror On head rod 4, according to building, slope retaining structure, reclamation embankment, dam foundation Height Adjustment horizontal direction angle and perpendicular Straight orientation angle, afterwards by adjusting, tightening standing screw 5 and fixing nut 6, makes prism just to control point direction.
By combining height, the angle of monitoring site and control point point position before observation, displacement monitoring mark is adjusted flexibly Angle direction set, can preferably meet displacement monitoring requirements of one's work, not only manufacture craft is simple, and according to highway Roadbed, reclamation embankment, dam foundation site operation situation, horizontal direction and vertical direction adjustment rotatable mirror head rod 4.
The utility model is not limited to above-mentioned preferred forms, anyone drawn under enlightenment of the present utility model its Product as his any and the utility model is same or like, all falls within protection domain of the present utility model.

Claims (3)

1. it is a kind of can be used for building displacement monitoring and settlement monitoring mark, including mark mobile jib (1), settlement monitoring bar (2) can Rotate camera lens bar (4), standing screw (5) and fixing nut (6);It is characterized in that:The bottom of mark mobile jib (1) is threaded There is a settlement monitoring bar (2) for top rounding at screw mandrel (3), middle part;Camera lens bar (4) is by standing screw (5) and fixing nut (6) installed in mark mobile jib (1) top, can 360 degree rotate, rotatable mirror head rod (4) elongated end can install standard size rib Mirror mark.
2. it is according to claim 1 it is a kind of can be used for building displacement monitoring and settlement monitoring mark, it is characterised in that:Mark Will mobile jib (1) is stainless steel solid bar, and length is 15cm to 20cm.
3. it is according to claim 1 it is a kind of can be used for building displacement monitoring and settlement monitoring mark, it is characterised in that:Top Settlement monitoring bar (2) length of portion's rounding is 5cm to 10cm.
CN201621235317.4U 2016-11-18 2016-11-18 Can be used to construct displacement monitoring and settlement monitoring's sign Active CN206192362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621235317.4U CN206192362U (en) 2016-11-18 2016-11-18 Can be used to construct displacement monitoring and settlement monitoring's sign

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621235317.4U CN206192362U (en) 2016-11-18 2016-11-18 Can be used to construct displacement monitoring and settlement monitoring's sign

Publications (1)

Publication Number Publication Date
CN206192362U true CN206192362U (en) 2017-05-24

Family

ID=58726604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621235317.4U Active CN206192362U (en) 2016-11-18 2016-11-18 Can be used to construct displacement monitoring and settlement monitoring's sign

Country Status (1)

Country Link
CN (1) CN206192362U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114152240A (en) * 2021-11-16 2022-03-08 中航勘察设计研究院有限公司 Settlement observation mark structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114152240A (en) * 2021-11-16 2022-03-08 中航勘察设计研究院有限公司 Settlement observation mark structure
CN114152240B (en) * 2021-11-16 2023-08-01 中航勘察设计研究院有限公司 Sedimentation observation mark structure

Similar Documents

Publication Publication Date Title
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN101838998B (en) Prestressed anchor cable pile sliding wall along river road shoulder and construction method thereof
CN202090437U (en) Adjustable steel column socle device
CN203403438U (en) Inspection well cover with protective construction die ring
CN108331385A (en) Prefabricated rod structure and its construction method are cheated in a kind of inspection
CN204151820U (en) Stone bolt location and installation support
CN104897143A (en) Cylinder forced centering observation pillar and embedment method thereof
CN206192362U (en) Can be used to construct displacement monitoring and settlement monitoring's sign
CN105804110A (en) Construction method of foundation bolts of railway contact net and mounting bracket
CN106988339B (en) Sandy gravel stratum piping lane construction technology
CN108560369B (en) Lofting construction method for high-speed loop curved surface paving
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN205421321U (en) Precast reinforced concrete base
CN201538969U (en) Precast concrete board forming die
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN104047228B (en) The prepared hole die of bridge stone bolt
CN208183782U (en) A kind of fixed device of the foundation bolt of contact net basic
CN204059200U (en) Bridge High-pier construction verticality automatic control structure
RU110761U1 (en) ROAD SIGN
CN213742373U (en) A scale for concrete thickness, elevation and roughness control
CN204531575U (en) Cement pole Reinforcement Reinforced Concrete Structure
CN204000641U (en) A kind of large-scale pier stud concrete vertical reinforcement locating rack
CN209011589U (en) A kind of pinner anchor hole accurate positioning fixture with adjustment height conduit
CN209669702U (en) A kind of auxiliary device being accurately positioned bearing pad stone prepared screw-bolt hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 570226 Room 403, building 25, Jinshan community, 88 Haiken Road, Longhua District, Haikou City, Hainan Province

Patentee after: Hainan Ruicheng Space Engineering Technology Co.,Ltd.

Address before: 570226 Room 403, building 25, Jinshan community, 88 Haiken Road, Longhua District, Haikou City, Hainan Province

Patentee before: HAINAN TAIBO GEOGRAPHY INFORMATION TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder