CN206189287U - Box culvert is used in urgent construction of municipal works - Google Patents

Box culvert is used in urgent construction of municipal works Download PDF

Info

Publication number
CN206189287U
CN206189287U CN201621182980.2U CN201621182980U CN206189287U CN 206189287 U CN206189287 U CN 206189287U CN 201621182980 U CN201621182980 U CN 201621182980U CN 206189287 U CN206189287 U CN 206189287U
Authority
CN
China
Prior art keywords
plate
support column
side plate
connecting plate
box culvert
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621182980.2U
Other languages
Chinese (zh)
Inventor
潘祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Hua Long Construction Co Ltd
Original Assignee
Wenzhou Hua Long Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Hua Long Construction Co Ltd filed Critical Wenzhou Hua Long Construction Co Ltd
Priority to CN201621182980.2U priority Critical patent/CN206189287U/en
Application granted granted Critical
Publication of CN206189287U publication Critical patent/CN206189287U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a box culvert is used in urgent construction of municipal works, its technical scheme main points are: set up the curb plate on the bottom plate including bottom plate and symmetry, curb plate and bottom plate are articulated and can dismantle and be connected, can dismantle at the top of two blocks of curb plates is equipped with the roof, lie in on the bottom plate curb plate below inlay be equipped with can with a joint strip of curb plate butt, it has the support column to articulate on the lateral surface of curb plate, in the time of the perpendicular setting of curb plate and bottom plate, the support column is with the bottom plate butt and be in the stress, when the installation, with the support column rotate with the position of bottom plate butt, the support column is in the stress, reach a the force balance, can realize the fixed of curb plate like this, make the curb plate keep at vertical state, do not need the staff to hold up the curb plate always, the installation of realization roof that can be very convenient, in addition, in mounting, the support column is not dismantled, the support column can support the curb plate, the overall structure intensity of the compressive strength and the box culvert of curb plate has been improved.

Description

A kind of urgent construction box culvert of municipal works
Technical field
The utility model is related to box culvert technical field, more specifically, it relates to a kind of urgent construction case of municipal works Contain.
Background technology
Box culvert is the construction parts often considered in planning in municipal works, and related application, example are also obtained in terms of draining As city is flooded certain areas after heavy rain invasion and attack by rainwater, it is necessary to timely draining, but traditional drainage pattern is generally Water pumper is drawn water, and its flow is limited by water pipe volume, causes flow smaller, thus often draining not in time, traditional box culvert Volume is big, and is structure as a whole, it has not been convenient to carry, therefore, a kind of it is proposed that urgent construction box culvert of municipal works.
Therefore, notification number is promptly constructed for the utility model of CN205046490U provides a kind of municipal works and uses box culvert, Convenient dismounting, and be easily assembled, facilitate engineering staff to use.
Box culvert of the prior art, mainly including base plate, two blocks of side plates and top board, is vertically arranged, two blocks of side plates two-by-two Hinged with base plate, top board lid is located on two blocks of side plates, and top board is connected by screw with two blocks of side plates, when mounted, first Side plate is installed on base plate, then side plate is turned to perpendicular to the position of base plate, finally by the two ends of cover plate respectively with it is right The side plate answered is fixed by screws in together, but in actual installation, due to needing that side plate is maintained at perpendicular to base plate State, could realize the installation of side plate and top board, due to not having any fixing device on base plate, be acted in the elastic force of rubber strip Under, side plate can topple over laterally, accordingly, it would be desirable to staff buttresses side plate always, the installation of side plate and top board could be realized, during installation In the presence of certain inconvenience.
Utility model content
In view of the shortcomings of the prior art, the purpose of this utility model is to provide a kind of municipal works promptly construction box culvert, The installation between side plate and top board can be fixed to side plate and then facilitated during installation.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of municipal works are urgent Construction box culvert, including base plate and the side plate that is symmetricly set on base plate, side plate are hinged and are detachably connected with base plate, The top side detachable of two blocks of side plates is provided with top board, side plate lower section is located on the base plate and is embedded with first for being abutted with side plate Sealing joint strip, support column is hinged with the lateral surface of the side plate, when side plate and base plate are vertically arranged, support column and bottom Plate is abutted and in stress.
By using above-mentioned technical proposal:When mounted, first base plate is placed on the ground, then, by two on base plate Block side plate is installed, and when side plate is turned to perpendicular to the position of base plate, now rotational support post, support column is turned to and bottom The position that plate is abutted, under the driving of the first fluid sealant, side plate can only be turned out, but be provided with support column, and support column can To prevent side plate from being turned out, now side plate is in a state for stress balance, is so capable of achieving the fixation of side plate, makes side Plate is maintained at vertical state, so when mounted, avoids the need for staff and buttresses side plate always, can very easily realize top board Installation, additionally, after installing, support column is still within Support Position, support column can be supported to side plate, improve The compression strength and the overall construction intensity of box culvert of side plate, additionally, support column is arranged into what is be hinged, does not interfere with side The installation of plate and base plate, it is ensured that the simplification operated during installation.
Preferably, the first connecting plate is detachably provided with by screw on the side plate, it is removable by screw on the base plate Unload and be provided with the second connecting plate, the first connecting plate and the second connecting plate pass through gemel connection.
By using above-mentioned technical proposal:First connecting plate, the second connecting plate and hinge are set, you can realize side plate with The rotation connection of base plate, the first connecting plate and the second connecting plate can be as middle transitions, and the stress of side plate and base plate is very Uniformly, hinge and side plate, the bonding strength of base plate are enhanced, further, since the first connecting plate and the second connecting plate have been set, When keeping flat, can there is a gap between side plate and base plate, can so avoid the occurrence of the phenomenon that side plate clashes into base plate, and It is also convenient for lifting side plate.
Preferably, the support column is hinged on the first connecting plate, the shaft parallel of the support column is in the rotating shaft of hinge Set.
By using above-mentioned technical proposal:When in use, rotational support post, support column can between the first connecting plate shape In an angle, under the cooperation of the first rubber blanket, side plate cannot be rotated, spacing along with hinge, you can to realize side plate It is completely fixed, simple structure, support is convenient.
Preferably, second connecting plate is provided with fixing hole, and when side plate is perpendicular to base plate, support column insertion fixing hole It is interior.
By using above-mentioned technical proposal:Fixing hole is set on the second connecting plate, in support column insertion fixing hole, you can The fixation of support column and the second connecting plate is realized, by setting fixing hole, support column can be avoided to go out in the interference by external force Now move, the phenomenon for causing support to fail occurs, and improves box culvert reliability when mounted.
Preferably, the rotating shaft of the support column is set perpendicular to the first connecting plate, and when side plate and base plate are vertically arranged, branch Dagger is fitted perpendicular to the top surface of the second connecting plate and support column with the second connecting plate.
By using above-mentioned technical proposal:During support, the surface pivots of support column the first connecting plate of laminating, when side plate is in During plumbness, support column is abutted perpendicular to the second connecting plate and with the second connecting plate, now due to the support of support column, the One connecting plate cannot be turned out with the second connecting plate, and in the presence of the first sealing joint strip, can be pressed on for support column by side plate The surface of the second connecting plate, now side plate, in a stress balance state, is not in rotate, in stationary state.
Preferably, the end of the support column is provided with arc surface, the axis of the arc surface sets perpendicular to the first connecting plate Put.
By using above-mentioned technical proposal:Arc surface is set, and in rotational support post, arc surface can play guiding and make With, it is ensured that the state in linear contact lay when support column and the second connecting plate, the contact area of support column and the second connecting plate is reduced, The abrasion of support column is reduced, the service life of support column is improve, further, since resistance is reduced, accordingly it is also possible to very Realize the rotation of support column in labour-saving.
Preferably, parallel with the first sealing joint strip on the side plate be provided with press strip, after installing, press strip is pressed against On one sealing joint strip.
By using above-mentioned technical proposal:Press strip is set, and when side plate belongs to vertical state, press strip can compress the One sealing joint strip, can not only ensure the sealing effectiveness between side plate and base plate, and, now side plate has what is be turned out to become Gesture, can so make side plate apply a pressure on support bar, it is ensured that the support column side plate that support bar can be stablized, and carry The fixed effect of support column high.
Preferably, the side plate is provided with the second sealing joint strip that can be abutted with top board, the top board be provided with for Accommodate the holding tank of the second sealing joint strip.
By using above-mentioned technical proposal:After installing, the second sealing joint strip can realize side plate and top board it Between sealing, the first sealing joint strip and the second sealing joint strip coordinate, and can improve the overall sealing intensity of box culvert, sets and accommodates Groove, such second sealing joint strip only have one side be it is exposed outside, holding tank can to the second sealing joint strip play protection make With, extend the service life of the second sealing joint strip, additionally, holding tank can increase the contact area of side plate and top board, improve side Bonding strength between plate and base plate.
In sum, the utility model has the advantages that:
1st, by setting the structures such as support column, the first connecting plate and the second connecting plate, box culvert facilitates when mounted;
The 2nd, first sealing joint strip and the second sealing joint strip are set, it is ensured that the sealing effectiveness of box culvert.
Brief description of the drawings
Fig. 1 is the assembling schematic diagram of embodiment one;
Fig. 2 is the sectional arrangement drawing of embodiment one;
Fig. 3 is the assembling schematic diagram of embodiment two;
Fig. 4 is the second connecting plate open mode figure of embodiment two.
In figure:1st, base plate;11st, the first sealing joint strip;2nd, side plate;21st, press strip;22nd, the second sealing joint strip;3rd, the first connection Plate;4th, the second connecting plate;41st, fixing hole;5th, support bar;51st, arc surface;6th, screw;7th, top board;71st, holding tank;8th, hinge.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing 1-4.
Embodiment one:
A kind of municipal works are promptly constructed and use box culvert, reference picture 1, including base plate 1 and the side that is symmetricly set on base plate 1 Plate 2, side plate 2 is disposed in parallel relation to one another and near the two ends of base plate 1, top board is provided with parallel to base plate 1 at two pieces of tops of side plate 2 7, during installation, after base plate 1 is in place, then two blocks of side plates 2 are installed on base plate 1, after side plate 2 is installed, finally Top board 7 is installed.
Reference picture 1, the first connecting plate 3 is provided with the bottom of side plate 2, and the upper surface of base plate 1 of being fitted on base plate 1 is provided with the Two connecting plates 4, the first connecting plate 3 and the second connecting plate 4 are fixed by screw 6, can so realize that screw 6 and first connects The dismounting of the connecting plate 4 of fishplate bar 3 and second, hinge 8 is provided between the first connecting plate 3 and the second connecting plate 4, is closed by setting Page 8, you can realize that the first connecting plate 3 is connected with the rotation of the second connecting plate 4, and then the company of base plate 1 and side plate 2 can be realized Connect, screw 6 be vertically provided with top board 7, screw 6 is threadedly coupled with top board 7, screw 6 after through top board 7, It is threadedly coupled with side plate 2, realizes the fixation of side plate 2 and top board 7.
Reference picture 1 and Fig. 2, in order to improve the sealing property of box culvert, the underface positioned at side plate 2 on base plate 1 is embedded Have the first sealing joint strip 11, the length of the first sealing joint strip 11 and the equal length of side plate 2, side plate 2 parallel beneath in the One sealing joint strip 11 is provided with press strip 21, when side plate 2 is parallel to the first sealing joint strip 11, the sealing joint strip of press strip 21 and first 11 are abutted, and the second sealing joint strip 22 is provided with the top of side plate 2, and the second sealing joint strip 22 is set along the length direction of side plate 2, The bottom surface of top board 7 is provided with holding tank 71, holding tank 71 and the second sealing joint strip 22 coordinate, during installation, the second sealing joint strip 22 are located inside holding tank 71.
Reference picture 1 and Fig. 2, rotate on the first connecting plate 3 and are provided with support bar 5, and the shaft parallel of support bar 5 is in hinge 8 rotating shaft is set, i.e., support bar 5 is rotated up in the side of vertical first connecting plate 3, when side plate 2 turns to vertical position When putting, now, abutted with the second connecting plate 4 from support bar 5, support bar 5 is in stress, and support bar 5 is in the first fluid sealant In the presence of bar 11, the surface of the second connecting plate 4 is pressed in, in order to avoid support bar 5 is slided on the second connecting plate 4, Second connecting plate 4 is provided with fixing hole 41, and support bar 5 may be inserted into fixing hole 41.
Installation process, installs hinge 8 first between the first connecting plate 3 and the second connecting plate 4, after installing, The second connecting plate 4 is fixed with screw 6 on base plate 1, the first connecting plate 3 is fixed in the bottom screw 6 of side plate 2, can now completed Side plate 2 and the installation of base plate 1, then, support bar 5 are inserted in fixing hole 41, and now side plate 2 is positively retained at vertical state, Then, then by top board 7 it is installed to the top of side plate 2, you can realize the installation of box culvert, unloading process is similar with installation process, tearing open When unloading, the hinge 8 on the first connecting plate 3 and the second connecting plate 4 can be without dismounting, so convenient assembling next time.
Embodiment two:
A kind of municipal works are promptly constructed and use box culvert, reference picture 3 and Fig. 4, and the difference with embodiment one is, this In embodiment, the rotating shaft of support bar 5 is set perpendicular to the first connecting plate 3, and first connecting plate 3 that can fit of support bar 5 is rotated, when Support bar 5 is turned to after the position of the second connecting plate 4, and the top of support bar 5 abuts with the second connecting plate 4, this When support bar 5 can limitation side plate 2 rotate, rotary supporting rod 5, are provided with arc surface 51 on the top surface of support bar 5 for convenience, The axis of arc surface 51 is set perpendicular to the first connecting plate 3.
The above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.Should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (8)

1. a kind of municipal works are promptly constructed and use box culvert, including base plate (1) and the side plate (2) that is symmetricly set on base plate (1), Side plate (2) is hinged and is detachably connected with base plate (1), and top board (7) is provided with the top side detachable of two pieces of side plates (2), described Side plate (2) lower section is located on base plate (1) and is embedded with the first sealing joint strip (11) that can be abutted with side plate (2), it is characterised in that: Support column is hinged with the lateral surface of the side plate (2), when side plate (2) and base plate (1) are vertically arranged, support column and bottom Plate (1) is abutted and in stress.
2. municipal works according to claim 1 are promptly constructed and use box culvert, it is characterised in that:Pass through on the side plate (2) Screw (6) is detachably provided with the first connecting plate (3), and detachably the second connecting plate is provided with by screw (6) on the base plate (1) (4), the first connecting plate (3) is connected with the second connecting plate (4) by hinge (8).
3. municipal works according to claim 2 are promptly constructed and use box culvert, it is characterised in that:The support column is hinged on On one connecting plate (3), the shaft parallel of the support column is set in the rotating shaft of hinge (8).
4. municipal works according to claim 3 are promptly constructed and use box culvert, it is characterised in that:Second connecting plate (4) Fixing hole (41) is provided with, when side plate (2) is perpendicular to base plate (1), support column is inserted in fixing hole (41).
5. municipal works according to claim 2 are promptly constructed and use box culvert, it is characterised in that:The rotating shaft of the support column is hung down Straight to be set in the first connecting plate (3), when side plate (2) and base plate (1) are vertically arranged, support column is perpendicular to the second connecting plate (4) And the top surface of support column is fitted with the second connecting plate (4).
6. municipal works according to claim 5 are promptly constructed and use box culvert, it is characterised in that:The end of the support column sets The axis for having arc surface (51), the arc surface (51) is set perpendicular to the first connecting plate (3).
7. municipal works according to claim 1 are promptly constructed and use box culvert, it is characterised in that:With on the side plate (2) One sealing joint strip (11) is parallel to be provided with press strip (21), and after installing, press strip (21) is pressed against on the first sealing joint strip (11).
8. municipal works according to claim 7 are promptly constructed and use box culvert, it is characterised in that:The side plate (2) is provided with The second sealing joint strip (22) that can be abutted with top board (7), the top board (7) is provided with for accommodating the second sealing joint strip (22) Holding tank (71).
CN201621182980.2U 2016-11-03 2016-11-03 Box culvert is used in urgent construction of municipal works Expired - Fee Related CN206189287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621182980.2U CN206189287U (en) 2016-11-03 2016-11-03 Box culvert is used in urgent construction of municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621182980.2U CN206189287U (en) 2016-11-03 2016-11-03 Box culvert is used in urgent construction of municipal works

Publications (1)

Publication Number Publication Date
CN206189287U true CN206189287U (en) 2017-05-24

Family

ID=58733583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621182980.2U Expired - Fee Related CN206189287U (en) 2016-11-03 2016-11-03 Box culvert is used in urgent construction of municipal works

Country Status (1)

Country Link
CN (1) CN206189287U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018178668A (en) * 2017-04-21 2018-11-15 佐々木 洋二 Overturning preventing device of concrete secondary product and construction method of concrete secondary product
CN110187240A (en) * 2019-06-21 2019-08-30 郑波 A kind of distribution low-voltage distribution network operation data acquisition system and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018178668A (en) * 2017-04-21 2018-11-15 佐々木 洋二 Overturning preventing device of concrete secondary product and construction method of concrete secondary product
CN110187240A (en) * 2019-06-21 2019-08-30 郑波 A kind of distribution low-voltage distribution network operation data acquisition system and its application method

Similar Documents

Publication Publication Date Title
CN206189287U (en) Box culvert is used in urgent construction of municipal works
CN102367735A (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN204163203U (en) For waterproof construction and the box-body movable house thereof of mobile house
CN206711520U (en) A kind of new waterproof surface welded LED display screen module
CN202370544U (en) Installation equipment for back-stick type waterstop for tunnel construction joint
CN203339639U (en) Lightning arrester preventing water seepage and leakage of steel plate tile roof
CN214659291U (en) Glass steel rail convenient to installation
CN208518220U (en) A kind of colored steel roof water-tight device
CN203213366U (en) Prefabricated house roof
CN208347823U (en) A kind of prefabricated subway dispersing platform bracket
CN205712596U (en) A kind of underground detachable barrier wall structure of nuclear power conventional island Factory Building
CN207794622U (en) The guiding device poured for ground gap
CN211228692U (en) Municipal works water supply energy-saving protection device
CN205754135U (en) A kind of support for photovoltaic module Fast Installation
CN205705867U (en) A kind of ideology and politics blackboard for teaching
CN215928627U (en) Reinforcing device for structural engineering
CN202202253U (en) Water seepage treatment structure of bridge expansion joint
CN203320830U (en) Cross beam of energy-saving daylighting roof
CN204753924U (en) Adopt sealed unitized curtain wall system of dry process
CN217630913U (en) Roofing seam plugging device
CN108988250A (en) A kind of foldable antidetonation gantry
CN207251046U (en) A kind of power engineering box-type substation of good waterproof performance
CN208777423U (en) A kind of constructing device of anti-water Double-layer floor drain
CN205046490U (en) Box culvert is used in urgent construction of municipal works
CN220908735U (en) Anti-leakage structure for deformation joint of building floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20201103