CN206181952U - Quick installation thermal -insulation shed support - Google Patents

Quick installation thermal -insulation shed support Download PDF

Info

Publication number
CN206181952U
CN206181952U CN201621233015.3U CN201621233015U CN206181952U CN 206181952 U CN206181952 U CN 206181952U CN 201621233015 U CN201621233015 U CN 201621233015U CN 206181952 U CN206181952 U CN 206181952U
Authority
CN
China
Prior art keywords
back timber
column
pull bar
screw
insulating support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621233015.3U
Other languages
Chinese (zh)
Inventor
陈�全
吴鹏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan K-Better Photovoltaic Power Generation Co Ltd
Original Assignee
Hunan K-Better Photovoltaic Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan K-Better Photovoltaic Power Generation Co Ltd filed Critical Hunan K-Better Photovoltaic Power Generation Co Ltd
Priority to CN201621233015.3U priority Critical patent/CN206181952U/en
Application granted granted Critical
Publication of CN206181952U publication Critical patent/CN206181952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Greenhouses (AREA)

Abstract

The utility model discloses a quick installation thermal -insulation shed support, but including extending structure, cylinder lug, card strip, screw rod, back timber, top dead lever, stand, pull rod, pull rod fixing device, spacing piece, screw sleeve, swing handle, screw thread, spud pile, centrum, first fixed slot, long handle bolt, top dead lever connecting device and second fixed slot, the utility model discloses accelerated the connection speed between each parts, crucial position passes through the screw sleeve connection simultaneously, can guarantee the whole good stability of big -arch shelter support when guaranteeing the high -speed joint again, but also the effectual spoilage that has reduced when the big -arch shelter is removed, direct connect stand and back timber through the sleeve, not only accelerate the speed of setting up of back timber greatly, lightened the big -arch shelter support in self weight, can guarantee that the big -arch shelter is whole simultaneously again and have very strong stability, separately set up stand and spud pile, not only can accelerate the fixing speed that buries underground of spud pile, can guarantee the big -arch shelter simultaneously again and remove shi buhui damage stand.

Description

It is a kind of that roof insulating support is quickly installed
Technical field
The utility model is related to a kind of roof insulating support, specially a kind of quickly to install roof insulating support, belongs to agricultural Plantation applied technical field.
Background technology
Greenhouse gardening is used widely in modern agriculture plantation, and it to planting environment significant advantage is that can carry out Regulation and control, can greatly reduce the influence of weather and bad weather to crops, improve the yield of crops, break weather to agriculture The limitation of crop, realizes the food or melon and fruit that can be had want to eat throughout the year, improves the food supply of people, therefore greatly Canopy plantation has great significance to modern agriculture.
Connect general by colligation connection or welding between traditional greenhouse bracket, such greenhouse bracket installs speed Degree is relatively slow, and stability is bad;It is so more numb when embedded and traditional greenhouse column and spud pile are an entirety It is tired of, and is easily caused the damage of column, the recovery utilization rate of column is relatively low when greenhouse bracket is removed;Traditional greenhouse bracket top End is set up and is more bothered, and speed is slower, and stability is nor very good;Traditional greenhouse frame is more fixed, it is difficult to real The extension in existing greenhouse later stage, but growing up with crops, the growing space in greenhouse will be less and less, agriculture in influence greenhouse The growth of crop.Therefore, a kind of quickly installation roof insulating support is proposed regarding to the issue above.
The content of the invention
The purpose of this utility model is that and provide a kind of quickly installation roof insulating support in order to solve the above problems.
The utility model is achieved through the following technical solutions above-mentioned purpose, a kind of quickly to install roof insulating support, bag Include back timber, column and spud pile;Connected by screw shell between the back timber and the column, and screw shell bearing Screw thread is equipped with top and column;The back timber and the column are provided with welded limiting piece at the screw thread;The screw shell Be connected through the hinge swing handle;The column connects the spud pile away from the back timber end, and spud pile bottom is provided with centrum;Institute State cylinder lever connecting rod between column;The stud sides wall welding rod fixing device, and pull bar fixing device is provided with the first fixation Groove;The pull bar fixing device side sets long handle bolt, and pull bar fixation device side wall described in long handle bolt-through;The top The distribution top fix bar of parallel equidistant between beam, and top fix bar by top fix rod connecting device be connected with back timber; The top is fixed in rod connecting device and is provided with the second fixing groove, and the top fix bar engages with the second fixing groove.
Preferably, the back timber is a kind of steel pipe back timber of circular arc, and back timber fixes rod connecting device welding with top It is fixed.
Preferably, connected by screw shell between the column and spud pile, and screw shell junction is provided with spacing Piece and screw thread.
Preferably, the top fix bar and pull bar are vertical with back timber.
Preferably, the top fix bar and pull bar two ends are L-shaped, and pull bar two ends are fastened in the first fixing groove.
Preferably, the middle part of the fix bar and pull bar is equipped with Collapsible structure, and Collapsible structure uniformly Cylinder projection is provided with, while cylinder projection is fastened on inside card article, and card article is fixed by screw rod.
The beneficial effects of the utility model are:Each part of the utility model passes through to be connected together and be threadedly coupled, significantly The connection speed between each part is accelerated, while key position is connected by screw shell, it is ensured that while quick connection again The integrally good stability of greenhouse bracket is can guarantee that, but also effectively reduces spoilage when greenhouse is removed, improve big The recovery utilization rate of canopy support;Column and back timber are attached by sleeve directly, the erection of back timber is not only greatly accelerated Speed, alleviates greenhouse bracket in own wt, while can guarantee that greenhouse integrally has very strong stability again, by column with it is solid Determine stake separately to set up, can not only accelerate the embedded fixed speed of spud pile, while will not damage vertical when can guarantee that greenhouse is removed again Post;Greenhouse top fix bar and pull bar flexible, the scope of application are more extensive, and are conducive to the secondary enlarging of roof insulating;Tool There is good economic benefit and social benefit, be adapted to promote the use of.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model pillar construction schematic diagram;
Fig. 3 is the utility model pull bar fixture structure schematic diagram;
Fig. 4 is that rod connecting device structural representation is fixed on the utility model top;
Fig. 5 is the utility model Collapsible structure schematic diagram;
Fig. 6 is the utility model cylinder projection mounting structure schematic diagram.
In figure:A, Collapsible structure, A1, cylinder projection, A2, card article, A3, screw rod, 1, back timber, 2, top fix bar, 3, Column, 4, pull bar, 5, pull bar fixing device, 6, banking stop, 7, screw shell, 8, swing handle, 9, screw thread, 10, spud pile, 11, vertebra Body, the 12, first fixing groove, 13, long handle bolt, 14, top fix rod connecting device, the 15, second fixing groove.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Refer to shown in Fig. 1-6, it is a kind of that roof insulating support, including back timber 1, column 3 and spud pile 10 are quickly installed;Institute State and connected by screw shell 7 between back timber 1 and the column 3, and be all provided with the back timber 1 and column 3 of the bearing of screw shell 7 There is screw thread 9;The back timber 1 and the column 3 are provided with welded limiting piece 6 at the screw thread 9, it is easier to find out the screw shell Whether 7 connect in place;The screw shell 7 is connected through the hinge swing handle 8, it is ensured that swing handle 8 can be folded;The column 3 is away from institute State the end of back timber 1 and connect the spud pile 10, and the bottom of spud pile 10 is provided with centrum 11;Cylinder lever connecting rod 4 between the column 3;Institute The sidewall weld pull bar fixing device 5 of column 3 is stated, and pull bar fixing device 5 is provided with the first fixing groove 12;The pull bar fixes dress Put 5 sides and long handle bolt 13 is set, and long handle bolt 13 runs through the side wall of the pull bar fixing device 5;It is parallel between the back timber 1 Equidistant distribution top fix bar 2, and top fix bar 2 by top fix rod connecting device 14 be connected with back timber 1;The top The second fixing groove 15 is provided with the fixed rod connecting device 14 in end, and the top fix bar 2 engages with the second fixing groove 15.
Used as a kind of technical optimization scheme of the present utility model, the back timber 1 is a kind of steel pipe back timber 1 of circular arc, and Back timber 1 is fixed rod connecting device 14 and is welded and fixed with top, it is ensured that fixed rod connecting device 14 will not fall off.
As a kind of technical optimization scheme of the present utility model, screw shell 7 is passed through between the column 3 and spud pile 10 Connection, and the junction of screw shell 7 is provided with banking stop 6 and screw thread 9, screw shell 7 is connected and not only fastened, and quickly.
Used as a kind of technical optimization scheme of the present utility model, the top fix bar 2 and pull bar 4 are vertical with back timber 1, Ensure that whole support is relatively stable.
Used as a kind of technical optimization scheme of the present utility model, the top fix bar 2 and the two ends of pull bar 4 are L-shaped, and The two ends of pull bar 4 are fastened in the first fixing groove 12, it is ensured that pull bar 4 can be stablized to be fixed.
Used as a kind of technical optimization scheme of the present utility model, the middle part of the fix bar 2 and pull bar 4 is equipped with can Cylinder projection A1 is uniformly provided with stretching structure A, and Collapsible structure A, while cylinder projection A1 is fastened on inside card article A2, and Card article A2 is fixed by screw rod A3, effectively roof insulating support can be stretched, extended volume.
The utility model nuzzle or beat when in use, first by the centrum 11 of the bottom of spud pile 10 ensure into soil compared with For firm, then column 3 is connected by screw shell 7 with spud pile 10, when screw shell 7 is used, by swing handle 8 first by screw thread Sleeve 7 is connected with spud pile 10, and screw shell 7 is rotated to the top of spud pile 10 flushes, and then again vertically puts column 3 Put on the top of screw shell 7, at rotation screw shell 7 to banking stop 6;After fixing column 3, then by screw shell 7 Back timber 1 is fixed on the top of column 3, in the first fixing groove 12 that then two ends of pull bar 4 are fastened in pull bar fixing device 5, Long handle bolt 13 is finally tightened, after connecting pull bar 4, the two ends of top fix bar 2 is fastened on top and is fixed rod connecting device 14 On the second fixing groove 15 in.
The middle part of wherein fix bar 2 and pull bar 4 is equipped with Collapsible structure A, and Collapsible structure A is by some etc. Away from pole be bolted, it is foldable or elongate so as to realize the change of fix bar 2 and the length of pull bar 4, in scalable knot After the distance of structure A is adjusted, card article A2 is engaged on cylindrical bump A1, then by screw rod A3 fixing strip A2, therefore just The stability of Collapsible structure A can be ensured, keep its flexible distance constant.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can in other specific forms realize that this practicality is new Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each implementation method is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Specification an as entirety, the technical scheme in each embodiment can also be formed into those skilled in the art through appropriately combined May be appreciated other embodiment.

Claims (6)

1. it is a kind of that roof insulating support, including back timber are quickly installed(1), column(3)And spud pile(10), it is characterised in that:Institute State back timber(1)With the column(3)Between pass through screw shell(7)Connection, and screw shell(7)The back timber of bearing(1)With Column(3)On be equipped with screw thread(9);The back timber(1)With the column(3)It is provided with the screw thread(9)Place's welded limiting piece (6);The screw shell(7)Be connected through the hinge swing handle(8);The column(3)Away from the back timber(1)End connection is described solid Determine stake(10), and spud pile(10)Bottom is provided with centrum(11);The column(3)Between cylinder lever connecting rod(4);The column(3) Sidewall weld pull bar fixing device(5), and pull bar fixing device(5)It is provided with the first fixing groove(12);The pull bar fixes dress Put(5)Side sets long handle bolt(13), and long handle bolt(13)Through the pull bar fixing device(5)Side wall;The back timber (1)Between parallel equidistant distribution top fix bar(2), and top fix bar(2)Rod connecting device is fixed by top(14) With back timber(1)Connection;Rod connecting device is fixed on the top(14)Inside it is provided with the second fixing groove(15), and the top fix bar (2)With the second fixing groove(15)Engaging.
2. one kind according to claim 1 quickly installs roof insulating support, it is characterised in that:The back timber(1)It is one Plant the steel pipe back timber of circular arc(1), and back timber(1)Rod connecting device is fixed with top(14)It is welded and fixed.
3. one kind according to claim 1 quickly installs roof insulating support, it is characterised in that:The column(3)With it is solid Determine stake(10)Between pass through screw shell(7)Connection, and screw shell(7)Junction is provided with banking stop(6)And screw thread(9).
4. one kind according to claim 1 quickly installs roof insulating support, it is characterised in that:The top fix bar (2)And pull bar(4)And back timber(1)Vertically.
5. one kind according to claim 1 quickly installs roof insulating support, it is characterised in that:The top fix bar (2)And pull bar(4)Two ends are L-shaped, and pull bar(4)Two ends are fastened on the first fixing groove(12)It is interior.
6. one kind according to claim 1 quickly installs roof insulating support, it is characterised in that:The fix bar(2)With Pull bar(4)Middle part be equipped with Collapsible structure(A), and Collapsible structure(A)On be uniformly provided with cylinder projection(A1), together Shi Yuanzhu projections(A1)It is fastened on card article(A2)Inside, and card article(A2)By screw rod(A3)It is fixed.
CN201621233015.3U 2016-11-17 2016-11-17 Quick installation thermal -insulation shed support Active CN206181952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621233015.3U CN206181952U (en) 2016-11-17 2016-11-17 Quick installation thermal -insulation shed support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621233015.3U CN206181952U (en) 2016-11-17 2016-11-17 Quick installation thermal -insulation shed support

Publications (1)

Publication Number Publication Date
CN206181952U true CN206181952U (en) 2017-05-24

Family

ID=58726641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621233015.3U Active CN206181952U (en) 2016-11-17 2016-11-17 Quick installation thermal -insulation shed support

Country Status (1)

Country Link
CN (1) CN206181952U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108811954A (en) * 2018-06-08 2018-11-16 山东省众江农业科技有限公司 A kind of plastic greenhouse skeleton fixed convenient for quick assembling
CN112523342A (en) * 2020-12-24 2021-03-19 中建五局华东建设有限公司 Steel structure corridor with good wind resistance and construction method thereof
CN113875468A (en) * 2021-11-22 2022-01-04 浙江德利遮阳材料有限公司 Construction method of double-layer sunshade net arched shed for crop planting
CN115462267A (en) * 2021-10-01 2022-12-13 周广金 Adjustable guardrail for plant protection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108811954A (en) * 2018-06-08 2018-11-16 山东省众江农业科技有限公司 A kind of plastic greenhouse skeleton fixed convenient for quick assembling
CN112523342A (en) * 2020-12-24 2021-03-19 中建五局华东建设有限公司 Steel structure corridor with good wind resistance and construction method thereof
CN115462267A (en) * 2021-10-01 2022-12-13 周广金 Adjustable guardrail for plant protection
CN113875468A (en) * 2021-11-22 2022-01-04 浙江德利遮阳材料有限公司 Construction method of double-layer sunshade net arched shed for crop planting

Similar Documents

Publication Publication Date Title
CN206181952U (en) Quick installation thermal -insulation shed support
CN207167262U (en) A kind of gardens transplanting tree fixing device
CN206506973U (en) A kind of New Forestry tree erecting device
CN210470564U (en) Irrigation equipment is planted to kiwi fruit
CN203467336U (en) Device for fixing tree and support bars
CN206237966U (en) A kind of apple tree support frame
CN107743821A (en) A kind of multi-functional Kiwi berry plantation climbing support
CN204653206U (en) A kind of Novel tree supporting frame
CN109105222B (en) Green irrigation equipment for environmental protection engineering
CN205648566U (en) A watering device for afforestation
CN208597439U (en) Pear tree composite frame
CN207526231U (en) Protective fence is blocked with flowers in a kind of gardens
CN206005389U (en) A kind of portable nursery stock supporting device
CN206698936U (en) A kind of plant rain cover
CN209089558U (en) A kind of forestry plantation is with helping tree device
CN208739718U (en) A kind of greenhouse frame
CN204031958U (en) A kind of tree fixer
CN207269463U (en) A kind of agricultural greenhouse arch tube attachment device
CN205623562U (en) Gardens tree support frame
CN204994351U (en) Vine cane plant plants frame
CN110583356A (en) Structure and planting method suitable for planting large trees
CN208624243U (en) A kind of orchard cultivation bracket
CN103782866A (en) Branch fastening device
CN110140566A (en) A kind of disengaging type direct transfers gasoline laminating machine
CN107318582A (en) A kind of windproof processing system of seedling growth

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Quick installation thermal -insulation shed support

Effective date of registration: 20200401

Granted publication date: 20170524

Pledgee: Hunan Jinxin Financing Guarantee Co., Ltd.

Pledgor: HUNAN KEBITE PHOTOVOLTAIC GENERATING Co.,Ltd.

Registration number: Y2020980001244

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210104

Granted publication date: 20170524

Pledgee: Hunan Jinxin Financing Guarantee Co.,Ltd.

Pledgor: HUNAN KEBITE PHOTOVOLTAIC GENERATING Co.,Ltd.

Registration number: Y2020980001244

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A fast installation of heat insulation shed bracket

Effective date of registration: 20210429

Granted publication date: 20170524

Pledgee: Hunan Jinxin Financing Guarantee Co.,Ltd.

Pledgor: HUNAN KEBITE PHOTOVOLTAIC GENERATING Co.,Ltd.

Registration number: Y2021980003168

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220106

Granted publication date: 20170524

Pledgee: Hunan Jinxin Financing Guarantee Co.,Ltd.

Pledgor: HUNAN KEBITE PHOTOVOLTAIC GENERATING CO.,LTD.

Registration number: Y2021980003168