CN206179295U - Exploratory trench engineering situation teaching device in school - Google Patents

Exploratory trench engineering situation teaching device in school Download PDF

Info

Publication number
CN206179295U
CN206179295U CN201621120969.3U CN201621120969U CN206179295U CN 206179295 U CN206179295 U CN 206179295U CN 201621120969 U CN201621120969 U CN 201621120969U CN 206179295 U CN206179295 U CN 206179295U
Authority
CN
China
Prior art keywords
exploratory trench
school
exploratory
trench
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621120969.3U
Other languages
Chinese (zh)
Inventor
郑平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Engineering Polytechnic
Original Assignee
Hunan Engineering Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Engineering Polytechnic filed Critical Hunan Engineering Polytechnic
Priority to CN201621120969.3U priority Critical patent/CN206179295U/en
Application granted granted Critical
Publication of CN206179295U publication Critical patent/CN206179295U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an exploratory trench engineering situation teaching device in school is equipped with on platform (1) exploratory trench (6) of downward concave yield, the one end of platform (1) be equipped with the connection platform (1) the outside with entry ladder (2) of exploratory trench (6), the bottom of exploratory trench (6) be equipped with the tank bottom and spread layer (3), the lateral wall of exploratory trench (6) be equipped with cell wall characteristic show area (4), the keeping away from of exploratory trench (6) the one end of entry ladder (2) for ledge show end (5). The utility model discloses possessed exploratory trench engineering situation teaching function, the micro of having realized the mineral deposit type appears and simulate the true environment and carry out lifelike demonstration teaching, easy access, and the teaching process is lively, the the teaching efficiency height.

Description

A kind of exploratory trench engineering the situation teaching device in the school
Technical field
This utility model is related to a kind of instructional device, more particularly, to a kind of exploratory trench engineering the situation teaching device in the school.
Background technology
Culture geologic survey and geologic survey, two Major Core Competences of mineral exploration of search for mineral deposit Major, need The situation teaching demand such as to edit and record with reference to measurement, ground, the underground engineering survey of hydrogeology specialty, underground engineering, but, it is existing Some schools do not build exploration engineering the situation teaching area in the school, it is impossible to carry out " classroom building site " teaching using the situation teaching area Reform, it is impossible to realize and improve Practice Teaching System, is only limited to classroom books teaching, lacks exploratory trench engineering the situation teaching device, True environment cannot be simulated carries out teaching demonstration, and teaching process is uninteresting.At present, traditional Engineering Teaching of exploratory trench in the school is arranged to be present Lack exploratory trench engineering the situation teaching device, it is impossible to which simulating true environment carries out teaching demonstration, the uninteresting problem of teaching process.
Utility model content
Technical problem to be solved in the utility model is to provide one kind can simulate true environment carries out teaching demonstration and religion The interesting engineering the situation teaching device of exploratory trench in the school of process.
In order to solve above-mentioned technical problem, the engineering the situation teaching device of exploratory trench in the school that this utility model is provided, on platform Exploratory trench recessed down is provided with, one end of described platform is provided with the outside of the described platform of connection and the entrance of described exploratory trench Ladder, the bottom of described exploratory trench are provided with bottom land laying, and the side wall of described exploratory trench is provided with cell wall characterization area, described spy One end away from described entrance ladder of groove is that ledge shows end.
Described cell wall characterization area is provided with mantle rock, country rock packed layer, fracture stimulation floor and ore body observation layer.
Described mantle rock is arranged on the top in described cell wall characterization area, described country rock packed layer, fracture mould Intend the bottom that floor and ore body observation layer are arranged on described cell wall characterization area, described fracture stimulation layer, ore body observation layer It is arranged between described country rock packed layer.
Further, described entrance ladder be specifically built into using Rhizoma Begoniae Willsonii it is stepped, arrange inside and outside two sides ladder, be modeled to by The sense of reality that earth's surface is excavated downwards, also allows for entering and exiting exploratory trench.
Further, described bottom land laying is spent to the side of described entrance ladder using the artificial gradient 3 to 5 and is inclined, and adopts It is arranged to country rock, fracture, Geological Characteristics of Orebody laying with cement, finish paint wearability material.
Using the engineering the situation teaching device of exploratory trench in the school of above-mentioned technical proposal, inlet porting ladder possesses exploratory trench and goes out Enter device, improve the convenience of discrepancy;Bottom land laying is set, simulation quality and fastness is improve;Cell wall characterization is set Area, realizing simulation true environment carries out teaching demonstration, improves teaching process vividly interesting.Exploratory trench engineering situation religion in the school Learn device and possess exploratory trench engineering the situation teaching, realizing the micro presentation of deposit type and simulating true environment carries out true to nature drilling Teaching, easy access, teaching process are lively, and teaching efficiency is high.
In sum, this utility model is that a kind of true environment of simulating carries out the interesting school of teaching demonstration and teaching process Interior exploratory trench engineering the situation teaching device.
Description of the drawings
Fig. 1 is elevation of the present utility model.
Fig. 2 is top view of the present utility model.
Fig. 3 is the line A-A cut-away view along Fig. 2.
In figure:1- terrace at entrances;2- entrance ladders;3- bottom land layings;4- cell wall characterizations area;41- mantle rocks;42- Country rock packed layer;43- fracture stimulation layers;44- ore body observation layers;5- ledges show end;6- exploratory trenches.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, with reference to embodiments, to this Utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain this practicality It is new, it is not used to limit this utility model.
Below in conjunction with the accompanying drawings and specific embodiment is further described to application principle of the present utility model.
As shown in Figure 1, Figure 2 and Figure 3, platform 1 is provided with exploratory trench 6 recessed down, and one end of platform 1 is provided with connecting platform 1 outside and the entrance ladder 2 of exploratory trench 6, the bottom of exploratory trench 6 are provided with bottom land laying 3, and the side wall of exploratory trench 6 is provided with cell wall characteristic exhibition Show area 4, one end away from entrance ladder 2 of exploratory trench 6 is that ledge shows end.
Specifically, cell wall characterization area 4 is provided with mantle rock 41, country rock packed layer 42, fracture stimulation floor 43 and ore body Observation layer 44.
Specifically, mantle rock 41 is arranged on the top in cell wall characterization area 4, country rock packed layer 42, fracture stimulation layer 43 The bottom in cell wall characterization area 4 is arranged on ore body observation layer 44, fracture stimulation layer 43, ore body observation layer 44 are arranged on country rock Between packed layer 42.
Further, entrance ladder 2 is specifically built into stepped, the inside and outside two sides ladder of setting using Rhizoma Begoniae Willsonii, is modeled to by earth's surface The sense of reality excavated downwards, also allows for entering and exiting exploratory trench 6.
Further, bottom land laying 3 is spent to the side of entrance ladder 2 using the artificial gradient 3 to 5 and is inclined, using cement, finish paint Wearability material is arranged to country rock, fracture, Geological Characteristics of Orebody laying.
Referring to Fig. 1, Fig. 2 and Fig. 3, use principle of the present utility model is:
During work, by the entrance ladder 2 on platform 1 is in exploratory trench 6 or standing is viewed and emulated on the platform 1, using entrance Ladder 2 is walked to platform 1 and bottom land laying 3, the discrepancy function of possessing exploratory trench 6, improves the convenience of discrepancy, by bottom land Laying 3 and cell wall characterization area 4 carry out various geological phenomenon researchs, carry out the observation of waste by mantle rock 41, utilize Country rock packed layer 42 carries out different kinds of rocks contrast and identification, carries out tomography geometric element measurement using fracture stimulation layer 43, utilizes Ore body observation layer 44 carries out ore mineral identification and orebody shape measurement, shows that end 5 carries out rock mass occurrence observation using ledge, real Having showed simulation true environment carries out teaching demonstration, improves teaching process vividly interesting.
Preferred embodiment of the present utility model is the foregoing is only, it is not to limit this utility model, all at this Any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in this utility model Protection domain within.

Claims (5)

1. one kind exploratory trench engineering the situation teaching device in the school, is characterized in that:Platform (1) is provided with exploratory trench (6) recessed down, institute The one end for the platform (1) stated is provided with the outside of the described platform (1) of connection and the entrance ladder (2) of described exploratory trench (6), described The bottom of exploratory trench (6) be provided with bottom land laying (3), the side wall of described exploratory trench (6) is provided with cell wall characterization area (4), described Exploratory trench (6) the one end away from described entrance ladder (2) be ledge show end (5).
2. the engineering of exploratory trench in the school the situation teaching device according to claim 1, is characterized in that:Described cell wall characterization Area (4) is provided with mantle rock (41), country rock packed layer (42), fracture stimulation floor (43) and ore body observation layer (44).
3. the engineering of exploratory trench in the school the situation teaching device according to claim 2, is characterized in that:Described mantle rock (41) sets Put the top in described cell wall characterization area (4), described country rock packed layer (42), fracture stimulation layer (43) and ore body are seen Survey the bottom that floor (44) is arranged on described cell wall characterization area (4), described fracture stimulation layer (43), ore body observation layer (44) it is arranged between described country rock packed layer (42).
4. the engineering of exploratory trench in the school the situation teaching device according to claim 1 and 2, is characterized in that:Described entrance ladder (2) stepped, two sides ladder inside and outside setting is built into using Rhizoma Begoniae Willsonii.
5. the engineering of exploratory trench in the school the situation teaching device according to claim 1 and 2, is characterized in that:Described bottom land laying (3) spent to the side of described entrance ladder (2) using the artificial gradient 3 to 5 and inclined, set using cement, finish paint wearability material It is set to country rock, fracture, Geological Characteristics of Orebody laying.
CN201621120969.3U 2016-10-13 2016-10-13 Exploratory trench engineering situation teaching device in school Expired - Fee Related CN206179295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621120969.3U CN206179295U (en) 2016-10-13 2016-10-13 Exploratory trench engineering situation teaching device in school

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621120969.3U CN206179295U (en) 2016-10-13 2016-10-13 Exploratory trench engineering situation teaching device in school

Publications (1)

Publication Number Publication Date
CN206179295U true CN206179295U (en) 2017-05-17

Family

ID=58677623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621120969.3U Expired - Fee Related CN206179295U (en) 2016-10-13 2016-10-13 Exploratory trench engineering situation teaching device in school

Country Status (1)

Country Link
CN (1) CN206179295U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108961894A (en) * 2018-05-14 2018-12-07 河海大学 It is a kind of to simulate the experimental simulation device of sediment contamination release and its application under lock under gate unlocking condition
CN110379281A (en) * 2019-07-23 2019-10-25 甘肃工业职业技术学院 A kind of teaching emulation prospect tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108961894A (en) * 2018-05-14 2018-12-07 河海大学 It is a kind of to simulate the experimental simulation device of sediment contamination release and its application under lock under gate unlocking condition
CN108961894B (en) * 2018-05-14 2021-01-05 河海大学 Experimental simulation device for simulating release of sludge pollutants at lower bottom of gate under gate opening condition and application of experimental simulation device
CN110379281A (en) * 2019-07-23 2019-10-25 甘肃工业职业技术学院 A kind of teaching emulation prospect tunnel
CN110379281B (en) * 2019-07-23 2021-06-01 甘肃工业职业技术学院 Simulation mining tunnel for teaching

Similar Documents

Publication Publication Date Title
Argote-Espino et al. 3D electrical prospection in the archaeological site of El Pahñú, Hidalgo State, Central Mexico
Riis et al. CO2 Storage Atlas of the Norwegian Continental Shelf: Methods Used to Evaluate Capacity and Maturity of the CO2 Storage Potential.
CN206179295U (en) Exploratory trench engineering situation teaching device in school
Millaire et al. Ancient urban morphology in the Virú Valley, Peru: Remote sensing work at the Gallinazo Group (100 BC–AD 700)
CN105844708B (en) A kind of reservoir three-dimensional geological modeling method
CN105137035B (en) Sand body-plane of unconformity-fault transfer system control oil migration experimental provision and experimental technique
Grant et al. Degradation of Victoria crater, Mars
CN111859687B (en) Mixed geological modeling method and system for depicting geological structure of uranium-bearing sand layer
Privett The lines of evidence approach to challenges faced in engineering geological practice
Krahenbuhl et al. Developing a large underground geophysical education laboratory at Colorado School of Mines
CN206115827U (en) Subsurface investigation simulation experiment platform
CN106781959B (en) A kind of exploratory trench engineering the situation teaching area implementation method in the school
Coşkun et al. Preliminary investigation of underground settlements of Nevşehir Castle region using 2.5-D electrical resistivity tomography: Cappadocia, Turkey
CN106093341A (en) The experimental provision of the surface drilling sliding deformation disrumpent feelings rule of inverting overlying strata and method
Prothro et al. Yucca flat Community Geologic Framework Model and associated velocity model
CN206340255U (en) A kind of shallow well the situation teaching device in the school
Junlan Practice and Teaching Reform of Engineering Geology for Urban Underground Space Engineering1
CN106781960B (en) A kind of shallow well the situation teaching area implementation method in the school
CINAR et al. City-scale modeling of San Francisco Bay Area underground for community-scale application of geothermal energy
Jørgensen et al. Geological Survey of Denmark and Greenland: Early sketches for a detailed nationwide 3D geological model based on geophysical data and boreholes
Pessu et al. Application of Electrical Resistivity Tomography for Soil Competence Study in University of Benin Teaching Hospital Environment, Edo State, Nigeria
Chapple 3D GEOLOGICAL MAPPING OF FRACTURE NETWORKS IN THE HAWKESBURY SANDSTONE AND THEIR IMPLICATIONS TO GROUNDWATER FLOW
Hutson et al. Regional integration involving Uci and its causeway
CN105390058A (en) Campus underground sap engineering situation teaching area implementation method
Jing et al. Numerical Modeling of Seepage-stress Coupling of Deep Foundation Pit Excavation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20171013

CF01 Termination of patent right due to non-payment of annual fee