CN206177729U - Arc stud welding shearing die plans test bench - Google Patents

Arc stud welding shearing die plans test bench Download PDF

Info

Publication number
CN206177729U
CN206177729U CN201621117731.5U CN201621117731U CN206177729U CN 206177729 U CN206177729 U CN 206177729U CN 201621117731 U CN201621117731 U CN 201621117731U CN 206177729 U CN206177729 U CN 206177729U
Authority
CN
China
Prior art keywords
weight
vertical
stud welding
arc stud
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621117731.5U
Other languages
Chinese (zh)
Inventor
郭猛
张勇
刘海伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Changchun Railway Vehicles Co Ltd
Original Assignee
CRRC Changchun Railway Vehicles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Changchun Railway Vehicles Co Ltd filed Critical CRRC Changchun Railway Vehicles Co Ltd
Priority to CN201621117731.5U priority Critical patent/CN206177729U/en
Application granted granted Critical
Publication of CN206177729U publication Critical patent/CN206177729U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

Arc stud welding shearing die plans test bench belongs to the arc stud welding intensity detection device field around the railway vehicle vehicle body steel structure gate, and it includes weight support, fixed pulley mechanism, rope mechanism, weight mechanism, exemplar fixture and base, weight mechanism and weight support sliding connection, and fixed pulley mechanism links firmly on the top of weight support, and rope mechanism's one end strides across fixed pulley mechanism and links firmly rope mechanism's the other end and the rear end swing joint of weight support bottom with weight mechanism, weight support and exemplar fixture's lower extreme all links firmly in the up end of base, and exemplar fixture is located the bottom front end of weight support. The utility model discloses the test bench is through quantity that changes the counter weight ring or the height that hangs that changes weight mechanism, can adjust the size of the weight impact force that the mechanism forms in a flexible way, makes its continuously adjustable in complete known error range.

Description

Arc stud welding shearing simulation testing stand
Technical field
This utility model belongs to the stud welding intensity detection means field around rail passenger car body steel construction doorway, specifically It is related to a kind of arc stud welding shearing simulation testing stand.
Background technology
Trolley coach needs to weld some studs with stud Welding on the side wall wallboard around steel structure of car body doorway, For installing slideway, passenger unavoidably will be trampled on slideway when getting on or off the bus, it is therefore desirable to determined strong after arc stud welding Degree.Existing detection meanss are to utilize wooden mallet welding along the mode of stud radial direction percussion to the arc stud welding by testing staff in postwelding Quality is detected.However, the hammering dynamics concordance of testing staff is poor, there is larger fluctuation in detection error, and when hammering It is also easy to cause stud bend fracture when dynamics is excessive.
If as shown in figure 1, the stud 1-2 and side wall wallboard 1-1 of phase same material can be utilized, then with identical welding side Formula and condition make and are welded into detection sample 1, and the weld strength of 1 upper stud 1-2 of the detection sample are carried out quick and accurate Axial shearing force simulation experiment, then be greatly improved welding strength of stud welding detection accuracy and improve passenger ride when Safety
Utility model content
In order to solve the stud on the existing side wall wallboard around steel structure of car body doorway with the welding of stud Welding, its The old method welding quality of the arc stud welding detected along the mode that stud is radially tapped using wooden mallet by testing staff There is larger fluctuation in detection error, and be also easy to cause stud bend fracture when hammer force spends big.It is special due to what is lacked With testing equipment, the detection sample that cannot be completed to stud Welding at present implements accurate and stable product quality inspection Technical problem, this utility model provide a kind of arc stud welding shearing simulation testing stand.
The technical scheme taken by this utility model solution technical problem is as follows:
Arc stud welding shearing simulation testing stand, which includes weight support, fixed pulley mechanism, rope mechanism, heavy hammer mechanism, exemplar Clamping device and pedestal, heavy hammer mechanism are slidably connected with weight support, and fixed pulley mechanism is connected in the top of weight support, rope One end of mechanism is connected across fixed pulley mechanism and with heavy hammer mechanism, the other end of rope mechanism and the rear end of weight support bottom It is flexibly connected;The lower end of weight support and exemplar clamping device is fixed on the upper surface of pedestal, and exemplar clamping device is located at weight The bottom front of hammer support.
The weight support includes that two pipe slide rail pillars, top connecting plate, rear guide stanchion, vertical axle center are oriented to Seat and cord end fixed seat;The upper end of described two pipe slide rail pillars is connected with top connecting plate, the common structure of its three Into a gate frame;Rear guide stanchion is located in the vertical center line at the rear of gate frame, the upper end of rear guide stanchion It is connected with top connecting plate, its lower end is connected with the upper surface of pedestal;Cord end fixed seat and rear guide stanchion lower end Lateral wall is connected;The rear end of vertical axle center guide holder is connected with the front end side wall on rear guide stanchion top;Fixed pulley mechanism is solid It is connected on the center line of top connecting plate, the middle line front end of top connecting plate is provided with connecting plate through hole;Vertical axle center guide holder is located at Below top connecting plate, the center of vertical axle center guide holder is provided with the vertical through hole of guide holder.
The axis of both the connecting plate through hole and the vertical through hole of guide holder is respectively positioned in the vertical center line of gate frame.
The heavy hammer mechanism includes chopping block, two lateral assembly pulleys, balancing weight mandrel and multiple counterweight rings, lateral assembly pulley Including channel-section steel axle bed and two rollers with circular arc concave surface, described two roller axis with circular arc concave surface are parallel, and which two Person is with the side wall of channel-section steel axle bed as axle bed and vertically arranges up and down;The rear end face of two channel-section steel axle beds respectively with anvil The left and right side wall of plate is connected;The center that balancing weight mandrel is vertically connected with chopping block upper surface, the equal coaxial sleeve of multiple counterweight rings are being matched somebody with somebody On pouring weight mandrel.
The upper end of the balancing weight mandrel is connected with a termination of rope mechanism by lockset link;With circular arc concave surface Roller pipe slide rail pillar corresponding with it is tangent and be slidably connected;Set on another termination of the rope mechanism There is hook, cord end fixed seat is provided with link, mounting both which.
The exemplar clamping device includes horizontal stand, screw support and vertical screw mandrel, and the horizontal segment front end of screw support sets There is screw, vertical screw mandrel is collectively forming axially vertical screw mechanism with screw, and the vertical section lower end of screw support is in horizontal stand Upper surface be connected, the upper surface of the bottom base of horizontal stand is connected.
The distance between the rear end face of the horizontal stand and the front end face of chopping block are 5 to 10 millimeters.
The beneficial effects of the utility model are:The arc stud welding shearing simulation testing stand, is used as door by pipe slide rail pillar The pillar of type framework, and while also serve as the rail plate of heavy hammer mechanism, the roller with circular arc concave surface is enable along pipe slide rail The upper and lower slip of pillar.Heavy hammer mechanism is lifted by crane by fixed pulley mechanism and makes heavy hammer mechanism high in required suspension by rope mechanism Position on degree.Exemplar clamping device is for being fixed to inspecting detection sample by random samples, and makes the stud direction in sampling observation detection sample The side that heavy hammer mechanism is located.The heavy hammer mechanism of the shearing simulation testing stand is produced given big by way of the movement of falling object Little impact momentum, and stud to be measured is clashed into the lower surface of chopping block, to test the intensity of its arc stud welding.By changing The suspension height of the quantity or change heavy hammer mechanism of counterweight ring, can be adjusted flexibly the size of the formed impulsive force of heavy hammer mechanism, Make its continuously adjustabe in the completely known range of error.
In addition the arc stud welding shearing simulation testing stand is also with simple and practical, easy to operate, with low cost, is easy to push away Broad-spectrum and the advantages of.
Description of the drawings
Fig. 1 is the axonometric chart for being inspected by random samples detection sample by the stud Welding that stud and side wall wallboard are collectively forming;
Fig. 2 is the axonometric chart of this utility model arc stud welding shearing simulation testing stand;
Fig. 3 is the left view of this utility model arc stud welding shearing simulation testing stand;
Fig. 4 is axonometric chart of this utility model arc stud welding shearing simulation testing stand under another visual angle;
Fig. 5 is the partial enlarged drawing of I parts in Fig. 4;
Fig. 6 is the axonometric chart of this utility model exemplar clamping device;
Fig. 7 is the axonometric chart of this utility model heavy hammer mechanism;
Fig. 8 is the application schematic diagram of this utility model arc stud welding shearing simulation testing stand;
Fig. 9 is the application schematic diagram of this utility model exemplar clamping device.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further details.
As shown in Figures 2 to 7, this utility model arc stud welding shearing simulation testing stand includes weight support 2, fixed pulley mechanism 3rd, rope mechanism 4, heavy hammer mechanism 5, exemplar clamping device 6 and pedestal 7, heavy hammer mechanism 5 are slidably connected with weight support 2, fixed sliding Wheel mechanism 3 is connected in the top of weight support 2, and one end of rope mechanism 4 is across fixed pulley mechanism 3 and connected with heavy hammer mechanism 5, The other end of rope mechanism 4 is connected with the back end activity of 2 bottom of weight support.The lower end of weight support 2 and exemplar clamping device 6 The upper surface of pedestal 7 is fixed on, exemplar clamping device 6 is located at the bottom front of weight support 2.
Weight support 2 includes two pipe slide rail pillar 2-1, top connecting plate 2-5, rear guide stanchion 2-2, vertical axles Heart guide holder 2-3 and cord end fixed seat 2-4, the upper end of two pipe slide rail pillar 2-1 are solid with top connecting plate 2-5 Even, its three collectively forms a gate frame.Rear guide stanchion 2-2 is located in the vertical center line at the rear of gate frame, The upper end of rear guide stanchion 2-2 is connected with top connecting plate 2-5, and its lower end is connected with the upper surface of pedestal 7.Cord end is solid Reservation 2-4 is connected with the lateral wall of rear guide stanchion 2-2 lower end.The rear end of vertical axle center guide holder 2-3 is oriented to rear and is propped up The front end side wall on post 2-2 tops is connected.Fixed pulley mechanism 3 is fixed on the center line of top connecting plate 2-5, top connecting plate 2-5 Middle line front end be provided with connecting plate through hole 2-5-1.Vertical axle center guide holder 2-3 is located at below top connecting plate 2-5.
The axis of both the connecting plate through hole 2-5-1 and vertical through hole 2-3-1 of guide holder be respectively positioned on gate frame it is vertical in On line.
Heavy hammer mechanism 5 includes chopping block 5-1, two lateral assembly pulley 5-2, balancing weight mandrel 5-3 and multiple counterweight ring 5-4, Lateral assembly pulley 5-2 includes channel-section steel axle bed 5-2-1 and two roller 5-2-2 with circular arc concave surface, the rolling with circular arc concave surface Wheel 5-2-2 is in totally hourglass shape, two roller 5-2-2 diameter parallels with circular arc concave surface, with channel-section steel axle bed 5- both which The side wall of 2-1 is axle bed and vertically arranges up and down.The rear end face of two channel-section steel axle bed 5-2-1 respectively with chopping block 5-1 Left and right side wall be connected.The center that balancing weight mandrel 5-3 is vertically connected with chopping block 5-1 upper surfaces, multiple counterweight ring 5-4 are same Axle sleeve is on balancing weight mandrel 5-3.
The center of vertical axle center guide holder 2-3 is provided with the vertical through hole 2-3-1 of guide holder, and one end of rope mechanism 4 is across calmly After pulley mechanism 3, through the vertical through hole 2-3-1 of guide holder, and even hung by lockset link with the upper end of balancing weight mandrel 5-3.
Roller 5-2-2 with circular arc concave surface pipe slide rail pillar 2-1 corresponding with are tangent and are slidably connected.Rope Another termination of rope mechanism 4 is provided with hook, and cord end fixed seat 2-4 is provided with link, mounting both which.
Exemplar clamping device 6 includes horizontal stand 6-1, screw support 6-2 and vertical screw mandrel 6-3, the level of screw support 6-2 Duan Qianduan is provided with screw 6-2-1, vertical screw mandrel 6-3 and screw 6-2-1 and is collectively forming axially vertical screw mechanism, screw support The vertical section lower end of 6-2 is connected in the upper surface of horizontal stand 6-1, and the upper surface of the bottom base 7 of horizontal stand 6-1 is connected.
The distance between the rear end face of horizontal stand 6-1 and the front end face of chopping block 5-1 are 5 to 10 millimeters.
As shown in Fig. 8 to Fig. 9, during concrete application this utility model arc stud welding shearing simulation testing stand, according to be tested The diameter of stud 1-2 determines the numerical value of its theoretical corresponding shearing force, and the equation of momentum according to classical physics calculates required The gross mass and suspension height of heavy hammer mechanism 5.Hereafter, according to the gross mass adjustment counterweight ring 5-4 for calculating the heavy hammer mechanism 5 for determining Number, recycle rope mechanism 4 by heavy hammer mechanism 5 lifted and respective heights needed for being fixed on, and pass through cord end Hook on rope mechanism 4 is fixed by link in fixed seat 2-4 temporarily.
Then, the perpendicular type side wall wallboard 1-1 in sampling observation detection sample 1 is placed directly on horizontal stand 6-1, makes right angle Two end faces at the right angle of type side wall wallboard 1-1 upper surface and rear end face patch of horizontal stand 6-1 respectively with horizontal stand 6-1 Close, and make the side that stud 1-2 is located towards chopping block 5-1.Hereafter, with the lower end of vertical screw mandrel 6-3 by perpendicular type side wall wallboard The upper end of the horizontal end faces of 1-1 compresses downwards, is completely fixed sampling observation detection sample 1.
Hereafter, you can the hook on rope mechanism 4 is discharged on the link from cord end fixed seat 2-4, and makes weight Mechanism 5 does the movement of falling object under gravity, and the lower surface using its chopping block 5-1 is hammered to stud 1-2, with Test the intensity of its arc stud welding.

Claims (7)

1. arc stud welding shearing simulation testing stand, it is characterised in that:The testing stand include weight support (2), fixed pulley mechanism (3), Rope mechanism (4), heavy hammer mechanism (5), exemplar clamping device (6) and pedestal (7), heavy hammer mechanism (5) are slided with weight support (2) Connection, fixed pulley mechanism (3) are connected in the top of weight support (2), and one end of rope mechanism (4) is across fixed pulley mechanism (3) And be connected with heavy hammer mechanism (5), the other end of rope mechanism (4) is connected with the back end activity of weight support (2) bottom;Weight The lower end of frame (2) and exemplar clamping device (6) is fixed on the upper surface of pedestal (7), and exemplar clamping device (6) is positioned at weight The bottom front of frame (2).
2. arc stud welding shearing simulation testing stand as claimed in claim 1, it is characterised in that:The weight support (2) includes two Individual pipe slide rail pillar (2-1), top connecting plate (2-5), rear guide stanchion (2-2), vertical axle center guide holder (2-3) and rope Bitter end head fixed seat (2-4);The upper end of described two pipe slide rail pillars (2-1) is connected with top connecting plate (2-5), and which three Person collectively forms a gate frame;Rear guide stanchion (2-2) in the vertical center line at the rear of gate frame, lead by rear It is connected to the upper end of pillar (2-2) with top connecting plate (2-5), its lower end is connected with the upper surface of pedestal (7);Cord end is solid Reservation (2-4) is connected with the lateral wall of rear guide stanchion (2-2) lower end;The rear end and rear of vertical axle center guide holder (2-3) The front end side wall on guide stanchion (2-2) top is connected;Fixed pulley mechanism (3) is fixed on the center line of top connecting plate (2-5), top The middle line front end of portion's connecting plate (2-5) is provided with connecting plate through hole (2-5-1);Vertical axle center guide holder (2-3) connects positioned at top Below plate (2-5), the center of vertical axle center guide holder (2-3) is provided with the vertical through hole of guide holder (2-3-1).
3. arc stud welding shearing simulation testing stand as claimed in claim 2, it is characterised in that:The connecting plate through hole (2-5-1) It is respectively positioned in the vertical center line of gate frame with guide holder vertical through hole (2-3-1) axis of the two.
4. arc stud welding shearing simulation testing stand as claimed in claim 2, it is characterised in that:The heavy hammer mechanism (5) is including anvil Plate (5-1), two lateral assembly pulleys (5-2), balancing weight mandrel (5-3) and multiple counterweight rings (5-4), lateral assembly pulley (5-2) Including channel-section steel axle bed (5-2-1) and two rollers (5-2-2) with circular arc concave surface, described two rollers with circular arc concave surface (5-2-2) diameter parallel, vertically arranges with the side wall of channel-section steel axle bed (5-2-1) as axle bed and up and down both which;Two The rear end face of individual channel-section steel axle bed (5-2-1) is respectively connected with the left and right side wall of chopping block (5-1);Balancing weight mandrel (5-3) is vertically The center being connected with chopping block (5-1) upper surface, multiple counterweight rings (5-4) coaxial sleeve is on balancing weight mandrel (5-3).
5. arc stud welding shearing simulation testing stand as claimed in claim 4, it is characterised in that:The balancing weight mandrel (5-3) Upper end is connected with a termination of rope mechanism (4) by lockset link;Roller with circular arc concave surface (5-2-2) with one Corresponding pipe slide rail pillar (2-1) is tangent and is slidably connected;Another termination of the rope mechanism (4) is provided with extension Hook, cord end fixed seat (2-4) are provided with link, mounting both which.
6. arc stud welding shearing simulation testing stand as claimed in claim 4, it is characterised in that:Exemplar clamping device (6) bag Horizontal stand (6-1), screw support (6-2) and vertical screw mandrel (6-3) are included, the horizontal segment front end of screw support (6-2) is provided with screw (6-2-1), vertical screw mandrel (6-3) is collectively forming axially vertical screw mechanism with screw (6-2-1), screw support (6-2) Vertical section lower end is connected in the upper surface of horizontal stand (6-1), and the upper surface of the bottom base (7) of horizontal stand (6-1) is connected.
7. arc stud welding shearing simulation testing stand as claimed in claim 6, it is characterised in that:The rear end of the horizontal stand (6-1) The distance between front end face of face and chopping block (5-1) is 5 to 10 millimeters.
CN201621117731.5U 2016-10-13 2016-10-13 Arc stud welding shearing die plans test bench Expired - Fee Related CN206177729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621117731.5U CN206177729U (en) 2016-10-13 2016-10-13 Arc stud welding shearing die plans test bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621117731.5U CN206177729U (en) 2016-10-13 2016-10-13 Arc stud welding shearing die plans test bench

Publications (1)

Publication Number Publication Date
CN206177729U true CN206177729U (en) 2017-05-17

Family

ID=58678652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621117731.5U Expired - Fee Related CN206177729U (en) 2016-10-13 2016-10-13 Arc stud welding shearing die plans test bench

Country Status (1)

Country Link
CN (1) CN206177729U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107900933A (en) * 2017-11-28 2018-04-13 中车长春轨道客车股份有限公司 Suitable for alignment positioning device in the train room of different inner widths

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107900933A (en) * 2017-11-28 2018-04-13 中车长春轨道客车股份有限公司 Suitable for alignment positioning device in the train room of different inner widths

Similar Documents

Publication Publication Date Title
CN206177729U (en) Arc stud welding shearing die plans test bench
CN103416319B (en) Holding electronic cage scale for live pigs
CN106289510A (en) A kind of Wheel Rail Contact state is detrained unsteadiness of wheels acoustic radiation characteristic test method and device
CN207882052U (en) Multifunction structure frame
CN209624252U (en) Hanging Basket artificial intelligence loading system
CN109506860B (en) Load test device for rotary hinge device
CN202918844U (en) Holding electronic cage scale for living pig
CN206583688U (en) A kind of reinforcing bar alternating bending machine of quick detection steel tube performance defect
CN201876395U (en) Impact hammer device for drop calibration test
CN205000372U (en) Side slope of being completed prestressed anchorage cable locking power detection device
CN209992436U (en) Eddy nondestructive testing device for small-diameter pipe
CN107084835B (en) Cantilever pre-configuration data detection device and detection method thereof
CN207501847U (en) The testing apparatus for verticality of vertical structure
CN206246053U (en) A kind of detection means of ground foundation engineering construction sediment thickness
CN105510135B (en) Constant hanger babinet device for testing tensile force and constant hanger babinet pull force test method
CN105319077B (en) A kind of wheel unloading experimental rig and test method
CN109682690A (en) Hanging Basket artificial intelligence loading system
CN201289474Y (en) Ultrasonic inspection machine for suspension type seamless steel pipe
CN205562286U (en) Hoist girder test device
CN2791247Y (en) Drilling-tool flaw-detector head suspension device
CN105738205A (en) Test device for crane girder
CN205981928U (en) A detector for testing leather shoes steel colludes heart rigidity
CN208167830U (en) A kind of compound base loading test device
CN211740582U (en) Load test tool for blowout preventer of semi-submersible drilling platform
CN206876143U (en) A kind of construction supervision stake holes hole diameter detection apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

CF01 Termination of patent right due to non-payment of annual fee