CN206174986U CN201621264291.6U CN201621264291U CN206174986U CN 206174986 U CN206174986 U CN 206174986U CN 201621264291 U CN201621264291 U CN 201621264291U CN 206174986 U CN206174986 U CN 206174986U
Authority
CN
China
Prior art keywords
air
standby
blast pipe
supply line
main air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621264291.6U
Other languages
Chinese (zh)
Inventor
房鹏
唐治群
谢明生
全青云
周伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANZHIHUA TAIHAI TECHNOLOGY Co Ltd
Original Assignee
PANZHIHUA TAIHAI TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PANZHIHUA TAIHAI TECHNOLOGY Co Ltd filed Critical PANZHIHUA TAIHAI TECHNOLOGY Co Ltd
Priority to CN201621264291.6U priority Critical patent/CN206174986U/en
Application granted granted Critical
Publication of CN206174986U publication Critical patent/CN206174986U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a double fan ventilation system, including main air -supply line and reserve air -supply line, and with communicating tuber pipe of exit end of two air -supply lines, with main air -supply line to should there being the main air blower, with reserve air -supply line to should there being the standby fan, be equipped with accessible pivot pivoted baffle at two junctures that advance air duct outlet, the baffle can be after the rotation respectively with the inner wall contact of main air -supply line or reserve air -supply line, the baffle is connected to the control cabinet through extending to external vaulting pole, the control cabinet is connected with main air blower and standby fan respectively through motor and the controlling means who is connected. The utility model discloses a double fan ventilation system, what the switching that can follow main air blower, standby fan suited carries out the automatic switch -over protection to airflow channel, has effectively avoided the loss of air output, has also avoided the fan to damage because of flowing backward the air current simultaneously.

Description

Two fans ventilating system
Technical field
The utility model is related to the ventilating system of the underground engineerings such as underground mining, constructing tunnel, is concretely two fans Ventilating system.
Background technology
In the underground engineerings such as underground mining, tunnel excavation, it is required for being blown to driving face by ventilating system.By Worked long hours in blower fan and easily break down, therefore at present frequently with dual air blowers and dual power, its main air blower, standby fan, sent Connected by three-way air duct between wind air duct, once power supply or mechanical breakdown occurs in main air blower, standby fan can be opened automatically immediately It is dynamic, it is ensured that continuous air feed.
Existing three-way air duct is in Y types or T-shaped, and containing a discharge pipe, two blast pipes, three airducts are mutually interconnected It is logical.During work, when main air blower is blown as a example by, fraction can enter standby fan so as to cause wind loss, cause reality Air output is not enough, easily causes potential safety hazard, therefore in order to ensure air output, it is necessary to increase the work(of main air blower, standby fan Rate, considerably increases the cost of whole system;Meanwhile, the air-flow into standby fan can also hinder maintenance to standby fan, Even result in the damage of standby fan.
Utility model content
The utility model provides a kind of two fans ventilating system, can be logical to air-flow with the switching of main air blower, standby fan Road carries out automatic switchover protection, it is to avoid wind loss and avoid blower fan from being damaged because pouring in down a chimney air-flow.
Two fans ventilating system of the present utility model, including main blast pipe and standby blast pipe, and with it is described two enter The discharge pipe that the port of export of airduct is communicated, with main blast pipe to that should have main air blower, with standby blast pipe to that should have standby fan, The intersection of two blast pipes outlet be provided with can by the baffle plate of axis of rotation, baffle plate can after rotation respectively with main blast pipe or The inwall contact of standby blast pipe, baffle plate is connected to console by extending to the strut in the external world, and console passes through what is be connected Motor and control device are connected with main air blower and standby fan respectively.After baffle plate is contacted with the inwall of corresponding blast pipe, can hinder Trapping stream pours in down a chimney as in corresponding blower fan from the blast pipe.Because main air blower and standby fan only have one of them section at the same time Interior startup, therefore baffle plate acquiescence is what is contacted with the inwall of standby blast pipe, after main air blower breaks down to be stopped, being started standby During blower fan, the enabling signal of standby fan is sent in described control device simultaneously, and control device can be by PLC or single-chip microcomputer Deng composition, its control program uses common automatic control program.Control device is opened according to the enabling signal of standby fan Dynamic motor is rotated, and motor carries out extension and contraction control by console to strut.Rotated around the axis by the flexible drive baffle plate of strut To being contacted with main air intake inside pipe wall, that realizes main blast pipe pours in down a chimney air-flow closing.When main air blower is enabled again, carry out on similar The operation stated.
Further, strut is provided with sealing ring with the intersection of main blast pipe or standby blast pipe, can avoid normal blowing When air-flow excessive leakage.
Further, the motor is either-rotation motor, convenient to control the flexible of strut, and is using an either-rotation motor Can, it is cost-effective without using two one-way motors simultaneously.
Specifically, the worm-gear-worm in the console by coordinating is connected with strut.
Two fans ventilating system of the present utility model, can with main air blower, standby fan switching be adapted to air-flow Passage carries out automatic switchover protection, effectively prevent the loss of air output, while it also avoid blower fan being damaged because pouring in down a chimney air-flow.
Specific embodiment with reference to embodiments, remakes further specifically to the above of the present utility model It is bright.But this scope for being interpreted as the above-mentioned theme of the utility model should not be only limitted to following example.It is new this practicality is not departed from In the case of the above-mentioned technological thought of type, according to various replacements or change that ordinary skill knowledge and customary means are made, Should be included in the range of the utility model.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model two fans ventilating system.
Specific embodiment
Two fans ventilating system of the present utility model as shown in Figure 1, including main blast pipe 1 and standby blast pipe 2, Yi Jiyu The discharge pipe 3 that the port of export of described two blast pipes is communicated.1 pair should have main air blower 6 with main blast pipe, with standby blast pipe 2 pairs There should be standby fan 7.Being provided with the intersection of two outlets of blast pipe 1 be able to can turned by the baffle plate 4 of axis of rotation, baffle plate 4 Inwall after dynamic respectively with main blast pipe 1 or standby blast pipe 2 is contacted.Baffle plate 4 is connected to by extending to the strut 10 in the external world Console 9, and strut 10 is provided with sealing ring with the intersection of main blast pipe 1 or standby blast pipe 2.By matching somebody with somebody in console 9 The worm-gear-worm structure control strut 10 of conjunction stretches.The control that console 9 passes through the motor 5 and single chip computer architecture being connected is filled Put 8 to be connected with main air blower 6 and standby fan 7 respectively, wherein motor 5 is either-rotation motor.
The acquiescence of baffle plate 4 is what is contacted with the inwall of standby blast pipe 2, after main air blower 6 breaks down to be stopped, being started standby During blower fan 7, the enabling signal of standby fan 7 is sent in the control device 8 of the single chip computer architecture simultaneously, wherein single-chip microcomputer Control program uses common automatic control program.Control device 8 starts motor 5 according to the enabling signal of standby fan 7 Rotate, motor 5 carries out extension and contraction control by console 9 to strut 10.Rotated around the axis by the flexible drive baffle plate 4 of strut 10 To being contacted with the inwall of main blast pipe 1, that realizes main blast pipe 1 pours in down a chimney air-flow closing.When main air blower 6 is enabled again, class is carried out Like above-mentioned operation.

Claims (4)

1. two fans ventilating system, including main blast pipe (1) and standby blast pipe (2), and go out with described two blast pipes The discharge pipe (3) that mouth end communicates, with main blast pipe (1) to that should have main air blower (6), with standby blast pipe (2) to that should have standby wind Machine (7), it is characterized by:Being provided with the intersection of two blast pipe (1) outlets can be by the baffle plate (4) of axis of rotation, baffle plate (4) Inwall that can be respectively with main blast pipe (1) or standby blast pipe (2) after rotation is contacted, and baffle plate (4) is by extending to the external world Strut (10) is connected to console (9), console (9) by the motor (5) and control device (8) that are connected respectively with main air blower (6) connected with standby fan (7).
2. two fans ventilating system as claimed in claim 1, it is characterized by:Strut (10) and main blast pipe (1) or it is standby enter The intersection of airduct (2) is provided with sealing ring.
3. two fans ventilating system as claimed in claim 1, it is characterized by:The motor (5) is either-rotation motor.
4. the two fans ventilating system as described in one of claims 1 to 3, it is characterized by:By coordinating in the console (9) Worm-gear-worm be connected with strut (10).
CN201621264291.6U 2016-11-24 2016-11-24 Double fan ventilation system Active CN206174986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621264291.6U CN206174986U (en) 2016-11-24 2016-11-24 Double fan ventilation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621264291.6U CN206174986U (en) 2016-11-24 2016-11-24 Double fan ventilation system

Publications (1)

Publication Number Publication Date
CN206174986U true CN206174986U (en) 2017-05-17

Family

ID=58686084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621264291.6U Active CN206174986U (en) 2016-11-24 2016-11-24 Double fan ventilation system

Country Status (1)

Country Link
CN (1) CN206174986U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437813A (en) * 2016-11-24 2017-02-22 攀枝花市钛海科技有限责任公司 Dual-fan ventilation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437813A (en) * 2016-11-24 2017-02-22 攀枝花市钛海科技有限责任公司 Dual-fan ventilation system

Similar Documents

Publication Publication Date Title
CN202170804U (en) Three-way air duct of a double fan ventilation system
CN207209475U (en) Simple And Practical dry ash is removed stage makeup and costume system
CN105370312B (en) A kind of automation lightweight air curtain generating means for colliery tunneling working face
CN206174986U (en) Double fan ventilation system
CN107620606A (en) A kind of coal mine main ventilator not blowing-out method of falling machine based on frequency control function
CN104314600A (en) Method for constructing and ventilating three parallel tunnels
CN106437813A (en) Dual-fan ventilation system
CN105986833A (en) Inclined shaft auxiliary type tunnel ventilation system with partition plates
CN106761878A (en) A kind of mine ventilation system
CN107091110B (en) A kind of dust removing down-hole of coal mine device
KR101439597B1 (en) Ventilation Apparatus And Method for Underground Tunnel
CN203771618U (en) Double-fan system
CN104566851A (en) Ventilating control device with air pipe pressure adjusting function for CIT
CN203582032U (en) Ash silo discharging system
CN206129311U (en) A three air funnels for double fan ventilation system
CN201363160Y (en) Automatic draught distributor for mine local fan
CN103601003A (en) Ash silo discharge system
CN207165518U (en) A kind of pressure control device for preventing cavity leakage
CN202280470U (en) Iron made wind distributing device
CN203145984U (en) Double fan air duct automatic switching device
CN204921011U (en) Air distribution mechanism of blast pipe
CN203476376U (en) Underground coal mine local ventilator wind direction adjusting device
CN203599165U (en) Automatic dedusting device for cigarette making machine flow collecting pipe
CN205934133U (en) But automatic switch -over air intake system's crystallization bed
CN208124570U (en) Rain-proof waterproof air-exhausting duct

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20181008

Granted publication date: 20170517

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20211008

Granted publication date: 20170517

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20231220

Granted publication date: 20170517