CN205934133U - But automatic switch air intake system's crystallization bed - Google Patents

But automatic switch air intake system's crystallization bed Download PDF

Info

Publication number
CN205934133U
CN205934133U CN201620771977.8U CN201620771977U CN205934133U CN 205934133 U CN205934133 U CN 205934133U CN 201620771977 U CN201620771977 U CN 201620771977U CN 205934133 U CN205934133 U CN 205934133U
Authority
CN
China
Prior art keywords
accessory fan
air blower
main air
fan
auxiliary fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620771977.8U
Other languages
Chinese (zh)
Inventor
朱延伟
孙德荣
孙德明
王学利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU SILK FIBER TECHNOLOGY CO LTD
Original Assignee
XUZHOU SILK FIBER TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU SILK FIBER TECHNOLOGY CO LTD filed Critical XUZHOU SILK FIBER TECHNOLOGY CO LTD
Priority to CN201620771977.8U priority Critical patent/CN205934133U/en
Application granted granted Critical
Publication of CN205934133U publication Critical patent/CN205934133U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Control Of Positive-Displacement Air Blowers (AREA)

Abstract

The utility model discloses a crystallization bed capable of automatically switching an air inlet system, which comprises an auxiliary fan system and a signal controller system, wherein the auxiliary fan system comprises an auxiliary fan, an auxiliary fan air outlet pipeline, an auxiliary fan air outlet valve, an auxiliary fan air inlet pipeline and an auxiliary fan air inlet valve, one end of the auxiliary fan air outlet pipeline is connected with the auxiliary fan, the other end is connected with a main machine air outlet pipeline and a crystallization bed air inlet pipeline, the auxiliary fan air outlet valve is arranged on the auxiliary fan air outlet pipeline, one end of the auxiliary fan air inlet pipeline is connected with the auxiliary fan, the other end is connected with a main fan air inlet pipeline and a crystallization bed air outlet pipeline, the auxiliary fan air inlet valve is arranged on the auxiliary fan air inlet pipeline, the signal control system comprises a signal controller, a main fan signal line and an auxiliary fan signal line, one end of the main fan signal line is connected with the signal controller, the other end of the main fan signal line is connected with the main fan, one end of the auxiliary fan signal line is connected with the signal controller, and the other end of the auxiliary fan signal line is connected with the auxiliary fan. Ensures the continuity of drying crystallization and finally ensures normal production.

Description

A kind of gas handling system that automatically switches crystallizing bed
Technical field
This utility model be related to a kind of crystallizing bed, more particularly, to a kind of gas handling system that automatically switches crystallizing bed, Belong to synthetic fiber spinning technical field.
Background technology
In order to ensure normal spinning production, drying crystalline system plays vital effect.Crystallizing bed is usually to adopt After the heating of inner loop wind, to crystallizing bed interior section crystallization.But drying crystalline system needs time-based maintenance, need in maintenance Shut down and just can carry out, which results in the unstable of whole spinning system.
Content of the invention
This utility model provide a kind of the crystallizing bed of gas handling system that automatically switches it is ensured that drying crystalline continuous Property, finally ensure that normal production.
The technical scheme is that:
A kind of gas handling system that automatically switches crystallizing bed, include main air blower system, crystallization bed system, described main air Machine system includes main air blower, main air blower wind pipe, main air blower outlet valve, main air blower intake stack, main air blower air inlet valve, institute The crystallization bed system stated includes crystallizing bed, crystallizing bed intake stack, crystallizing bed wind pipe it is characterised in that including auxiliary Blower fan system and signal controller system, described accessory fan system includes accessory fan, accessory fan wind pipe, auxiliary Help blower fan outlet valve, accessory fan intake stack, accessory fan air inlet valve, described accessory fan wind pipe one end and auxiliary Blower fan is connected, and the other end is connected with main frame wind pipe and crystallizing bed intake stack, and described accessory fan outlet valve is installed On accessory fan wind pipe, described accessory fan intake stack one end is connected with accessory fan, the other end and main air blower Intake stack and crystallizing bed wind pipe are connected, and described accessory fan air inlet valve is installed on accessory fan intake stack, Described whistle control system, includes signal controller, main air blower holding wire, accessory fan holding wire, described main air blower Holding wire one end is connected with signal controller, and the other end is connected with main air blower, described accessory fan holding wire, one end and signal Controller is connected, and the other end is connected with accessory fan.
Brief description
Fig. 1 is a kind of crystallizing bed structural representation of the gas handling system that automatically switches.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As described in Figure 1, a kind of gas handling system that automatically switches is crystallizing bed, includes main air blower system 1, crystallization bed system 3, described main air blower system 1 includes main air blower 15, main air blower wind pipe 12, main air blower outlet valve 11, main air blower air intake Pipeline 14, main air blower air inlet valve 13, described crystallization bed system 3 includes crystallizing bed 33, crystallizing bed intake stack 31, crystallizing bed Wind pipe 32 it is characterised in that including accessory fan system 2 and signal controller system 4, described accessory fan system 2 Include accessory fan 25, accessory fan wind pipe 22, accessory fan outlet valve 21, accessory fan intake stack 24, auxiliary Blower fan air inlet valve 23, described accessory fan wind pipe 22 one end is connected with accessory fan 25, the other end and main frame discharge pipe Road 12 and crystallizing bed intake stack 31 are connected, and described accessory fan outlet valve 21 is installed on accessory fan wind pipe 22 On, described accessory fan intake stack 24 one end is connected with accessory fan 25, the other end and main air blower intake stack 14 and Crystallizing bed wind pipe 32 is connected, and described accessory fan air inlet valve 23 is installed on accessory fan intake stack 24, described Whistle control system 4, includes signal controller 43, main air blower holding wire 41, accessory fan holding wire 42, described main air blower Holding wire 41 one end is connected with signal controller 43, and the other end is connected with main air blower 15, described accessory fan holding wire 42 1 End is connected with signal controller 43, and the other end is connected with accessory fan 25.
Operation principle:Wherein main air blower system 1 be just conventional, accessory fan system 2 be standby, when main air blower system 1 just When often running, main air blower air inlet valve 13 and main air blower outlet valve 11 in opened condition, accessory fan air inlet valve 23 and accessory fan Outlet valve 21 is in closed mode, and the circulated air that now main air blower 15 is formed enters crystallizing bed blast pipe by main frame wind pipe 12 Road 31, enters back into crystallizing bed 33, the circulated air after completing section crystallization crystallizing bed 33, is entered by crystallizing bed wind pipe 32 Main air blower intake stack 14 forms circulated air.When main air blower 15 is shut down, signal controller 43 is received by host signal line 41 After main air blower 15 stopping signal, start accessory fan 25, simultaneously close off main air blower air inlet valve 13 and main air blower outlet valve 11, open Accessory fan air inlet valve 23 and accessory fan outlet valve 21.When accessory fan 25 is shut down, principle is same as above.
When this utility model to illustrate with reference to above example, those skilled in the art should be noted that permissible This utility model is carried out with various change and part is replaced.Accordingly, it is to be understood that:This utility model is not limited only to here The specific embodiment of disclosed optimal mode is implementing this utility model.On the premise of conceiving without departing substantially from this utility model, institute Change and each fall within the protection domain of claims with modification.

Claims (1)

1. a kind of gas handling system that automatically switches is crystallizing bed, includes main air blower system, crystallization bed system, described main air blower System includes main air blower, main air blower wind pipe, main air blower outlet valve, main air blower intake stack, main air blower air inlet valve, described Crystallization bed system include crystallizing bed, crystallizing bed intake stack, crystallizing bed wind pipe it is characterised in that including auxiliary wind Machine system and signal controller system, described accessory fan system includes accessory fan, accessory fan wind pipe, auxiliary Blower fan outlet valve, accessory fan intake stack, accessory fan air inlet valve, described accessory fan wind pipe one end and auxiliary wind Machine is connected, and the other end is connected with main frame wind pipe and crystallizing bed intake stack, and described accessory fan outlet valve is installed on On accessory fan wind pipe, described accessory fan intake stack one end is connected with accessory fan, and the other end is entered with main air blower Wind pipeline and crystallizing bed wind pipe are connected, and described accessory fan air inlet valve is installed on accessory fan intake stack, institute The whistle control system stated, includes signal controller, main air blower holding wire, accessory fan holding wire, and described main air blower is believed Number line one end is connected with signal controller, and the other end is connected with main air blower, described accessory fan holding wire, one end and signal control Device processed is connected, and the other end is connected with accessory fan.
CN201620771977.8U 2016-07-21 2016-07-21 But automatic switch air intake system's crystallization bed Active CN205934133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620771977.8U CN205934133U (en) 2016-07-21 2016-07-21 But automatic switch air intake system's crystallization bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620771977.8U CN205934133U (en) 2016-07-21 2016-07-21 But automatic switch air intake system's crystallization bed

Publications (1)

Publication Number Publication Date
CN205934133U true CN205934133U (en) 2017-02-08

Family

ID=57926604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620771977.8U Active CN205934133U (en) 2016-07-21 2016-07-21 But automatic switch air intake system's crystallization bed

Country Status (1)

Country Link
CN (1) CN205934133U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970304A (en) * 2016-07-21 2016-09-28 徐州斯尔克纤维科技股份有限公司 But automatic switch air intake system's crystallization bed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970304A (en) * 2016-07-21 2016-09-28 徐州斯尔克纤维科技股份有限公司 But automatic switch air intake system's crystallization bed

Similar Documents

Publication Publication Date Title
CN204396447U (en) Intelligence cleaner
CN210236436U (en) Dynamic energy-saving control system for motor frequency of wind power feeding system
CN205934133U (en) But automatic switch air intake system's crystallization bed
CN209284309U (en) A kind of plugging alarm and Adaptable System
CN108433174B (en) Pipe blocking alarm and self-adaptive system
CN103355736A (en) Device and method for controlling centralized moisture-removal air pressure in primary tobacco processing
CN202828967U (en) Expandable polystyrene (EPS) conveying anti-blocking pipe
CN205425587U (en) Refrigerator automatically cleaned ware
CN205925374U (en) Cold machine piping system that does that can automatic switch-over
CN204270749U (en) A kind of cable cover(ing) blow-dry device
CN205762764U (en) A kind of inner chamber cleaning systems of air pipeline
CN206666701U (en) A kind of used by rotor spinning frame impurity-discharging pipe
CN202570724U (en) Novel dust removal mechanism of superfine fiber buffing machine
CN202566240U (en) Centralized moisture-removal air pressure control device for tobacco primary processing
CN109234480A (en) A kind of blast furnace blower switches technique online
CN205505323U (en) Box -like new trend system of two fresh air processing units
CN201733836U (en) Pneumatic control cleaning device for obstruction of rubbing plate of cigarette plug assembler
CN105970304A (en) But automatic switch air intake system's crystallization bed
CN210506614U (en) Two-way mute energy-saving cotton distribution system
CN204806910U (en) A wind air feed system of cement calcining kiln
CN206174986U (en) Double fan ventilation system
CN201424521Y (en) Spinning lateral blow air pipe device
CN208446594U (en) A kind of wind model fragile material adaptive control system
CN206014994U (en) Blast furnace dehumidifying air blast one takes off two energy-saving efficiency-increasing devices
CN111981861A (en) Non-stop turning-on method for smelting flue gas high-temperature exhaust fan

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant