CN206174907U - Water injection well measure and regulate operation well head discharge is collected and is recycled device - Google Patents

Water injection well measure and regulate operation well head discharge is collected and is recycled device Download PDF

Info

Publication number
CN206174907U
CN206174907U CN201621135285.0U CN201621135285U CN206174907U CN 206174907 U CN206174907 U CN 206174907U CN 201621135285 U CN201621135285 U CN 201621135285U CN 206174907 U CN206174907 U CN 206174907U
Authority
CN
China
Prior art keywords
collecting tank
water injection
lubricator
well head
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621135285.0U
Other languages
Chinese (zh)
Inventor
李德忠
张福涛
田俊
安百新
郭慧
聂文龙
任从坤
黄辉才
曾凡春
马骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering Shengli Co filed Critical China Petroleum and Chemical Corp
Priority to CN201621135285.0U priority Critical patent/CN206174907U/en
Application granted granted Critical
Publication of CN206174907U publication Critical patent/CN206174907U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a water injection well measure and regulate operation well head discharge is collected and is recycled device, including collecting tank, honeycomb duct, booster pump, recycle pipe, the collecting tank is installed in the upper end of lubricator, and the lubricator lower extreme is connected in the well head upper end, the guide pipe connection collecting tank is passed through to booster pump one end, and other end intercommunication recycles manages, recycle the pipe through oil pipe cross -connection well head. It is provided with manometer and single current valve to recycle to manage. The water conservancy diversion mouth with guide pipe connection is seted up to the oblique below of collecting tank, the positive lower extreme of collecting tank is main interface, and main interface is connected with the lubricator. The utility model discloses the sewage that spills over from the water injection well well head along with test cable in the time of can making the operation of water injection well measure and regulate is realized recycling in getting into and getting into the oil pipe cross behind the water catch bowl under the effect of booster pump. The device has the non -staining environment, saves the characteristics of water source and ability recycle sump oil.

Description

Water injection well is surveyed and adjusts operation wellhead discharge to collect re-injection device
Technical field
The utility model is related to oil-water well shaft mouth operation device, specifically water injection well to survey and adjust operation wellhead discharge to collect Re-injection device.
Background technology
Current water injection well is surveyed and adjusts institutional operation technology progressively in oil field large scale application, the economic benefit day of acquirement Become notable.But water injection well survey adjust operation when the water with sump oil can from test line is moved up and down when return out, these contain Oily water overflows to ground and pollutes environment, has an effect on workman's normal operation, destroys ecological environment, while the sewage of discharge is obtained Less than making full use of, the wasting of resources is caused, increase operating cost.
The content of the invention
The purpose of this utility model is to provide water injection well to survey tune operation wellhead discharge collection re-injection device, can make water injection well Survey after the sewage overflowed from wellhead of water injection well with test cable when adjusting operation enters water leg and enter oil in the presence of booster pump Re-injection is realized in pipe four-way.The characteristics of device has free from environmental pollution, saving water source and can recycle sump oil.
In order to reach above-mentioned purpose, the utility model employs following technical scheme, and water injection well is surveyed and adjusts operation wellhead discharge Re-injection device, including collecting tank, mozzle, booster pump, re-injection pipe are collected, the collecting tank is arranged on the upper end of lubricator, prevents Jet pipe lower end is connected to well head upper end, and described booster pump one end connects collecting tank, other end connection re-injection pipe, institute by mozzle State re-injection pipe and well head is connected by oil pipe four-way.
Pressure gauge and ball-and-seat are provided with the re-injection pipe.
The collecting tank obliquely downward opens up the flow-guiding mouth being connected with mozzle, and the positive lower end of the collecting tank is main interface, Main interface is connected with lubricator.
The main interface of the collecting tank is connected through a screw thread lubricator and sets sealing ring.
Collecting tank lower end external cylindrical surface is provided with right angle rack bar, and upper block is installed in right angle rack bar upper end, described anti- Jet pipe lower end is connected on well head by upright box cupling, horizontal stand bar is fixed with the upright box cupling, on horizontal stand bar Lower tumbler is installed, test cable bypasses lower tumbler, upper block successively, well head is entered after then passing perpendicularly through collecting tank, lubricator Interior, the well head is also connected with water injection pipe, and pressure gauge is set on water injection pipe.
Compared to prior art, the utility model has the advantages that:
(1)The apparatus structure is simply compact, and construction technique is simple and reliable.
(2)It is free from environmental pollution, water source is saved, while sewage can be recycled.
Brief description of the drawings
Fig. 1 is that the utility model water injection well surveys the structural representation for adjusting operation wellhead discharge to collect re-injection device;
Fig. 2 is the profile of the utility model water leg.
In figure:Upper block 1, collecting tank 2, mozzle 3, test cable 4, lubricator 5, upright box cupling 6, lower tumbler 7, water filling Well is surveyed and adjusts well head 8, oil pipe four-way 9, water injection pipe 10, pressure gauge 11,14, re-injection pipe 12, ball-and-seat 13 and booster pump 15.
Specific embodiment
Relevant detailed description of the present utility model and technology contents, coordinate brief description of the drawings as follows, but accompanying drawing only provides ginseng Examine and purposes of discussion, not for being any limitation as to the utility model.
According to Fig. 1, water injection well is surveyed and adjusts operation wellhead discharge to collect re-injection device, is mainly surveyed by water injection well and is adjusted well head 8, water filling Pipe 10, pressure gauge 11,14, upright box cupling 6, lubricator 5, collecting tank 2, upper block 1, test cable 4, lower tumbler 7, mozzle 3, Booster pump 15, re-injection pipe 12, ball-and-seat 13 and oil pipe four-way 9 are constituted, and described water injection well is surveyed to adjust and sequentially installed on well head 8 upright Box cupling 6, lubricator 5 and collecting tank 2, described upper block 1 are arranged on the upper end of support 201 on collecting tank 2, described lower tumbler 7 crossbar ends for being arranged on upright box cupling 6, the described one end connection winch of test cable 4, one end sequentially bypasses the He of lower tumbler 7 Upper block 1, into collecting tank 2, lubricator 5, until injection well testing section, between described collecting tank 2 and oil pipe four-way 9 sequentially Connection mozzle 3, booster pump 15, pressure gauge 14, re-injection pipe 12 and ball-and-seat 13.
According to Fig. 2, the described lower end external cylindrical surface of collecting tank 2 is provided with right angle rack bar 201.
According to Fig. 2, the described lower end of collecting tank 2 is provided with the screwed hole and sealing ring 202 being tightly connected with lubricator 5.
According to Fig. 2, described collecting tank 2 is provided with the flow-guiding mouth 203 being connected with mozzle.
According to Fig. 1, described ball-and-seat 13 is arranged on the end of oil pipe four-way 9, only allows liquid to enter oil pipe four-way 9.
In field conduct, according to Fig. 1, after installing each part, collecting tank 2 is exited into test cable 4 when there is liquid In, liquid flows to the entrance of booster pump 15 under Gravitative Loads, and after being pressurized through booster pump 15, fluid pressure exceedes water injection pipe 10 After pressure, ball-and-seat 13 is opened, and liquid enters water filling interval in well by oil pipe four-way 9.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the scope of the claims of the present utility model, its He all should all belong to the scope of the claims of the present utility model with the equivalence changes of patent spirit of the present utility model.

Claims (5)

1. water injection well is surveyed and adjusts operation wellhead discharge to collect re-injection device, it is characterised in that including collecting tank, mozzle, booster pump, Re-injection pipe, the collecting tank is arranged on the upper end of lubricator, and lubricator lower end is connected to well head upper end, and described booster pump one end leads to Mozzle connection collecting tank is crossed, other end connection re-injection pipe, the re-injection pipe connects well head by oil pipe four-way.
2. water injection well according to claim 1 is surveyed and adjusts operation wellhead discharge to collect re-injection device, it is characterised in that described time Pressure gauge and ball-and-seat are provided with note pipe.
3. water injection well according to claim 1 is surveyed and adjusts operation wellhead discharge to collect re-injection device, it is characterised in that the collection Liquid bath obliquely downward opens up the flow-guiding mouth being connected with mozzle, and the positive lower end of the collecting tank is main interface, main interface and lubricator Connection.
4. water injection well according to claim 3 is surveyed and adjusts operation wellhead discharge to collect re-injection device, it is characterised in that the collection The main interface of liquid bath is connected through a screw thread lubricator and sets sealing ring.
5. water injection well according to claim 1 is surveyed and adjusts operation wellhead discharge to collect re-injection device, it is characterised in that the collection Liquid bath lower end external cylindrical surface is provided with right angle rack bar, and upper block is installed in right angle rack bar upper end, and the lubricator lower end is by straight Vertical box cupling is connected on well head, and horizontal stand bar is fixed with the upright box cupling, and lower tumbler is installed on horizontal stand bar, test Cable bypasses lower tumbler, upper block successively, enters in well head after then passing perpendicularly through collecting tank, lubricator, and the well head also connects Water injection pipe is connect, pressure gauge is set on water injection pipe.
CN201621135285.0U 2016-10-18 2016-10-18 Water injection well measure and regulate operation well head discharge is collected and is recycled device Expired - Fee Related CN206174907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621135285.0U CN206174907U (en) 2016-10-18 2016-10-18 Water injection well measure and regulate operation well head discharge is collected and is recycled device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621135285.0U CN206174907U (en) 2016-10-18 2016-10-18 Water injection well measure and regulate operation well head discharge is collected and is recycled device

Publications (1)

Publication Number Publication Date
CN206174907U true CN206174907U (en) 2017-05-17

Family

ID=58679227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621135285.0U Expired - Fee Related CN206174907U (en) 2016-10-18 2016-10-18 Water injection well measure and regulate operation well head discharge is collected and is recycled device

Country Status (1)

Country Link
CN (1) CN206174907U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437646A (en) * 2016-12-03 2017-02-22 沈阳泰博达石油测控仪器有限公司 Method and device for on spot immediate back injection of contaminated liquid leaked from the process of testing and adjusting oil field water injection well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437646A (en) * 2016-12-03 2017-02-22 沈阳泰博达石油测控仪器有限公司 Method and device for on spot immediate back injection of contaminated liquid leaked from the process of testing and adjusting oil field water injection well

Similar Documents

Publication Publication Date Title
CN203702118U (en) Experimental device for simulating propping agent sedimentation and paving inside fracturing cracks
CN102830217B (en) The critical experimental study device that subsides of the variable multiscale coupling of fracture opening
CN201697813U (en) Crude oil tank and crude oil multi-pipeline automatic sampling device
CN104374680A (en) Slip casting diffusion testing device and testing method using same
CN102324202A (en) Self-circulation axial-radial seepage Darcy law experimental apparatus
CN206174907U (en) Water injection well measure and regulate operation well head discharge is collected and is recycled device
CN202578729U (en) Hand-held type mining pneumatic anchor rope tension machine
CN204740474U (en) Detection apparatus for gravity type stool pot water efficiency test
CN206583774U (en) A kind of concrete penetrometer of Fast Installation
CN205936490U (en) Quick connecting device of individual well measurement
CN206440550U (en) A kind of pipeline compressive resistance experimental rig
CN202442860U (en) Pipeline analog detector
CN204113157U (en) Oil well operation plug-removing device
CN211263132U (en) Concrete viscosity detects uses tensiometer for civil engineering
CN200940469Y (en) Flow pipe net of separate production and separate transport wellhead
CN104865085A (en) Pressure type closet water-use efficiency (WUE) test detection device
CN204740142U (en) Detection apparatus for pressure type stool pot water efficiency test
CN203940234U (en) A kind of sledge dress crude oil metering device with filtration and check function
CN209100031U (en) A kind of formation testing pumping sampling equipment
CN205078215U (en) Water injection well head device
CN105988394A (en) Sand-prevention-data real-time monitoring device
CN206429334U (en) A kind of fuel spray nozzle detection means
CN202788731U (en) Siphoning type blowout-control pressing cap for water injection well testing
CN203783566U (en) Device for measuring pressure in hole in gas-water separation process
CN210457444U (en) Oil well dirty liquid recovery and reinjection device and hydraulic funnel and liquid receiving funnel thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517