CN206174880U - Auxiliary device is bored to geology of using in underwater blasting - Google Patents

Auxiliary device is bored to geology of using in underwater blasting Download PDF

Info

Publication number
CN206174880U
CN206174880U CN201621068809.9U CN201621068809U CN206174880U CN 206174880 U CN206174880 U CN 206174880U CN 201621068809 U CN201621068809 U CN 201621068809U CN 206174880 U CN206174880 U CN 206174880U
Authority
CN
China
Prior art keywords
steel
base
geology
auxiliary device
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621068809.9U
Other languages
Chinese (zh)
Inventor
李本伟
陈德志
罗鹏
胡浩川
周应军
甄梦阳
安玉东
李克菲
张萍
何国敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 23rd Bureau Group (Hubei) blasting Co.,Ltd.
Original Assignee
Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd filed Critical Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd
Priority to CN201621068809.9U priority Critical patent/CN206174880U/en
Application granted granted Critical
Publication of CN206174880U publication Critical patent/CN206174880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an auxiliary device is bored to geology of using in underwater blasting. Include: work platform 8, work platform 8 comprises two rectangular frame, base 1, base 1 includes box iron frame 4, rectangle steel 5, rectangle steel 5 is connected with box iron frame 4's rear end is perpendicular in the middle of the box iron frame 4 front portion, 5 both sides of rectangle steel are equipped with three draw -in groove 6 respectively, 3 welding of geological drilling rig are on base 1, three steel pipes 2, three 2 upper portions of steel pipe concatenations are fixed through bolt and the pulley 14 that lifts by crane with wire rope together, the lower part of three steel pipes 2 uses the bolt fastening respectively on the three draw -in groove of base 16, two rectangular frame of work platform 8 insert respectively in the steel cylinder of 1 rear end 5 both sides of rectangle steel of base to with two fixed rectangular frame of screwed connection. It is nimble that auxiliary device economy is bored to this geology, and assembly and disassembly is convenient, can make the frame in advance, for narrow work platform provides a work platform from the area, can supply to change work such as drilling rod, metering orifice, powder charge and use.

Description

A kind of geology used in explosion under water bores auxiliary device
Technical field
This utility model belongs to engineering explosion technical field, and in particular to the geology used in a kind of explosion under water is bored auxiliary Help device.
Background technology
Well foundation is a kind of pattern of the underground structure and deep foundation constructed with drop shaft sinking;It is first to be fabricated in earth's surface The works of one pit shaft shape(Open caisson), then open caisson is made from recast by constantly cutting the earth from well under the going along with sb. to guard him of the borehole wall Gradually sink with, after reaching predetermined design absolute altitude, then carry out back cover, construct internal structure.
In sinking watching, designed elevation is sunk to as common casting means cannot be continued with, hence with Underwater demolition method loosens soil, is easy to continue casting.To be bored to making using geology drilling row drilling, existing geology before explosion Industry environment and itself operation requirement exist it is claimed below with it is inconvenient.
(1)As open caisson work platformses are narrower, there is no enough job platforms to ensure being normally carried out for boring work.
(2)Geology is bored using area and must is fulfilled for certain putting and working place.
(3)Existing geology needs to set up wooden ladder when being drilled in replacing drilling rod.
The content of the invention
The purpose of this utility model be overcome existing geology be drilled on open caisson or the narrower scope of operation work when limited by place; Need the defect of temporary erection wooden ladder, there is provided a kind of in narrow work surface energy safety, geology that is economic, effectively carrying out bore operation Bore auxiliary working platform.
This utility model purpose is realized by following technical solutions:A kind of geology used in explosion under water is bored auxiliary Device is helped, including:
Work platformses, the work platformses are made up of two rectangular frames;
Base, the base include U-steel frame, rectangle steel, and the rectangle steel is vertical with the rear end of U-steel frame to be connected, in institute State U-steel frame anteriomedial, rectangle steel and be respectively provided on two sides with three draw-in grooves, geological drilling rig is welded on base;
Three steel pipes, the three steel pipe top are stitched together, and are fixed by pulley of the latch with lifting steel wire rope; The bottom of three steel pipes is respectively bolted on three draw-in grooves of base;
In the steel cylinder of two rectangular frame difference inserted base rear end rectangle steel both sides of the work platformses, and use screw Be connected two rectangular frames.
Further, triangle is provided with the inside of the right angle of two rectangular frames of the work platformses and puts block, in the square Reserved annulus is provided with the outside of the bottom right angle of shape framework.
Further, steel wire rope is buckled with the reserved annulus infantile tic.
Further, the U-steel frame of the base, the outside of rectangle steel connecting portion arrange channel-section steel.
Further, screw thread steel stair is provided with the steel pipe.
A kind of geology used in explosion under water bores auxiliary device, bores size previously according to geology and makes fixed geology brill Framework.It is narrower in work platformses, it is impossible to when entering row address rig operations, the framework platform of pre-production is bored installed in address On machine, and screw is used, steel wire rope fixed installation is completed, recycles loop wheel machine to be placed into work platformses, make auxiliary working platform hanging, To provide a working place.
This utility model using having the channel-section steel of national standard, screw, steel wire rope, steel pipe, a screw-thread steel, its intensity, quantity and Quantities can be calculated, and be easy to engineering management.
This utility model is installed by following construction process:1st, placement rig is on level land;2nd, three steel pipes are spliced one Rise, and steel pipe and lifting steel wire rope are fixed with latch;3rd, three steel pipes are screwed on rig substructure respectively and are reserved Draw-in groove in;4th, framework is inserted respectively in the steel cylinder of rig substructure rear end both sides, and two rectangular frames are fixed with screw connection;5、 By wire line hitch on the reserved annulus of rectangular frame and steel pipe, and tighten steel wire rope;6th, by boards rest in rectangular frame bottom Triangle put on block.
The beneficial effects of the utility model are:This geology bores auxiliary device economy flexibly, and assembly and disassembly is convenient, can make in advance Make framework, the work platformses for carrying are provided for narrow work platformses, be available for the work such as replacing drilling rod, metering-orifice, powder charge to make With.
Description of the drawings
Fig. 1 is geological drilling rig and tube chamber welds with base schematic diagram.
Fig. 2 is base schematic diagram.
Fig. 3 is work platformses schematic diagram.
Fig. 4 is that the geology used in a kind of explosion under water bores auxiliary device scheme of installation.
In figure:1- bases;2- steel pipes;3- geological drilling rigs;4- U-steel frames;5- rectangle steels;6- draw-in grooves;7- channel-section steels;8- works Platform;9- rectangular steel pipes;10- rectangular steel pipes;11- rectangular steel pipes;12- triangles put block;13- reserves annulus;14- pulleys;15- spiral shells Stricture of vagina steel stair;16- steel wire ropes.
Specific embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein ad initio Same or similar element or the element with same or like function are represented to same or similar label eventually.Below by ginseng The embodiment for examining Description of Drawings is exemplary, it is intended to for explaining this utility model, and it is not intended that to this utility model Restriction.
In description of the present utility model, it is to be understood that term " longitudinal direction ", " horizontal ", " on ", D score, " front ", " afterwards ", the orientation or position relationship of the instruction such as "left", "right", " vertical ", " level " is based on orientation shown in the drawings or position Relation, is for only for ease of description this utility model and simplifies description, rather than indicates or imply that the device or element of indication must Must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.
A kind of geology used in explosion under water bores drilling aid, including:
Work platformses 8, the work platformses 8 are made up of two rectangular frames;
Base 1, the base 1 include U-steel frame 4, rectangle steel 5, and the rectangle steel 5 is vertical with the rear end of U-steel frame 4 to be connected Connecing, three draw-in grooves 6 being respectively provided on two sides with 4 anteriomedial of the U-steel frame, rectangle steel 5, geological drilling rig 3 is welded on base 1;
Three steel pipes 2, three steel pipes, 2 top are stitched together, by latch and the pulley 14 of lifting steel wire rope It is fixed;The bottom of three steel pipes 2 is respectively bolted on three draw-in grooves 6 of base 1;
In the steel cylinder of two 1 rear end rectangle steel of rectangular frame difference inserted base, 5 both sides of the work platformses 8, it is used in combination Screw connection fixes two rectangular frames.
Triangle is provided with the inside of the bottom right angle of two rectangular frames of the work platformses 8 and puts block 12, in the rectangle Reserved annulus 13 is provided with the outside of the bottom right angle of framework;The middle and lower part of three steel pipes 2 is provided with reserved annulus 13;Described pre- 13 infantile tic of annulus is stayed to be buckled with steel wire rope 16;The U-steel frame 4 of the base 1, the outside of 5 connecting portion of rectangle steel arrange channel-section steel 7;It is described Screw thread steel stair 15 is provided with steel pipe 2.
A kind of geology used in explosion under water bores the making of drilling aid and installation steps are as follows.
(1)Select rapidoprint:
The screw-thread steel of screw thread steel stair 15 is processed using the selection of standard GB/T 700-88, chooses diameter 20mm screw-thread steels;
Steel wire rope 16 is processed using the selection of standard GB/T 8918-2006, chooses diameter 10mm steel wire ropes;
Using standard GB/T/T3094-2000 selections processing, the length of side is 40mm, wall thickness 4mm to rectangular steel pipe 9;
, using the processing of standard GB/T/T3094-2000 selections, the length of side is 80mm, wall thickness for rectangle steel 5, rectangular steel pipe 10 8mm;
Using standard GB/T/T3094-2000 selections processing, the length of side is 60mm, wall thickness 8mm to rectangular steel pipe 11;
The channel-section steel of U-steel frame 4, using standard GB/T/T707-1988 selections processing, from model 10, is highly 100mm, Average lower limb thickness 8.5mm;
Channel-section steel 7, using standard GB/T/T707-1988 selections processing, from model 8, is highly 80mm, average lower limb thickness 8.0mm;
Using the processing of standard GB/T/T 8162-2008 selections, external diameter is 45mm to steel pipe 2, tube thickness 3mm.
(2), by 2 length 1.9m channel-section steels, 3 length 0.7m channel-section steel compositions, channel-section steels 7 are by 2 length 0.6m grooves for U-steel frame 4 Steel composition, rectangle steel 5 are made up of 2 0.45m rectangular steel pipes;U-steel frame 4, channel-section steel 7, rectangle steel 5 are welded into bottom as shown in Figure 2 Seat 1.
(3)Such as Fig. 1, geological drilling rig 3 is welded and fixed with base 1.
(4)Screw-thread steel is welded on steel pipe 2 every 0.4m, and by the such as Fig. 4 screw connections of three steel pipes 2 in base 1 Draw-in groove 6 on, and pulley 14 is fixed on into 2 junction of steel pipe.
(5)Rectangular steel pipe 9 chooses rectangle steel 6 1.3m of montant, 4 1.6m of cross bar, 2 1.3m, 2 0.85m;Rectangle steel Pipe 10 chooses 1 0.4m of rectangle steel;Selection 2 0.6m of rectangle steel of rectangular steel pipe 11,2 1.5m, 2 0.9m, rectangular steel pipe 9, Rectangular steel pipe 10 is welded into the right rectangular frame of work platformses 8 as shown in Figure 3;Rectangular steel pipe 11 is welded into as shown in Figure 3 The left rectangular frame of work platformses 8.
(6)Two rectangular frames of work platformses 8 are spliced on base 1, and is screwed two frameworks.
(7)Steel wire rope 16 is fixed on reserved annulus 13.
(8)Boards rest is put on block 12 in triangle.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is Exemplary, it is impossible to it is interpreted as to restriction of the present utility model, one of ordinary skill in the art is in scope of the present utility model It is interior above-described embodiment to be changed, be changed, being replaced and modification.

Claims (6)

1. the geology used in a kind of explosion under water bores auxiliary device, it is characterised in that include:
Work platformses(8), the work platformses(8)It is made up of two rectangular frames;
Base(1), the base(1)Including U-steel frame(4), rectangle steel(5), the rectangle steel(5)With U-steel frame(4)Rear end It is vertical to connect, in the U-steel frame(4)Anteriomedial, rectangle steel(5)It is respectively provided on two sides with three draw-in grooves(6), geological drilling rig(3) It is welded on base(1)On;
Three steel pipes(2), three steel pipes(2)Top is stitched together, by latch and the pulley of lifting steel wire rope (14)It is fixed;Three steel pipes(2)Bottom be respectively bolted to base(1)Three draw-in grooves(6)On;
The work platformses(8)Two rectangular frames difference inserted bases(1)Rear end rectangle steel(5)In the steel cylinder of both sides, and Two rectangular frames are fixed with screw connection.
2. the geology used in a kind of explosion under water according to claim 1 bores auxiliary device, it is characterised in that in institute State work platformses(8)Two rectangular frames bottom right angle on the inside of be provided with triangle and put block(12), at the bottom of the rectangular frame Reserved annulus is provided with the outside of portion right angle(13).
3. the geology used in a kind of explosion under water according to claim 1 bores auxiliary device, it is characterised in that described Three steel pipes(2)Middle and lower part be provided with reserved annulus(13).
4. the geology used in a kind of explosion under water according to Claims 2 or 3 bores auxiliary device, it is characterised in that The reserved annulus(13)Infantile tic is buckled with steel wire rope(16).
5. the geology used in a kind of explosion under water according to claim 1 bores drilling aid, it is characterised in that The base(1)U-steel frame(4), rectangle steel(5)The outside of connecting portion arranges channel-section steel(7).
6. the geology used in a kind of explosion under water according to claim 1 bores auxiliary device, it is characterised in that described Steel pipe(2)On be provided with screw thread steel stair(15).
CN201621068809.9U 2016-09-22 2016-09-22 Auxiliary device is bored to geology of using in underwater blasting Active CN206174880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621068809.9U CN206174880U (en) 2016-09-22 2016-09-22 Auxiliary device is bored to geology of using in underwater blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621068809.9U CN206174880U (en) 2016-09-22 2016-09-22 Auxiliary device is bored to geology of using in underwater blasting

Publications (1)

Publication Number Publication Date
CN206174880U true CN206174880U (en) 2017-05-17

Family

ID=58676446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621068809.9U Active CN206174880U (en) 2016-09-22 2016-09-22 Auxiliary device is bored to geology of using in underwater blasting

Country Status (1)

Country Link
CN (1) CN206174880U (en)

Similar Documents

Publication Publication Date Title
CN105735251B (en) Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN109139052B (en) Grouting hole device based on high-pressure deep hole grouting and construction method
CN109595004B (en) Tunnel two-expansion four-expansion excavation method
CN104790959B (en) A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN102767178B (en) Stand column pile and construction method thereof
CN103266603A (en) Construction method for pre-drilling hole-forming base-expanding and grouting of prestressed concrete special-shaped pile
CN114233385A (en) Treatment method for mud burst and water burst of inclined shaft
CN106089027A (en) A kind of construction method utilizing anti-well rig maintenance drop shaft
CN108049397A (en) The construction method of Karst Geological Landscape drilled pile
CN103643673B (en) Steel-pipe pile and construction method can be recycled in self-advancing type
CN101832137A (en) Pre-embedding method for coal seam roof strut
CN112855029B (en) Goaf drilling external pipe expansion construction method
CN110094162A (en) A kind of drilling equipment and boring method of the pack hole for mine capital construction construction
CN104790971B (en) A kind of advanced pre-add solid method of steel tube shed of the small spacing ground constructing tunnel of shallow embedding
CN206174880U (en) Auxiliary device is bored to geology of using in underwater blasting
CN202688989U (en) Upright pile
CN110644492B (en) Comprehensive grouting construction method for steep dip angle wide-crack stratum
CN106836215B (en) Inside and outside hydraulic pressure autobalance steel pile casting
CN114233374B (en) Ground grouting construction method for reinforcing cavity collapse area of inclined shaft after mud burst and water burst
CN206785331U (en) A kind of rig for campshed of constructing
CN103088813B (en) Reinforcing cage anchoring method for manufacturing cast-in-situ bored pile
CN215169870U (en) A water installation is prevented gushing in drill way for horizontal directional drilling engineering geological survey
CN205154025U (en) Drill bit that construction drilling bored concrete pile was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211217

Address after: 430081 office a210, building 47, No. 1244, Heping Avenue, Qingshan District, Wuhan City, Hubei Province

Patentee after: China Railway 23rd Bureau Group (Hubei) blasting Co.,Ltd.

Address before: 430081 No. 1244 Heping Avenue, Qingshan District, Hubei, Wuhan

Patentee before: SINOSTEEL CORPORATION WUHAN SAFETY AND ENVIRONMENTAL PROTECTION RESEARCH INSTITUTE Co.,Ltd.

TR01 Transfer of patent right