CN206173198U - Sludge water piece -rate system - Google Patents
Sludge water piece -rate system Download PDFInfo
- Publication number
- CN206173198U CN206173198U CN201621085314.7U CN201621085314U CN206173198U CN 206173198 U CN206173198 U CN 206173198U CN 201621085314 U CN201621085314 U CN 201621085314U CN 206173198 U CN206173198 U CN 206173198U
- Authority
- CN
- China
- Prior art keywords
- cyclone
- charging
- delivery pump
- swirler
- charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cyclones (AREA)
Abstract
The utility model relates to a sludge water piece -rate system, including swirler, sludge tihckener and sewage desliming ware, the upper and lower both ends of swirler are equipped with mud water discharging tube and magnetic discharge pipe, and one side of swirler has an inlet pipe, the lower extreme of inlet pipe is equipped with first delivery pump, installs the second delivery pump between sludge tihckener and the sewage desliming ware, install magnetic separator between swirler and the sludge tihckener, the inlet pipe includes that the feeding is responsible for and is in charge of with the feeding of feeding person in charge diametric connection side by side from top to bottom, the feeding be in charge of with distribute upper and lower global in swirler of the link of swirler, the setting of staggering from top to bottom of upper and lower adjacent link, the lower extreme that the feeding was responsible for is connected the booster pump is installed to upper end that first delivery pump, feeding were responsible for, the output of booster pump has many pressure boost pipes, be connected with the honeycomb duct between the lower part lateral wall of swirler and the magnetic separator, install the third delivery pump on the honeycomb duct.
Description
Technical field
This utility model is related to technical field of environment protection equipment, more particularly to sewage disposal system.
Background technology
In prior art, sewage disposal system is carried out again after using cyclone is separated the magnetic powder in muddy water to muddy water
Concentration, the muddy water after concentration is exported again Jing after sludge dewatering equipment process.Wherein, because cyclone is only provided with a charging aperture,
It is provided with charging aperture into material conveying pump, the generally vertical tubular structure of cyclone, single charging aperture can not meet detached
High efficiency requires that charging rate is slow and concentrates, and causes separating effect poor;And can not be completely removed in sewage using cyclone
Magnetic powder, need the long period to separate, the bottom of cyclone often residual fraction sludge, it is difficult to remove.
Utility model content
The applicant is studied and is improved, there is provided a kind of sludge water piece-rate system for the disadvantages mentioned above of prior art,
Its cyclone adopts multiple feeding inlet structures, is effectively improved powder feeding efficiency, meets production requirement.
In order to solve the above problems, this utility model adopts following scheme:
A kind of sludge water piece-rate system, including cyclone, sludge concentration tank and sewage desliming device, the upper and lower ends of cyclone
Muddy water discharge pipe and magnetic powder discharge pipe are provided with, the side of cyclone carries the charging aperture of feed pipe, the feed pipe and cyclone
Connection, the lower end of the feed pipe is provided with the first delivery pump, between sludge concentration tank and sewage desliming device the second conveying is provided with
Pump,
Magnetic separator is installed between the cyclone and sludge concentration tank;The feed pipe include charging supervisor and on
Under be in charge of with the charging radially connected charging of supervisor side by side, the charging is in charge of and is distributed in cyclone with the connection end of cyclone
Upper and lower side face, neighbouring connection end is staggered up and down setting;The lower end of the charging supervisor connects first delivery pump, enters
The upper end of material supervisor is provided with booster pump, and the outfan of the booster pump has many pressure inlets, and the pressure inlet is corresponded to and entered
Material is in charge of connection;
Mozzle is connected between the lower sides and magnetic separator of the cyclone, is provided with the mozzle
Three delivery pumps, mozzle is located at the lower section of the pressure inlet of bottom with the connection end of cyclone.
It is of the present utility model to have technical effect that:
In this utility model, using the cyclone with many feed pipes, realize to distributing conveying material (sludge), profit
In lock out operation, its separation efficiency and effect are improved;Auxiliary delivery pump is set on cyclone, beneficial to increase discharge pressure, enters one
Step improves separation efficiency;The bottom of cyclone arranges mozzle, derives beneficial to the sludge to bottom, it is to avoid sludge is remained,
Improve separating effect.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1st, cyclone;2nd, muddy water discharge pipe;3rd, magnetic powder discharge pipe;4th, the first delivery pump;5th, charging supervisor;6th, enter
Material is in charge of;61st, connection end;7th, booster pump;8th, pressure inlet;9th, sludge concentration tank;10th, sewage desliming device;11st, magnetic separator;
12nd, the second delivery pump;13rd, mozzle;14th, the 3rd delivery pump.
Specific embodiment
Specific embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
As shown in figure 1, the sludge water piece-rate system of the present embodiment, including cyclone 1, sludge concentration tank 9 and sewage desliming
Device 10, the upper and lower ends of cyclone 1 are provided with muddy water discharge pipe 2 and magnetic powder discharge pipe 3, and the side of cyclone 1 carries feed pipe, enters
Expects pipe is connected with the charging aperture of cyclone 1, and the lower end of feed pipe is provided with the first delivery pump 4, sludge concentration tank 9 and sewage desliming device
Second delivery pump 12 is installed between 10.
As shown in figure 1, being provided with magnetic separator 11 between cyclone 1 and sludge concentration tank 9;Feed pipe includes charging master
Pipe 5 and side by side up and down and charging 5 radially connected chargings of supervisor are in charge of 6, and charging is in charge of 6 and is distributed with the connection end 61 of cyclone 1
In the side face up and down of cyclone 1, neighbouring connection end is staggered setting about 61;The lower end connection first of charging supervisor 5 is defeated
The upper end for sending pump 4, charging supervisor 5 is provided with booster pump 7, and the outfan of booster pump 7 has many pressure inlets 8, the correspondence of pressure inlet 8
It is in charge of 6 with charging to connect;
As shown in figure 1, mozzle 13 is connected between the lower sides of cyclone 1 and magnetic separator 11, mozzle 13
On the 3rd delivery pump 14 is installed, mozzle 13 is located at the lower section of the pressure inlet 8 of bottom with the connection end of cyclone 1.
6 formation tertiary structure are in charge of in the charging of setting side by side up and down, realize that distributing conveying material is (dirty in cyclone 1
Mud), beneficial to the lock out operation of cyclone 1, improve its separation efficiency and effect;Booster pump 7 is set, beneficial to increase discharge pressure,
And it is in charge of 6 by the correspondence connection charging of pressure inlet 8, further improve separation efficiency.Muddy water of the sewage after separated from upper end
Export in discharge pipe 2, the magnetic powder isolated is expelled in magnetic separator 11, and positioned at rotation from the magnetic powder discharge pipe 3 of lower end
The partial sludge of stream device 1 bottom is entered in magnetic separator 11 under the guide functions of mozzle 13;Jing magnetic separators 11
Secondary separation magnetic powder, realizes that magnetic powder is completely separated out from sludge;Sludge after separation concentrate in sludge concentration tank 9 after through
Second delivery pump 12 is delivered in sewage desliming device 10 and carries out filter-press dehydration process.
In this utility model, cyclone 1, magnetic separator 11, sludge concentration tank 9 and sewage desliming device 10 belong to routine
Equipment, therefore its concrete structure and the course of work are described in detail.
Embodiment provided above is better embodiment of the present utility model, only for convenient explanation this utility model, and
It is non-to make any pro forma restriction to this utility model, any those of ordinary skill in the art, if without departing from
This utility model is carried in the range of technical characteristic, is locally changed or is repaiied using done by this utility model disclosed technology content
The Equivalent embodiments of decorations, and without departing from technical characteristic content of the present utility model, still fall within this utility model technical characteristic
In the range of.
Claims (1)
1. a kind of sludge water piece-rate system, including cyclone (1), sludge concentration tank (9) and sewage desliming device (10), cyclone
(1) upper and lower ends are provided with muddy water discharge pipe (2) and magnetic powder discharge pipe (3), and the side of cyclone (1) carries feed pipe, described
Feed pipe is connected with the charging aperture of cyclone (1), and the lower end of the feed pipe is provided with the first delivery pump (4), sludge concentration tank (9)
Second delivery pump (12) is installed between sewage desliming device (10), it is characterised in that:
Magnetic separator (11) is installed between the cyclone (1) and sludge concentration tank (9);The feed pipe includes charging master
Pipe (5) and the charging radially connected with charging supervisor (5) side by side up and down are in charge of (6), and (6) and cyclone (1) are in charge of in the charging
Connection end (61) be distributed in the side face up and down of cyclone (1), neighbouring connection end (61) is staggered up and down setting;It is described enter
The lower end of material supervisor (5) connects first delivery pump (4), and the upper end of charging supervisor (5) is provided with booster pump (7), the increasing
The outfan of press pump (7) has many pressure inlets (8), and pressure inlet (8) correspondence is in charge of (6) with charging and is connected;
Mozzle (13), the mozzle are connected between the lower sides and magnetic separator (11) of the cyclone (1)
(13) the 3rd delivery pump (14) is installed, mozzle (13) is located at the pressure inlet (8) of bottom with the connection end of cyclone (1) on
Lower section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621085314.7U CN206173198U (en) | 2016-09-27 | 2016-09-27 | Sludge water piece -rate system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621085314.7U CN206173198U (en) | 2016-09-27 | 2016-09-27 | Sludge water piece -rate system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206173198U true CN206173198U (en) | 2017-05-17 |
Family
ID=58676944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621085314.7U Expired - Fee Related CN206173198U (en) | 2016-09-27 | 2016-09-27 | Sludge water piece -rate system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206173198U (en) |
-
2016
- 2016-09-27 CN CN201621085314.7U patent/CN206173198U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103157303B (en) | A kind of oscillating mode swash plate box settlement separator | |
CN203948083U (en) | A kind of heterogeneous cyclone desanding device | |
CN204211565U (en) | Sewage purification device | |
CN206188452U (en) | Oil -water separator | |
CN206173159U (en) | Sludge water processing system | |
CN203948084U (en) | A kind of many hydrocyclones | |
CN103801553A (en) | Concrete waste comprehensive treatment system | |
CN206173198U (en) | Sludge water piece -rate system | |
CN206173034U (en) | Mud -water separation uses swirler separator | |
CN210278496U (en) | Oil-water separator | |
CN203791330U (en) | Concrete waste comprehensive processing system | |
CN204769204U (en) | Pond method of filling out sediment thick liquid conveyor that builds a dam | |
CN204981529U (en) | High -efficient mud -water separation system | |
CN204981469U (en) | Mud -water separation system | |
CN201342285Y (en) | Silt particle high efficient separating purifier | |
CN208356216U (en) | A kind of sewage discharge dirt separation case | |
CN204981470U (en) | Whirlwind isolating construction of mud -water separation system | |
CN201320470Y (en) | Separating and regenerating device for ion exchange resin and active carbon | |
CN106430410A (en) | Cyclone-type mud-water separation device | |
CN106242153A (en) | A kind of sludge slurry treatment system | |
CN106242235A (en) | A kind of sludge water piece-rate system | |
CN103481207B (en) | Recovery device of abrasive in abrasive water-jet descaling system | |
CN208512058U (en) | A kind of efficiency material dewatering system | |
CN206554913U (en) | A kind of oil field shaft mouth oil removing is removed sand skid integrated purification device | |
CN205461369U (en) | Tailing dry emission system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 Termination date: 20170927 |