CN206169049U - Stamping die is connected to an awl section of thick bamboo - Google Patents
Stamping die is connected to an awl section of thick bamboo Download PDFInfo
- Publication number
- CN206169049U CN206169049U CN201620901280.8U CN201620901280U CN206169049U CN 206169049 U CN206169049 U CN 206169049U CN 201620901280 U CN201620901280 U CN 201620901280U CN 206169049 U CN206169049 U CN 206169049U
- Authority
- CN
- China
- Prior art keywords
- station
- punch
- cutting
- mold
- die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Punching Or Piercing (AREA)
Abstract
本实用新型提出了一种锥筒连接冲压模具,包括上模和下模,所述上模自上至下依次连接有上模座、上垫板、上夹板、上挡板和脱料板,所述下模自下至上依次连接有下模座、下垫板、下模板和导料板,所述上模和下模之间依次设有冲孔工位、冲裁工位、折弯工位、整圆工位、整形修边工位和切落工位。本实用新型提出的连接冲压模具与单工模具相比,有效地提高了工件在生产过程中的生产效率,同时,有效地提高了其加工精度,提高了产品质量,同时,降低成本投入及相关的人员成本,提高了经济效益。
The utility model proposes a stamping die connected by a cone cylinder, which includes an upper die and a lower die, and the upper die is sequentially connected with an upper die base, an upper backing plate, an upper splint, an upper baffle plate and a stripping plate from top to bottom. The lower mold is sequentially connected with a lower mold base, a lower backing plate, a lower template and a material guide plate from bottom to top, and a punching station, a blanking station, and a bending station are successively arranged between the upper mold and the lower mold. Station, full circle station, shaping and trimming station and cutting off station. Compared with the simplex mold, the connecting stamping die proposed by the utility model effectively improves the production efficiency of the workpiece in the production process, and at the same time, effectively improves its processing accuracy and improves the product quality. At the same time, it reduces cost input and related Personnel cost, improve economic efficiency.
Description
技术领域technical field
本实用新型涉及冲压模具技术领域,具体涉及一种锥筒连接冲压模具。The utility model relates to the technical field of punching dies, in particular to a punching die connected with a cone.
背景技术Background technique
模具是制造业的重要工艺基础,在我国模具制造属于专用设备制造业。冲压模具,是在冷冲压加工中,将材料(金属或非金属)加工成零件(或半成品)的一种特殊工艺装备,称为冷冲压模具。冲压,是在室温下,利用安装在压力机上的模具对材料施加压力,使其产生分离或塑性变形,从而获得所需零件的一种压力加工方法。冲压模具是冲压生产必不可少的工艺装备,是技术密集型产品。冲压件的质量、生产效率以及生产成本等,与模具设计和制造有直接关系。模具设计与制造技术水平的高低,是衡量一个国家产品制造水平高低的重要标志之一,在很大程度上决定着产品的质量、效益和新产品的开发能力。Mold is an important technological foundation of the manufacturing industry. In my country, mold manufacturing belongs to the special equipment manufacturing industry. Stamping die is a special process equipment for processing materials (metal or non-metal) into parts (or semi-finished products) in cold stamping processing, called cold stamping die. Stamping is a pressure processing method that uses a mold installed on a press to apply pressure to the material at room temperature to cause separation or plastic deformation to obtain the required parts. Stamping die is an indispensable process equipment for stamping production, and it is a technology-intensive product. The quality, production efficiency and production cost of stamping parts are directly related to the design and manufacture of molds. The level of mold design and manufacturing technology is one of the important symbols to measure the level of a country's product manufacturing, and it determines the quality, efficiency and new product development capabilities of products to a large extent.
目前,汽车部件都是通过单工模具来制作完成,由多个加工工序加工制作完成,利用单工模具需要多套模具相互配合使用,这样整个加工工艺复杂,增加了生产成本,同时因为要经过多套模具的加工,不能保证工件的工艺要求,在制造过程中容易出现偏差,精度低,而且生产效率低。At present, automobile parts are all made by simplex molds, which are processed and produced by multiple processing procedures. The use of simplex molds requires multiple sets of molds to be used together, so that the entire processing process is complicated, which increases production costs. The processing of multiple sets of molds cannot guarantee the technological requirements of the workpiece, and deviations are prone to occur during the manufacturing process, with low precision and low production efficiency.
因此,针对上述问题,本实用新型提出了一种新的技术方案。Therefore, for the problems referred to above, the utility model proposes a new technical solution.
实用新型内容Utility model content
本实用新型的目的是提供一种结构合理,提高生产效率,提高加工精度,提高产品质量,降低生产成本的锥筒连接冲压模具。The purpose of the utility model is to provide a cone-tube connection stamping die with reasonable structure, high production efficiency, high processing precision, high product quality and low production cost.
本实用新型是通过以下技术方案来实现的:The utility model is achieved through the following technical solutions:
一种锥筒连接冲压模具,包括上模和下模,所述上模自上至下依次连接有上模座、上垫板、上夹板、上挡板和脱料板,所述下模自下至上依次连接有下模座、下垫板、下模板和导料板,所述上模和下模之间依次设有冲孔工位、冲裁工位、折弯工位、整圆工位、整形修边工位和切落工位;A stamping die connected by a cone barrel, comprising an upper die and a lower die, the upper die is connected with an upper die base, an upper backing plate, an upper splint, an upper baffle plate and a stripping plate in sequence from top to bottom, and the lower die is From the bottom to the top, there are lower mold base, lower backing plate, lower template and material guide plate in sequence. The punching station, blanking station, bending station, and full-circle station are arranged between the upper mold and the lower mold in sequence. station, shaping and trimming station and cutting station;
所述冲孔工位包括固定安装在上夹板上的冲孔冲头,所述冲孔冲头安装于上夹板入块上;The punching station includes a punching head fixed on the upper splint, and the punching head is installed on the upper splint block;
所述冲裁工位包括位于上夹板上的第一裁切冲头、第二裁切冲头和第三裁切冲头,所述第一裁切冲头、第二裁切冲头和第三裁切冲头之间相互配合;The punching station includes a first cutting punch, a second cutting punch and a third cutting punch on the upper clamping plate, the first cutting punch, the second cutting punch and the third cutting punch The three cutting punches cooperate with each other;
所述折弯工位包括位于上夹板的折弯冲,所述下模板上设有顶料销,所述顶料销两侧设有成型块,成型块、折弯冲和顶料销之间配合完成打弧形工序;The bending station includes a bending punch located on the upper splint, and a jacking pin is provided on the lower template, and forming blocks are arranged on both sides of the jacking pin, between the forming block, the bending punch and the jacking pin Cooperate to complete the arc forming process;
所述整圆工位包括位于上夹板上的整圆冲,所述下模板上设有与整圆冲相配合的第一下模板入块,所述整圆冲安装于滑座上,所述滑座设有上夹板上;The full-circle station includes a full-circle punch located on the upper splint, and the lower template is provided with a first lower template entry block matched with the full-circle punch, and the full-circle punch is installed on a sliding seat. The sliding seat is provided with an upper splint;
所述整形工位包括位于上夹板上的整形冲和第二下模板入块,所述整形冲与第二下模板入块相配合;The shaping station includes a shaping punch positioned on the upper splint and a second lower template block, the shaping punch is matched with the second lower template block;
所述切落工位包括切刀,所述切刀安装于上夹板上,所述下垫板上设有刀口入块,所述刀口入块与切刀相配合。The cutting and dropping station includes a cutting knife, the cutting knife is installed on the upper splint, and the lower backing plate is provided with a knife-edge block, and the knife-edge block cooperates with the cutting knife.
进一步地,所述冲裁工位与折弯工位之间设有刻字工位,所述刻字位包括刻字模,所述刻字模安装于上夹板上。Further, a lettering station is provided between the punching station and the bending station, and the lettering station includes a lettering mold, and the lettering mold is installed on the upper splint.
进一步地,所述冲孔工位、冲裁工位、折弯工位、整圆工位、整形修边工位和切落工位的脱料板上均设有引导针。Further, guide pins are provided on the stripping plates of the punching station, blanking station, bending station, full circle station, trimming station and cutting station.
进一步地,所述整圆工位和整形修边工位段均设有导向块,所述导向块与安装于下模座弹簧相连接。Further, the full circle station and the shaping and trimming station section are equipped with guide blocks, and the guide blocks are connected to the springs installed on the lower die base.
进一步地,所述下模板两侧设有靠块。Further, there are resting blocks on both sides of the lower formwork.
进一步地,所述上模座上内导柱,所述下模座上设有内导套,所述内导柱与内导套相配合。Further, an inner guide post is provided on the upper die base, and an inner guide sleeve is provided on the lower die base, and the inner guide post cooperates with the inner guide sleeve.
进一步地,所述上夹板上设有外限位柱。Further, the upper splint is provided with an outer limit post.
进一步地,所述下模板一侧设有定位块,所述定位块与切断工位相配合。Further, a positioning block is provided on one side of the lower formwork, and the positioning block cooperates with the cutting station.
本实用新型的有益效果是:本实用新型提出的连接冲压模具与单工模具相比,有效地提高了工件在生产过程中的生产效率,同时,有效地提高了其加工精度,提高了产品质量,同时,降低成本投入及相关的人员成本,提高了经济效益。The beneficial effects of the utility model are: compared with the simplex mold, the connection stamping die proposed by the utility model effectively improves the production efficiency of the workpiece in the production process, and at the same time, effectively improves its processing accuracy and improves product quality. , At the same time, the cost input and related personnel costs are reduced, and the economic benefits are improved.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型的主视图;Fig. 2 is the front view of the utility model;
图3为本实用新型中上垫板的结构示意图;Fig. 3 is the structural representation of the upper backing plate in the utility model;
图4为本实用新型中上夹板的结构示意图;Fig. 4 is the structural schematic diagram of upper splint in the utility model;
图5为本实用新型中脱料板的结构示意图;Fig. 5 is the structural representation of stripping plate in the utility model;
图6为本实用新型中下模板的结构示意图。Fig. 6 is a structural schematic diagram of the middle and lower formwork of the present invention.
其中:1、上模座,2、上垫板,3、上夹板,4、上挡板,5、脱料板,6、下模座,7、下垫板,8、下模板,9、导料板,10、冲孔冲头,11、上夹板入块,12、第一裁切冲头,13、第二裁切冲头,14、第三裁切冲头,15、刻字模,16、折弯冲,17、滑座,18、整圆冲,19、成型块,20、顶料销,21、第二下模板入块,22、整形冲,23、第一下模入块,24、切刀,25、刀口入块,26、定位块,27、靠块,28、引导针,29、导向块,30、外限位块。Among them: 1. Upper mold base, 2. Upper backing plate, 3. Upper splint, 4. Upper baffle plate, 5. Stripper plate, 6. Lower mold base, 7. Lower backing plate, 8. Lower template, 9. Material guide plate, 10, punching punch, 11, upper splint into block, 12, first cutting punch, 13, second cutting punch, 14, third cutting punch, 15, lettering die, 16. Bending punch, 17. Sliding seat, 18. Full circle punch, 19. Forming block, 20. Ejector pin, 21. Blocking of the second lower template, 22. Shaping punch, 23. Blocking of the first lower die , 24, cutter, 25, knife edge into block, 26, positioning block, 27, by block, 28, guide needle, 29, guide block, 30, outer limit block.
具体实施方式detailed description
下面结合附图说明结本实用新型做进一步地说明。Below in conjunction with the accompanying drawings, the utility model will be further described.
如图1~6所示,一种锥筒连接冲压模具,包括上模和下模,上模自上至下依次连接有上模座1、上垫板2、上夹板3、上挡板4和脱料板5,下模自下至上依次连接有下模座6、下垫板7、下模板8和导料板9,上模和下模之间依次设有冲孔工位、冲裁工位、折弯工位、整圆工位、整形修边工位和切落工位;As shown in Figures 1 to 6, a stamping die connected by a cone tube includes an upper die and a lower die. The upper die is connected with an upper die base 1, an upper backing plate 2, an upper splint 3, and an upper baffle 4 in sequence from top to bottom. And the stripper plate 5, the lower mold is connected with the lower mold base 6, the lower backing plate 7, the lower template 8 and the material guide plate 9 successively from bottom to top. Station, bending station, full circle station, shaping and trimming station and cutting off station;
冲孔工位包括固定安装在上夹板3上的冲孔冲头10,冲孔冲头10安装于上夹板入块11上;The punching station includes a punch 10 fixedly installed on the upper splint 3, and the punch 10 is installed on the upper splint entry block 11;
冲裁工位包括位于上夹板3上的第一裁切冲头12、第二裁切冲头13和第三裁切冲头14,第一裁切冲头12、第二裁切冲头13和第三裁切冲头14之间相互配合;The blanking station includes the first cutting punch 12, the second cutting punch 13 and the third cutting punch 14 positioned on the upper clamping plate 3, the first cutting punch 12, the second cutting punch 13 Cooperate with the third cutting punch 14;
折弯工位包括位于上夹板的折弯冲16,下模板8上设有顶料销20,顶料销20两侧设有成型块19,成型块19、折弯冲16和顶料销20之间配合完成打弧形工序;The bending station includes a bending punch 16 located on the upper splint, a jacking pin 20 is arranged on the lower template 8, and forming blocks 19 are arranged on both sides of the jacking pin 20, the forming block 19, the bending punch 16 and the jacking pin 20 Cooperate with each other to complete the arc forming process;
整圆工位包括位于上夹板上的整圆冲18,下模板8上设有与整圆冲18相配合的第一下模板入块23,整圆冲18安装于滑座17上,滑座17设有上夹板3上;The full-circle station includes a full-circle punch 18 located on the upper splint. The lower template 8 is provided with a first lower template entry block 23 that matches the full-circle punch 18. The full-circle punch 18 is installed on the slide 17, and the slide 17 is provided with upper splint 3;
整形工位包括位于上夹板3上的整形冲22和第二下模板入块21,整形冲22与下第二下模板入块21相配合;The shaping station includes a shaping punch 22 on the upper splint 3 and a second lower template entry block 21, and the shaping punch 22 is matched with the second lower template entry block 21;
切落工位包括切刀24,切刀24安装于上夹板3上,下垫板7上设有刀口入块25,刀口入块25与切刀24相配合。Cutting off station comprises cutter 24, and cutter 24 is installed on the upper splint 3, and lower backing plate 7 is provided with edge of a knife and goes into block 25, and edge of a knife goes into block 25 and cutter 24 and cooperates.
在本实施例中,冲裁工位与折弯工位之间设有刻字工位,刻字位包括刻字模15,刻字模15安装于上夹板3上。In this embodiment, a lettering station is provided between the punching station and the bending station, and the lettering station includes a lettering mold 15 installed on the upper splint 3 .
在本实施例中,冲孔工位、冲裁工位、折弯工位、整圆工位、整形修边工位和切落工位的脱料板5上均设有引导针28。In this embodiment, guide pins 28 are provided on the stripping plate 5 of the punching station, blanking station, bending station, rounding station, trimming station and cutting station.
在本实施例中,整圆工位和整形修边工位段均设有导向块29,导向块29与安装于下模座6弹簧相连接。In this embodiment, both the full-circle station and the trimming station section are provided with a guide block 29, and the guide block 29 is connected with the spring installed on the lower mold base 6.
在本实施例中,下模板8两侧设有靠块27。In this embodiment, there are supporting blocks 27 on both sides of the lower template 8 .
在本实施例中,上模座1上内导柱,下模座6上设有内导套,内导柱与内导套相配合。In this embodiment, the upper die base 1 is provided with an inner guide post, and the lower die base 6 is provided with an inner guide sleeve, and the inner guide post is matched with the inner guide sleeve.
在本实施例中,上夹板3上设有外限位柱30。In this embodiment, the upper splint 3 is provided with an outer limit post 30 .
在本实施例中,下模板8一侧设有定位块26,定位块26与切断工位相配合。In this embodiment, a positioning block 26 is provided on one side of the lower template 8, and the positioning block 26 cooperates with the cutting station.
本实用新型提出的连接冲压模具与单工模具相比,有效地提高了工件在生产过程中的生产效率,同时,有效地提高了其加工精度,提高了产品质量,同时,降低成本投入及相关的人员成本,提高了经济效益。Compared with the simplex mold, the connecting stamping die proposed by the utility model effectively improves the production efficiency of the workpiece in the production process, and at the same time, effectively improves its processing accuracy and improves the product quality. At the same time, it reduces cost input and related Personnel cost, improve economic benefits.
以上仅是本实用新型的实施例,并非是对本实用新型作任何其他形式的限制,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only the embodiments of the utility model, and are not intended to limit the utility model in any other way. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620901280.8U CN206169049U (en) | 2016-08-19 | 2016-08-19 | Stamping die is connected to an awl section of thick bamboo |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620901280.8U CN206169049U (en) | 2016-08-19 | 2016-08-19 | Stamping die is connected to an awl section of thick bamboo |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206169049U true CN206169049U (en) | 2017-05-17 |
Family
ID=60240164
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620901280.8U Expired - Fee Related CN206169049U (en) | 2016-08-19 | 2016-08-19 | Stamping die is connected to an awl section of thick bamboo |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206169049U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107971398A (en) * | 2018-01-03 | 2018-05-01 | 昆山晶瑞立新五金有限公司 | A kind of projector radiating frame stamping die |
| CN109175100A (en) * | 2018-11-14 | 2019-01-11 | 东莞勤德五金制品有限公司 | A kind of thin arm-piece stamping die of display backlight with shaping feature in mould |
| CN113102629A (en) * | 2021-03-25 | 2021-07-13 | 皇裕电子科技(扬州)有限公司 | Waste-free rounding device and method |
-
2016
- 2016-08-19 CN CN201620901280.8U patent/CN206169049U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107971398A (en) * | 2018-01-03 | 2018-05-01 | 昆山晶瑞立新五金有限公司 | A kind of projector radiating frame stamping die |
| CN109175100A (en) * | 2018-11-14 | 2019-01-11 | 东莞勤德五金制品有限公司 | A kind of thin arm-piece stamping die of display backlight with shaping feature in mould |
| CN113102629A (en) * | 2021-03-25 | 2021-07-13 | 皇裕电子科技(扬州)有限公司 | Waste-free rounding device and method |
| CN113102629B (en) * | 2021-03-25 | 2022-11-22 | 皇裕电子科技(扬州)有限公司 | Waste-free rounding device and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206824495U (en) | Annular stretching hole flanging shaping class progressive die | |
| CN210586743U (en) | Support flanging hole flanging tool | |
| CN109676027A (en) | Electric car start stop apparatus shell stamping die and technique | |
| CN202377388U (en) | Automobile spare wheel bin part manufacture system | |
| CN206169049U (en) | Stamping die is connected to an awl section of thick bamboo | |
| CN204912477U (en) | Stamping die is connected to shell fragment | |
| CN204620843U (en) | Make the progressive die of automotive seat clamp support | |
| CN106140963A (en) | A kind of cone cylinder continuous stamping die | |
| CN107442650A (en) | A kind of narrow body stamping parts forming technology and set of molds | |
| CN210788848U (en) | A spacer processing mold with replaceable mold core | |
| CN205613917U (en) | A continuous stamping die for a car roll bracket | |
| CN204584061U (en) | A kind of automobile exhaust pipe end cone drawing die | |
| CN105081103A (en) | Continuous mold for cement cover and similar hardware | |
| CN205056804U (en) | Cement cover modulus of continuity | |
| CN206997508U (en) | A mold for the production of resistor brackets | |
| CN105081100A (en) | Door frame hardware progressive die | |
| CN203972626U (en) | The punch level progressive die mould that die body is not fragile and energy quick-replaceable is inserted | |
| CN107971398A (en) | A kind of projector radiating frame stamping die | |
| CN102699206A (en) | Continuous punching mould of movement bracket | |
| CN103182422B (en) | A kind of method that automobile spare tire cabin part is produced | |
| CN202683762U (en) | S-shaped bent spring die | |
| CN207857630U (en) | A kind of projector radiating frame diel | |
| CN207941871U (en) | A kind of novel flanging and restriking mold | |
| CN205183505U (en) | Bending angle finely tunes forming device | |
| CN206854457U (en) | The punch-forming mold of motor rotor rack |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 |