CN206162213U - Dormitory collective heating installation is used for being under construction - Google Patents

Dormitory collective heating installation is used for being under construction Download PDF

Info

Publication number
CN206162213U
CN206162213U CN201621008473.7U CN201621008473U CN206162213U CN 206162213 U CN206162213 U CN 206162213U CN 201621008473 U CN201621008473 U CN 201621008473U CN 206162213 U CN206162213 U CN 206162213U
Authority
CN
China
Prior art keywords
heating
control circuit
water tank
pipeline
radiator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621008473.7U
Other languages
Chinese (zh)
Inventor
王群伟
崔建涛
韩富强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
13th Construction Co Ltdof China National Chemical Engineering
Original Assignee
13th Construction Co Ltdof China National Chemical Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 13th Construction Co Ltdof China National Chemical Engineering filed Critical 13th Construction Co Ltdof China National Chemical Engineering
Priority to CN201621008473.7U priority Critical patent/CN206162213U/en
Application granted granted Critical
Publication of CN206162213U publication Critical patent/CN206162213U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model provides a dormitory collective heating installation is used for being under construction, includes CPU, control circuit, hot -water heating pipeline and adds heat -insulating material, the heating part is heated the hot -water heating pipeline through control circuit by CPU, the hot -water heating pipeline includes water tank, pipeline and radiator, the water tank constitutes circulation pipeline with the radiator, adding heat -insulating material and being located the water tank, it is connected with control circuit, it is first heating rod to add heat -insulating material. The utility model discloses a radiator can take the connected mode of a plurality of parallelly connected companies to assemble, has realized through a heating source, and has reached the multiunit radiator and carry out radiating purpose. And, at the foretell temperature control of cooperation, then avoided effectively because of the pipeline longer, and the not enough problem of the heat supply that causes.

Description

One kind is for dormitory collective heating installation of constructing
Technical field
The utility model is related to a kind of heating installation, particularly a kind of suitable for used in dormitory at the construction field (site) Controllable type heating installation, belongs to heating technical field.
Background technology
With the continuous development of warmer, heating installation is also constantly being improved, to be more applicable for people's In productive life.At present, the heater that heating is used is mostly individual separate heater, the heating installation of this type, because of behaviour Make succinct, conveniently moving, the features such as stable, and it is widely used by people institute.However, in job site, by its condition institute Limit, in the past suitable for the heating installation of people, is not particularly suited for the place such as at the construction field (site) and uses.It is described due to job site Living environment is mostly dormitory, more with number, and area is larger, the characteristic such as plot ratio is larger, and this has resulted in individuality Independent heater, can not well complete work of warming oneself;And if take and use simultaneously if multiple separate heaters, can The living environment of workmen is further reduced, reduces activity space, so the independent heating installation of this individuality, can not expire The requirement of sufficient job site heating.Further, since the house desigh of job site is also different from house at ordinary times, so, it is right The control of temperature, it is also desirable to carry out high and low adjustment constantly, to ensure the normal life of workmen.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided one kind serves collective place at the construction field (site) House heating installation, it is its simple structure, easy for installation, can effectively ensure the auto-control system of heater heating-up temperature.
Problem described in the utility model is solved by the following technical programs:
One kind is for construct dormitory collective heating installation, including CPU, control circuit, hot-water heating pipeline and heating member;It is described to add By CPU hot-water heating pipeline is heated by control circuit hot part;The hot-water heating pipeline includes water tank, pipeline and radiator; The water tank constitutes circulation line with radiator;The heating member is located in water tank, and it is connected with control circuit;The heating member For the first heating rod.
It is above-mentioned for dormitory collective heating installation of constructing, the control circuit includes the first relay and the first triode; The base stage of first triode is connected with the P2.0 ends of CPU, grounded emitter, and colelctor electrode is connected with first relay one end; The other end of first relay is connected with power end;The normally opened contact of first relay, its one end and AC power End connection, the other end is connected with the first heating rod, controls the first heating rod state.
Above-mentioned to set up temperature control part for dormitory collective heating installation of constructing, the temperature control part is temperature sensor, and it is arranged In the backwater end of water tank, the temperature sensor is connected with the P1.0 ends of CPU.
It is above-mentioned for dormitory collective heating installation of constructing, the heating rod and control circuit are disposed as multigroup;It is described to add Hot pin sets up second, third heating rod, constitutes complete independence with second, third relay and second, third triode respectively Control circuit.
It is above-mentioned for dormitory collective heating installation of constructing, set up circulating pump, the circulating pump and be arranged on the water side of water tank.
It is above-mentioned for dormitory collective heating installation of constructing, the radiator be set to it is multiple, parallel connection constitute circulation line.
The utility model realizes the real-time inspection and control of right heating installation temperature by temperature sensor and CPU, and leads to Multigroup control circuit is crossed, the multiple heating rods in water tank are controlled respectively, to complete the control to temperature, effectively carried The high practicality of heating installation, it is not in place to temperature control to solve traditional heating installation, and caused heat supply is excessive or not The phenomenons such as foot, have ensured the quality of life of workmen.In addition, radiator of the present utility model can take multiple companies even in parallel The mode of connecing is assembled, and is realized by a heating source, and reaches the purpose that multigroup radiator is radiated.And, matching somebody with somebody Close the temperature control stated, then efficiently avoid because pipeline is longer, and the not enough problem of the heat supply for causing.
Description of the drawings
Fig. 1 is the utility model structural representation.
Each list of reference numerals is in figure:1. water tank, 2. water-changing tube, 3. pipeline, 4. radiator, the heating rods of L1. first, L2. Two heating rods, the heating rods of L3. the 3rd, the relays of J1. first, the relays of J2. second, the relays of J3. the 3rd, the poles of Q1. the one or three Pipe, the triodes of Q2. second, the triodes of Q3. the 3rd, B. circulating pumps, the relay normally open contacts of J1-1. first, the relays of J2-1. second Device normally opened contact, the relay normally open contacts of J3-1. the 3rd, P. temperature sensors.
Specific embodiment
Referring to Fig. 1, the utility model includes CPU, control circuit, hot-water heating pipeline and heating member;The heating part is by CPU Hot-water heating pipeline is heated by control circuit;The hot-water heating pipeline includes water tank 1, pipeline 3 and radiator 4;The water tank 1 Circulation line is constituted with radiator 4;The heating member is located in water tank 1, and it is connected with control circuit;The heating member is first Heating rod L1.In addition, unobstructed in order to ensure the water circulation in pipeline, spy sets up circulating pump B, the circulating pump B and is arranged on water tank 1 Water side.The radiator 4 is set to multiple, parallel connection composition circulation line.
Control circuit described in the utility model is used to control the working condition of heating rod, and it includes the first relay J1 With the first triode Q1;The base stage of the first triode Q1 is connected with the P2.0 ends of CPU, grounded emitter, colelctor electrode and One relay J1 one end connects;The other end of the first relay J1 is connected with power end;The first relay J1's is normal Contact J1-1 is opened, its one end is connected with alternating current source, the other end is connected with the first heating rod L1, control the first heating rod L1 shapes State.
The utility model also has additional the temperature control part for coordinating control circuit to use, and the temperature control part is temperature sensor P, it The backwater end of water tank 1 is arranged on, for collecting the water temperature of backwater end.The temperature sensor P is connected with the P1.0 ends of CPU.
Heating rod of the present utility model and control circuit are disposed as multigroup;The heating rod sets up second, third heating Rod, constitutes complete independent controling circuit, so as to realize to taking with second, third relay and second, third triode respectively The multi-temperature control of heater device so as to which the life for being more suitable for people is used.

Claims (6)

1. a kind of for dormitory collective heating installation of constructing, it is characterised in that:Including CPU, control circuit, hot-water heating pipeline and heating Part;The heating part is heated by control circuit by CPU to hot-water heating pipeline;The hot-water heating pipeline includes water tank (1), pipe Road (3) and radiator (4);The water tank (1) constitutes circulation line with radiator (4);The heating member is located in water tank (1), It is connected with control circuit;The heating member is the first heating rod (L1).
2. according to claim 1 for dormitory collective heating installation of constructing, it is characterised in that:The control circuit includes First relay (J1) and the first triode (Q1);The base stage of the first triode (Q1) is connected with the P2.0 ends of CPU, transmitting Pole is grounded, and colelctor electrode is connected with the first relay (J1) one end;The other end of first relay (J1) is connected with power end; The normally opened contact (J1-1) of first relay (J1), its one end is connected with alternating current source, the other end and the first heating rod (L1) connect, control the first heating rod (L1) state.
3. according to claim 1 and 2 for dormitory collective heating installation of constructing, it is characterised in that:Set up temperature control part, institute It is temperature sensor (P) to state temperature control part, and it is arranged on the P1.0 of the backwater end of water tank (1), the temperature sensor (P) and CPU End connection.
4. according to claim 3 for dormitory collective heating installation of constructing, it is characterised in that:The heating rod and control Circuit is disposed as multigroup;The heating rod sets up second, third heating rod, respectively with second, third relay and second, Three triodes constitute complete independent controling circuit.
5. according to claim 4 for dormitory collective heating installation of constructing, it is characterised in that:Set up circulating pump (B), institute State the water side that circulating pump (B) is arranged on water tank (1).
6. according to claim 5 for dormitory collective heating installation of constructing, it is characterised in that:The radiator (4) sets It is set to multiple, parallel connection composition circulation line.
CN201621008473.7U 2016-08-31 2016-08-31 Dormitory collective heating installation is used for being under construction Active CN206162213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621008473.7U CN206162213U (en) 2016-08-31 2016-08-31 Dormitory collective heating installation is used for being under construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621008473.7U CN206162213U (en) 2016-08-31 2016-08-31 Dormitory collective heating installation is used for being under construction

Publications (1)

Publication Number Publication Date
CN206162213U true CN206162213U (en) 2017-05-10

Family

ID=58648809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621008473.7U Active CN206162213U (en) 2016-08-31 2016-08-31 Dormitory collective heating installation is used for being under construction

Country Status (1)

Country Link
CN (1) CN206162213U (en)

Similar Documents

Publication Publication Date Title
CN206162213U (en) Dormitory collective heating installation is used for being under construction
CN204560658U (en) Constant temperature and humidity supports she chang
CN203629057U (en) Air source heat pump auxiliary solar water heating system
CN203131962U (en) Solar ground source heating device
CN207407414U (en) A kind of phase-change material regenerative apparatus
CN202444985U (en) Water heating system for fishpond
CN206150218U (en) Solar heating formula fish breed station circulation water treatment system that releases
CN203928110U (en) A kind of heating installation that utilizes northern heated kang waste heat
CN209171135U (en) Heating leakage dropping-board for pig house and combinations thereof structure
CN206817778U (en) A kind of energy-saving heating apparatus based on solar energy and air energy heat pump
CN209101579U (en) A kind of split type directly-heated solar water heater of two storehouse temperature controls
CN208765037U (en) A kind of warm-air drier
CN207220567U (en) Tubular type Water-heating bed
CN206335823U (en) A kind of heating and cooling device for mould
CN205162517U (en) Electricity adds hot -water circulation heat preservation mattress
CN206062668U (en) A kind of balcony solar energy phase transition heat accumulation warms up bed apparatus
CN205402886U (en) Rural novel energy -concerving and environment -protective heating system
CN104488610B (en) A kind of booth full-automatic low energy consumption temperature-increasing system
CN201448920U (en) Solar heating device
CN209152807U (en) A kind of chop bed heating installation
CN203657073U (en) Heating pipeline system for heatable brick bed
CN103528120B (en) Floor heating Water electric heater
CN203100197U (en) Fixed-temperature-starting circulating pump circulating heating device
CN209512166U (en) A kind of cold and hot water circulation system of house ornamentation
CN211822671U (en) Warm up system of heating in greenhouse heat pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant