CN206154230U - A auxiliary device and assembly and disassembly tools for tightening bolt - Google Patents

A auxiliary device and assembly and disassembly tools for tightening bolt Download PDF

Info

Publication number
CN206154230U
CN206154230U CN201621077975.5U CN201621077975U CN206154230U CN 206154230 U CN206154230 U CN 206154230U CN 201621077975 U CN201621077975 U CN 201621077975U CN 206154230 U CN206154230 U CN 206154230U
Authority
CN
China
Prior art keywords
screw connection
nut
hole
nut screw
servicing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621077975.5U
Other languages
Chinese (zh)
Inventor
周元海
史建国
冷程杰
张晓英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201621077975.5U priority Critical patent/CN206154230U/en
Application granted granted Critical
Publication of CN206154230U publication Critical patent/CN206154230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an auxiliary device and assembly and disassembly tools for tightening bolt. Auxiliary device includes: nut cooperation portion, nut cooperation portion have the nut mating holes, and the nut outside is located in order to be used for the making nut spline to nut cooperation borehole jack, the portion of gripping, the one end and the nut cooperation portion of the portion of gripping are connected, and the other end edge of the portion of gripping is on a parallel with the the central axis's of nut mating holes direction extension, wherein, has the space of dodging between nut cooperation portion and the portion of gripping. The technical scheme of the utility model elasticity well head insulation can bolt needs two staff's operations in can solving prior art, occupies the problem of more manpower resources.

Description

For the servicing unit and dismantling device of elasticity bolt
Technical field
The utility model is related to instrument and accessory field, in particular to a kind of servicing unit for elasticity bolt And dismantling device.
Background technology
During oil exploitation, whenever running into annulus logging, underground work, well head and connecting the operations such as head, well head rectification, It is required for coordinating above-mentioned operation to dismount the bolt on well head thermal-insulating box in time.As shown in figure 1, in prior art, using box spanner Demounting bolt.When one staff adopts the bolt of box spanner elastic well head thermal-insulating box, nut easily skids.Due to well head Incubator size is larger, to fixing nut, needs two staff just to complete operation.Due to well head thermal-insulating box dismounting frequency Numerous, workload is big, and prior art needs to take more human resources.
Utility model content
Main purpose of the present utility model is to provide a kind of servicing unit and dismantling device for elasticity bolt, and this is auxiliary Help device to realize the bolt of the elastic well head thermal-insulating box of one man operation, to solve prior art in elastic well head thermal-insulating box bolt Two operated by personnel are needed, the problem of more human resources is taken.
To achieve these goals, according to one side of the present utility model, there is provided a kind of for the auxiliary of elasticity bolt Device, servicing unit is helped to include:Nut screw connection portion, nut screw connection portion has nut screw connection hole, and nut screw connection borehole jack is located at nut Outside is for making nut rotation stop;Grip part, one end of grip part is connected with nut screw connection portion, and the other end of grip part is along parallel Extend in the direction of the central axis in nut screw connection hole;Wherein, have between nut screw connection portion and grip part and avoid space.
Further, grip part has installation through-hole, and one end of box spanner passes and be set in after installation through-hole and nut The bolt periphery of cooperation.
Further, servicing unit also includes connecting portion, and nut screw connection portion is connected with grip part by connecting portion, and nut is matched somebody with somebody Close hole to be coaxially disposed with installation through-hole.
Further, connecting portion includes the first linkage section, the second linkage section and the 3rd linkage section being sequentially connected, and first connects Connect section to be connected with nut screw connection portion, the 3rd linkage section is connected with grip part, the first linkage section and the 3rd linkage section interval setting.
Further, grip part includes:Sleeve pipe, with interior bone;Extension pipe, and sleeve pipe connection, interior bone and plus Long tube is internally formed installation through-hole.
Further, the inscribed circle diameter in nut screw connection hole 1mm bigger than the inscribed circle diameter of nut.
Further, nut screw connection portion has external screw thread, and connecting portion is provided with the screwed hole being engaged with external screw thread, nut Auxiliary section is threadedly coupled with connecting portion.
Further, servicing unit also includes anti-loose structure, the first location hole is arranged in nut screw connection portion, on connecting portion Second location hole corresponding with the first location hole be set, and anti-loose structure passes through the second location hole and the first location hole with by spiral shell Female auxiliary section is fixed on connecting portion.
According to other side of the present utility model, there is provided a kind of dismantling device, dismantling device include box spanner and It is previously described for the servicing unit of elasticity bolt.
Further, box spanner includes sleeve and the handle with sleeve connection, wherein, the external diameter of sleeve is logical more than installing The aperture in hole is limiting the axial operating range of sleeve.
Using the technical solution of the utility model, nut screw connection portion is set in by nut outside by nut screw connection hole, is made Nut does not relatively rotate with nut screw connection portion, and because one end of grip part is connected with nut screw connection portion, the other end is along nut The direction of the central axis of mating holes extends, and one hand of staff grips on grip part and grip part force can be prevented Nut skids, and another hand can use spanner elasticity bolt, therefore, can complete pine using one staff of the servicing unit The operation of tight well head thermal-insulating box bolt, reduces cost of labor.
Description of the drawings
The Figure of description for constituting the part of the application is used for providing further understanding to of the present utility model, this practicality New schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model. In the accompanying drawings:
Fig. 1 shows the structural representation using the elastic well head thermal-insulating box bolt of box spanner of prior art;
Fig. 2 shows the structural representation of the embodiment according to elasticity bolt servicing unit of the present utility model;And
Fig. 3 shows the structural representation of the embodiment according to elasticity bolt instrument of the present utility model.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
10th, nut screw connection portion;11st, nut screw connection hole;20th, connecting portion;21st, the first linkage section;22nd, the second linkage section;23、 3rd linkage section;30th, grip part;31st, installation through-hole;32nd, sleeve pipe;33rd, pipe joint;34th, extension pipe;40th, anti-loose structure; 50th, box spanner;51st, sleeve.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Below with reference to the accompanying drawings and in conjunction with the embodiments describing the utility model in detail.
It is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.It is below illustrative to the description only actually of at least one exemplary embodiment, never as to this practicality New and its application or any restriction for using.Based on the embodiment in the utility model, those of ordinary skill in the art are not having Have and make the every other embodiment obtained under the premise of creative work, belong to the scope of the utility model protection.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
Unless specifically stated otherwise, the part for otherwise illustrating in these embodiments and positioned opposite, the digital table of step Scope of the present utility model is not limited up to formula and numerical value.Simultaneously, it should be appreciated that each shown in accompanying drawing for the ease of description The size of individual part is not to draw according to actual proportionate relationship.For skill known to person of ordinary skill in the relevant Art, method and apparatus may be not discussed in detail, but in the appropriate case, the technology, method and apparatus should be considered to award A part for power specification.In all examples shown here and discussion, any occurrence should be construed as merely example Property, not as restriction.Therefore, the other examples of exemplary embodiment can have different values.It should be noted that:It is similar Label and letter similar terms is represented in following accompanying drawing, therefore, once be defined in a certain Xiang Yi accompanying drawing, then with It need not be further discussed in accompanying drawing afterwards.
In the utility model, in the case where contrary explanation is not made, the noun of locality for using such as " upper and lower, top, bottom " is generally It is for direction shown in the drawings, or for part sheet is on vertical, vertical or gravity direction;Together Sample ground, for ease of understanding and describing, " inside and outside " is referred to relative to the inside and outside of each part profile of itself, but the above-mentioned noun of locality is simultaneously It is not used in restriction the utility model.
The utility model provides a kind of servicing unit and dismantling device for elasticity bolt.In the utility model and originally In the embodiment of utility model, the servicing unit and dismantling device for elasticity bolt is used for elastic well head thermal-insulating box bolt.
As shown in figure 3, in embodiment of the present utility model, dismantling device includes box spanner 50 and for elasticity bolt Servicing unit.
As shown in Figures 2 and 3, in embodiment of the present utility model, the servicing unit for elasticity bolt is matched somebody with somebody including nut Conjunction portion 10 and grip part 30.Nut screw connection portion 10 have nut screw connection hole 11, nut screw connection hole 11 be sheathed on nut outside with In making nut rotation stop.One end of grip part 30 is connected with nut screw connection portion 10, and the other end edge of grip part 30 is matched somebody with somebody parallel to nut The direction for closing the central axis in hole 11 extends.Wherein, have between nut screw connection portion 10 and grip part 30 and avoid space.
By above-mentioned setting, it is possible to use nut screw connection portion 10 is set in nut outside by nut screw connection hole 11, makes nut Do not relatively rotate between nut screw connection portion 10.Because one end of grip part 30 is connected with nut screw connection portion 10, the other end The region that staff can grip is extended to along the direction of the central axis in nut screw connection hole 11, one hand of staff is gripped Can prevent nut from skidding on grip part 30 and to the force of grip part 30, another hand can be with monkey wrench or ratchet spanner Deng elasticity bolt.Space is avoided due to having between nut screw connection portion 10 and grip part 30, therefore with the operation of elasticity bolt not Interfere between meeting and grip part 30.Using the servicing unit, a staff can complete elastic well head thermal-insulating box spiral shell The operation of bolt, has liberated human resources, reduces cost of labor.
As shown in Figures 2 and 3, in embodiment of the present utility model, grip part 30 has installation through-hole 31, box spanner 50 One end pass the bolt periphery being set in after installation through-hole 31 with nut screw connection.
By arranging installation through-hole on grip part 30, one end of box spanner 50 passes and can be arranged after installation through-hole 31 In the bolt periphery with nut screw connection.Staff one is held on grip part 30, and another hand can be with operating sleeve spanner 50 elasticity bolts, so as to improve the operating efficiency of elasticity bolt, reduce labour intensity.
As shown in Figures 2 and 3, in embodiment of the present utility model, servicing unit also includes connecting portion 20, nut screw connection portion 10 are connected with grip part 30 by connecting portion 20, and nut screw connection hole 11 is coaxially disposed with installation through-hole 31.
By above-mentioned setting, using the attaching nut auxiliary section 10 of connecting portion 20 and grip part 30, installation through-hole is facilitated implementation 31 are coaxially disposed with nut screw connection hole 11.So, outline of the box spanner 50 through on grip part 30 with box spanner 50 During the installation through-hole 31 being adapted, grip part 30 can play fixes sleeve spanner 50, prevent what box spanner 50 from shaking Effect.While fixing nut and box spanner 50, protect elastic well head by staff only needs a hand to hold grip part 30 Incubator bolt it is more convenient to operate.
Specifically, as shown in Figures 2 and 3, in embodiment of the present utility model, in order that nut screw connection hole 11 leads to installing Hole 31 is coaxially disposed, and avoidance space, nut screw connection portion 10, connecting portion 20 are formed between nut screw connection portion 10 and grip part 30 The structure of " several " font similar with the connection formation of grip part 30.
Preferably, as shown in Figures 2 and 3, in embodiment of the present utility model, connecting portion 20 includes first for being sequentially connected Linkage section 21, the second linkage section 22 and the 3rd linkage section 23.First linkage section 21 is connected with nut screw connection portion 10, the 3rd linkage section 23 are connected with grip part 30, the first linkage section 21 and the interval setting of the 3rd linkage section 23.
By the way that connecting portion 20 is set to into three linkage sections, servicing unit can be made in order to the processing and manufacturing of connecting portion 20 Compact conformation.
Preferably, the first linkage section 21 and the 3rd linkage section 23 are welded to connect with the second linkage section 22, the first linkage section 21 and the 3rd linkage section 23 be vertically arranged with the second linkage section 22.
So, bonding strength is not only can ensure that, and manufacture difficulty and cost can be reduced.Meanwhile, the first linkage section 21 and the 3rd linkage section 23 and the second linkage section 22 be vertically arranged and can facilitate implementation nut screw connection hole 11 with installation through-hole 31 It is coaxially disposed.
Specifically, the end of the 3rd linkage section 23 is provided with the gap matched with the outer surface of grip part 30, grip part 30 The one end towards nut screw connection portion 10 be welded on the gap of the 3rd linkage section 23.
Above-mentioned setting is easy to fabricate servicing unit, advantageously reduces cost, and ensures grip part 30 and connecting portion 20 bonding strength.
Certainly, in embodiments not shown in the figures, grip part 30 may be arranged as removably connecting with connecting portion 20 Connect, such that it is able to be needed to change grip part 30 according to the use of box spanner 50.
As shown in Figures 2 and 3, in embodiment of the present utility model, grip part 30 includes sleeve pipe 32 and extension pipe 34.Sleeve pipe 32 have interior bone.Extension pipe 34 is connected with sleeve pipe 32, and the interior bone of sleeve pipe 32 and extension pipe 34 are internally formed installation Through hole 31.
By above-mentioned setting, when well head thermal-insulating box size is larger, the length of grip part 30 can be extended by extension pipe 34 Degree, is easy to the operation of staff, makes servicing unit have more preferable applicability.
Specifically, as shown in Figures 2 and 3, in embodiment of the present utility model, extension pipe 34 is by pipe joint 33 and sleeve pipe 32 connections.Wherein, sleeve pipe 32 and extension pipe 34 have an external screw thread, pipe joint 33 have pipe joint interior bone and with sleeve pipe 32 The internal thread being engaged with the external screw thread of extension pipe 34, sleeve pipe 32 and extension pipe 34 are threadedly coupled with pipe joint 33.
Sleeve pipe 32 is threadedly coupled with pipe joint 33, and extension pipe 34 is threadedly coupled with pipe joint 33 and is conveniently replaceable lengthening Pipe 34 or sleeve pipe 32, can be with according to the extension pipe 34 of the size of well head thermal-insulating box replacing different length.
Certainly, in embodiments not shown in the figures, it is also possible to be not provided with pipe joint 33, make extension pipe 34 straight with sleeve pipe 32 Connected internal and external screw thread connection.
In embodiment of the present utility model, the inscribed circle diameter 1mm bigger than the inscribed circle diameter of nut in nut screw connection hole 11.
By above-mentioned setting, on the one hand, can prevent nut under the external force effect of elasticity bolt in nut screw connection hole 11 It is middle to skid;On the other hand, nut screw connection hole 11 can be avoided with the dismounting inconvenience caused by nut screw connection tension.
Preferably, nut screw connection hole 11 is regular hexagon hole, the hexagon of the inscribed circle diameter in regular hexagon hole than nut The big 1mm of inscribed circle diameter of outline.
In embodiment of the present utility model, nut screw connection portion 10 is detachably connected with connecting portion 20.
By above-mentioned setting, nut screw connection portion 10 can be changed according to the model of bolt, make the nut in nut screw connection portion 10 Mating holes 11 is adapted with the nut of different model, improves the applicability of servicing unit.
Specifically, as shown in Figures 2 and 3, in order that nut screw connection portion 10 is easy to dismounting, nut screw connection portion 10 has outer spiral shell Line, connecting portion 20 is provided with the screwed hole being engaged with external screw thread, and nut screw connection portion 10 is threadedly coupled with connecting portion 20.
Preferably, as shown in Figures 2 and 3, in order to prevent nut screw connection portion 10 elastic with being threaded in for connecting portion 20 Get loose under the external force effect of bolt, servicing unit also includes anti-loose structure 40.Arrange first in nut screw connection portion 10 to determine Position hole, arranges second location hole corresponding with the first location hole on connecting portion 20, anti-loose structure 40 passes through the second location hole With the first location hole so that nut screw connection portion 10 is fixed on connecting portion 20.
Specifically, as shown in Figures 2 and 3, anti-loose structure 40 is bolt, and the first location hole and/or the second location hole are Screwed hole.When nut screw connection portion 10 is tightened on connecting portion 20, the dead in line of the axis of the first location hole and the second location hole.
Anti-loose structure 40 is set to into bolt, the first location hole and/or the second location hole pass through with anti-loose structure 40 Threaded connection, can be in order to the replacing in nut screw connection portion 10.
As shown in Figures 2 and 3, in embodiment of the present utility model, the box spanner 50 of dismantling device includes the He of sleeve 51 The handle being connected with sleeve 51.Wherein, the external diameter of sleeve 51 is living with the axial direction for limiting sleeve 51 more than the aperture of installation through-hole 31 Dynamic distance.
By above-mentioned setting, the axially activity of elasticity bolt can be limited by limiting the axial operating range of sleeve 51 Distance, preventing the axial operating range of bolt excessive causes nut to release from bolt suddenly and lose.
Specifically, during elasticity bolt, first the nut screw connection portion 10 of servicing unit is sheathed on into nut outside, then makes set One end of the installation sleeve 51 of the handle of barrel spanner 50 through installation through-hole 31 extend into nut screw connection portion 10 and grip part 30 it Between avoidance space in, the other end of handle is located at the outside of grip part 30, subsequently sleeve 51 is connected on handle again.Work The direction that one hand of personnel is held grip part 30 and is slightly located to staff is exerted oneself, and another hand holds the hand of box spanner 50 Handle rotation is simultaneously slightly exerted oneself to the direction away from staff, you can fast and effeciently elastic well head thermal-insulating box bolt.
Preferably, by nut screw connection portion 10 towards a side end face of grip part 30 and matching somebody with somebody towards nut for grip part 30 The distance between one side end face in conjunction portion 10 makes the axial direction of bolt living limiting axial operating range of the bolt during elastic Dynamic distance is less than 100mm.
Servicing unit and dismantling device for elasticity bolt of the present utility model can realize one man operation, operation letter It is single, it is safe and reliable.The speed of elastic incubator bolt can be improved more than 2 times, and processing cost is low, often covers dismantling device Processing cost be 400 yuan or so, carry, it is easy to assembly, it is easy to safeguard.
As can be seen from the above description, the utility model the above embodiments realize following technique effect:Pass through Nut screw connection portion is set in nut outside by nut screw connection hole, makes nut not relatively rotate with nut screw connection portion, by even The grip part that socket part attaching nut auxiliary section extends with the central axial direction along nut screw connection hole, staff can be to gripping Portion exerts a force to prevent nut from skidding during elasticity bolt, so as to realize one man operation, liberates human resources, reduces artificial Cost;By arranging the installation through-hole coaxial with nut screw connection hole on grip part, one end of box spanner can pass installation The bolt periphery with nut screw connection is set in after through hole, so as to using box spanner elasticity bolt, improve operating efficiency, Er Qieke By grip part fixes sleeve spanner, to make the more convenient to operate of elastic well head thermal-insulating box bolt.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of servicing unit for elasticity bolt, it is characterised in that the servicing unit includes:
Nut screw connection portion (10), the nut screw connection portion (10) is with nut screw connection hole (11), nut screw connection hole (11) set Located at nut outside for making the nut rotation stop;
Grip part (30), one end of the grip part (30) is connected with the nut screw connection portion (10), the grip part (30) The other end extends along the direction of the central axis parallel to the nut screw connection hole (11);
Wherein, have between the nut screw connection portion (10) and the grip part (30) and avoid space.
2. the servicing unit for elasticity bolt according to claim 1, it is characterised in that the grip part (30) has Installation through-hole (31), one end of box spanner (50) passes the spiral shell being set in after the installation through-hole (31) with the nut screw connection Bolt periphery.
3. the servicing unit for elasticity bolt according to claim 2, it is characterised in that the servicing unit also includes Connecting portion (20), the nut screw connection portion (10) is connected with the grip part (30) by the connecting portion (20), the nut Mating holes (11) is coaxially disposed with the installation through-hole (31).
4. the servicing unit for elasticity bolt according to claim 3, it is characterised in that the connecting portion (20) includes The first linkage section (21), the second linkage section (22) and the 3rd linkage section (23) being sequentially connected, first linkage section (21) with Nut screw connection portion (10) connection, the 3rd linkage section (23) is connected with the grip part (30), first linkage section And the 3rd linkage section (23) interval setting (21).
5. the servicing unit for elasticity bolt according to claim 2, it is characterised in that grip part (30) bag Include:
Sleeve pipe (32), with interior bone;
Extension pipe (34), is connected with described sleeve pipe (32), and being internally formed for the interior bone and the extension pipe (34) is described Installation through-hole (31).
6. the servicing unit for elasticity bolt according to any one of claim 2 to 5, it is characterised in that the spiral shell The inscribed circle diameter 1mm bigger than the inscribed circle diameter of the nut of female mating holes (11).
7. the servicing unit for elasticity bolt according to claim 3, it is characterised in that the nut screw connection portion (10) With external screw thread, the connecting portion (20) is provided with the screwed hole being engaged with the external screw thread, the nut screw connection portion (10) It is threadedly coupled with the connecting portion (20).
8. the servicing unit for elasticity bolt according to claim 3, it is characterised in that the servicing unit also includes Anti-loose structure (40), arranges the first location hole on the nut screw connection portion (10), arrange on the connecting portion (20) with it is described The second corresponding location hole of first location hole, the anti-loose structure (40) is determined through second location hole and described first Position hole is so that the nut screw connection portion (10) is fixed on the connecting portion (20).
9. a kind of dismantling device, it is characterised in that the dismantling device includes in box spanner (50) and claim 2 to 8 times The servicing unit for elasticity bolt described in one.
10. dismantling device according to claim 9, it is characterised in that the box spanner (50) including sleeve (51) and The handle being connected with the sleeve (51), wherein, the external diameter of the sleeve (51) more than the installation through-hole (31) aperture with Limit the axial operating range of the sleeve (51).
CN201621077975.5U 2016-09-23 2016-09-23 A auxiliary device and assembly and disassembly tools for tightening bolt Active CN206154230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621077975.5U CN206154230U (en) 2016-09-23 2016-09-23 A auxiliary device and assembly and disassembly tools for tightening bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621077975.5U CN206154230U (en) 2016-09-23 2016-09-23 A auxiliary device and assembly and disassembly tools for tightening bolt

Publications (1)

Publication Number Publication Date
CN206154230U true CN206154230U (en) 2017-05-10

Family

ID=58651542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621077975.5U Active CN206154230U (en) 2016-09-23 2016-09-23 A auxiliary device and assembly and disassembly tools for tightening bolt

Country Status (1)

Country Link
CN (1) CN206154230U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111283415A (en) * 2018-12-10 2020-06-16 上汽通用五菱汽车股份有限公司 Frock is screwed up to preceding lower swing arm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111283415A (en) * 2018-12-10 2020-06-16 上汽通用五菱汽车股份有限公司 Frock is screwed up to preceding lower swing arm

Similar Documents

Publication Publication Date Title
CN204095764U (en) For removing the clearing device of foreign matter in tire tread
CN206154230U (en) A auxiliary device and assembly and disassembly tools for tightening bolt
CN207297574U (en) A kind of multi-functional installation bolt
CN206241916U (en) A kind of combination wrench
CN206029704U (en) Scalable double -end sleeve
CN104538752A (en) Grounded drill rod easy to insert and pull and special inserting and pulling tool
CN207432113U (en) A kind of device for taking out pin
CN203895852U (en) Distribution network live-working insulating sleeve rod
CN205521091U (en) Bolt assembling and disassembling tool
CN205572278U (en) Narrow and small space inner cover nut loading and unloading frock
CN104210467B (en) For removing the removing equipment of foreign matter in tire tread
CN201316970Y (en) Special-shaped nut sleeve
CN202292548U (en) External hexagonal sleeve-screwing tool
CN207548613U (en) A kind of provision for disengagement for tap
CN201925317U (en) Antitheft bolt and special sleeve tool thereof
CN202917871U (en) Wiring lug extractor for power transformer
CN203487881U (en) Unlocking device
CN203006799U (en) Standard knot coupling sleeve stop device of tower crane
CN206169957U (en) Automatic mark hexagon socket head cap screw screws up frock
CN206475107U (en) A kind of Multifunctional sleeve
CN206344062U (en) A kind of driver's tool with Telescopic
CN205290775U (en) Combination cylinder spanner
CN205033132U (en) A T type long arm sleeve for fastening lead screw
CN215567111U (en) Novel hidden expansion screw
CN208215209U (en) Box spanner is used in a kind of construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant