CN206146313U - Reduce and surpass cloth pore structure of owing to dig - Google Patents

Reduce and surpass cloth pore structure of owing to dig Download PDF

Info

Publication number
CN206146313U
CN206146313U CN201621128926.XU CN201621128926U CN206146313U CN 206146313 U CN206146313 U CN 206146313U CN 201621128926 U CN201621128926 U CN 201621128926U CN 206146313 U CN206146313 U CN 206146313U
Authority
CN
China
Prior art keywords
holes
pore structure
dense
spaced
spacer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621128926.XU
Other languages
Chinese (zh)
Inventor
陈吉辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201621128926.XU priority Critical patent/CN206146313U/en
Application granted granted Critical
Publication of CN206146313U publication Critical patent/CN206146313U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a reduce and surpass cloth pore structure of owing to dig, it arranges intensive hole (1) and spaced -apart ports (2) to include on edge excavation round profile (3), spaced -apart ports (2) are located between two intensive hole (1), the degree of depth of intensive hole (1) is greater than spaced -apart ports (2), intensive hole (1) and spaced -apart ports (2) parallel arrangement are on excavation wheel profile (3). The utility model discloses simple structure, convenient operation effectively solves the method construction china super -league matches of subway tunnel mine and owes the problem of digging.

Description

A kind of cloth pore structure for reducing out break
Technical field
This utility model belongs to Tunnel Engineering field, reduces in being related to a kind of shallow buried covered excavation urban subway tunnel blast working The cloth pore structure of out break.
Background technology
In urban subway tunnel blast working, primary requirement is that outline excavation shaping is regular, and scar is smooth, strict to control Out break.Tunnel Overbreak & Underbreak has a strong impact on construction period, increases construction cost.Conventional processing means are using photoface exploision skill Art.Smooth Surface Blasting Technology measure required using low blasting speed, low-density, the small diameter medicine roll of low power, and periphery hole accomplish while Detonation.In practice of construction, especially shallow buried covered excavation urban subway tunnel receives surrounding constructure influence, and vibration velocity control is strict, It is difficult to accomplish periphery hole while detonation.The method difficulty of construction is big, deficiency in economic performance.Therefore, need badly a kind of more economical effective Reduction out break cloth pore structure.
The content of the invention
The purpose of this utility model is had high demands for existing smooth Surface Blasting Technology measure, and operating difficultiess enter to periphery hole Row optimization, proposes a kind of rational arrangement bores structure, to solve the problems, such as shallow buried covered excavation urban subway tunnel blast working out break.
The purpose of this utility model can be realized by following technical proposal:
A kind of cloth pore structure for reducing out break, arranges dense holes and spacer holes including along excavation contour line;Interval hole position Between two dense holes;The depth of dense holes is more than spacer holes;Dense holes are arranged in parallel on excavation contour line with spacer holes.
Described intensive pitch of holes is controlled in 200 ~ 300mm.
Described dense holes are 3 ~ 5 ° with the outer limb of spacer holes.
Described spacer holes severity control is the 1/3 ~ 1/2 of intensive hole depth.
This utility model does not need strict requirements in smooth Surface Blasting Technology measure, easy to operate, and effective control is super Owe to dig.
Description of the drawings
Fig. 1 is cloth hole structural representation of the present utility model;
Fig. 2 is this utility model A-A section partial schematic diagrams;
In figure, 1, dense holes;2nd, spacer holes;3rd, excavation contour line.
It is clear to represent, facilitate engineering staff to understand that dense holes are represented with macropore in Fig. 1, and spacer holes are represented with aperture, it is real In the construction of border, both apertures are the same.
Specific embodiment
To make those skilled in the art more be apparent from the utility model, below in conjunction with accompanying drawing and it is embodied as Example, elaborates.
In the present embodiment, a kind of cloth pore structure for reducing out break includes arranging dense holes 1 and spacer holes along excavation contour line 2;Spacer holes 2 are located between two dense holes 1;The depth of dense holes 1 is more than spacer holes 2;Dense holes 1 and 2 parallel cloth of spacer holes Put on excavation contour line 3.
Described 1 spacing of dense holes is 300mm;Described dense holes 1 are 3 ° with 2 outer limb of spacer holes;Between described Every 2 severity control of hole the 1/2 of 1 depth of dense holes.
Certain subway tunnel section is constructed using benching tunnelling method, top bar 1.5 meters of daily footage of design, borehole diameter 42mm, auxiliary Eye borehole depth 1.7m, spacing 600mm.Periphery hole presses 300mm spacing arrangement dense holes 1, between arranging between each two dense holes 1 Every hole 2.1 depth 1.7m of dense holes, 2 depth 0.85m of spacer holes.Snubber single hole powder charge 0.45kg, reliever single hole powder charge 0.3kg, 1 single hole powder charge 0.3kg of dense holes, 2 single hole powder charge 0.15kg of spacer holes.
After the completion of powder charge, detonated using non-electrical millisecond extension mode, wherein dense holes 1 are prolonged using millisecond altogether with spacer holes 2 15,16,17 sections of phase series Jian Ge not be detonated.Demolition effect is good, profiled outline shaping rule, substantially without out break problem.

Claims (4)

1. it is a kind of reduce out break cloth pore structure, it is characterised in that include along excavation contour line(3)Upper arrangement dense holes(1) With spacer holes(2);Spacer holes(2)Positioned at two dense holes(1)It is middle;Dense holes(1)Depth be more than spacer holes(2);It is intensive Hole(1)With spacer holes(2)It is arranged in parallel in excavation contour line(3)On.
2. it is according to claim 1 it is a kind of reduce out break cloth pore structure, it is characterised in that described dense holes(1) Spacing is controlled in 200 ~ 300mm.
3. it is according to claim 1 it is a kind of reduce out break cloth pore structure, it is characterised in that described dense holes(1) With spacer holes(2)Outer limb is 3 ~ 5 °.
4. it is according to claim 1 it is a kind of reduce out break cloth pore structure, it is characterised in that described spacer holes(2) Severity control is in dense holes(1)The 1/3 ~ 1/2 of depth.
CN201621128926.XU 2016-10-18 2016-10-18 Reduce and surpass cloth pore structure of owing to dig Expired - Fee Related CN206146313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621128926.XU CN206146313U (en) 2016-10-18 2016-10-18 Reduce and surpass cloth pore structure of owing to dig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621128926.XU CN206146313U (en) 2016-10-18 2016-10-18 Reduce and surpass cloth pore structure of owing to dig

Publications (1)

Publication Number Publication Date
CN206146313U true CN206146313U (en) 2017-05-03

Family

ID=58621293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621128926.XU Expired - Fee Related CN206146313U (en) 2016-10-18 2016-10-18 Reduce and surpass cloth pore structure of owing to dig

Country Status (1)

Country Link
CN (1) CN206146313U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504872A (en) * 2017-09-13 2017-12-22 大连理工大学 It is a kind of to prevent tunnel arch foot to owe the blasting method dug

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107504872A (en) * 2017-09-13 2017-12-22 大连理工大学 It is a kind of to prevent tunnel arch foot to owe the blasting method dug

Similar Documents

Publication Publication Date Title
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN107829742B (en) Caving-filling-open stope-caving mining method
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN109826637A (en) A kind of double structure TBM and its construction method
CN104863592B (en) A kind of big structure sublevel drill and benching ore removal afterwards filling mining method
CN105003288B (en) A kind of method and support system of medium-thickness seam gob side entry retaining
CN209724344U (en) A kind of double structure TBM
CN102121385B (en) Tunnel excavation method for extending existing single-hole tunnel into double-arch tunnel
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN103939135B (en) A kind of fully-mechanized mining working removes frame passage rapid constructing method
CN105674816A (en) Medium-length hole blasting one-time shaft-forming method used for non-coal mine mountain
CN102392642A (en) Method for arranging roadways on coal-pillar-free stope
CN105386771A (en) Shield type digging and anchoring machine
CN104088638B (en) Large-inclination-angle coal bed longwell large-mining-height working surface coal wall caving and roof fall control technology
CN103382844A (en) Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN206146313U (en) Reduce and surpass cloth pore structure of owing to dig
CN108915738A (en) A kind of tunnel tunnel face supporting apparatus
CN111005740A (en) Method for controlling surrounding rock of upper and lower walls of stope by medium-length hole pre-grouting
CN113669060B (en) H-shaped coal face stoping roadway arrangement method
CN107575228A (en) A kind of coal-mining method for reducing double lane protection pillar sizes and reducing roadway deformation amount
CN201650332U (en) Hydraulic supporting device for fully-mechanized coal winning working face
CN204386597U (en) The coal road comprehensive dig-anchor machine of large width simultaneous drifting
WO2018133744A1 (en) Trench-cutting device for underground construction and working method thereof
CN105179002A (en) Construction method for dynamic ventilation channels of underground mining of thick ore body
CN102644477A (en) Method for extracting gas of protected layer through wear layer drilling in protective layer airway high-position drilling field

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20171018

CF01 Termination of patent right due to non-payment of annual fee