CN206144250U - Communication tower base construction - Google Patents

Communication tower base construction Download PDF

Info

Publication number
CN206144250U
CN206144250U CN201621071279.3U CN201621071279U CN206144250U CN 206144250 U CN206144250 U CN 206144250U CN 201621071279 U CN201621071279 U CN 201621071279U CN 206144250 U CN206144250 U CN 206144250U
Authority
CN
China
Prior art keywords
communication tower
hole
screw
base plate
shrinkage pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621071279.3U
Other languages
Chinese (zh)
Inventor
陈玉兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Ding Jian communication service Limited by Share Ltd.
Henan Dingwen Communication Technology Co ltd
Original Assignee
Huian County Smart Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huian County Smart Electronic Technology Co Ltd filed Critical Huian County Smart Electronic Technology Co Ltd
Priority to CN201621071279.3U priority Critical patent/CN206144250U/en
Application granted granted Critical
Publication of CN206144250U publication Critical patent/CN206144250U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a communication tower base construction, comprising a base plate, the bottom of bottom plate is provided with the shrinkage pool the hole bottom position department of shrinkage pool is provided with the through -hole the below of bottom plate is provided with pours the pole, the top of pouring the pole is provided with the quotation, the quotation assigns into in the shrinkage pool the top of bottom plate is provided with the screw, the interior top position department welding of pouring the pole is provided with the nut, the screw passes behind the through -hole with the nut cooperatees, the top axle center position department of bottom plate is provided with communication tower installation cover, the top outer ring position department annular of communication tower installation cover is provided with the screw hole more than three the threaded hole cooperation has fastening screw, this device is placeed to the ground inside through pouring the pole, plays the fastening effect, then accomplishes the fixed of bottom plate through the cooperation of screw and nut, accomplishes the fixed mounting of communication tower through communication tower installation cover, and this device fixed mounting is comparatively convenient, reduction use cost.

Description

A kind of communication tower base holder structure
Technical field
The utility model is related to a kind of communication tower base holder structure.
Background technology
Miniature communication tower is mostly directly to be set up on the ground, needs to set up base in the bottom of communication tower during erection Seat, pedestal is concrete pedestal, when pouring, need perforate on the ground, operation more bother, and manufacture cost compared with It is high.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of communication tower base holder structure, and this device is by pouring bar peace It is inserted to inside ground, plays fastening effect, the fixation of base plate is then completed by the cooperation of screw and nut, is pacified by communication tower Encapsulation completes the fixed installation of communication tower, and the fixed installation of this device is more convenient, and later stage repeatable utilization, and reduction is used into This.
To solve the above problems, the utility model is adopted the following technical scheme that:
A kind of communication tower base holder structure, including base plate, the bottom of the base plate is provided with shrinkage pool, in the bottom hole of the shrinkage pool Through hole is provided with position, is provided with below the base plate and is poured bar, described pouring be provided with the top of bar card, described Card is assigned in the shrinkage pool, and screw is provided with above the base plate, is welded at the inner top position for pouring bar Nut is provided with, the screw is engaged with the nut through after the through hole, sets at the top shaft core position of the base plate Communication tower installation set is equipped with, annular is provided with the screwed hole of more than three at the top outer ring position of the communication tower installation set, Fastening screw is combined with the screwed hole.
Preferably, annular is provided with more than three pieces of deep floor at the outer ring position of the communication tower installation set, described Deep floor is welded and fixed respectively between the communication tower installation set and the base plate.
Preferably, it is combined with the first deep floor between the bottom of the card and the outer wall for pouring bar, described One deep floor be welded and fixed between bar respectively with the card and described being poured.
Preferably, interference fits between the card and the shrinkage pool.
Preferably, osculum is provided with the bottom position of the outer ring of the communication tower installation set, in communication tower peace Seal washer is provided with the top inner ring position of encapsulation.
The beneficial effects of the utility model are:This device is assigned to ground by pouring bar, plays fastening effect, and Complete the fixation of base plate by the cooperation of screw and nut afterwards, the fixed installation of communication tower is completed by communication tower installation set, this Device fixed installation is more convenient, and later stage repeatable utilization, reduces use cost, and the structure of this device is relatively simple, into This is more cheap, is adapted to promote the use of.
Description of the drawings
In order to be illustrated more clearly that the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is front view of the present utility model;
Fig. 2 is the upward view of base plate.
Specific embodiment
Preferred embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings, so that advantage of the present utility model Can be easier to be readily appreciated by one skilled in the art with feature, it is apparent clear and definite so as to make to protection domain of the present utility model Define.
Refering to a kind of communication tower base holder structure shown in Fig. 1 and Fig. 2, including base plate 1, the bottom of the base plate 1 is provided with Shrinkage pool 101, at the bottom hole position of the shrinkage pool 101 through hole 102 is provided with, and is provided with the lower section of the base plate 1 and is poured bar 2, the top for pouring bar 2 is provided with card 201, and the card 201 is assigned in the shrinkage pool 101, in the base plate 1 Top is provided with screw 3, and welding at the inner top position for pouring bar 2 is provided with nut(It is not shown), the screw 3 passes through It is engaged with the nut after the through hole 102, communication tower installation set 4, institute is provided with the top shaft core position of the base plate 1 State the screwed hole that annular at the top outer ring position of communication tower installation set 4 is provided with more than three(It is not shown), in the screw thread Fastening screw 401 is combined with hole.
A preferred embodiment in the utility model, annular is provided with the outer ring position of the communication tower installation set 4 More than three pieces of deep floor 5, the deep floor 5 welds solid between the communication tower installation set 4 and the base plate 1 respectively It is fixed.
A preferred embodiment in the utility model, between the bottom of the card 201 and the outer wall for pouring bar 2 The first deep floor 221 is combined with, first deep floor 221 weld between bar 2 respectively with the card 201 and described being poured Connect fixation.
A preferred embodiment in the utility model, interference fits between the card 201 and the shrinkage pool 101.
A preferred embodiment in the utility model, is arranged at the bottom position of the outer ring of the communication tower installation set 4 There is osculum 441, at the top inner ring position of the communication tower installation set 4 seal washer 442 is provided with.
The beneficial effects of the utility model are:This device is assigned to ground by pouring bar, plays fastening effect, and Complete the fixation of base plate by the cooperation of screw and nut afterwards, the fixed installation of communication tower is completed by communication tower installation set, this Device fixed installation is more convenient, and later stage repeatable utilization, reduces use cost, and the structure of this device is relatively simple, into This is more cheap, is adapted to promote the use of.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, the utility model can also on the premise of without departing from the utility model spirit and scope There are various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model will Protection domain is asked to be defined by appending claims and its equivalent.

Claims (5)

1. a kind of communication tower base holder structure, it is characterised in that:Including base plate, the bottom of the base plate is provided with shrinkage pool, described Through hole is provided with the bottom hole position of shrinkage pool, is provided with below the base plate and is poured bar, the top for pouring bar is arranged There is card, the card is assigned in the shrinkage pool, screw, the inner top for pouring bar are provided with above the base plate Welding at position is provided with nut, and the screw is engaged through after the through hole with the nut, the top axle of the base plate Communication tower installation set is provided with heart position, annular is provided with more than three at the top outer ring position of the communication tower installation set Screwed hole, be combined with fastening screw in the screwed hole.
2. communication tower base holder structure according to claim 1, it is characterised in that:The outer ring position of the communication tower installation set Place's annular is provided with more than three pieces of deep floor, the deep floor respectively with the communication tower installation set and the base plate it Between be welded and fixed.
3. communication tower base holder structure according to claim 1, it is characterised in that:The bottom of the card pours bar with described Outer wall between be combined with the first deep floor, first deep floor weld between bar respectively with the card and described being poured Connect fixation.
4. communication tower base holder structure according to claim 1, it is characterised in that:Transition between the card and the shrinkage pool Coordinate.
5. communication tower base holder structure according to claim 1, it is characterised in that:The bottom of the outer ring of the communication tower installation set Portion is provided with osculum at position, and at the top inner ring position of the communication tower installation set seal washer is provided with.
CN201621071279.3U 2016-09-22 2016-09-22 Communication tower base construction Expired - Fee Related CN206144250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621071279.3U CN206144250U (en) 2016-09-22 2016-09-22 Communication tower base construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621071279.3U CN206144250U (en) 2016-09-22 2016-09-22 Communication tower base construction

Publications (1)

Publication Number Publication Date
CN206144250U true CN206144250U (en) 2017-05-03

Family

ID=58618698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621071279.3U Expired - Fee Related CN206144250U (en) 2016-09-22 2016-09-22 Communication tower base construction

Country Status (1)

Country Link
CN (1) CN206144250U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503554A (en) * 2017-07-31 2017-12-22 中国铁塔股份有限公司长春市分公司 A kind of communication base station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503554A (en) * 2017-07-31 2017-12-22 中国铁塔股份有限公司长春市分公司 A kind of communication base station

Similar Documents

Publication Publication Date Title
CN206144250U (en) Communication tower base construction
CN206110196U (en) Well lid device for highway engineering
CN205636551U (en) High -speed signboard
CN205894829U (en) Radio and television emission tower
CN201865202U (en) Concrete node poured in steel hemisphere
CN209653570U (en) A kind of transformable building construction security protection enclosing
CN205670674U (en) Wire supporting frame
CN206941481U (en) A kind of protector of municipal administration
CN206395738U (en) Tower crane cab seat
CN204332386U (en) A kind of protection of instrumentation cover
CN205775947U (en) A kind of interim channel-dividing device being easy to quickly assemble
CN205818978U (en) A kind of railway contact line pillar
CN208439769U (en) A kind of municipal and environment-friendly dustbin
CN206270331U (en) A kind of monitoring point perforate protection device of groundwater monitoring
CN206625468U (en) A kind of exterior wall's drainage pipe adjustable anti-theft device
CN210985319U (en) Second grade block terminal of simple and easy installation
CN206452064U (en) A kind of electric power cable erection bridge device
CN213360760U (en) Connecting column of supporting mechanism of dust removal device
CN205931004U (en) Bicycle lock pole structure
CN211690407U (en) Pile foundation for collapsible loess field
CN206144251U (en) Level land communication tower bears device
CN220377365U (en) Pile foundation drill way protector
CN211119231U (en) Safety support of outer frame safety packway lamp strip
CN210598355U (en) Subassembly is erect in communication guyed tower high altitude
CN208284651U (en) A kind of grounding-for-lightning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180327

Address after: 450003 Jinshui District, Zhengzhou, Henan Province, No. 2, No. 2, No. 86, No. 2, north of No. 86, north, No. 20, No. 20

Patentee after: Henan Dingwen Communication Technology Co.,Ltd.

Address before: 450003, No. 521, No. 11, Dongfeng Road, Dongfeng Road, Jinshui District, Zhengzhou, Henan

Patentee before: Henan Ding Jian communication service Limited by Share Ltd.

Effective date of registration: 20180327

Address after: 450003, No. 521, No. 11, Dongfeng Road, Dongfeng Road, Jinshui District, Zhengzhou, Henan

Patentee after: Henan Ding Jian communication service Limited by Share Ltd.

Address before: 362100, Fujian, Quanzhou province Huian County town of foreign exchange hang Yang Village No. 23

Patentee before: HUIAN COUNTY CHANGZHI ELECTRONIC TECHNOLOGY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503