CN206143936U - Basement outer wall post -cast strip shutoff waterproof construction - Google Patents

Basement outer wall post -cast strip shutoff waterproof construction Download PDF

Info

Publication number
CN206143936U
CN206143936U CN201621053935.7U CN201621053935U CN206143936U CN 206143936 U CN206143936 U CN 206143936U CN 201621053935 U CN201621053935 U CN 201621053935U CN 206143936 U CN206143936 U CN 206143936U
Authority
CN
China
Prior art keywords
wall
cover plate
elastic webbing
basement
poured band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621053935.7U
Other languages
Chinese (zh)
Inventor
劳锦洪
林谷
刘付亚福
向小英
赵晓彬
许捷聪
杜向浩
谢家彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co
Original Assignee
GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co filed Critical GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co
Priority to CN201621053935.7U priority Critical patent/CN206143936U/en
Application granted granted Critical
Publication of CN206143936U publication Critical patent/CN206143936U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a basement outer wall post -cast strip shutoff waterproof construction, include buried bolt, blocking cover plate, stagnant water elastic webbing and lock nut in advance, in advance in the wall body around the pre -buried outdoor wall post -cast strip underground of buried bolt's first end, buried bolt's second end stretches out in advance the wall body, the blocking cover plate lid is established the outside of basement outer wall post -cast strip, the stagnant water elastic webbing is located blocking cover plate with between the wall body, the stagnant water elastic webbing with blocking cover plate passes buried bolt's second is held in advance, locking nut installed is in buried bolt's second end makes in advance the blocking cover plate pre -compaction is in on the stagnant water elastic webbing. Basement outer wall post -cast strip shutoff waterproof construction, elastic deformation can take place for the stagnant water elastic webbing under the effect of blocking cover plate's precompression, the closely knit gap of filling contact surface between wall body and the blocking cover plate, shutoff water -proof effects is good, can guarantee the engineering quality, shortens construction period.

Description

Poured band of outer wall of basement blocks waterproof construction
Technical field
This utility model is related to block waterproof technique field, more particularly to a kind of poured band of outer wall of basement closure waterproof knot Structure.
Background technology
With complicated various, the continuous intensification of basement ground depth of modern architecture version, in order to solve knot Structure is complicated to pour the ununiform shrinkage of body of wall, cracking, seepy question compared with long concrete, generally using late poured band structure, that is, adopts The construction method of one ribbon concrete of late days teeming.During design of basement has the engineering of post-cast strip, after basement Pour band and its both sides exterior wall wants the longer contraction time of indwelling, follow-up waterproof and backfill construction can be affected.In order to carry out ground in time Backfill construction is enclosed in lower outdoor, shortens the construction period, and generally requiring carries out closure waterproof to post-cast strip.
Traditional, post-cast strip closure waterproof construction can be summarized as two kinds of forms:One kind is precast slab closure waterproof Structure, arranges precast slab on the outside of post-cast strip, but precast slab only blocks the effect for stopping backfill, when after When pouring with there is crack and the concrete of both sides between, it may appear that leakage problem;Another kind is that steel plate adds waterproof mortar to block Waterproof construction, arranges the firm plate of closure on the outside of post-cast strip, steel plate is by the embedded bar drawknot in the body of wall of basement post-pouring zone both sides Fixed, steel plate periphery smears waterproof mortar, but, steel plate is different from the material of waterproof mortar, and thermal expansion expansion and contraction is different, its knot Be likely to occur at conjunction gap, also, waterproof mortar usually can be bonding insecure with xoncrete structure and steel plate and come off, room Outer underground water energy enough enters xoncrete structure by post-cast strip gap, and then causes waterproof construction to fail, and has a strong impact on engineering matter Amount.Therefore, all there is waterproof defect in above two structure, does not reach closure waterproof quality standard and requires.
The content of the invention
Based on this, this utility model is the defect for overcoming prior art, there is provided a kind of closure good water-proof effect, Neng Goubao Card construction quality, shortens the poured band of outer wall of basement closure waterproof construction of construction period.
Its technical scheme is as follows:
A kind of poured band of outer wall of basement blocks waterproof construction, including pre-embedded bolt, closure cover plate, sealing elastic webbing and Locking nut, the first end of the pre-embedded bolt are embedded in the body of wall around poured band of outer wall of basement, the pre-embedded bolt The second end stretch out the body of wall, the closure cover plate lid is located at the outside of the poured band of outer wall of basement, the sealing bullet Property band be located at it is described closure cover plate and the body of wall between, the sealing elastic webbing with it is described closure cover plate pass through the pre-buried spiral shell Second end of bolt, the locking nut are arranged on the second end of the pre-embedded bolt, the closure cover plate precompressed is stopped described On water elastic webbing.
Wherein in one embodiment, the pre-embedded bolt is multiple, and multiple pre-embedded bolts are embedded in outside the room of underground In the body of wall of wall post-cast strip both sides and bottom, the sealing elastic webbing, the closure cover plate are in the poured band of outer wall of basement Both sides and bottom be pressed on the body of wall.
Wherein in one embodiment, the body of wall edge of the poured band of outer wall of basement both sides and bottom is reserved with peace Dress groove, the pre-embedded bolt are embedded in the installation groove, and the sealing elastic webbing is arranged in the installation groove, institute State closure cover plate lid to be located on the sealing elastic webbing.
Wherein in one embodiment, the sealing elastic webbing is the U-shape structure with the structure matching for installing groove.
Wherein in one embodiment, the poured band of outer wall of basement closure waterproof construction also includes waterproof roll or anti- Water conservation layer, the waterproof roll or fish tail and waterproof layer be laid in it is described closure cover plate outside and the capping panel area Body of wall on.
Wherein in one embodiment, the curved structure of first end of the pre-embedded bolt, the second of the pre-embedded bolt End is provided with the screw thread for coordinating with the locking nut.
Wherein in one embodiment, set with the pre-buried position corresponding section of the pre-embedded bolt on the sealing elastic webbing Flexible band pilot hole.
Wherein in one embodiment, the outline chi of the outer profile size and the sealing elastic webbing for blocking cover plate It is very little consistent, cover plate pilot hole is provided with the rigging position corresponding section of the pre-embedded bolt on the closure cover plate.
Wherein in one embodiment, the poured band of outer wall of basement closure waterproof construction also includes steel plate for sealing water, institute State steel plate for sealing water to be arranged in the body of wall of the poured band of outer wall of basement both sides.
Wherein in one embodiment, the torsional moment of tightening of the locking nut is 40Nm~65Nm.
The beneficial effects of the utility model are:
The poured band of outer wall of basement blocks waterproof construction, blocks cover plate and has the envelope for stopping outer wall of basement backfill Stifled effect, by arranging sealing elastic webbing between the body of wall around poured band of outer wall of basement and closure cover plate, blocks steel plate Can coordinate with pre-embedded bolt, by tightening the locking nut on pre-embedded bolt so that closure cover plate compresses sealing bullet Property band, there is elastic deformation in sealing elastic webbing under the precompression effect of closure cover plate, and then closely knit can fill up body of wall with envelope The gap of contact surface between blanking cover plate, reaches effective sealed waterproof effect, and then realizes closure and seal waterproof;Also, wall When body and closure cover plate change under the ambient temperature expanded with heat and contract with cold, gap can be produced as its shrinkage factor is inconsistent, now, only Water elastic webbing still can occur elastic deformation under the precompression set up, and still closely knit can fill up and contact between body of wall and closure cover plate The gap in face, blocks good water-proof effect.The poured band of outer wall of basement blocks waterproof construction, closure good water-proof effect, can Ensure construction quality, shorten the construction period.
Description of the drawings
Fig. 1 is the front view that the poured band of outer wall of basement described in this utility model embodiment blocks waterproof construction;
Fig. 2 is the A-A sectional views in Fig. 1;
Fig. 3 is the mplifying structure schematic diagram at A in Fig. 2;
Fig. 4 is the structural representation of the pre-embedded bolt described in this utility model embodiment.
Fig. 5 is the front view of the sealing elastic webbing described in this utility model embodiment.
Fig. 6 is the front view of the closure cover plate described in this utility model embodiment.
Description of reference numerals:
10th, pre-embedded bolt, 12, screw thread, 20, closure cover plate, 22, cover plate pilot hole, 30, sealing elastic webbing, 32, elastic webbing Pilot hole, 40, locking nut, 50, elastic washer, 60, waterproof roll, 70, steel plate for sealing water, 100, poured band of outer wall of basement, 200th, body of wall, 210, install groove.
Specific embodiment
Below embodiment of the present utility model is described in detail:
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of poured band of outer wall of basement blocks waterproof construction, including pre-embedded bolt 10, envelope Blanking cover plate 20, sealing elastic webbing 30 and locking nut 40, after the first end of the pre-embedded bolt 10 is embedded in outer wall of basement Pour with the body of wall 200 around 100, the body of wall 200 is stretched out at the second end of the pre-embedded bolt 10, and the closure cover plate 20 is covered The outside of the poured band of outer wall of basement 100 is located at, the sealing elastic webbing 30 is located at the closure cover plate 20 and the wall Between body 200, the sealing elastic webbing 30 passes through the second end of the pre-embedded bolt 10, the locking with the closure cover plate 20 Nut 40 is arranged on the second end of the pre-embedded bolt 10, the closure cover plate 20 is pressed on the sealing elastic webbing 30 in advance. In the present embodiment, the sealing elastic webbing 30 is sealing rubber strip, and the closure cover plate 20 is closure steel plate.The locking nut 40 torsional moment of tightening is 40Nm~65Nm, and then can effectively ensure that sealing elastic webbing 30 is issued in the precompression set up Change shape, it is ensured that effectively seals water resistance, and being unlikely to firmly excessive again causes pre-embedded bolt 10 to rupture.
The poured band of outer wall of basement blocks waterproof construction, blocks cover plate 20 and has stop outer wall of basement backfill Plugging action, by arranging sealing elastic webbing between the body of wall 200 around poured band of outer wall of basement 100 and closure cover plate 20 30, closure steel plate can be coordinated with pre-embedded bolt 10, by tightening the locking nut 40 on pre-embedded bolt 10 so that envelope Blanking cover plate 20 compresses sealing elastic webbing 30, and sealing elastic webbing 30 occurs elastic deformation under the precompression effect of closure cover plate 20, And then closely knit can fill up body of wall 200 and block the gap of contact surface between cover plate 20, effective sealed waterproof effect is reached, is entered And realize closure and seal waterproof;Also, when body of wall 200 and closure cover plate 20 change under the ambient temperature expanded with heat and contract with cold, by Gap can be produced in its shrinkage factor is inconsistent, now, the elastic deformation of watertight rubber band allows deformation model in the precompression set up Still there is elastic deformation in enclosing, still closely knit can fill up the gap of contact surface between body of wall 200 and closure cover plate 20, closure is anti- Water effect is good, can preferably solve the problems, such as post-cast strip seepage.Poured band of outer wall of basement closure described in the present embodiment is anti- Water-bound, by arranging closure cover plate 20, can fulfil backfilling of earthwork plugging construction ahead of schedule, shorten the construction period, improve construction effect Rate,
In the present embodiment, the pre-embedded bolt 10 is multiple, after multiple pre-embedded bolts 10 are embedded in outer wall of basement Pour in the body of wall 200 with 100 both sides and bottom, the sealing elastic webbing 30, the closure cover plate 20 are in the outer wall of basement The both sides and bottom of post-cast strip 100 are pressed on the body of wall 200.By at 100 both sides of poured band of outer wall of basement and bottom The pre-buried pre-embedded bolt 10 in the body of wall 200 in portion, sealing elastic webbing 30 is coordinated with closure cover plate 20 realizes closure waterproof effect During fruit, can realize blocking waterproof in the both sides of poured band of outer wall of basement 100 and bottom, i.e., to poured band of outer wall of basement 100 may all be sealed where water inlet, block and good water-proof effect.Corresponding, the locking nut 40 is also multiple, use In coordinating with corresponding pre-embedded bolt 10, the closure cover plate 20 is locked on each position.Specifically, the pre-embedded bolt 10 According to 100 structure of the poured band of outer wall of basement, U-shaped arrangement is embedded in poured band of outer wall of basement 100 weeks at a certain distance In the body of wall 200 for enclosing, and then ensure the effectiveness of whole closure waterproof construction.The quantity of the pre-embedded bolt 10, specification and Arrangement pitch can be arranged according to the concrete structure shape situation of codes and standards, performance and post-cast strip.
In the present embodiment, 200 edge of body of wall of 100 both sides of the poured band of outer wall of basement and bottom is reserved with installation Groove 210, the pre-embedded bolt 10 are embedded at the installation groove 210, and the sealing elastic webbing 30 is arranged on the installation In groove 210, closure cover plate 20 lid is located on the sealing elastic webbing 30.Using said structure, sealing elastic webbing 30 is pacified It is mounted in the installation groove 210, sealing elastic webbing 30 is coordinated with closure cover plate 20 can be in poured band of outer wall of basement 100 Both sides and bottom are realized blocking waterproof, and poured band of outer wall of basement 100 may be all sealed where water inlet, closure and Good water-proof effect;When there is elastic deformation under the precompression effect for blocking cover plate 20 in sealing elastic webbing 30, sealing elastic webbing 30 It is bigger with the contact area of body of wall 200, and then sealing effectiveness is also more preferably, after can further improve the outer wall of basement of the present embodiment Pour the closure with closure waterproof construction and water resistance;Additionally, after sealing elastic webbing 30 is installed, will not take on the outside of body of wall 200 Space, will not outside construction be caused to interfere, and structure is attractive in appearance.
In the present embodiment, the poured band of outer wall of basement closure waterproof construction also includes elastic washer 50, the elasticity Packing ring 50 is set on the pre-embedded bolt 10, and the elastic washer 50 is located at the closure cover plate 20 and the locking nut Between 40, the elastic washer 50 is coordinated with the locking nut 40 realizes that locking is acted on.Specifically, the elastic washer 50 with Locking nut 40 adopts mechanical standard parts, and cost is relatively low, and can ensure that locking nut 40 is connected with pre-embedded bolt 10 and used Effectiveness in journey.The poured band of outer wall of basement closure waterproof construction also includes waterproof roll 60 or fish tail and waterproof layer, institute State waterproof roll 60 or fish tail and waterproof layer be laid in the closure cover plate 20 outside and the closure cover plate 20 around wall On body 200.By laying waterproof volume on the body of wall 200 around the outside of the closure cover plate 20 and the closure cover plate 20 Material 60 or fish tail and waterproof layer, can further function as waterproof action, improve waterproof effect.Signal in the accompanying drawing of the present embodiment is processed and is set Put the situation of waterproof roll 60.The poured band of outer wall of basement closure waterproof construction also includes steel plate for sealing water 70, the sealing Steel plate 70 is arranged in the body of wall 200 of 100 both sides of the poured band of outer wall of basement.By arranging steel plate for sealing water 70, can play The press water of outside is prevented to permeate the ground the effect of room.
As shown in Figure 3, Figure 4, the curved structure of the first end of the pre-embedded bolt 10, the second end of the pre-embedded bolt 10 It is provided with the screw thread 12 for coordinating with the locking nut 40.The first end of pre-embedded bolt 10 is convexly curved structure, and then, energy The breakout capacity of pre-embedded bolt 10 is improved enough, it is ensured that when locking nut 40 is tightened, the pre-embedded bolt 10 is not pulled out and loses Effect, the second end of pre-embedded bolt 10 are provided with screw thread 12, for the locking with the locking sealing elastic webbing 30 and closure cover plate 20 Nut 40 is assembled.
As shown in Fig. 2, Fig. 5, the sealing elastic webbing 30 is the U-shape structure with the structure matching for installing groove 210. By sealing elastic webbing 30 is arranged to U-shape structure, on the one hand, so that the inner side of sealing elastic webbing 30 is engraved structure, pre- Under pressure effect, the thickness of sealing elastic webbing 30 reduces, and in the case of constancy of volume, sealing elastic webbing 30 can be to circumferential expansion, U Type structure can give sealing elastic webbing 30 sufficient dilation space, be further ensured that body of wall 200 and closure cover plate 20 it Between contact surface closely knit laminating;On the other hand, contact surface gap between body of wall 200 and closure cover plate 20 can closely knit filled up On the basis of, also can material-saving, it is and then cost-effective.In the present embodiment, with the pre-embedded bolt on the sealing elastic webbing 30 10 pre-buried position corresponding section is provided with elastic webbing pilot hole 32.By reserved elastic webbing pilot hole 32, sealing elasticity is capable of achieving Assembling with 30 Yu pre-embedded bolt 10, later stage assembling installation processing ease, effectively can use manpower and material resources sparingly resource, and raising is applied Work efficiency rate.Further, the aperture of the elastic webbing pilot hole 32 can be configured to the diameter slightly larger than pre-embedded bolt 10, such as may be used To be set to 1.1 times of 10 diameters of pre-embedded bolt, on the premise of closure water-proof function is ensured, be conducive to the suitable of sealing elastic webbing 30 Profit positioning and installation.The thickness of the sealing elastic webbing 30 could be arranged to 10mm-15mm, can play effective waterproof sealing Effect.
As described in Fig. 2, Fig. 6, the outline chi of the outer profile size and the sealing elastic webbing 30 for blocking cover plate 20 It is very little consistent, cover plate pilot hole 22 is provided with the rigging position corresponding section of the pre-embedded bolt 10 on the closure cover plate 20.It is logical Reserved cover plate pilot hole 22 is crossed, closure cover plate 20 can realize the assembling with pre-embedded bolt 10, later stage assembling installation operation Easily, effectively can use manpower and material resources sparingly resource, improve efficiency of construction, and by the outer profile size of closure cover plate 20 is configured to Consistent with the outer profile size of sealing elastic webbing 30, closure cover plate 20 can effectively apply precompression to sealing elastic webbing 30, Ensure that sealing elastic webbing 30 closely knit can fill up the gap of contact surface between body of wall 200 and closure cover plate 20.Further, the lid The aperture of plate pilot hole 22 can be configured to the diameter slightly larger than pre-embedded bolt 10, such as could be arranged to 1.2 times of pre-embedded bolts 10 Diameter, on the premise of closure water-proof function is ensured, closure cover plate 20 can smoothly be positioned and be installed.The closure cover plate 20 Thickness could be arranged to 8mm-12mm, and structural strength is good, can play effectively closure waterproof action.It is described closure cover plate 20 be Rectangle tabular structure, can effectively play plugging action, and compress the sealing elastic webbing 30.
Poured band of outer wall of basement closure waterproof construction described in the present embodiment, by arranging closure cover plate 20, can be in advance The construction of backfill is carried out, shortens the construction period;By arranging pre-embedded bolt 10, sealing elastic webbing 30 and locking nut 40, Pre-embedded bolt 10 is coordinated with locking nut 40 tightens up closure cover plate 20 so that closure cover plate 20 and sealing elastic webbing 30, sealing bullet Property with the closely knit contact of contact surface between 30 and body of wall 200, can ensure construction quality on the premise of, long-time realize closure Waterproof effect, long service life, further, it is possible to make body of wall 200 and closure steel plate around poured band of outer wall of basement 100 in heat Under conditions of swollen shrinkage, effectively closure waterproof effect is still ensured that;By being coordinated with locking nut 40 using pre-embedded bolt 10 Structure realize locking, it is not necessary to welding procedure, simple structure, processing and fabricating convenience, processing ease, cost are relatively low, flexible side Just, environmental protection.
Each technical characteristic of embodiment described above arbitrarily can be combined, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, some deformations and improvement can also be made, these belong to Protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.

Claims (10)

1. a kind of poured band of outer wall of basement blocks waterproof construction, it is characterised in that including pre-embedded bolt, closure cover plate, sealing Elastic webbing and locking nut, the first end of the pre-embedded bolt are embedded in the body of wall around poured band of outer wall of basement, institute The body of wall is stretched out at the second end for stating pre-embedded bolt, and the closure cover plate lid is located at the outside of the poured band of outer wall of basement, The sealing elastic webbing is located between the closure cover plate and the body of wall, and the sealing elastic webbing is passed through with the closure cover plate Second end of the pre-embedded bolt, the locking nut are arranged on the second end of the pre-embedded bolt, make the closure cover plate pre- It is pressed on the sealing elastic webbing.
2. poured band of outer wall of basement according to claim 1 blocks waterproof construction, it is characterised in that the pre-embedded bolt For multiple, multiple pre-embedded bolts are embedded in the body of wall of poured band of outer wall of basement both sides and bottom, the sealing elasticity Band, the closure cover plate are pressed on the body of wall in the both sides and bottom of the poured band of outer wall of basement.
3. poured band of outer wall of basement according to claim 1 blocks waterproof construction, it is characterised in that outside the underground room The body of wall edge of wall post-cast strip both sides and bottom is reserved with installation groove, and the pre-embedded bolt is embedded in the installation groove Place, the sealing elastic webbing are arranged in the installation groove, and the closure cover plate lid is located on the sealing elastic webbing.
4. poured band of outer wall of basement according to claim 3 blocks waterproof construction, it is characterised in that the sealing elasticity Band is the U-shape structure with the structure matching for installing groove.
5. poured band of outer wall of basement according to claim 1 blocks waterproof construction, it is characterised in that also roll up including waterproof Material or fish tail and waterproof layer, the waterproof roll or fish tail and waterproof layer be laid in it is described closure cover plate outside and the capping On the body of wall of panel area.
6. the poured band of outer wall of basement according to any one of Claims 1 to 5 blocks waterproof construction, it is characterised in that institute State the curved structure of first end of pre-embedded bolt, the second end of the pre-embedded bolt is provided with for being coordinated with the locking nut Screw thread.
7. the poured band of outer wall of basement according to any one of Claims 1 to 5 blocks waterproof construction, it is characterised in that institute State elastic webbing pilot hole is provided with the pre-buried position corresponding section of the pre-embedded bolt on sealing elastic webbing.
8. the poured band of outer wall of basement according to any one of Claims 1 to 5 blocks waterproof construction, it is characterised in that institute The outer profile size for stating closure cover plate is consistent with the outer profile size of the sealing elastic webbing, pre- with described on the closure cover plate The rigging position corresponding section for burying bolt is provided with cover plate pilot hole.
9. the poured band of outer wall of basement according to any one of Claims 1 to 5 blocks waterproof construction, it is characterised in that also Including steel plate for sealing water, the steel plate for sealing water is arranged in the body of wall of the poured band of outer wall of basement both sides.
10. the poured band of outer wall of basement according to any one of claim 1-5 blocks waterproof construction, it is characterised in that institute That states locking nut tightens torsional moment for 40Nm~65Nm.
CN201621053935.7U 2016-09-13 2016-09-13 Basement outer wall post -cast strip shutoff waterproof construction Active CN206143936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621053935.7U CN206143936U (en) 2016-09-13 2016-09-13 Basement outer wall post -cast strip shutoff waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621053935.7U CN206143936U (en) 2016-09-13 2016-09-13 Basement outer wall post -cast strip shutoff waterproof construction

Publications (1)

Publication Number Publication Date
CN206143936U true CN206143936U (en) 2017-05-03

Family

ID=58618262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621053935.7U Active CN206143936U (en) 2016-09-13 2016-09-13 Basement outer wall post -cast strip shutoff waterproof construction

Country Status (1)

Country Link
CN (1) CN206143936U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108203997A (en) * 2018-02-09 2018-06-26 南通华新建工集团有限公司 For the prefabricated board and its construction method closed on the outside of post-cast strip
CN109931080A (en) * 2019-03-06 2019-06-25 上海隧道工程有限公司 Pipe curtain mortar filling device and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108203997A (en) * 2018-02-09 2018-06-26 南通华新建工集团有限公司 For the prefabricated board and its construction method closed on the outside of post-cast strip
CN109931080A (en) * 2019-03-06 2019-06-25 上海隧道工程有限公司 Pipe curtain mortar filling device and its construction method

Similar Documents

Publication Publication Date Title
CN107605507B (en) Service channel shield-tunneling construction receives structure and construction method
CN201606084U (en) Waterproof structure of shield-structured tunnel segment
CN210263442U (en) Deformation joint leakage repair structure
CN201714396U (en) Waterproof structure of shield tunnel segment seam
CN206143936U (en) Basement outer wall post -cast strip shutoff waterproof construction
CN202248308U (en) Anti-seepage device for deformation joint of concrete structure
CN103850181B (en) Dismantled and assembled dragline anchorage sealed structure and realize ground tackle sealing method
CN105697034A (en) Grouting system and grouting method used for composite lining structure backfill and grouting
CN209873746U (en) Water stopping structure of high-water-pressure water conveying tunnel structural joint
CN203654328U (en) Assembly type water stop structure
CN108560612B (en) Water stop device
CN214143829U (en) Drainable externally-attached water stop with pasting timeliness
CN209891254U (en) Utility tunnel movement joint waterproof construction
CN110805460A (en) Waterproof sealing method for bolt hole of shield tunnel segment
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN218267677U (en) Leakage-proof structure for building water supply and drainage engineering
CN109183847B (en) Underground prefabricated pipe gallery
CN107975153A (en) A kind of roof deformation stitches processing structure
CN205477669U (en) A slip casting system that is used for combined type lining cutting structure to backfill slip casting behind one's back
CN111997557B (en) Oil extraction wellhead sealing device
CN209308053U (en) A kind of leak stopping system of composite paster slip casting
CN107101052A (en) The waterproof construction of wall pipe after a kind of flexibility
CN210196712U (en) Sealing assembly and gas sleeve
CN209873861U (en) Sealing device for lap joint of steel corrugated plate pipe gallery plates
CN112459130A (en) Drainable externally-adhered water stop with adhesion timeliness and application

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant