CN206143631U - A leading wheel device for installation of cable -stay bridge cable - Google Patents

A leading wheel device for installation of cable -stay bridge cable Download PDF

Info

Publication number
CN206143631U
CN206143631U CN201621060690.0U CN201621060690U CN206143631U CN 206143631 U CN206143631 U CN 206143631U CN 201621060690 U CN201621060690 U CN 201621060690U CN 206143631 U CN206143631 U CN 206143631U
Authority
CN
China
Prior art keywords
cable
guide wheel
leading wheel
directive wheel
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621060690.0U
Other languages
Chinese (zh)
Inventor
熊新光
卫千峰
孔建
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201621060690.0U priority Critical patent/CN206143631U/en
Application granted granted Critical
Publication of CN206143631U publication Critical patent/CN206143631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a leading wheel device for installation of cable -stay bridge cable, including leading wheel setting element and leading wheel subassembly, the leading wheel subassembly is fixed in on the leading wheel setting element, the leading wheel setting element is fixed and is being exposed the suo kongshang of bridge floor, the one end of haulage rope is passed leading wheel subassembly and the cable lifting appliance connection of setting on treating the stay guy, draw gear is connected to the other end. The device provided by the utility model simple structure, high, the easy preparation of stability, easy dismounting and low cost can improve work efficiency greatly and save artifically and machinery when adopting the construction of this device, change control suspension cable anchor head and go into the cable hole, and whole towing is not direct to the anchor head application of force, avoids the damage to anchor head silk mouth, this device can carry out the adjustment of distance and size according to the size in all alone hole and the angle of suspension cable, improves the construction degree of accuracy.

Description

A kind of guide wheel device installed for cable-stayed bridge cable
Technical field
This utility model belongs to technical field of building construction, is related to the installation operation of cable-stayed bridge, and in particular to a kind of The guide wheel device into rope hole is installed for cable-stayed bridge cable.
Background technology
Drag-line is one of main stress structure of cable-stayed bridge, with very big pulling force, while drag-line itself has constant weight, At the scene in work progress, using fork truck etc., some big machineries coordinate the construction of leading block group, directive wheel to have traction oblique pull The effect of rope anchor head.Enter Suo Kongshi in drag-line, because the machineries such as weight effect, crane should not control the position of anchor head and pull to, It is possible to simultaneously to the destruction of drag-line crust and anchor head silk injury of mouth, it is unnecessary for suspension cable less than normal of conducting oneself with dignity to be led using complicated Wheel assembles conjunction heavy mechanical equipment operation together, and the complexity of guide wheel group can increase difficulty of construction.
The content of the invention
Goal of the invention:This utility model purpose is for the deficiencies in the prior art, there is provided a kind of simple structure, easily making And the good guide wheel device installed for cable-stayed bridge cable of guide effect.
Technical scheme:A kind of guide wheel device installed for cable-stayed bridge cable described in the utility model, including guiding Wheel keeper and guide wheel assemblies, the guide wheel assemblies are fixed on the directive wheel keeper, and directive wheel keeper is fixed Exposing the Suo Kongshang of bridge floor;Hang with the drag-line being arranged on drag-line to be fixed through the guide wheel assemblies one end of pull rope Tool connection, other end connection traction apparatuss.
Further, the directive wheel keeper is the anchor ear of one end open, and the non-opening on the anchor ear is provided with company Connect platform;The guide wheel assemblies are linked as entirety by the connecting platform with the directive wheel keeper;The anchor ear opening One end arrange locking member.
Further, the locking member is a pair of engaging lugs being placed at the anchor ear opening, is opened up on the engaging lug It is some to assemble conjunction screw, installation locking bolt in screw.
Further, the guide wheel assemblies include guide wheel bracket and directive wheel, and the directive wheel is fixed by rotating shaft On the guide wheel bracket, and the duct that indwelling is passed through for pull rope between the directive wheel and guide wheel bracket.
Further, enter hole for ease of steel for wire drawing, prevent occurring position offset problem in distraction procedure, the drag-line Suspender is fixed on drag-line apart from the position of 1 ~ 3m of steel for wire drawing.
Further, the traction apparatuss are hoist engine.
Further, the guide wheel assemblies are apart from the m of the hoist engine 15 ~ 30.
Beneficial effect:This utility model provide apparatus structure it is simple, stability is high, easy making, easy accessibility and into This is cheap, work efficiency is greatly improved when constructing using this device and saves artificial and machinery, and suspension cable anchor head more easy to control enters Suo Kong, whole distraction procedure is not directly to anchor head force, it is to avoid the damage to anchor head silk mouth;(2)This device can be according to rope hole The angle of size and suspension cable enters the adjustment of row distance and size, improves construction accuracy.
Description of the drawings
Fig. 1 is the positive structure schematic of this utility model device;
Fig. 2 is the side structure schematic diagram of this utility model device;
Fig. 3 is using the job site schematic diagram of this utility model device;
Wherein:1st, anchor ear, 2, engaging lug, 3, screw, 4, Suo Kong, 5, guide wheel bracket, 6, directive wheel, 7, rotating shaft, 8, hole Road, 9, pull rope, 10, drag-line, 11, drag-line suspender, 12, bridge floor.
Specific embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but protection domain of the present utility model It is not limited to the embodiment.
Embodiment:A kind of guide wheel device installed for cable-stayed bridge cable, including directive wheel keeper and directive wheel group Part, directive wheel keeper is the anchor ear 1 of one end open, and the non-opening on anchor ear is provided with connecting platform;Guide wheel assemblies pass through Connecting platform is linked as entirety with directive wheel keeper;One end of the opening of anchor ear 1 is provided with a pair of engaging lugs 2, if opening up on engaging lug 2 It is dry to assemble conjunction screw 3, installation locking bolt in screw;Anchor ear 1 is encircled on the rope hole 4 for exposing bridge floor 12, and by clamping screw Locking positioning;Guide wheel assemblies include guide wheel bracket 5 and directive wheel 6, and directive wheel 6 is fixed on guide wheel bracket 5 by rotating shaft 7 On, and the duct 8 that indwelling is passed through for pull rope between directive wheel 6 and guide wheel bracket 5;One end of pull rope 9 passes through the hole Road 8 is connected with the drag-line suspender 11 being arranged on drag-line to be fixed 10, other end connection hoist engine;Wherein drag-line suspender 11 is fixed Apart from the position of the m of steel for wire drawing 2 on drag-line 10, guide wheel assemblies are apart from the m of the hoist engine 20.
Comprised the steps in construction using this device:
(1)Whole guide wheel device is fixed on into Suo Kongshang by anchor ear, and by clamping screw lock-bit;
(2)Drag-line suspender is fixed on drag-line apart from the position of steel for wire drawing 2m;
(3)In the hoist engine that a 5T is fixed apart from the position of guide wheel assemblies 20m;
(4)Traction steel wire on hoist engine is fixed on drag-line suspender through the duct in guide wheel assemblies, Ran Houqi The anchor head of dynamic hoist engine traction cable enters rope hole, completes to be oriented to and installs.
As described above, although this utility model has been represented and described with reference to specific preferred embodiment, it must not It is construed to the restriction to this utility model itself.In the spirit and scope of the present utility model defined without departing from claims Under the premise of, can in the form and details various changes can be made to it.

Claims (7)

1. it is a kind of for cable-stayed bridge cable install guide wheel device, it is characterised in that:Including directive wheel keeper and directive wheel Component, the guide wheel assemblies are fixed on the directive wheel keeper, and directive wheel keeper is fixed on the rope hole for exposing bridge floor On;One end of pull rope is connected through the guide wheel assemblies with the drag-line suspender being arranged on drag-line to be fixed, and the other end connects Connect traction apparatuss.
2. it is according to claim 1 for cable-stayed bridge cable install guide wheel device, it is characterised in that:The directive wheel Keeper is the anchor ear of one end open, and the non-opening on the anchor ear is provided with connecting platform;The guide wheel assemblies pass through institute State connecting platform and be linked as entirety with the directive wheel keeper;One end of the anchor ear opening arranges locking member.
3. it is according to claim 2 for cable-stayed bridge cable install guide wheel device, it is characterised in that:The locking member For a pair of engaging lugs being placed at the anchor ear opening, some assembling is opened up on the engaging lug and install in conjunction screw, screw lock Tight bolt.
4. it is according to claim 1 for cable-stayed bridge cable install guide wheel device, it is characterised in that:The directive wheel Component includes guide wheel bracket and directive wheel, and the directive wheel is fixed on the guide wheel bracket by rotating shaft, and described leads To the duct that indwelling between wheel and guide wheel bracket is passed through for pull rope.
5. it is according to claim 1 for cable-stayed bridge cable install guide wheel device, it is characterised in that:The drag-line hangs Tool is fixed on drag-line apart from the position of 1 ~ 3m of steel for wire drawing.
6. it is according to claim 1 for cable-stayed bridge cable install guide wheel device, it is characterised in that:The traction dress It is set to hoist engine.
7. it is according to claim 6 for cable-stayed bridge cable install guide wheel device, it is characterised in that:The directive wheel Component is apart from the m of the hoist engine 15 ~ 30.
CN201621060690.0U 2016-09-18 2016-09-18 A leading wheel device for installation of cable -stay bridge cable Expired - Fee Related CN206143631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621060690.0U CN206143631U (en) 2016-09-18 2016-09-18 A leading wheel device for installation of cable -stay bridge cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621060690.0U CN206143631U (en) 2016-09-18 2016-09-18 A leading wheel device for installation of cable -stay bridge cable

Publications (1)

Publication Number Publication Date
CN206143631U true CN206143631U (en) 2017-05-03

Family

ID=58618601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621060690.0U Expired - Fee Related CN206143631U (en) 2016-09-18 2016-09-18 A leading wheel device for installation of cable -stay bridge cable

Country Status (1)

Country Link
CN (1) CN206143631U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560861A (en) * 2020-05-22 2020-08-21 中铁大桥局集团有限公司 Large-span steel truss girder cable hanging device and method
CN112482227A (en) * 2020-11-21 2021-03-12 安徽省路港工程有限责任公司 Low-tower cable-stayed bridge cable penetrating system and method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560861A (en) * 2020-05-22 2020-08-21 中铁大桥局集团有限公司 Large-span steel truss girder cable hanging device and method
CN112482227A (en) * 2020-11-21 2021-03-12 安徽省路港工程有限责任公司 Low-tower cable-stayed bridge cable penetrating system and method thereof
CN112482227B (en) * 2020-11-21 2022-03-04 安徽省路港工程有限责任公司 Low-tower cable-stayed bridge cable penetrating system and method thereof

Similar Documents

Publication Publication Date Title
CN101966965A (en) Special hanger with guide cover wheel hub and turning and hanging method
CN206143631U (en) A leading wheel device for installation of cable -stay bridge cable
CN205558958U (en) Hoist device of tunnel efflux fan
CN102815627A (en) Automatic traction system for large-scale tower-type crane standard-knot removal and installation
CN202924590U (en) Novel crane hook anti-drop device
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN109898422A (en) Rope method for rapidly mounting between a kind of abnormal shape steel bridge tower tower
CN106429869A (en) Horizontal heavy equipment aerial mounting device and mounting method
CN105977870A (en) Power leading-down cable fixing device
CN205653106U (en) Explosion -proof wire rope electric block
CN201825639U (en) Special tool for hoisting steering clutch of bulldozer
CN205422583U (en) Lifting hook, hang assembly and hang hoisting accessory
CN207030716U (en) A kind of motor vehicle repair plain type part hanging apparatus
CN205687400U (en) A kind of power transmission shaft lifting accessory appliance
CN202936125U (en) Boom frame and steel wire rope protection device thereof
CN208265617U (en) Driving motor lifting appliance for electric automobile
CN206553031U (en) A kind of elevator traction machine hook
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender
CN206188249U (en) Novel swift mounting structure of pull rod
CN205668869U (en) A kind of boom hoisting for dredge pump maintenance
CN205653025U (en) Wind wheel lifting device
CN202785356U (en) Auxiliary anti-falling pulley device for oil drilling rig crane
CN204040498U (en) A kind of steel work Multi-section column lifting automatic decoupling device
CN210944589U (en) Self-detaching attachment mechanism
CN219860290U (en) Suspension type double-wheel milling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503