CN206143564U - Pavement structure - Google Patents

Pavement structure Download PDF

Info

Publication number
CN206143564U
CN206143564U CN201620805564.7U CN201620805564U CN206143564U CN 206143564 U CN206143564 U CN 206143564U CN 201620805564 U CN201620805564 U CN 201620805564U CN 206143564 U CN206143564 U CN 206143564U
Authority
CN
China
Prior art keywords
paving structure
buckle
road paving
water
dop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620805564.7U
Other languages
Chinese (zh)
Inventor
秦升益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renchuang ecological environmental protection Polytron Technologies Inc
Original Assignee
Beijing Rechsand Ecological Environment Protection Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rechsand Ecological Environment Protection Science And Technology Co Ltd filed Critical Beijing Rechsand Ecological Environment Protection Science And Technology Co Ltd
Priority to CN201620805564.7U priority Critical patent/CN206143564U/en
Application granted granted Critical
Publication of CN206143564U publication Critical patent/CN206143564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a pavement structure for lay on the brick that permeates water (40), include plastics loading board (30) and permeate water concrete layer (20), plastics loading board (30) have that a plurality of downward vertical extensions are banding buckle (32) and a plurality of confession instrument stretches into dismantlement hole (33) of stirring buckle (32), buckle (32) set up in the lower surface of plastics loading board (30) and adjacent with dismantlement hole (33), permeate water concrete layer (20) via hole (21) that hole (33) correspond have and dismantle, protruding be equipped with dop (321) in side of every buckle (32), it is provided with and supplies dop (321) to block fixed fixture block (41) to permeate water the side of brick (40). Pavement structure can form the protection to the brick that permeates water, avoids pedestrian or vehicle to the direct impact of the brick that permeates water, when pavement structure damages, and the pavement structure that can conveniently remove it and more renew, the brick that permeates water then less so can continue the use owing to the absorb.

Description

Road paving structure
Technical field
This utility model is related to a kind of water-permeable brick field, in particular it relates to a kind of road surface for being laid on water-permeable brick Paving structure.
Background technology
Water-permeable brick is the core component for building sponge city.The water-permeable brick of prior art is typically integrative-structure, and entirety is all It is made up of the higher pervious concrete of consistency, relatively costly, expensive, the difficulty of popularization and application is larger.Also, this one Once the water-permeable brick Damage of body structure is accomplished by whole replacing, the significant wastage of material is caused.
Utility model content
The purpose of this utility model is to provide a kind of road paving structure for being laid on water-permeable brick, the paving Structure can be formed to water-permeable brick and protected, so as to extending the service life of water-permeable brick and can reducing being manufactured into for water-permeable brick This.
To achieve these goals, this utility model provides a kind of road paving structure, for being laid on water-permeable brick, institute Stating road paving structure includes the plastic pallet with multiple permeable holes and the permeable coagulation being formed on the plastic pallet The shape of soil layer, the pervious concrete layer and plastic pallet is adapted, and the plastic pallet has multiple vertical downwards Extend the buckle in strip and multiple confession instruments stretch into the removal hole for stirring the buckle, the buckle is arranged at the plastics and holds The lower surface of support plate and adjacent with the removal hole, the pervious concrete layer has via corresponding with the removal hole, often The side of individual buckle is convexly equipped with dop, and the side of the water-permeable brick is provided with and is available for the dop to block fixed fixture block.
Preferably, the fixture block is in arrow-shaped, and upper end is trigonocephaly, and the trigonocephalic lower end evagination is formed and is available for the card The outer of head clamping.
Preferably, multiple buckle combination of two become buckle group, the opposite side of two buckles in each buckle group Face is provided with the dop, and the distance between the opposite flank of two buckles is more than the width of the trigonocephaly outer.
Preferably, the upper surface of the dop be plane, the inclined-plane that lower surface is inserted for ease of the fixture block.
Preferably, each buckle group is adjacent to a removal hole.
Preferably, location hole is provided with the water-permeable brick, is formed with locating dowel on the plastic pallet, the locating dowel Extend vertically downward to insert the location hole from the lower surface of the plastic pallet.
Preferably, multiple bond posts are formed with the plastic pallet, the plurality of bond post is embedded in the permeable coagulation In soil layer.
Preferably, it is coated with coating of titanium dioxide in the pervious concrete layer.
Preferably, the upper table facial contour of the road paving structure is rectangle.
Preferably, the upper table facial contour of the road surface bricks paving structure is in regular hexagon.
Road paving structure of the present utility model is arranged on water-permeable brick, water-permeable brick can be formed and be protected, it is to avoid pedestrian Or direct impact of the vehicle to water-permeable brick, when road paving structure weares and teares because of life-time service or damages, can be conveniently The ground road paving structure being removed and more renewed, water-permeable brick then due to withstanding shocks less therefore can be continuing with, with This mode significantly extends the service life of water-permeable brick.Also, because road paving structure plays a part of impurity screening so that As long as water-permeable brick can be permeable, this greatly reduces the requirement to permeable brick, reduces the manufacturing cost of water-permeable brick.
Other feature and advantage of the present utility model will be described in detail in subsequent specific embodiment part.
Description of the drawings
Accompanying drawing is further understood to of the present utility model for providing, and constitutes a part for description, and following Specific embodiment be used to explain this utility model together, but do not constitute to restriction of the present utility model.In the accompanying drawings:
Fig. 1 is according to a kind of axonometric chart of the road paving structure of embodiment of the present utility model;
Fig. 2 is the sectional view that the line A-A in Fig. 1 is intercepted;
Fig. 3 is a kind of axonometric chart of embodiment of plastic pallet;
Fig. 4 is the axonometric chart of the another embodiment of plastic pallet;
Fig. 5 is the assembling exploded view of road paving structure of the present utility model and water-permeable brick;
Fig. 6 is the installation diagram of road paving structure of the present utility model and water-permeable brick;
Fig. 7 is the sectional view that the line B-B in Fig. 6 is intercepted;
Fig. 8 is the sectional view that the line C-C in Fig. 6 is intercepted.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein Described specific embodiment is merely to illustrate and explains this utility model, is not limited to this utility model.
As shown in Figures 1 to 8, this utility model provides a kind of road paving structure, for being laid on water-permeable brick 40, institute Stating road paving structure includes the plastic pallet 30 with multiple permeable holes 31 and is formed in saturating on the plastic pallet 30 The shape of water coagulation soil layer 20, pervious concrete layer 20 and plastic pallet 30 is adapted, plastic pallet 30 have it is multiple to Lower buckle 32 of the vertically extension in strip and multiple confession instruments stretch into the removal hole 33 for stirring buckle 32, and buckle 32 is arranged at plastics The lower surface of loading plate 30 and adjacent with removal hole 33, pervious concrete layer 20 has via 21 corresponding with removal hole 33, often The side of individual buckle 32 is convexly equipped with dop 321, and the side of water-permeable brick 40 is provided with and is available for dop 321 to block fixed fixture block 41.
In road paving structure of the present utility model, pervious concrete layer 20 is by will be containing the first aggregate and first What the mixture of binding agent solidify to form, and the first binding agent contains hydrophilic agglomerant.The porous of pervious concrete layer 20 and Permeable hole is little, not only with water permeability, additionally it is possible to play a role in filtering, and prevents granule larger on road from entering wherein. Plastic pallet 30 plays a part of to carry pervious concrete layer 20 as the skeleton of road paving structure.
Specifically, the method for formation road paving structure of the present utility model can be:Pervious concrete layer 20 will be formed Each material mixing it is uniform, obtain mixture, and add this mixture in the mould of pervious concrete layer 20, this into Plastic pallet 30 is pre-placed in pattern tool, has then been cured to form in cured condition tight with plastic pallet 30 The close pervious concrete layer 20 being combined together.
Road paving structure of the present utility model is navigated on water-permeable brick 40 by the cooperation of dop 321 and fixture block 41. When needing to install fixed, the road paving structure is attached on water-permeable brick 40, pushing makes dop 321 block fixture block 41 i.e. Can;When needing to pull down, strip instrument, such as screwdriver are used, stretch into from via 21 and removal hole 33 and stir buckle 32 so as to Generation slight deformation, dop 321 departs from fixture block 41, then removes the road paving structure.
Road paving structure dismounting of the present utility model and installation are all relatively simple quick, when carrying out scale installation, safeguarding, A large amount of manpowers will not be expended.
The shape and structure of dop 321 can have various, and such as cylindrical body upper end arranges the raised line of evagination and blocks for dop 321 Firmly, or inverted cone etc..In the illustrated embodiment, it is trigonocephaly in the upper end of fixture block 41, overall is in arrow-shaped, trigonocephalic Upper-end inner diameter reduces, and lower end evagination forms outer, and buckle 32 can block the outer and fix.The fixture block 41 of placed arrow type, not only can The effect of dop 321 is blocked in realization, and when needing to remove buckle 32, extracting tool front end is stretched into into removal hole 33, is against The inclined-plane of trigonocephaly upper end slides, and after sliding into extreme position, power is decomposed into horizontal force by triangular ramp, is all applied to card On button 32, the deformation of buckle 32 is forced to depart from fixture block 41, extracting tool is without the need for complex operations, it is only necessary to vertically push, and simplifies The operation of unloading process, further saves manpower consumption.
The upper surface of dop 321 is plane, it is ensured that clamping firmly, and under the compressing of instrument, is easily slipped, its The inclined-plane that lower surface is inserted for ease of the trigonocephaly of fixture block 41, during installation, directly presses, the lower surface of dop 321 and the upper end of fixture block 41 Sliding is close in face, forces buckle 32 to deform, and snaps in fixation.
In road paving structure of the present utility model, the combination of two of multiple buckles 32 is a buckle group, in each card In button group, the opposite flank of two buckles 32 is provided with dop 321, and the distance of the two opposite flank more than trigonocephaly outer Width.Two buckles 32 of buckle group are connected to the both sides of fixture block 41 simultaneously, are sandwiched centre, make to connect and fix more firm Gu.
In the illustrated embodiment, the road paving structure and water-permeable brick are rectangle, under road paving structure Along the corner of rectangle, uniform ring is arranged with four groups of buckle groups at end, and each buckle group is adjacent to a removal hole 33, i.e., two cards Button 32 shares a removal hole 33, so only departs from the buckle 32 on the one side in four groups of buckle groups, you can road surface is pulled in inclination Paving structure is removed, and under the premise of dismounting easily is ensured, can reduce the quantity of removal hole 33.
According to this utility model, in order to the side for ensureing road paving structure flushes with the side of water-permeable brick 40, it is preferable that The side of water-permeable brick 40 is provided with the groove 42 connected with the upper surface of water-permeable brick 40, and fixture block 41 is formed on groove 42.
In sum, road paving structure of the present utility model is arranged on water-permeable brick 40, and water-permeable brick 40 can be formed Protection, it is to avoid the direct impact of pedestrian or vehicle to water-permeable brick 40, when road paving structure occur because of life-time service abrasion or During damage, the road paving structure that can be easily removed and more be renewed, water-permeable brick 40 then due to withstand shocks it is less because This can be continuing with, and the service life of water-permeable brick 40 is significantly extended in this way.Also, because road paving structure is played The effect of impurity screening so that as long as water-permeable brick 40 can be permeable, this greatly reduces the requirement (example to permeable brick Such as, water-permeable brick 40 can be manufactured more than second aggregate and the second binding agent of the first aggregate using particle diameter, or using by In made by impermeable material, the brick with water stream channel be used as water-permeable brick 40), so as to greatly reduce the system of water-permeable brick Cause this.
In order to be further ensured that the road paving structure will not be relative to the sliding of water-permeable brick 40, it is preferable that such as Fig. 2 and Tu Shown in 8, location hole 43 is provided with water-permeable brick 40, locating dowel 34 is formed with plastic pallet 30, the locating dowel 34 is from plastics The lower surface of loading plate 30 is extended vertically downward and is coupled in location hole 43 with inserting.
In order that pervious concrete layer 20 is bound more closely with plastic pallet 30, as a kind of embodiment, such as Fig. 3 It is shown, be formed with multiple bond posts 35 on plastic pallet 30, the plurality of bond post 35 perpendicular to the plastic pallet 30 upwards In extending to be embedded into pervious concrete layer 20.
Used as another embodiment, as shown in figure 4, being formed with a plurality of positioning bar 36 on plastic pallet 30, this is a plurality of Positioning bar 36 protrudes from the upper surface of plastic pallet 30 and is embedded in pervious concrete layer 20.Wherein, a plurality of positioning Muscle 36 includes being staggered to form a plurality of longitudinal register muscle and located lateral muscle of lattice structure, and multiple permeable holes 31 are located at respectively each In grid.
In order to increase the roughness of road paving structure upper surface, prevent pedestrian from slipping, the upper table of pervious concrete layer 20 Face is formed with multiple anti-skidding boss 22.In the embodiment shown in Fig. 1, anti-skidding boss 22 is elongated.It is possible at other In embodiment, anti-skidding boss 22 can also be circle.
In order to prevent dust granule from blocking the permeable hole of pervious concrete layer 20, it is preferable that as shown in Fig. 2 permeable coagulation Coating of titanium dioxide 10 is coated with soil layer 20.Coating of titanium dioxide 10 can decompose road paving structure surface and hole Dirt, such as carbon monoxide, nitrogen dioxide, sulphur compound and other oxynitride, purify air prevents hole to be blocked simultaneously Plug.
This utility model is not particularly limited for the shape of road paving structure, as long as mutually fitting with the shape of water-permeable brick 40 Should.In the illustrated embodiment, water-permeable brick 40 and road paving structure are in cuboid.In other possible embodiment party In formula, water-permeable brick 40 and road paving structure can be in positive six prismsby shape.
According to this utility model, under preferable case, pervious concrete layer 20 has loose structure.Invention of the present utility model People has found through lot of experiments, when the bore dia of the loose structure is 0.1-0.5mm, when porosity is 15%-35%, Ensure that pervious concrete layer 20 has excellent water penetration and good filtering function simultaneously.Wherein, the loose structure Bore dia and porosity can adopt well known to a person skilled in the art method is measured, it is for instance possible to use electronics Microscope is measured to bore dia, and porosity is measured using drainage.
In the mixture for forming pervious concrete layer 20, the content of first aggregate and hydrophilic agglomerant can be Select in larger scope and adjust, for example, on the basis of the first aggregate of 100 weight portions, the hydrophilic agglomerant contains Amount can be 1-20 weight portions;Under preferable case, on the basis of the first aggregate of 100 weight portions, the hydrophilic agglomerant Content is 2-15 weight portions.
The hydrophilic agglomerant can be existing various hydrophilic agglomerants, as long as disclosure satisfy that by itself and the first bone Cured the formed pervious concrete layer 20 of mixture of material granule has excellent water permeable ability, and with some strength Material, can be used as the requirement of road pavement material.For example, the hydrophilic agglomerant can be selected from hydrophilic epoxy tree One or more in fat, hydrophilic polyurethane resin and hydrophilic acrylic resin.
According to this utility model, the hydrophilic matrix tablets, hydrophilic polyurethane resin and hydrophilic acrylic resin Refer to the epoxy resin containing enough hydrophilic group and/or hydrophilic segment, polyurethane resin and acrylic acid tree in molecular structure Fat, the hydrophilic group can for example be selected from one or more in hydroxyl, carboxyl, sulfonic group and ammonium, the hydrophilic segment For example can be (- CH2-CH2-O-)n, wherein, n is the integer of 1-10.
It is solid in order to contain in the mixture for improving curing performance, first particles of aggregates and hydrophilic agglomerant Agent.This utility model is not particularly limited for the species of the firming agent, can be carried out rationally according to hydrophilic agglomerant Ground is selected.For example, for hydrophilic matrix tablets, the firming agent can be that amine system firming agent and/or anhydride system solidify Agent.Specifically, the amine system firming agent can be ethylenediamine, trimethylhexamethylenediamine, diethyl triamine, methylol second two Amine, hydroxyethylethylene diamine, dihydroxy ethyl ethylenediamine, ethoxy diethylenetriamine, dihydroxy ethyl ethylenediamine, ethoxy divinyl three Amine, dihydroxy ethyl diethylenetriamine, ethoxy hexamethylene diamine, a cyanoethyl ethylenediamine, dicyanoethyl ethylenediamine, dicyanoethyl oneself two Amine, dicyanodiamine, cyclohexanediamine, Meng's alkane diamidogen, amine ethyl croak piperazine, hexamethylenetetramine, isophorone diamine and diaminourea One or more in hexamethylene;The anhydride can be methyl tetrahydrophthalic anhydride, methyl hexahydrophthalic anhydride, succinic anhydride With one or more in adipic anhydride.For hydrophilic polyurethane resin, it is different that the firming agent is preferably selected from toluene two The trimerization of cyanate (TDI), the addition product, the prepolymer of TDI and hydroxy-containing component and TDI of Trimethoprim (TMP) Body.Relative to the hydrophilic agglomerant of 100 weight portions, the content of the firming agent can be 1-20 weight portions, preferably 5-18 weight portions.
In order to improve the weatherability of the road paving structure, under preferable case, first binding agent can also contain Weatherability resinoid bond.Usually, on the basis of the first aggregate of 100 weight portions, the weatherability resinoid bond and parent The total content of aqueous resinous binders is 1-20 weight portions, preferably 2-10 weight portions;And the weatherability resinoid bond with The weight ratio of hydrophilic resin binding agent is 0-3: 1.The weatherability resinoid bond can be for example epoxy resin and poly- ammonia One or more in ester resin.It should be noted that as the epoxy resin and polyurethane of the weatherability resinoid bond Resin is epoxy resin and polyurethane resin without hydrophilic group and/or hydrophilic segment.
According to this utility model, the epoxy resin can for example be selected from cycloaliphatic epoxy resin, hydrogenated bisphenol A type epoxy Resin, organic-silicon-modified bisphenol A type epoxy resin, saturation glycidyl ester type epoxy resin, heterocyclic type and mixed type asphalt mixtures modified by epoxy resin One or more in fat.The polyurethane resin is made up of polyisocyanates and polyhydric alcohol;Wherein, the polyisocyanates example 1 can be such as selected from, hexamethylene-diisocyanate (HDI), isophorone diisocyanate (IPDI), XDI (XDI), 1,3-Diisocyanatomethylcyclohexane (HTDI), dicyclohexyl methyl hydride diisocyanate (HMDI), the methylene of durol two Group diisocyanate (TMXDI), 1, hexamethylene-diisocyanate biuret, 1, hexamethylene-diisocyanate trimer, isophorone two Isocyanate trimer, toluene di-isocyanate(TDI) (TDI) and 1, the mixed trimer or performed polymer of hexamethylene-diisocyanate (HDI) In one or more;The polyhydric alcohols can such as be selected from PEPA, tetrahydrofuran for the polyether polyol of base, containing hydroxyl One or more in the acrylic resin of base and the organic siliconresin of hydroxyl.The polyurethane resin can be added with urethane level Solvent, chain extender and cross-linking agent.This utility model is to the consumption of the urethane level solvent, chain extender and cross-linking agent without especially limit Fixed, for example, on the basis of the gross weight of the polyurethane resin, the consumption of the urethane level solvent can be 0.1-2 weight %; The chain extender can be 0.1-2 weight % with total consumption of cross-linking agent.The urethane level solvent is preferably ethyl acetate, acetic acid One or more in methyl ester, dimethyl succinate, diethyl succinate.The chain extender is preferably alcohols and amine with cross-linking agent Class chain extender and cross-linking agent, described alcohols and amine chain extender and cross-linking agent for example can be BDO, 1,6- oneself two Alcohol, trimethylolpropane and 3,3 '-two chloro- 4, one or more in 4 '-diaminourea-diphenyl methane MOCA.The poly- ammonia Urethane cures catalysts can also be added with ester resin.The urethane cures catalysts are preferably organotin One or more in system or lead series catalysts;Described organotin series catalysts can be dibutyl tin laurate, octanoic acid Stannous, stannous iso caprylate;The lead series catalysts can be selected from the one kind or many in epoxyeicosatrienoic acid zinc, lead naphthenate and isooctyl acid lead Kind.This utility model is not particularly limited to the consumption of the urethane cures catalysts, for example, with the polyurethane tree On the basis of the gross weight of fat, the consumption of the urethane cures catalysts can be 0.1-2 weight %.
In order to improve the intensity and water permeability of road paving structure, under preferable case, in the pervious concrete layer 20 Hydrophilic inorganic material can also be contained.The hydrophilic inorganic material can be existing various hydrophilic inorganic materials, excellent In the case of choosing, the hydrophilic inorganic material is selected from one or more in kieselguhr, bentonite and perlite.And with 100 weights On the basis of first particles of aggregates of amount part, the content of the hydrophilic inorganic material is 1-20 weight portions, preferably 5-15 weight Part.
In order to strengthen the adhesion strength between the first aggregate, it is preferable that can also contain in the pervious concrete layer 20 The coupling agent of siliceous, titanium or P elements, the quality of the coupling agent can be the 0-10% of the hydrophilic agglomerant quality, excellent Select 0.5-5%.The coupling agent for example can be VTES, γ-glycidyl ether oxygen propoxypropyl three One or more in methoxy silane etc..
Under preferable case, weatherability additive is also contained in the pervious concrete layer 20, the weatherability additive is Light stabilizer and/or antioxidant.The light stabilizer is a kind of light stability auxiliary agent that can improve macromolecular material, and it can shield Cover ultraviolet or absorb ultraviolet and it is converted into harmless heat energy;Or it is quenched the molecule or group excited by ultraviolet Excited state so as to be returned to ground state;Or the free radical that capture is produced because of photooxidation, it is to avoid photooxidation reaction goes on, So that macromolecular material exempts from the destruction of ultraviolet.The antioxidant is used to strengthen the antioxygen of the pervious concrete layer 20 The property changed, it is to avoid the road paving structure is aoxidized due to the effect of oneself factor and environmental factorss, so as to cause road surface to spread The decline or loss of assembling structure performance.Therefore, add in the pervious concrete layer 20 light stabilizer and/or antioxidant it Afterwards, the service life of the water-permeable brick can effectively be extended.
This utility model is not particularly limited to the consumption of the light stabilizer and/or antioxidant, for example, the light Total consumption of stabilizer and antioxidant can be 0.1-5 weight % of first binder content.It should be noted that working as When containing light stabilizer and antioxidant in the pervious concrete layer 20, total consumption of the light stabilizer and antioxidant refers to Be light stabilizer and antioxidant consumption sum;When in the pervious concrete layer 20 only containing light stabilizer or antioxidation During agent, total consumption of the light stabilizer and antioxidant refers to the consumption of light stabilizer or antioxidant.The light is stablized Agent can for example be selected from benzophenone, salicylic acid esters, benzotriazole, hindered amines, light stabilizer HPT and light stabilizer Any one or several in EPU;Wherein, the benzophenone light stabilizer for example can for UV-207, UV-9, UV-531, One or more in UV-A, MA, D49 and light stabilizer -50;The salicylate light stabilizer for example can be stable for light Agent TBS, light stabilizer BAD etc.;The benzotriazole light stabilizer for example can be UV-P, UV-320, UV-326, UV- 327th, UV-328 and UV-5411 etc.;The hindered amine light stabilizer for example can for light stabilizer 744, light stabilizer 144, Hindered amine 770, light stabilizer 292 etc..The antioxidant can use antioxidant 1222, AT-76, antioxidant 2246-S, AT- 59th, antioxidant 1035, antioxidant 1098, antioxidant 3125, TPP, TNPP, AT-168, antioxidant 245, GA-80, antioxidant 858th, one or more in antioxidant 1010.
This utility model is not particularly limited to the first particles of aggregates diameter, as long as the road surface paving for enabling to Assembling structure has excellent intensity and drainability, under preferable case, the average particulate diameter of first particles of aggregates Can be 0.05-1 millimeters.First particles of aggregates various can be used to be formed with known to those skilled in the art Water brick and the aggregate with some strength, for example, first aggregate can be quartz sand and/or roughing sand.
According to this utility model, in order that to more aesthetically pleasing road paving structure, under preferable case, first bone Material granule is the first particles of aggregates of Surface coating chromatic colour resin bed, and the color resin layer is by containing pigment agent and hydrophilic The colour-wash of resin solidify to form.And relative to the first particles of aggregates of 100 weight portions, the content of the color resin layer can Think 0.5-3.5 weight portions, preferably 0.8-1.8 weight portions.The weight ratio of the pigment agent and hydrophilic resin can be 0.05-0.5: 1, preferably 0.2-0.3: 1.
This utility model is not particularly limited to the species of the pigment agent, for example can be selected from titanium white, Zinc Oxide, red One or more in color ferrum oxide, Cinnabaris, ultramarine, cobalt oxide, titan yellow, chrome yellow, white carbon black and phthalocyanine blue.The face of the pigment agent Color is also not particularly limited, and can be properly selected as needed.
Preferred implementation of the present utility model is described in detail above in association with accompanying drawing, but, this utility model is not limited Detail in above-mentioned embodiment, in range of the technology design of the present utility model, can be to skill of the present utility model Art scheme carries out various simple variants, and these simple variants belong to protection domain of the present utility model.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, this utility model is to each Plant possible compound mode no longer separately to illustrate.
Additionally, combination in any can also be carried out between a variety of embodiments of the present utility model, as long as it is not disobeyed Thought of the present utility model is carried on the back, it should equally be considered as content disclosed in the utility model.

Claims (7)

1. a kind of road paving structure, for being laid on water-permeable brick (40), it is characterised in that the road paving structure includes Plastic pallet (30) with multiple permeable holes (31) and the pervious concrete layer being formed on the plastic pallet (30) (20), the plastic pallet (30) is stretched into and is dialled with multiple buckles (32) of the extension in strip vertical downwards and multiple confession instruments Move the buckle (32) removal hole (33), the buckle (32) be arranged at the lower surface of the plastic pallet (30) and with institute State removal hole (33) adjacent, the pervious concrete layer (20) with via (21) corresponding with the removal hole (33), each The side of buckle (32) is convexly equipped with dop (321), and the side of the water-permeable brick (40) is provided with and is available for the dop (321) to block Fixed fixture block (41).
2. road paving structure according to claim 1, it is characterised in that in arrow-shaped, upper end is the fixture block (41) Trigonocephaly, the trigonocephalic lower end evagination forms the outer for being available for the dop (321) clamping.
3. road paving structure according to claim 2, it is characterised in that multiple buckle (32) combination of two become Buckle group, the opposite flank of two buckles (32) in each buckle group is provided with the dop (321), and two buckles (32) width of the distance between the opposite flank more than the trigonocephaly outer.
4. road paving structure according to claim 3, it is characterised in that the upper surface of the dop (321) is plane, The inclined-plane that lower surface is inserted for ease of the fixture block (41).
5. road paving structure according to claim 4, it is characterised in that each buckle group described in adjacent to tearing open Unload hole (33).
6. road paving structure according to claim 1, it is characterised in that the upper table facial contour of the road paving structure It is rectangle.
7. road paving structure according to claim 1, it is characterised in that the upper table facial contour of the road surface bricks paving structure In regular hexagon.
CN201620805564.7U 2016-07-27 2016-07-27 Pavement structure Active CN206143564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620805564.7U CN206143564U (en) 2016-07-27 2016-07-27 Pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620805564.7U CN206143564U (en) 2016-07-27 2016-07-27 Pavement structure

Publications (1)

Publication Number Publication Date
CN206143564U true CN206143564U (en) 2017-05-03

Family

ID=58617713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620805564.7U Active CN206143564U (en) 2016-07-27 2016-07-27 Pavement structure

Country Status (1)

Country Link
CN (1) CN206143564U (en)

Similar Documents

Publication Publication Date Title
CN103132423A (en) Water permeable brick
AU2007306792B2 (en) Composite water permeable brick and composition for producing the same
CN107663820A (en) Split type water-permeable brick
CN103525248B (en) A kind of compound terrace paint and preparation method thereof and using method
CN107663823A (en) Split type water-permeable brick
CN206266974U (en) Road paving structure
CN206143552U (en) Split type brick that permeates water
CN106699011A (en) Composite materials comprising aggregate and an elastomeric composition
CN206219931U (en) Road paving structure
CN206279412U (en) Split type water-permeable brick
CN206143554U (en) Split type brick that permeates water
CN105860008A (en) Air-permeable polyurethane plastic runway surface cementing material
CN1125454A (en) Open-pore mouldings for use in the construction industry
CN206143564U (en) Pavement structure
KR101084708B1 (en) Permeability block and method for manufacturing thereof
CN107663824A (en) Split type water-permeable brick
CN206143551U (en) Pavement structure
CN108219654A (en) Polyurethane non-skid coating
CN206143558U (en) Split type brick that permeates water
CN206143553U (en) Pavement structure
CN206143556U (en) Pavement structure
KR101471446B1 (en) Ecofriendly porous binder composition for polymer concrete
CN107663822A (en) Split type water-permeable brick
CN206219932U (en) Split type water-permeable brick
KR100757400B1 (en) Constructing method of anti-slip material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Patentee after: Anhui Renchuang ecological environmental Polytron Technologies Inc

Address before: 100085 room B, block B509, Jiahua building, No. 9, 3rd Street, Beijing, Haidian District

Patentee before: Beijing Rechsand Ecological Environment Protection Science and Technology Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Patentee after: Renchuang ecological environmental protection Polytron Technologies Inc

Address before: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Patentee before: Anhui Renchuang ecological environmental Polytron Technologies Inc