CN206219931U - Road paving structure - Google Patents

Road paving structure Download PDF

Info

Publication number
CN206219931U
CN206219931U CN201620802806.7U CN201620802806U CN206219931U CN 206219931 U CN206219931 U CN 206219931U CN 201620802806 U CN201620802806 U CN 201620802806U CN 206219931 U CN206219931 U CN 206219931U
Authority
CN
China
Prior art keywords
road paving
paving structure
water
permeable brick
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620802806.7U
Other languages
Chinese (zh)
Inventor
秦升益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renchuang ecological environmental protection Polytron Technologies Inc
Original Assignee
Anhui Renchuang Ecological Environmental Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Renchuang Ecological Environmental Polytron Technologies Inc filed Critical Anhui Renchuang Ecological Environmental Polytron Technologies Inc
Priority to CN201620802806.7U priority Critical patent/CN206219931U/en
Application granted granted Critical
Publication of CN206219931U publication Critical patent/CN206219931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of road paving structure, for being laid on water-permeable brick (40), road paving structure includes the pervious concrete layer (20) for having the plastic pallet (30) of multiple permeable holes (33) and being formed on the plastic pallet (30), the shape of pervious concrete layer (20) and plastic pallet (30) is adapted, the upper surface of water-permeable brick (40) is provided with dovetail groove (41), and the lower surface of plastic pallet (30) is formed with the trapezoidal slide unit (31) matched with dovetail groove (41).Road paving structure of the present utility model is arranged on water-permeable brick; water-permeable brick can be formed and protected; avoid the direct impact of pedestrian or vehicle to water-permeable brick; when road paving structure weares and teares or damages because of long-term use; the road paving structure that can be easily removed and more renewed; water-permeable brick then due to withstanding shocks smaller therefore can be continuing with, significantly extends the service life of water-permeable brick in this way.

Description

Road paving structure
Technical field
The utility model is related to a kind of water-permeable brick field, in particular it relates to a kind of road surface for being laid on water-permeable brick Paving structure.
Background technology
Water-permeable brick is the core component for building sponge city.The water-permeable brick of prior art is typically integrative-structure, and entirety is all It is made up of consistency pervious concrete higher, relatively costly, expensive, the difficulty of popularization and application is larger.Also, this one Once the water-permeable brick Damage of body structure is accomplished by whole replacing, the significant wastage of material is caused.
Utility model content
The purpose of this utility model is to provide a kind of road paving structure for being laid on water-permeable brick, the paving Structure can be formed to water-permeable brick and protected, so as to extend the service life of water-permeable brick and can reduce being manufactured into for water-permeable brick This.
To achieve these goals, the utility model provides a kind of road paving structure, for being laid on water-permeable brick, institute Stating road paving structure includes the permeable coagulation for having the plastic pallet of multiple permeable holes and being formed on the plastic pallet The shape of soil layer, the pervious concrete layer and plastic pallet is adapted, and the upper surface of the water-permeable brick is provided with dovetail groove, The lower surface of the plastic pallet is formed with the trapezoidal slide unit matched with the dovetail groove, the pervious concrete layer, modeling The first dowel hole, the second dowel hole and the 3rd fixed matched with alignment pin are respectively arranged with material loading plate and water-permeable brick Position pin-and-hole.
Preferably, the 3rd dowel hole is blind hole.
Preferably, the upper surface of the pervious concrete layer is formed with multiple anti-skidding boss.
Preferably, the head shape of the alignment pin is identical with the shape of the anti-skidding boss.
Preferably, it is coated with coating of titanium dioxide in the pervious concrete layer.
Preferably, multiple bond posts are formed with the plastic pallet, the plurality of bond post is embedded in the permeable coagulation In soil layer.
Preferably, the pervious concrete layer has loose structure, and the bore dia of the loose structure is 0.1-0.5mm, hole Gap rate is 15%-35%.
Preferably, the upper table facial contour of the road paving structure is rectangle.
Preferably, the upper table facial contour of the road paving structure is in regular hexagon.
Road paving structure of the present utility model is arranged on water-permeable brick, water-permeable brick can be formed and protected, it is to avoid OK The direct impact of people or vehicle to water-permeable brick, when road paving structure weares and teares or damages because of long-term use, Ke Yifang Just the road paving structure removed and more renewed, water-permeable brick then due to withstanding shocks smaller therefore can be continuing with, The service life of water-permeable brick is significantly extended in this way.Also, because road paving structure plays a part of impurity screening, make Can be permeable as long as obtaining water-permeable brick, the requirement to permeable brick is reduced (it is for instance possible to use particle diameter is more than the first aggregate The second aggregate and the second binding agent manufacture water-permeable brick, or using being made due to impermeable material, logical with current The brick in road is used as water-permeable brick), significantly reduce the manufacturing cost of water-permeable brick.
Other feature and advantage of the present utility model will be described in detail in subsequent specific embodiment part.
Brief description of the drawings
Accompanying drawing is further understood to of the present utility model for providing, and constitutes a part for specification, and following Specific embodiment be used to explain the utility model together, but do not constitute to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is according to a kind of stereogram of the road paving structure of implementation method of the present utility model;
Fig. 2 is the sectional view intercepted along the line A-A in Fig. 1;
Fig. 3 is a kind of stereogram of implementation method of plastic pallet;
Fig. 4 is the assembling exploded view of road paving structure of the present utility model and water-permeable brick;
Fig. 5 is the installation diagram of road paving structure of the present utility model and water-permeable brick;
Fig. 6 is the sectional view intercepted along the line B-B in Fig. 5.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein Described specific embodiment is merely to illustrate and explains the utility model, is not limited to the utility model.
As shown in Figures 1 to 6, the utility model provides a kind of road paving structure, for being laid on water-permeable brick 40, institute Stating road paving structure includes the plastic pallet 30 with multiple permeable holes 33 and is formed in saturating on the plastic pallet 30 The shape of water coagulation soil layer 20, pervious concrete layer 20 and plastic pallet 30 is adapted, and the upper surface of water-permeable brick 40 is provided with Dovetail groove 41, the lower surface of plastic pallet 30 is formed with the trapezoidal slide unit 31 matched with dovetail groove 41, and trapezoidal slide unit 31 is used In dovetail groove 41 is assembled to, the first positioning is respectively arranged with pervious concrete layer 20, plastic pallet 30 and water-permeable brick 40 Pin-and-hole 21, the second dowel hole 32 and the 3rd dowel hole 42, alignment pin 50 pass through the first dowel hole 21 and the second alignment pin Hole 32 is to be coupled in the 3rd dowel hole 42, so as to the road paving structure is positioned on water-permeable brick 40.
In the illustrated embodiment, the road paving structure is in rectangular shape, and trapezoidal slide unit 31 is along the road The length direction of face paving structure extends, and trapezoidal slide unit 31 limits the road paving structure with the fit structure of dovetail groove 41 The free degree on width and thickness direction, alignment pin 50 further limit the road paving structure in the longitudinal direction The free degree, so that the road paving structure is positioned on water-permeable brick 40.During installation, trapezoidal slide unit 31 is first slipped into dovetail In groove 41, alignment pin 50 is then charged into;During dismounting, first alignment pin 50 is extracted, then by trapezoidal slide unit 31 from dovetail groove 41 Skid off.
In road paving structure of the present utility model, pervious concrete layer 20 is by that will contain the first aggregate and first What the mixture of binding agent solidify to form, and the first binding agent contains hydrophilic agglomerant.Pervious concrete layer 20 it is porous and Permeable hole is small, not only with water permeability, additionally it is possible to play a role in filtering, and prevents particle larger on road from entering wherein. Plastic pallet 30 plays and carries pervious concrete layer 20, improves road paving structure as the skeleton of road paving structure The effect of intensity.
Specifically, the method for formation road paving structure of the present utility model can be:Pervious concrete layer 20 will be formed Each material mixing it is uniform, obtain mixture, and add this mixture to the mould of pervious concrete layer 20, this into Plastic pallet 30 is pre-placed in pattern tool, has then been cured to form in cured condition tight with plastic pallet 30 The close pervious concrete layer 20 being combined together.
Road paving structure of the present utility model is arranged on water-permeable brick 40, water-permeable brick 40 can be formed and protected, kept away Exempt from the direct impact of pedestrian or vehicle to water-permeable brick 40, when road paving structure weares and teares or damages because of long-term use, The road paving structure that can be easily removed and more renewed, water-permeable brick 40 is then smaller therefore can be after due to withstanding shocks It is continuous to use, the service life of water-permeable brick 40 is significantly extended in this way.Also, because road paving structure plays impurity screening Effect so that as long as water-permeable brick 40 can be permeable, this greatly reduces requirement to the material of water-permeable brick 40 (for example, can be with Water-permeable brick 40 is manufactured more than second aggregate and the second binding agent of the first aggregate using particle diameter, or using due to waterproof Brick that material is made, with water stream channel is used as water-permeable brick 40), reduce the manufacturing cost of water-permeable brick 40.
In order that pervious concrete layer 20 is bound more closely with plastic pallet 30, as a kind of implementation method, such as Fig. 3 It is shown, multiple bond posts 34 are formed with plastic pallet 30, the plurality of bond post 34 is upward perpendicular to the plastic pallet 30 Extend to be embedded into pervious concrete layer 20.
In order to increase the roughness of road paving structure upper surface, prevent pedestrian from slipping, the upper table of pervious concrete layer 20 Face is formed with multiple anti-skidding boss 22.
In order to prevent alignment pin 50 from artificially being extracted by child, it is preferable that the head shape of alignment pin 50 and anti-skidding boss 22 Shape it is identical, to increase the disguise of alignment pin 50, it is not easy to identify.
In order to prevent dust granule from blocking the permeable hole of pervious concrete layer 20, it is preferable that as shown in Fig. 2 permeable coagulation Coating of titanium dioxide 10 is coated with soil layer 20.Coating of titanium dioxide 10 can decompose road paving structure surface and hole Dirt, such as carbon monoxide, nitrogen dioxide, sulphur compound and other oxynitrides, purify air prevent hole to be blocked simultaneously Plug.
The utility model is not particularly limited for the shape of road paving structure, as long as mutually being fitted with the shape of water-permeable brick 40 Should.In the illustrated embodiment, water-permeable brick 40 and road paving structure are in cuboid.In other possible embodiment party In formula, water-permeable brick 40 and road paving structure can be in positive six prismsby shape.
According to the utility model, under preferable case, pervious concrete layer 20 has loose structure.Invention of the present utility model People has found by lot of experiments, when the bore dia of the loose structure is 0.1-0.5mm, when porosity is 15%-35%, Pervious concrete layer 20 be ensure that while having excellent water penetration and good filtering function.Wherein, the loose structure Bore dia and porosity can be using being measured well known to a person skilled in the art method, it is for instance possible to use electronics Microscope is measured to bore dia, and porosity is measured using drainage.
In the mixture for forming pervious concrete layer 20, the content of first aggregate and hydrophilic agglomerant can be Selection and adjusted in larger scope, for example, on the basis of the first aggregate of 100 weight portions, the hydrophilic agglomerant contains Amount can be 1-20 weight portions;Under preferable case, on the basis of the first aggregate of 100 weight portions, the hydrophilic agglomerant Content is 2-15 weight portions.
The hydrophilic agglomerant can be existing various hydrophilic agglomerants, as long as disclosure satisfy that by itself and the first bone Expecting cured the formed pervious concrete layer 20 of mixture of particle has excellent water permeable ability, and with some strength Material, can be used as the requirement of road pavement material.For example, the hydrophilic agglomerant can be selected from hydrophilic epoxy tree One or more in fat, hydrophilic polyurethane resin and hydrophilic acrylic resin.
According to the utility model, the hydrophilic matrix tablets, hydrophilic polyurethane resin and hydrophilic acrylic resin Refer to the epoxy resin containing enough hydrophilic radical and/or hydrophilic segment, polyurethane resin and acrylic acid tree in molecular structure Fat, the hydrophilic radical can for example be selected from one or more in hydroxyl, carboxyl, sulfonic group and ammonium, the hydrophilic segment For example can be (- CH2-CH2-O-)n, wherein, n is the integer of 1-10.
In order to improve curing performance, can also be containing solid in the mixture of first particles of aggregates and hydrophilic agglomerant Agent.The utility model is not particularly limited for the species of the curing agent, can be carried out rationally according to hydrophilic agglomerant Ground selection.For example, for hydrophilic matrix tablets, the curing agent can be that amine system curing agent and/or acid anhydrides system solidify Agent.Specifically, the amine system curing agent can be ethylenediamine, trimethylhexamethylenediamine, diethyl triamine, methylol second two Amine, AEEA, dihydroxy ethyl ethylenediamine, ethoxy diethylenetriamine, dihydroxy ethyl ethylenediamine, ethoxy divinyl three Amine, dihydroxy ethyl diethylenetriamine, ethoxy hexamethylene diamine, a cyanoethyl ethylenediamine, dicyanoethyl ethylenediamine, dicyanoethyl oneself two Amine, dicyanodiamine, cyclohexanediamine, Meng's alkane diamines, amine ethyl croak piperazine, hexa, IPD and diaminourea One or more in hexamethylene;The acid anhydrides can be methyl tetrahydrophthalic anhydride, methyl hexahydrophthalic anhydride, succinic anhydride With one or more in adipic anhydride.For hydrophilic polyurethane resin, it is different that the curing agent is preferably selected from toluene two The trimerization of cyanate (TDI), the addition product, the prepolymer of TDI and hydroxy-containing component and TDI of Trimethoprim (TMP) Body.Relative to the hydrophilic agglomerant of 100 weight portions, the content of the curing agent can be 1-20 weight portions, preferably 5-18 weight portions.
In order to improve the weatherability of the road paving structure, under preferable case, first binding agent can also contain Weatherability resinoid bond.Usually, on the basis of the first aggregate of 100 weight portions, the weatherability resinoid bond and parent The total content of aqueous resinous binders is 1-20 weight portions, preferably 2-10 weight portions;And the weatherability resinoid bond with The weight ratio of hydrophilic resin binding agent is 0-3: 1.The weatherability resinoid bond for example can be epoxy resin and poly- ammonia One or more in ester resin.It should be noted that as the epoxy resin and polyurethane of the weatherability resinoid bond Resin is epoxy resin and polyurethane resin without hydrophilic radical and/or hydrophilic segment.
According to the utility model, the epoxy resin can for example be selected from cycloaliphatic epoxy resin, hydrogenated bisphenol A type epoxy Resin, organic-silicon-modified bisphenol A type epoxy resin, saturation glycidyl ester type epoxy resin, heterocyclic type and mixed type asphalt mixtures modified by epoxy resin One or more in fat.The polyurethane resin is made up of polyisocyanates and polyalcohol;Wherein, the polyisocyanates example 1, hexamethylene-diisocyanate (HDI), IPDI (IPDI), XDI can be such as selected from (XDI), Methylcyclohexyl diisocyanate (HTDI), dicyclohexyl methyl hydride diisocyanate (HMDI), the methylene of durol two Group diisocyanate (TMXDI), 1, hexamethylene-diisocyanate biuret, 1, hexamethylene-diisocyanate tripolymer, isophorone two Isocyanate trimer, toluene di-isocyanate(TDI) (TDI) and 1, the mixed trimer or performed polymer of hexamethylene-diisocyanate (HDI) In one or more;The polyhydric alcohols can such as be selected from PEPA, tetrahydrofuran for the PPG of base, containing hydroxyl One or more in the acrylic resin of base and the organic siliconresin of hydroxyl.The polyurethane resin can be added with urethane level Solvent, chain extender and crosslinking agent.The utility model is not limited especially the consumption of urethane level solvent, chain extender and crosslinking agent It is fixed, for example, on the basis of the gross weight of the polyurethane resin, the consumption of the urethane level solvent can be 0.1-2 weight %; The chain extender can be 0.1-2 weight % with total consumption of crosslinking agent.The urethane level solvent is preferably ethyl acetate, acetic acid One or more in methyl esters, dimethyl succinate, diethyl succinate.The chain extender is preferably alcohols and amine with crosslinking agent Class chain extender and crosslinking agent, described alcohols and amine chain extender and crosslinking agent for example can be BDO, 1,6- oneself two Alcohol, trimethylolpropane and 3,3 '-two chloro- 4, one or more in 4 '-diaminourea-diphenyl methane MOCA.The poly- ammonia Urethane cures catalysts can also be added with ester resin.The urethane cures catalysts are preferably organotin System or lead series catalysts in one or more;Described organotin series catalysts can be dibutyl tin laurate, octanoic acid Stannous, stannous iso caprylate;The lead series catalysts can be selected from the one kind or many in epoxyeicosatrienoic acid zinc, lead naphthenate and isooctyl acid lead Kind.The utility model is not particularly limited to the consumption of the urethane cures catalysts, for example, with the polyurethane tree On the basis of the gross weight of fat, the consumption of the urethane cures catalysts can be 0.1-2 weight %.
In order to improve the intensity and water permeability of road paving structure, under preferable case, in the pervious concrete layer 20 Hydrophilic inorganic material can also be contained.The hydrophilic inorganic material can be existing various hydrophilic inorganic materials, excellent In the case of choosing, the hydrophilic inorganic material is selected from one or more in diatomite, bentonite and perlite.And with 100 weights Measure on the basis of first particles of aggregates of part, the content of the hydrophilic inorganic material is 1-20 weight portions, preferably 5-15 weight Part.
In order to strengthen the adhesion strength between the first aggregate, it is preferable that can also contain in the pervious concrete layer 20 The coupling agent of siliceous, titanium or P elements, the quality of the coupling agent can be the 0-10% of the hydrophilic agglomerant quality, excellent Select 0.5-5%.The coupling agent for example can be VTES, γ-glycidyl ether oxygen propoxypropyl three One or more in methoxy silane etc..
Under preferable case, weatherability additive is also contained in the pervious concrete layer 20, the weatherability additive is Light stabilizer and/or antioxidant.The light stabilizer is a kind of photostability auxiliary agent that can improve macromolecular material, and it can shield Cover ultraviolet or absorb ultraviolet and it is converted into harmless heat energy;Or the molecule or group excited by ultraviolet is quenched Excitation state, it is returned to ground state;Or the free radical that capture is produced by photooxidation, it is to avoid photooxidation reaction goes on, So that macromolecular material exempts from the destruction of ultraviolet.The antioxidant is used to strengthen the antioxygen of the pervious concrete layer 20 The property changed, it is to avoid the road paving structure is aoxidized due to the effect of oneself factor and environmental factor, so as to cause road surface to spread The decline or loss of assembling structure performance.Therefore, added in the pervious concrete layer 20 light stabilizer and/or antioxidant it Afterwards, the service life of the water-permeable brick can effectively be extended.
The utility model is not particularly limited to the consumption of the light stabilizer and/or antioxidant, for example, the light Total consumption of stabilizer and antioxidant can be the 0.1-5 weight % of first binder content.It should be noted that working as When containing light stabilizer and antioxidant in the pervious concrete layer 20, total consumption of the light stabilizer and antioxidant refers to Be light stabilizer and antioxidant consumption sum;When in the pervious concrete layer 20 only contain light stabilizer or anti-oxidant During agent, total consumption of the light stabilizer and antioxidant refers to the consumption of light stabilizer or antioxidant.The light stabilization Agent can for example be selected from benzophenone, salicylic acid esters, benzotriazole, hindered amines, light stabilizer HPT and light stabilizer Any one or several in EPU;Wherein, the benzophenone light stabilizer for example can for UV-207, UV-9, UV-531, One or more in UV-A, MA, D49 and light stabilizer -50;The salicylate light stabilizer for example can be light stabilization Agent TBS, light stabilizer BAD etc.;The benzotriazole light stabilizer for example can be UV-P, UV-320, UV-326, UV- 327th, UV-328 and UV-5411 etc.;The hindered amine light stabilizer for example can for light stabilizer 744, light stabilizer 144, Hindered amine 770, light stabilizer 292 etc..The antioxidant can use antioxidant 1222, AT-76, antioxidant 2246-S, AT- 59th, antioxidant 1035, antioxidant 1098, antioxidant 3125, TPP, TNPP, AT-168, antioxidant 245, GA-80, antioxidant 858th, one or more in antioxidant 1010.
The utility model is not particularly limited to the first particles of aggregates diameter, as long as the road surface for enabling to spreads Assembling structure has excellent intensity and drainability, under preferable case, the average particulate diameter of first particles of aggregates It can be 0.05-1 millimeters.First particles of aggregates various can be used to be formed with known to those skilled in the art Water brick and the aggregate with some strength, for example, first aggregate can be quartz sand and/or roughing sand.
According to the utility model, in order to obtain more aesthetically pleasing road paving structure, under preferable case, first aggregate Particle is the first particles of aggregates of Surface coating chromatic colour resin bed, and the color resin layer is by containing pigment agent and hydrophilic resin The colour-wash of fat solidify to form.And relative to the first particles of aggregates of 100 weight portions, the content of the color resin layer can be with It is 0.5-3.5 weight portions, preferably 0.8-1.8 weight portions.The weight ratio of the pigment agent and hydrophilic resin can be 0.05- 0.5: 1, preferably 0.2-0.3: 1.
The utility model is not particularly limited to the species of the pigment agent, for example can be selected from titanium white, zinc oxide, red One or more in color iron oxide, cinnabar, ultramarine, cobalt oxide, titan yellow, chrome yellow, carbon black and phthalocyanine blue.The face of the pigment agent Color is also not particularly limited, and can be properly selected as needed.
Preferred embodiment of the present utility model is described in detail above in association with accompanying drawing, but, the utility model is not limited Detail in above-mentioned implementation method, in range of the technology design of the present utility model, can be to skill of the present utility model Art scheme carries out various simple variants, and these simple variants belong to protection domain of the present utility model.
It is further to note that each particular technique feature described in above-mentioned specific embodiment, in not lance In the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, the utility model is to each Possible combination is planted no longer separately to illustrate.
Additionally, can also be combined between a variety of implementation methods of the present utility model, as long as it is not disobeyed Thought of the present utility model is carried on the back, it should equally be considered as content disclosed in the utility model.

Claims (7)

1. a kind of road paving structure, for being laid on water-permeable brick (40), it is characterised in that the road paving structure includes Plastic pallet (30) with multiple permeable holes (33) and the pervious concrete layer being formed on the plastic pallet (30) (20), the shape of the pervious concrete layer (20) and plastic pallet (30) is adapted, the upper surface of the water-permeable brick (40) It is provided with dovetail groove (41), the lower surface of the plastic pallet (30) is formed with trapezoidal with what the dovetail groove (41) matched Slide unit (31), is respectively arranged with and alignment pin on the pervious concrete layer (20), plastic pallet (30) and water-permeable brick (40) (50) the first dowel hole (21), the second dowel hole (32) and the 3rd dowel hole (42) for matching, the permeable coagulation The upper surface of soil layer (20) is formed with multiple anti-skidding boss (22).
2. road paving structure according to claim 1, it is characterised in that the head shape of the alignment pin (50) and institute The shape for stating anti-skidding boss (22) is identical.
3. road paving structure according to claim 1, it is characterised in that be coated with the pervious concrete layer (20) Coating of titanium dioxide (10).
4. road paving structure according to claim 1, it is characterised in that be formed with the plastic pallet (30) many Individual bond post (34), in the plurality of bond post (34) the insertion pervious concrete layer (20).
5. road paving structure according to claim 1, it is characterised in that the pervious concrete layer (20) is with porous Structure, the bore dia of the loose structure is 0.1-0.5mm, and porosity is 15%-35%.
6. road paving structure according to claim 1, it is characterised in that the upper table facial contour of the road paving structure It is rectangle.
7. road paving structure according to claim 1, it is characterised in that the upper table facial contour of the road paving structure In regular hexagon.
CN201620802806.7U 2016-07-27 2016-07-27 Road paving structure Active CN206219931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620802806.7U CN206219931U (en) 2016-07-27 2016-07-27 Road paving structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620802806.7U CN206219931U (en) 2016-07-27 2016-07-27 Road paving structure

Publications (1)

Publication Number Publication Date
CN206219931U true CN206219931U (en) 2017-06-06

Family

ID=58779889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620802806.7U Active CN206219931U (en) 2016-07-27 2016-07-27 Road paving structure

Country Status (1)

Country Link
CN (1) CN206219931U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221549A (en) * 2018-02-09 2018-06-29 钱娟娟 Municipal wind and snow road maintaining protective pad
CN108824116A (en) * 2018-09-14 2018-11-16 曹晓东 The porous light porous pavement brick structure that landscape engineering is laid with

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221549A (en) * 2018-02-09 2018-06-29 钱娟娟 Municipal wind and snow road maintaining protective pad
CN108824116A (en) * 2018-09-14 2018-11-16 曹晓东 The porous light porous pavement brick structure that landscape engineering is laid with

Similar Documents

Publication Publication Date Title
CN103132423B (en) A kind of permeable brick
CN103103904B (en) Composite water permeable brick and the compound for making composite water permeable brick top layer
CN106046979B (en) A kind of pervious concrete pavement noctilucence cover protective agent and the protectant road surface of cover containing noctilucence and construction method
CN1995257B (en) Weatherable water-permeable binder
CN206219931U (en) Road paving structure
CN107663823A (en) Split type water-permeable brick
CN107663820A (en) Split type water-permeable brick
CN206266974U (en) Road paving structure
CN101767947B (en) Light-emitting particles and preparation method and application thereof
CN105860008A (en) Air-permeable polyurethane plastic runway surface cementing material
CN206143554U (en) Split type brick that permeates water
CN206143553U (en) Pavement structure
CN206143551U (en) Pavement structure
CN107663824A (en) Split type water-permeable brick
CN206279412U (en) Split type water-permeable brick
CN206143552U (en) Split type brick that permeates water
CN206143556U (en) Pavement structure
CN206143558U (en) Split type brick that permeates water
CN206219932U (en) Split type water-permeable brick
KR101400959B1 (en) Coating type foor composite and foor construction methods thereby
CN206219933U (en) Split type water-permeable brick
CN206143564U (en) Pavement structure
CN206143555U (en) Split type brick that permeates water
CN107663822A (en) Split type water-permeable brick
CN206143557U (en) Split type brick that permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Patentee after: Renchuang ecological environmental protection Polytron Technologies Inc

Address before: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Patentee before: Anhui Renchuang ecological environmental Polytron Technologies Inc