CN206142336U - Double -deck transmission line - Google Patents

Double -deck transmission line Download PDF

Info

Publication number
CN206142336U
CN206142336U CN201621047920.XU CN201621047920U CN206142336U CN 206142336 U CN206142336 U CN 206142336U CN 201621047920 U CN201621047920 U CN 201621047920U CN 206142336 U CN206142336 U CN 206142336U
Authority
CN
China
Prior art keywords
transmission line
double
maintenance
conveyer belt
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621047920.XU
Other languages
Chinese (zh)
Inventor
何敏凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Huabei Electronic Technology Co Ltd
Original Assignee
Dongguan Huabei Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Huabei Electronic Technology Co Ltd filed Critical Dongguan Huabei Electronic Technology Co Ltd
Priority to CN201621047920.XU priority Critical patent/CN206142336U/en
Application granted granted Critical
Publication of CN206142336U publication Critical patent/CN206142336U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Branching, Merging, And Special Transfer Between Conveyors (AREA)

Abstract

The utility model discloses a double -deck transmission line, it is including first transmission line, second transmission line, the working length of first transmission line is less than the working length of second transmission line, the second transmission line has the transmission line of receipt, backward flow transmission line, maintenance transmission line, the backward flow transmission line is located under the first transmission line and with first transmission line is corresponding, receive transmission line, maintenance transmission line connect respectively in the both ends of backward flow transmission line. The utility model discloses an in the double -deck transmission line working process, the conveying opposite direction of first transmission line and second transmission line, meeting such as tray from the terminal automatic landing of first transmission line to receiving the transmission line, is conveyed the backward flow transmission line after that and again to maintaining the transmission line, is accomplished the recovery, later can be immediately come into operation once more at the head end of first transmission line. Realize the automatic backward flow of tray, improved the turnover efficiency of tray.

Description

Double-deck transmission line
Technical field
The utility model is related to a kind of double-deck transmission line.
Background technology
Line sending operation is mostly passed on a skill from a master to a single disciple in pallet operation of the prior art, typically chaotic using complete pallet without reflux The terminal position of transmission line is stacked at, is unfavorable for tool management, needed another arrangement special messenger to arrange and reclaim, cause manpower to waste, and It is time-consuming longer so that all transfer efficients of pallet are low, while affecting overall operating efficiency.Therefore provide it is a set of being capable of automatic back flow The transmission line of pallet can bring very big facility for pallet operation.
Utility model content
The technical problems to be solved in the utility model is to overcome the pallet operation of prior art to cause without reflux A kind of low defect of operating efficiency, there is provided double-deck transmission line.
The utility model is to solve above-mentioned technical problem by following technical proposals:
A kind of double-deck transmission line, its feature is that it includes the first transmission line, the second transmission line, first transmission Less than the active length of second transmission line, second transmission line has reception transmission line to the active length of line, flowing back passes Line sending, maintenance transmission line, the backflow transmission line be located at first transmission line underface and with the first transmission line phase Correspondence, it is described to receive the two ends that transmission line, maintenance transmission line are connected to the backflow transmission line.
It is preferred that first transmission line includes the first conveyer belt and the both sides before and after first conveyer belt Guardrail, the guardrail is higher than first conveyer belt.
Using above-mentioned setting, general status lower tray is moved under the driving of the first conveyer belt, is kept not when pallet is needed When dynamic, with the certain angle of rotary-tray it can be caused to be set up in guardrail.
It is preferred that the double-deck transmission line also includes collateral fagging, the collateral fagging is located at first transmission line Side and it is removably attachable to the guardrail.
Above-mentioned collateral fagging can be used for carrying some mini-plants or instrument such as filature, electric iron etc., collateral fagging Position can according to the position adjustment of operator, can with operator respectively positioned at the first transmission line both sides relevant position, It is easy to operator to pick and place.And some grooves or limiting plate can be arranged as required on collateral fagging, be easy to these equipment or Instrument carries out classification and puts, and simultaneously effective prevents them from dropping from collateral fagging.
It is preferred that the double-deck transmission line also includes upper backup pad, the upper backup pad is located at the top of the guardrail.
Above-mentioned upper backup pad can have a supplementary function with offside gripper shoe, can be used to place some tiny parts, or The rubbish produced during the interim stowing operation of person.Similarly, some grooves or spacing can be arranged as required on upper backup pad Plate.
It is preferred that the upper backup pad is U-shaped, the recess of the upper backup pad is corresponding with first conveyer belt, institute Two protuberances for stating upper backup pad are connected respectively with guardrail described in two.
Above-mentioned upper backup pad is connected to guardrail by two protuberances, rationally distributed;The setting of recess cause upper backup pad with Pallet on first conveyer belt will not be interfered with each other.
It is preferred that first conveyer belt is provided with some beat lines, width of the beat line along first conveyer belt Degree direction extends, and some beat lines are equally spaced distributed along the length direction of first conveyer belt.
Pallet can be placed according to the position of beat line so that arrangement of the pallet on the first conveyer belt is more uniform, carries High operating efficiency.Beat line can be drawn using coating, low cost simple to operate.
It is preferred that the one end in second transmission line near the maintenance transmission line is provided with baffle plate.
Direction of transfer when second transmission line works extremely flows back transmission line again to maintenance transmission line to receive transmission line, in dimension The person of repairing is reclaimed under situation not in time, and above-mentioned baffle plate can effectively prevent pallet from dropping.Meanwhile, it is close in the second transmission line to connect Receiving one end of transmission line can equally arrange baffle plate so that security is higher.
It is preferred that the side of first transmission line is provided with material frame and some test equipments, the material frame is close The maintenance transmission line, some test equipments are spaced apart along the length direction of first transmission line;The maintenance is passed The side of line sending is provided with maintenance table.
Above-mentioned material is placed on the initiating terminal of the first transmission line, and blowing person can be all put into required material with here position Pallet, is easy to granting, the verification of material.Work more heavy in blowing, when a people cannot complete, the side of blowing person can put A supplement material frame is put, the opposite of the supplement material frame can separately arrange a blowing person.Some test equipments may include testing current Equipment, audio-frequency test equipment, coupling measurement equipment etc..Maintenance table is used for maintenance man, and maintenance man can reclaim and be transported to maintenance The pallet of transmission line.
It is preferred that the double-deck transmission line is additionally provided with monitoring device, the monitoring device include display and with it is described The corresponding main frame of display, the display is located at the top of first transmission line, and the main frame is passed positioned at described second The lower section of line sending, the display is rotatably connected by support bar with the fixed support of the double-deck transmission line.
Above-mentioned monitoring device can be used to track the state of to be processed on transmission line/assembling product, be easy to subsequently review.
It is preferred that first transmission line, the second transmission line are horizontally disposed, the upper table of first transmission line The height in face is 0.75~0.9m, and the height of the upper surface of second transmission line is 0.6~0.7m.
Above-mentioned height more meets human body operating habit, the operating personnel of the first transmission line can standing operation, the second transmission line Support staff can side sit operation.
On the basis of common sense in the field is met, above-mentioned each optimum condition can be combined, obtain final product the utility model respectively compared with Good example.
Positive effect of the present utility model is:
In the double-deck transmission line course of work disclosed in the utility model, the direction of transfer of the first transmission line and the second transmission line Conversely, pallet etc. can be automatically slid to transmission line is received from the end of the first transmission line, it is then passed to flow back transmission line again To maintenance transmission line, complete to reclaim, can come into operation again in the head end of the first transmission line immediately afterwards.Realize pallet from Dynamic backflow, improves all transfer efficients of tray.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the double-deck transmission line of the utility model preferred embodiment.
Fig. 2 is the schematic front view of the double-deck transmission line of the utility model preferred embodiment.
Fig. 3 is the schematic top plan view of the transmission line of part first of the utility model preferred embodiment.
Description of reference numerals:
100:First transmission line
110:First conveyer belt
120:Guardrail
130:Collateral fagging
140:Upper backup pad
200:Second transmission line
210:Receive transmission line
220:Backflow transmission line
230:Maintenance transmission line
240:Baffle plate
300:Material frame
400:Maintenance table
500:Monitoring device
510:Display
520:Main frame
530:Support bar
600:Pallet
Specific embodiment
Name preferred embodiment, and combine accompanying drawing becoming apparent from intactly illustrating the utility model.
As shown in Figure 1-2, a kind of double-deck transmission line, includes the first transmission line 100, the second transmission line 200.First transmission Active length of the active length of line 100 less than the second transmission line 200.Second transmission line 200 has reception transmission line 210, returns Spread line sending 220, maintenance transmission line 230.Backflow transmission line 220 is located at the underface of the first transmission line 100 and transmits with first Line 100 is corresponding, receives transmission line 210, maintenance transmission line 230 and is connected to the two ends of backflow transmission line 220.
First transmission line 100 includes the first conveyer belt 110 and the guardrail located at the both sides in front and back of the first conveyer belt 110 120, guardrail 120 is higher than the first conveyer belt 110.First conveyer belt 110 is provided with some beat line (not shown), and beat line is along The width of one conveyer belt 110 extends, and some beat lines are equally spaced distributed along the length direction of the first conveyer belt 110.The One transmission line 100, the second transmission line 200 are horizontally disposed.The height of the upper surface of the first transmission line 100 can be 0.75 ~0.9m, the height of the upper surface of the second transmission line 200 can be 0.6~0.7m.
In the present embodiment, the second transmission line 200 is equally made up of conveyer belt.First conveyer belt 110 and the second transmission line The width of 200 conveyer belt can be set to 0.3m~0.4cm.The length of backflow transmission line 220 and the length of the first transmission line 100 It is equal.Receiving transmission line 210, the length of maintenance transmission line 230 can be set to 0.8~1.2m.The spacing of two adjacent beat lines It is set to 0.4m.In other embodiments, above-mentioned width, length, spacing can be modified according to the size of pallet 600.
Double-deck transmission line also includes collateral fagging 130, and it is located at the side of the first transmission line 100 and is removably attachable to Guardrail 120.Meanwhile, double-deck transmission line also includes upper backup pad 140, and it is located at the top of guardrail 120.Upper backup pad 140 is U Shape, its recess is corresponding with the first conveyer belt 110, and two protuberances are connected respectively with two guardrails 120.
The side of the first transmission line 100 can be provided with material frame 300 and testing current equipment, audio-frequency test equipment, coupling The test equipment (not shown) such as test equipment., near maintenance transmission line 230, some test equipments are along the first transmission for material frame 300 The length direction of line 100 is spaced apart.
One end in second transmission line 200 near maintenance transmission line 230 is provided with baffle plate 240.The side of maintenance transmission line 230 It is provided with maintenance table 400.
Double-deck transmission line is additionally provided with monitoring device 500, and it includes display 510 and the master corresponding with display 510 Machine 520, display 510 is located at the top of the first transmission line 100, and main frame 520 is located at the lower section of the second transmission line 200.Display 510 are rotatably connected by support bar 530 with the fixed support of double-deck transmission line.
After this double-deck transmission line starts, the first transmission line 100 and the reverse motions of the second transmission line 200, their speed ratio Can be 0.8~1.0.Blowing person stand the first transmission line 100 head end side, i.e., positioned at the opposite of material frame 300, blowing person Required material is all placed in pallet 600, then pallet 600 is placed on the first conveyer belt 110.Pallet 600 is with One conveyer belt 110 is moved, and sequentially passes through each station.The operator of each station can in the mobile pallet 600 to it is to be processed/ Assembling product is operated;Product can also be placed in into static upper backup pad 140 to be operated;Or as shown in figure 3, rotation support The certain angle of disk 600, is set up on guardrail 120 and is operated again.When pallet 600 is sent to the first conveyer belt 110 During end, due to the active force of the first conveyer belt 110, pallet 600 is slid to transmission line 210 is received, and is back to maintenance transmission line 230, the maintenance man for being sitting in maintenance transmission line 230 by side is reclaimed.
Although the foregoing describing specific embodiment of the present utility model, it will be appreciated by those of skill in the art that This is merely illustrative of, and protection domain of the present utility model is defined by the appended claims.Those skilled in the art On the premise of without departing substantially from principle of the present utility model and essence, various changes or modifications can be made to these embodiments, But these changes and modification each fall within protection domain of the present utility model.

Claims (10)

1. a kind of double-deck transmission line, it is characterised in that it includes the first transmission line, the second transmission line, first transmission line Active length less than second transmission line active length, second transmission line have receive transmission line, backflow transmission Line, maintenance transmission line, the backflow transmission line is positioned at the underface of first transmission line and relative with first transmission line Should, it is described to receive the two ends that transmission line, maintenance transmission line are connected to the backflow transmission line.
2. bilayer transmission line as claimed in claim 1, it is characterised in that first transmission line include the first conveyer belt and The guardrail of both sides before and after first conveyer belt, the guardrail is higher than first conveyer belt.
3. bilayer transmission line as claimed in claim 2, it is characterised in that the double-deck transmission line also includes collateral fagging, institute Collateral fagging is stated located at the side of first transmission line and the guardrail is removably attachable to.
4. bilayer transmission line as claimed in claim 2, it is characterised in that the double-deck transmission line also includes upper backup pad, institute Upper backup pad is stated located at the top of the guardrail.
5. bilayer transmission line as claimed in claim 4, it is characterised in that the upper backup pad is U-shaped, the upper backup pad Recess is corresponding with first conveyer belt, and two protuberances of the upper backup pad are connected respectively with guardrail described in two.
6. bilayer transmission line as claimed in claim 2, it is characterised in that first conveyer belt is provided with some beat lines, The beat line extends along the width of first conveyer belt, and some beat lines are equally spaced along the described first transmission The length direction distribution of band.
7. bilayer transmission line as claimed in claim 1, it is characterised in that near the maintenance transmission in second transmission line One end of line is provided with baffle plate.
8. bilayer transmission line as claimed in claim 1, it is characterised in that the side of first transmission line be provided with material frame with And some test equipments, near the maintenance transmission line, some test equipments are along first transmission line for the material frame Length direction be spaced apart;The side of the maintenance transmission line is provided with maintenance table.
9. bilayer transmission line as claimed in claim 1, it is characterised in that the double-deck transmission line is additionally provided with monitoring device, institute Monitoring device is stated including display and the main frame corresponding with the display, the display is located at first transmission line Top, the main frame is located at the lower section of second transmission line, and the display is rotatably double with described by support bar The fixed support of layer transmission line is connected.
10. the double-deck transmission line as described in any one of claim 1-9, it is characterised in that first transmission line, the second transmission Line is horizontally disposed, and the height of the upper surface of first transmission line is 0.75~0.9m, second transmission line The height of upper surface is 0.6~0.7m.
CN201621047920.XU 2016-09-09 2016-09-09 Double -deck transmission line Active CN206142336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621047920.XU CN206142336U (en) 2016-09-09 2016-09-09 Double -deck transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621047920.XU CN206142336U (en) 2016-09-09 2016-09-09 Double -deck transmission line

Publications (1)

Publication Number Publication Date
CN206142336U true CN206142336U (en) 2017-05-03

Family

ID=58618658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621047920.XU Active CN206142336U (en) 2016-09-09 2016-09-09 Double -deck transmission line

Country Status (1)

Country Link
CN (1) CN206142336U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108176970A (en) * 2018-01-08 2018-06-19 广东金弘达自动化科技股份有限公司 The provision for disengagement of host side cover and its method for dismounting
CN111136461A (en) * 2020-01-07 2020-05-12 长沙格力暖通制冷设备有限公司 Electric appliance box assembling device and assembling equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108176970A (en) * 2018-01-08 2018-06-19 广东金弘达自动化科技股份有限公司 The provision for disengagement of host side cover and its method for dismounting
CN111136461A (en) * 2020-01-07 2020-05-12 长沙格力暖通制冷设备有限公司 Electric appliance box assembling device and assembling equipment

Similar Documents

Publication Publication Date Title
CN206142336U (en) Double -deck transmission line
CN205204179U (en) Backward flow welding machine with supplementary fishplate bar structure
CN208747093U (en) A kind of product reflux device
CN207025866U (en) A kind of E-business logistics part sorting equipment
CN208194969U (en) A kind of E-business logistics part sorting equipment
CN207238514U (en) A kind of cargo automatic sorting device
CN204872493U (en) Conveying device
CN107585380A (en) A kind of jumbo bag automatic bag-breaking blanking station
CN206725780U (en) A kind of ecommerce detection means
CN105752667B (en) A kind of material transferring method of vein allotment room production process
CN206985016U (en) Supermarket's suspension conveying sorting system
CN112718511B (en) Electronic commerce article letter sorting platform
CN108328283A (en) Screening installation for auto parts
CN112027514B (en) Conveying device for logistics sorting
CN106583276A (en) Holding cabinet used for cargo sorting
CN102674026A (en) Line loading and unloading equipment for delivery port
CN210701268U (en) Big and small piece fusion sorting device
CN208716281U (en) A kind of automatic weighting sorter of logistics
CN207876694U (en) A kind of 12 station double-speed chains for armored door automatic assembly line
CN202245503U (en) Loading device for electroplating equipment
CN212168176U (en) Control device for express delivery distribution center
CN206649597U (en) A kind of automatic vending machine cargo path
CN210756644U (en) Multi-head steel cutting and blanking equipment
CN215142180U (en) Automatic box sorting equipment
CN213471431U (en) Discharging device of jumping knife cutting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant