CN206128621U - Folding template construction system - Google Patents
Folding template construction system Download PDFInfo
- Publication number
- CN206128621U CN206128621U CN201621117417.7U CN201621117417U CN206128621U CN 206128621 U CN206128621 U CN 206128621U CN 201621117417 U CN201621117417 U CN 201621117417U CN 206128621 U CN206128621 U CN 206128621U
- Authority
- CN
- China
- Prior art keywords
- folding
- template
- construction system
- support frame
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a folding template construction system, including the template system, with the support chassis of template headtotail with set up in the sliding system of support chassis bottom in order to make things convenient for construction system to move, the template system includes a plurality of independent template pieces, support chassis includes a plurality of support frames, each adjacent template interblock still is provided with the folding and then completion construction system folding folding mechanism of the template system that realizes, this is through the template system, support chassis and folding mechanism's setting, make the concrete side wall pressure accessible support chassis's that the template system received support alleviated, folding mechanism can realize construction system's folding transportation in order to make things convenient for construction system after accomplishing the construction, reduce place occupation space, the sliding system makes construction system's removal more convenient, this folding template construction system simple structure, the fill light is foldable, it is portable, short construction time and high construction efficiency, this utility model is used for engineering construction field.
Description
Technical field
This utility model is related to engineering construction field, more particularly to a kind of folding template construction system.
Background technology
The template construction system of the armored concrete side wall of subway especially subway side wall adopts plank sheathing and the lumps of wood now
Or steel form is fixed offer pulling force by wearing pull bar and scaffold tubes, support is provided by scaffold tubes and jacking.Take in operation
When it is laborious, the peace of template system, the complex operation such as tear, support, checking open, higher to the competency profiling of workman, circulation material expends greatly,
Low construction efficiency and potential safety hazard is big.To ensure the rapid of side wall construction, summary, standardized construction, folding template is designed
Construction system.
Utility model content
To solve the above problems, this utility model provides a kind of simple structure, foldable, mobile folding template construction
System.
This utility model solves the technical scheme adopted by its technical problem:
A kind of folding template construction system, including template system and template system connection support frame and be arranged on
The sliding system that support bone frame bottom is moved with convenient construction system, if template system includes end upper and lower hinged in series together
Dry independent formwork, in approximately the same plane, support frame includes some supports being cascaded up and down to each formwork
Frame, one end of each bracing frame are fixedly connected with each formwork respectively, and the other end adjacent position of each bracing frame is by some connections
Block is removably attachable to together, is additionally provided with and realizes that template system is folded and then completes construction system between each adjacent formwork
The fold mechanism of folding.
Used as the further improvement of above-mentioned technical proposal, each fold mechanism includes two folding connecting rods, two folding connecting rods
One end is hinged with two adjacent formworks respectively, and the other end of two folding connecting rods is mutually hinged, and is additionally provided with and passes through
Two folding connecting rod of telescopic drive drives adjacent forms block to realize the folding ram of jackknife action, and one end of each folding ram is hinged on
At the common pin joint of two folding connecting rods, the other end of each folding ram is respectively hinged on corresponding formwork.
Used as the further improvement of above-mentioned technical proposal, each formwork includes the steel facing being mutually stitched together and setting
Some skeleton ribs on each steel facing, each skeleton rib include cross rib and perpendicular rib.
Used as the further improvement of above-mentioned technical proposal, each bracing frame is English truss, and each English truss includes welding to be consolidated
It is scheduled on some quarter bends together.
Used as the further improvement of above-mentioned technical proposal, each bracing frame is bolted on each formwork, each to fold
Between mechanism and each formwork, latch is hinged.
Used as the further improvement of above-mentioned technical proposal, support frame place plane is mutually hung down with template system place plane
Directly, support frame lower end width is more than upper end width, support frame generally triangular supports, two right-angle sides of support frame
It is connected with each other with template system and sliding system respectively.
Used as the further improvement of above-mentioned technical proposal, the bottom of support frame is additionally provided with some supporting legs and is connected with ground
Construction system is supported on ground by each supporting leg and pre-buried pull bar by the pre-buried pull bar for connecing.
Used as the further improvement of above-mentioned technical proposal, sliding system includes the traversing slide block of support frame bottom and setting
Walking dolly on traversing slide block, the bottom of support frame are additionally provided with the chute used cooperatively with traversing slide block, traversing cunning
By chute, block realizes that construction system is separated with concrete side wall and the transfer of construction system is carried out using walking dolly.
As the further improvement of above-mentioned technical proposal, the hydraulic system that power is provided to folding ram is additionally provided with.
The beneficial effects of the utility model:This folding template construction system passes through template system, support frame and folding machine
The setting of structure so that the concrete side wall pressure that template system is subject to can be eased by the support of support frame, folding machine
Structure can realize after completing to construct that the folding of construction system, with the transport of convenient construction system, reduces place and takes up room, slide
System makes the movement of construction system more facilitate, the folding template construction system simple structure, foldable, removable, improves
Efficiency of construction.
Description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the front view of folding template construction system;
Fig. 2 is the left view of folding template construction system;
Fig. 3 is the folding schematic diagram of template system;
Fig. 4 is the structural representation of fold mechanism;
Fig. 5 is the folding schematic diagram of fold mechanism;
Fig. 6 is the folding schematic diagram of template system after the completion of construction;
Fig. 7 is the structural representation of traversing slide block;
Fig. 8 is the structural representation of contiguous block.
Specific embodiment
With reference to Fig. 1~Fig. 8, this utility model is a kind of folding template construction system, including template system 1, and template system
Support frame 2 and be arranged on the sliding system 4 that 2 bottom of support frame is moved with convenient construction system, template system that system 1 connects
1 includes the upper and lower hinged in series in end some independent formwork 11 together, and each formwork 11 is propped up in approximately the same plane
Support bone frame 2 includes some bracing frames 21 being cascaded up and down, and one end of each bracing frame 21 is fixed with each formwork 11 respectively
Connection, the other end adjacent position of each bracing frame 21 are removably attachable to together by some contiguous blocks 22, each adjacent mould
It is additionally provided between plate 11 and realizes that template system 1 is folded and then complete the fold mechanism 3 of construction system folding.
By the setting of template system 1, support frame 2 and fold mechanism 3 so that the concrete side that template system 1 is subject to
Wall pressure can be eased by the support of support frame 2, and fold mechanism 3 can realize the folding of construction system after completing to construct
With the transport of convenient construction system, reduce place and take up room, sliding system 4 makes the movement of construction system more facilitate, the folding
Folded template construction system structure is simple, foldable, removable, improves efficiency of construction.
Used as preferred embodiment, each fold mechanism 3 includes two folding connecting rods 31, one end point of two folding connecting rods 31
It is not hinged with two adjacent formworks 11, the other end of two folding connecting rods 31 is mutually hinged, and is additionally provided with by stretching
Contracting drives two folding connecting rods to drive adjacent forms block 11 to realize the folding ram 32 of jackknife action, one end hinge of each folding ram 32
It is connected at the common pin joint of two folding connecting rods 31, the other end of each folding ram 32 is respectively hinged at corresponding formwork 11
On.
Used as preferred embodiment, each formwork 11 includes the steel facing 111 being mutually stitched together and is arranged on each
Some skeleton ribs 112 on steel facing 111, each skeleton rib 112 include cross rib and perpendicular rib.
Used as preferred embodiment, each bracing frame 21 is English truss, and each English truss includes being welded and fixed together
Some quarter bends.
Used as preferred embodiment, each bracing frame 21 is bolted on each formwork 11, each fold mechanism 3 with
11 latches of each formwork are hinged.
Used as preferred embodiment, 2 place plane of support frame is mutually perpendicular to 1 place plane of template system, is supported
2 lower end width of skeleton is more than upper end width, the generally triangular supports of support frame 2, two right-angle side difference of support frame 2
It is connected with each other with template system 1 and sliding system 4, provides preferably to support to template system 1 by the stability of triangle and make
With.
As preferred embodiment, the bottom of support frame 2 be additionally provided with some supporting legs 23 and be connected with ground it is pre-
Pull bar 24 is buried, construction system is supported on by ground by each supporting leg 23 and pre-buried pull bar 24.
Used as preferred embodiment, sliding system 4 includes the traversing slide block 41 of 2 bottom of support frame and is arranged on traversing
Walking dolly 42 on slide block 41, the bottom of support frame 2 are additionally provided with the chute used cooperatively with traversing slide block 41, traversing cunning
By chute, block 41 realizes that construction system is separated with concrete side wall and the transfer of construction system is carried out using walking dolly 42.
As preferred embodiment, be additionally provided with to folding ram 32 provide power hydraulic system.
Used as preferred embodiment, the folding template construction system includes template system 1, support frame 2, fold mechanism
3 and sliding system 4, the hydraulic system that power is provided to folding ram 32 is additionally provided with, template system 1 includes upper, middle and lower three solely
Vertical formwork 11, three formworks 11 are mutually hinged, if each formwork 11 include the steel facing 111 for welding combination and
Dry skeleton rib 112, steel plate of the steel facing 111 using 6mm, skeleton rib 112 adopt 150*150H shaped steel, skeleton rib 112 to include horizontal stroke
Rib and perpendicular rib, skeleton rib 112 are welded on 111 back side of steel facing by cross rib 1m spacing, perpendicular rib 40cm spacing.Support frame 2 includes
The independent bracing frame 21 of upper, middle and lower three, each bracing frame are foldable right angle trigonometry truss, and bracing frame 21 is by some quarter bend rod members
It is welded, two upper and lower bracing frames 21 are welded by double quarter bend rod members of 120*60*6, the bracing frame of mid portion
21 are welded by single quarter bend rod member of 120*120*8, and the integral solder of bracing frame 21 is in three corresponding upper, middle and lower formworks
On 11, as two upper and lower bracing frames 21 are double quarter bend rod members, a middle bracing frame 21 is single quarter bend rod member, therefore connection
Block 21 is special-shaped mechanism.The bottom of support frame 2 is provided with two supporting legs 23, and each supporting leg 23 is bolted in support frame
On 2, the flexible of supporting leg 23 is realized by rotation and then construction system is supported on the ground, the bottom of support frame 2 also sets up
There is pre-buried pull bar 24, pre-buried pull bar 24 is the fining twisted steel for being embedded in structural corner, and pre-buried pull bar 24 is at the bottom of support frame 2
Portion is bolted, and construction system is fixedly supported on ground.Fold mechanism 3 is provided with upper and lower two, the folding of top
The formwork 11 of the connection of mechanism 3 the top and the formwork 11 at middle part, 11 He of formwork in the middle part of the following connection of fold mechanism 3
Formwork 11 bottom, fold mechanism 11 drive realization to fold by folding ram 32.
During construction, carried out according to following steps:
1st, the correlation data calculation of folding template construction system is carried out according to the practical situation of construction;
2nd, the design drawing of folding template construction system is drawn according to the data for calculating;
3rd, carry out the manufacture processing of folding template construction system associated components;
4th, the associated components of folding template construction system are transported to into job site;
5th, scene carries out the on-site consolidation of folding template construction system;
6th, construction is completed using the folding template construction system;
7th, the fractionation of folding template construction system is carried out after constructing;
8th, the recovery of folding template construction system associated components.
After the completion of construction, two supporting legs 23 of rotation make the bottom of each supporting leg 23 leave ground certain distance, then by horizontal stroke
Moving slide block 41 and being used in combination for walking dolly 42 makes folding template construction system leave concrete side wall, followed by hydraulic pressure system
Unite and the folding of three formworks 11 is realized to the power drive fold mechanism 3 that drives that folding ram 32 is provided, and then drive each
The folding of support 21, the folding template construction system after folding can easily be transported or move to new position and be carried out next time
Construction, realizes installation, dismounting and the rapid of support, summary, the standardization in construction, there is provided reliable stress system, replaces
For the force way of pull bar of boring a hole on traditional structure, efficiency of construction is high, saves circulation material, and the folding template system also meets peace
Entirely, civilization, the requirement of standardized construction.
Certainly, this utility model is not limited to above-mentioned embodiment, and those of ordinary skill in the art are without prejudice to this
Equivalent variations or replacement can also be made on the premise of utility model spirit, the deformation or replacement of these equivalents are all contained in the application
In claim limited range.
Claims (9)
1. a kind of folding template construction system, it is characterised in that:Including template system(1), and the template system(1)Connection
Support frame(2)Be arranged on the support frame(2)The sliding system that bottom is moved with convenient construction system(4), the mould
Plate system(1)Including the upper and lower hinged in series in end some independent formwork together(11), each formwork(11)
In approximately the same plane, the support frame(2)Including some bracing frames being cascaded up and down(21), each support frame as described above
(21)One end respectively with each formwork(11)It is fixedly connected, each support frame as described above(21)Other end adjacent position by some
Contiguous block(22)It is removably attachable to together, each adjacent formwork(11)Between be additionally provided with and realize template system(1)
Fold and then complete the fold mechanism of construction system folding(3).
2. folding template construction system according to claim 1, it is characterised in that:Each fold mechanism(3)Including two
Root folding connecting rod(31), folding connecting rod described in two(31)One end respectively with two adjacent formworks(11)It is hinged, described in two
Folding connecting rod(31)The other end be mutually hinged, be additionally provided with by described in telescopic drive two folding connecting rod drive it is adjacent
Formwork(11)Realize the folding ram of jackknife action(32), each folding ram(32)One end be hinged on two folding connecting rods
(31)Common pin joint at, each folding ram(32)The other end be respectively hinged at corresponding formwork(11)On.
3. folding template construction system according to claim 1, it is characterised in that:Each formwork(11)Including mutual
The steel facing being stitched together(111)Be arranged on each steel facing(111)On some skeleton ribs(112), each bone
Frame rib(112)Including cross rib and perpendicular rib.
4. folding template construction system according to claim 1, it is characterised in that:Each support frame as described above(21)For triangle purlin
Frame, each English truss include some quarter bends being welded and fixed together.
5. folding template construction system according to claim 1, it is characterised in that:Each support frame as described above(21)By bolt
It is connected to each formwork(11)On, each fold mechanism(3)With each formwork(11)Between latch it is hinged.
6. folding template construction system according to claim 1, it is characterised in that:The support frame(2)Place plane
With template system(1)Place plane is mutually perpendicular to, the support frame(2)Lower end width is more than upper end width, the support rib
Frame(2)Generally triangular supports, the support frame(2)Two right-angle sides respectively with template system(1)And sliding system
(4)It is connected with each other.
7. folding template construction system according to claim 1, it is characterised in that:The support frame(2)Bottom also
It is provided with some supporting legs(23)And the pre-buried pull bar being connected with ground(24), by each supporting leg(23)With pre-buried pull bar(24)
The construction system is supported on into ground.
8. folding template construction system according to claim 1, it is characterised in that:The sliding system(4)Including support
Skeleton(2)The traversing slide block of bottom(41)Be arranged on the traversing slide block(41)On walking dolly(42), the support rib
Frame(2)Bottom be additionally provided with and traversing slide block(41)The chute for using cooperatively, the traversing slide block(41)Realized by chute
Construction system is separated with concrete side wall and utilizes walking dolly(42)Carry out the transfer of construction system.
9. folding template construction system according to claim 2, it is characterised in that:It is additionally provided with to the folding ram
(32)The hydraulic system of power is provided.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621117417.7U CN206128621U (en) | 2016-10-12 | 2016-10-12 | Folding template construction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621117417.7U CN206128621U (en) | 2016-10-12 | 2016-10-12 | Folding template construction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206128621U true CN206128621U (en) | 2017-04-26 |
Family
ID=58572808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621117417.7U Active CN206128621U (en) | 2016-10-12 | 2016-10-12 | Folding template construction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206128621U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104451A (en) * | 2017-12-27 | 2018-06-01 | 中国核工业二四建设有限公司 | A kind of foldable template hanger bracket |
CN109736569A (en) * | 2019-02-28 | 2019-05-10 | 福建工程学院 | A kind of truss type formwork support frame and formwork support structure |
CN111042484A (en) * | 2019-12-14 | 2020-04-21 | 中冶天工集团有限公司 | Novel large-thickness concrete terrace template structure and using method thereof |
CN113775171A (en) * | 2021-09-28 | 2021-12-10 | 北京怡泰盛达技术发展有限责任公司 | Recycling method of special building template |
-
2016
- 2016-10-12 CN CN201621117417.7U patent/CN206128621U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104451A (en) * | 2017-12-27 | 2018-06-01 | 中国核工业二四建设有限公司 | A kind of foldable template hanger bracket |
CN109736569A (en) * | 2019-02-28 | 2019-05-10 | 福建工程学院 | A kind of truss type formwork support frame and formwork support structure |
CN109736569B (en) * | 2019-02-28 | 2024-03-26 | 福建工程学院 | Truss type template support frame and template support structure |
CN111042484A (en) * | 2019-12-14 | 2020-04-21 | 中冶天工集团有限公司 | Novel large-thickness concrete terrace template structure and using method thereof |
CN111042484B (en) * | 2019-12-14 | 2022-02-25 | 中冶天工集团有限公司 | Large-thickness concrete terrace template structure and using method thereof |
CN113775171A (en) * | 2021-09-28 | 2021-12-10 | 北京怡泰盛达技术发展有限责任公司 | Recycling method of special building template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206128621U (en) | Folding template construction system | |
CN204960311U (en) | Door and window entrance to a cave removable mold board bearing structure | |
CN204225273U (en) | A kind of large-span prestressed groove type plate of upper bands bending steel muscle and frame construction | |
CN206800451U (en) | A kind of piping lane top board construction chassis and chassis group | |
CN205804939U (en) | template assembly for subway station side wall | |
CN208152546U (en) | The tall and big formwork system of aluminum alloy mould plate | |
CN210067393U (en) | Adjustable stereotypes elevator shaft safety protection platform | |
CN104790644A (en) | Extending and contracting sliding support frame for roof decorative bottom boards | |
CN113622660B (en) | Integral hoisting type formwork structure for vertical hole and concrete construction method | |
CN205918078U (en) | Can dismantle mobile scaffold | |
CN108086644A (en) | The building and ornament materials fiber cement outer wall Slate hanging construction robot that can be squeegeeed automatically | |
WO2021120832A1 (en) | Portal-free lining formwork trolley device for concrete construction of tunnel | |
CN204609261U (en) | Movable up-down builds scaffold by laying bricks or stones | |
CN206928642U (en) | A kind of safety and environmental protection movable formwork support | |
CN206438747U (en) | It is a kind of to store integral scaffold | |
CN208934254U (en) | A kind of assembled Steel Reinforced Concrete Special-Shaped Columns connecting structure | |
CN206942788U (en) | A kind of split type two side-wall pilot tunnel tunnel lining trolley | |
CN212453556U (en) | Folding portable scaffold | |
CN108041824A (en) | A kind of multi-use architecture design platform and its application method | |
CN204899217U (en) | Concrete is vertical to meet template bracket reinforcing apparatus that batch position pour | |
CN208039813U (en) | A kind of folding type intelligent template system | |
CN206707259U (en) | bowl buckle fixing device | |
CN207073284U (en) | Last three-step mold matching system of aluminum alloy template stair and stair | |
CN110439260A (en) | The tall and big formwork system of aluminum alloy mould plate and its installation method | |
CN211949494U (en) | Foldable scaffold for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |