CN206128448U - Dysmorphism concrete arch post rebar positioning structure - Google Patents

Dysmorphism concrete arch post rebar positioning structure Download PDF

Info

Publication number
CN206128448U
CN206128448U CN201621078863.1U CN201621078863U CN206128448U CN 206128448 U CN206128448 U CN 206128448U CN 201621078863 U CN201621078863 U CN 201621078863U CN 206128448 U CN206128448 U CN 206128448U
Authority
CN
China
Prior art keywords
reinforcing bar
section
arch
construction
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621078863.1U
Other languages
Chinese (zh)
Inventor
汪立焕
向海静
姚军
邵君雅
黄展恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONGYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGYUAN CONSTRUCTION GROUP CO Ltd filed Critical LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201621078863.1U priority Critical patent/CN206128448U/en
Application granted granted Critical
Publication of CN206128448U publication Critical patent/CN206128448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a dysmorphism concrete arch post rebar positioning structure, including reinforcing bar, location support, the reinforcing bar divide into the three section, and first section steel bar arrangement is in stand upper portion 5m department, and second festival steel bar arrangement is at concrete below rice of encircleing the 5th section branching, and third festival steel bar arrangement is on the top of the 5th section hunch branching, location support has twice, and first support position in second knotted bar iron muscle top department is supporting the construction of the concrete that encircles branching second section, the second is said and support position in the top department of third knotted bar iron muscle is being supported hunch branching third, the muddy construction of soil with fixed attention of fourth section. The utility model discloses the technical problem of the gradual change inclined plane post that inboard batter post is big -end -up, the unable construction of mode that the stirrup overlaps from the top down in the conventional reinforcing bar construction side method is solved to the ability.

Description

Abnormity concrete counterfort reinforcing bar location structure
Technical field
This utility model is related to a kind of concrete counterfort reinforcing bar positioning, especially a kind of abnormity concrete counterfort reinforcing bar positioning Structure.
Background technology
Large-sized workshop, station and public venue according to big roof system is adopted architectural image, mixed on the downside of steel structural roof more Xtah Crude Clay structure includes roof system arch springing, concrete ring beam, Special-Shaped Column and batter post beam etc..Whole roof system is a unconventional property structure Part, moulding are often that special-shaped hyperboloid or primarily serving the purpose of for warped surface, the larger arch springing of the scale of construction and counterfort support whole big roof system System, arch springing batter post together form the plane outer support system to superstructure with lower rebar concrete, it is ensured which is stable Property and safety.
Plane outer support system feature:
1) the reinforcing bar cage bar diameter of counterfort and ring beam is 40mm, and reinforcing bar follows arch springing and the moulding of ring beam constantly turning round Song, the locus of every reinforcing bar are different from, and each reinforcing bar needs are separately machined according to locus, and itself load Greatly, the positioning of reinforced bar engineering and support must set up independent support, thus the positioning of whole complicated reinforced bar engineering, processing and Support difficulty quite big.
2) engineering structure is complicated, and counterfort is distortion, deformed shape with cant beam component, while domed end connects respectively in front and back Steel construction and xoncrete structure ring beam, it is to be ensured that the last accurate connection of construction;Concrete ring beam is also the 3 D stereo knot in space Structure, and up to 28 meters or so of height, accordingly, it would be desirable to work out the locus that special monitoring scheme monitors complex component.
3) every group of counterfort be not per root independence, but intersected according to certain angle by 2 arches and converged, and then separates again, The batter post of 2 intersections in front end supports moulding to constitute an arch springing.Counterfort is not only cambered in arch plane, and while to both sides There is the measurement and positioning difficulty of angle of inclination, reinforcing bar and template very big.The reinforcing bar setting-out of beam column intersection is extremely complex, and installation is stranded It is difficult.
4) on the inside of, batter post is up big and down small gradual change inclined-plane post, and in conventional Joint Re-bar Construction, stirrup covers from the top down Mode cannot be constructed.
The content of the invention
This utility model is to provide for a kind of abnormity concrete counterfort reinforcing bar location structure, asks for solving above-mentioned technology Topic.
The technical solution of the utility model is:A kind of abnormity concrete counterfort reinforcing bar location structure, including reinforcing bar, positioning Support, the reinforcing bar are divided into three sections, and, at the 5m of column top, second section steel-bar arrangement is in the 5th section of bifurcated of arch for first segment steel-bar arrangement Concrete below at rice, Section of three steel-bar arrangement is on the top of the 5th section of bifurcated of arch;Described positioning is supported by twice, first Support and locate at the top of second section reinforcing bar, support the construction of the concrete of arch bifurcated second segment;Second is supported positioned at the 3rd At the top of section reinforcing bar, arch bifurcated the 3rd, the construction of the 4th section of mixed solidifying soil are support.
Take out the three-dimensional dimension of the reinforcing bar of respective point position according to the division of construction section, the second section reinforcing bar and first Support is welded fixation, and Section of three reinforcing bar is supported with second and be welded fixation, for controlling the moulding of whole roof system arch springing.
The positioning is supported by two longitudinal steel pipes, and two horizontal steel pipes are constituted, and a horizontal steel pipe is placed on bottom two On the downside of root reinforcing bar, and it is welded;Another horizontal steel pipe is placed on the downside of the reinforcing bar of two, top, and is welded, two longitudinal steel pipes point Do not connect horizontal steel pipe, several rows of steel pipe is arranged according to bar spacing on longitudinal steel pipe, for supporting horizontal a lot of reinforcing bar.
The beneficial effects of the utility model are:
Abnormity concrete counterfort reinforcing bar localization method of the present utility model can have solution:
(1) positioning of the reinforced bar engineering of counterfort and ring beam and support must set up independent support, whole complicated reinforcing bar The positioning of engineering, processing and support the sizable technical problem of difficulty.
(2) locus of complex component are monitored without the need for the special monitoring scheme of establishment.
(3) the reinforcing bar setting-out of beam column intersection can be solved complicated, the difficult technical problem of installation.
(4) it is up big and down small gradual change inclined-plane post that can solve inner side batter post, and in conventional Joint Re-bar Construction, stirrup is from upper To the technical problem that the mode trapped cannot be constructed.
Description of the drawings
Fig. 1 is that reinforcing bar positions supporting plane figure;
Fig. 2 is reinforcement positioning support figure;
Fig. 3 is the sectional view in Fig. 2 along 1-1;
Fig. 4 is that reinforcing bar positions supporting plane layout drawing.
Specific embodiment
As shown in figure 1, a kind of abnormity concrete counterfort reinforcing bar location structure, including reinforcing bar, positioning support.Reinforcing bar is divided into three Section, first segment reinforcing bar 10 are arranged at column 1-3 top 5m, and second section reinforcing bar 11 is arranged under the concrete of the 5th section of bifurcated of arch At 2 meters of side, Section of three steel-bar arrangement is on the top of the 5th section of bifurcated of arch;The positioning is supported by twice, first support 20 Locate at the top of second section reinforcing bar 11, support the construction of the concrete of arch bifurcated second segment;Second supports 21 to be located at Section three At the top of reinforcing bar, arch bifurcated the 3rd, the construction of the 4th section of mixed solidifying soil are support.
Abnormity concrete counterfort is made up of face arch bifurcated post 1-1, rear arch bifurcated post 1-2, column 1-3.Mask on column 1-3 There are face arch bifurcated post 1-1, rear arch bifurcated post 1-2.Face arch bifurcated post 1-1 sequentially consists of face arch bifurcated second segment 2-A, front Arch the 3rd section of 3-A of bifurcated, the 4th 4-A of face arch bifurcated section, the 5th section of 5-A of face arch bifurcated.Rear arch bifurcated post 1-2 is from bottom to up successively For rear arch bifurcated second segment 2-B, the 3rd section of 3-B of rear arch bifurcated, the 4th section of 4-B of rear arch bifurcated, the 5th section of 5-B of rear arch bifurcated.
A kind of abnormity concrete counterfort reinforcing bar localization method, its step is:
1) steel bar segmentation
The reinforcing bar of counterfort is irregularly to distort reinforcing bar in addition to column and batter post, all, so by the four of arch springing angle steel Position and moulding that muscle, stirrup and positioning support to control reinforcing bar.Reinforcing bar is divided into three sections, on first segment reinforcing bar 10 to column 1-3 5m is removed, 2 meters or so below the concrete of second section reinforcing bar 11 to the 5th section of bifurcated of arch, Section of three reinforcing bar is to top.If twice are fixed Position supports, and first support 20 is located at the top of second section reinforcing bar 11 to be located, and supports the construction of the concrete of arch bifurcated second segment;The Two roads support 21 to be located at the top of Section of three reinforcing bar and (1-1 sections are taken on 5-A section concretes), support arch bifurcated the 3rd, the The construction of four sections of mixed solidifying soil.Steel bar segmentation and positioning supporting plane figure are as shown in Figure 1.
2) reinforcing bar moulding control
By taking four angle steel muscle of face arch as an example, 20mm protective layer thickness is removed, (reinforcing bar is straight to draw the graphics of four reinforcing bars Footpath 40mm), the three-dimensional dimension of the reinforcing bar of respective point position is taken out according to the division of construction section, delivering to specified process unit carries out adding Work;After machining, according to three-dimensional dimension precise positioning reinforcement location, then it is welded with positioning support, colligation and fixed stirrup, control Make the moulding of whole roof system arch springing.Directly steel is distributed according to bar spacing laying in four angle steel muscle again after controlling moulding Muscle.Rear arch and the same face arch of coupling beam reinforcing bar value.
3) positioning is supported:
Per group of positioning is supported from two 48X3mm steel pipes as vertical bar, and a horizontal steel pipe is placed on bottom two On the downside of reinforcing bar, after confirmation, it is welded;Another transverse steel is placed on the downside of the reinforcing bar of two, top, after confirmation, weldering Extremely, then with two longitudinal steel pipes connect horizontal steel pipe respectively, several rows of steel pipe is arranged according to bar spacing on longitudinal steel pipe, used In the horizontal a lot of reinforcing bar of support.
Whole arch springing construction deployment is as follows:Basis → first segment reinforcing bar colligation → first paragraph concrete construction → set up first Layer first reinforced bar support → second segment concrete construction of steel platform → colligation second section reinforcing bar → set up → set up second layer steel Section of three reinforcing bar of platform → colligation → set up second reinforced bar support → first of dismounting reinforced bar support → the 3rd section concrete is applied Work → set up third layer steel platform → the 4th concrete construction → dismounting second reinforced bar support → the 5th road concrete construction.It is fixed What position supported sets up and removes according to the flow process construction in construction deployment
Positioning Support Position determines:By taking face arch second section reinforced bar support as an example, 1- is taken at reinforced bar support in BIM models 1 section, obtains profile, can take out the Z coordinate of four pads A, B, C, D of reinforcing bar and horizontal cross bar;Further according to perspective Plane graph, can take out X, and Y-coordinate determines the three-dimensional coordinate of four pads of reinforcing bar and horizon bar, such as Fig. 2, shown in 3:
Reinforcing bar positioning supporting row frame is set up:By taking face arch second section Steel bar rack as an example:Between Steel bar rack both sides are respectively set up Twice steel pipe away from 800, while also setting up the twice steel pipe of spacing 800 in the side that cuts section bar, is collectively forming reinforcing bar positioning and supports row Frame system, as shown in Figure 4.
4) construction survey
Roof system counterfort belongs to three dimensions stereoscopic member, and the positioning of component has very big difficulty.By BIM three-dimensional modelings Software Create three-dimensional structure model, can be decomposed by software each four point in crucial section for drawing the component coordinate (x, Y, z), the space coordinatess of the point in each section are resolved into into plane coordinates (x, y), and corresponding absolute altitude H.
As the pitch of arch is higher after face arch, supports and setting-out has very big difficulty, set up steel platform propping up as component Support platform and sterically defined operating platform.
High process control:Plane control stake doubles as high process control stake, and vertical control point Fixed Initial Point is provided simultaneously using owner The bench mark for using is agreed in Jing management inspection.Each control point height adopts closed leveling line pilot measurement, and is closed by distance It is poor with tax.High process control is with reference to fourth-order leveling.

Claims (3)

1. a kind of abnormity concrete counterfort reinforcing bar location structure, including reinforcing bar, positioning are supported, it is characterised in that:The reinforcing bar point Save for three, first segment reinforcing bar (10) is arranged at column (1-3) top 5m, second section reinforcing bar (11) is arranged on the 5th section of bifurcated of arch Concrete below at 2 meters, Section of three steel-bar arrangement is on the top of the 5th section of bifurcated of arch;Described positioning is supported by twice, and first Road supports (20) to locate at the top of second section reinforcing bar (11), supports the construction of the concrete of arch bifurcated second segment;Second Support (21) supports arch bifurcated the 3rd, the construction of the 4th section of mixed solidifying soil at the top of Section of three reinforcing bar.
2. abnormity concrete counterfort reinforcing bar location structure according to claim 1, it is characterised in that:Drawing according to construction section The three-dimensional dimension of the reinforcing bar for taking out respective point position, the second section reinforcing bar (11) is divided to support (20) to be welded fixation with first, institute Stating Section of three reinforcing bar supports (21) to be welded fixation with second, for controlling the moulding of whole roof system arch springing.
3. abnormity concrete counterfort reinforcing bar location structure according to claim 1, it is characterised in that:It is described positioning support by Two longitudinal steel pipes, two horizontal steel pipes are constituted, and a horizontal steel pipe is placed on the downside of the reinforcing bar of bottom two, and is welded;It is another The horizontal steel pipe of root is placed on the downside of the reinforcing bar of two, top, and is welded, and two longitudinal steel pipes connect horizontal steel pipe respectively, in longitudinal steel Several rows of steel pipe is arranged according to bar spacing on pipe, for supporting horizontal a lot of reinforcing bar.
CN201621078863.1U 2016-09-24 2016-09-24 Dysmorphism concrete arch post rebar positioning structure Active CN206128448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621078863.1U CN206128448U (en) 2016-09-24 2016-09-24 Dysmorphism concrete arch post rebar positioning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621078863.1U CN206128448U (en) 2016-09-24 2016-09-24 Dysmorphism concrete arch post rebar positioning structure

Publications (1)

Publication Number Publication Date
CN206128448U true CN206128448U (en) 2017-04-26

Family

ID=58569923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621078863.1U Active CN206128448U (en) 2016-09-24 2016-09-24 Dysmorphism concrete arch post rebar positioning structure

Country Status (1)

Country Link
CN (1) CN206128448U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115217215A (en) * 2022-05-16 2022-10-21 浙江精工重钢结构有限公司 Forked bending-twisting joint with irregular section and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115217215A (en) * 2022-05-16 2022-10-21 浙江精工重钢结构有限公司 Forked bending-twisting joint with irregular section and manufacturing method thereof
CN115217215B (en) * 2022-05-16 2024-02-13 浙江精工重钢结构有限公司 Irregular-section forked bending and twisting node and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN106245852B (en) Abnormity concrete counterfort reinforcing bar localization method
CN107100645B (en) Shield tunnel curve section section of jurisdiction preassembling selection designing method based on BIM technology
CN103114732B (en) Cast steel penetration pipe node space positioning method
CN105113671B (en) A kind of large-scale conchoidal Double curved arc curtain wall construction method
CN103399849B (en) Road three-dimensional linear automatic optimization method based on improved particle swarm optimization
CN101556704A (en) Method for establishing temporary supporting frame system assembled by steel structures
CN107869249B (en) Arcuate structure high-formwork construction method
CN104895035B (en) The large-scale ship reception chamber Efficient installation method of vertical ship lift and installation positioning assisting tooling device
CN105651251B (en) A kind of one-tunnel two-tracks Tunnel Overbreak & Underbreak assay method
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN108049880A (en) The shield machine originated in shield method tunnel construction using small curve radius
CN103321350A (en) Multi-connection and large-cross-section combination-box-type thick-plate side column and construction method therefor
CN206128448U (en) Dysmorphism concrete arch post rebar positioning structure
CN101761134B (en) Construction technology of spatial variable curved surface reinforced concrete irregular barrel group structure
CN112663516A (en) Construction method of bridge thin-wall hollow pier column
CN106193094A (en) A kind of embedding anchor bolts construction mould and foundation bolt regulation construction method
CN107939141A (en) A kind of steel structure tower and its construction method
CN102842265B (en) Underground pipeline plane and cross section integration showing method
CN209538639U (en) Make track movable Scaffold by oneself
CN105544990B (en) The line setting and template construction method of arc accommodation rail
CN104278779A (en) Network cable for large decorative curtain wall and stretching formation method during mounting of network cable
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN104964674A (en) Control net used for large structure building size
CN116776449A (en) Sketchup software-based nuclear power plant area total plane layout method and system
CN204311622U (en) A kind of shape of a saddle prestressed cable net

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant