CN206127936U - Rope with thorn collude flower screen guardrail - Google Patents

Rope with thorn collude flower screen guardrail Download PDF

Info

Publication number
CN206127936U
CN206127936U CN201620504107.4U CN201620504107U CN206127936U CN 206127936 U CN206127936 U CN 206127936U CN 201620504107 U CN201620504107 U CN 201620504107U CN 206127936 U CN206127936 U CN 206127936U
Authority
CN
China
Prior art keywords
frame
elbow
rope
column
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620504107.4U
Other languages
Chinese (zh)
Inventor
张永良
杨莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Water Landscape Design Co Ltd
Original Assignee
Shanghai Water Landscape Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Landscape Design Co Ltd filed Critical Shanghai Water Landscape Design Co Ltd
Priority to CN201620504107.4U priority Critical patent/CN206127936U/en
Application granted granted Critical
Publication of CN206127936U publication Critical patent/CN206127936U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a rope with thorn collude flower screen guardrail, this rope with thorn collude flower screen guardrail include stand, frame, collude the flower screen piece, elbow and thorn rope, and the top fixed connection elbow of stand, this elbow are to the relative outside slope setting of colluding the flower screen guardrail, and the thorn rope sets up between the elbow of adjacent stand, collude the flower screen piece and fix in the frame of rectangle, form the protection network, constitute nodical department between the steel wire that colludes the flower screen piece and be 7 styles of calligraphy and connect and set up, the setting that assumes diamond in shape of the mesh that colludes the flower screen piece, overall structure is more firm, the frame is fixed to be set up between adjacent two stands, the below of thorn rope, the elbow and the rope of the thorn between the elbow that set up to the relative outside slope of colluding the flower screen guardrail for the top of colluding the flower screen guardrail has the corner, and no longer vertical setting has increaseed the climbing degree of difficulty, has effectively improved the security of colluding the flower screen guardrail.

Description

The hook flower net guardrail of barbed rope
Technical field
The utility model is related to a kind of safety device, the hook flower net guardrail of particularly a kind of barbed rope.
Background technology
In the both sides of high-speed railway approach city road or cell enclosure wall, in order to prevent personnel's climbing and attractive in appearance, equally The guardrail of anti-climbing effect is installed with certain aesthetic feeling and can functioned well as to needs.The anti-climbing guardrail for using at present is general The column with crotch is installed using on the top of guardrail, column spacing distance is limited by cost, and general span is larger, prevents Climbing effect is poor;Guardrail is arranged out of doors throughout the year, and bad environments, especially highway, the protection network of railway both sides, dust is tight Weight, easily adhering dust on guardrail affects attractive in appearance.
Utility model content
Technical problem to be solved in the utility model is to provide that a kind of anti-climbing effect is good, intensity big, more attractive in appearance The hook flower net guardrail of barbed rope.
In order to solve the above problems, the utility model provides a kind of hook flower net guardrail of barbed rope, the barbed rope Hooking flower net guardrail includes column, frame, hooks flower mesh sheet, elbow and thorn rope, and the top of the column is fixedly connected elbow, the elbow It is obliquely installed to the opposite exterior lateral sides for hooking flower net guardrail, the thorn rope is arranged between the elbow of adjacent upright posts;It is described to hook flower mesh sheet It is fixed in the frame of rectangle, forms protection network;The frame is fixedly installed between adjacent two root posts, the lower section of thorn rope, Thorn rope between the elbow being obliquely installed to the opposite exterior lateral sides for hooking flower net guardrail and elbow so that the top for hooking flower net guardrail has Corner, is no longer vertically arranged, and increases climbing difficulty, effectively increases the security for hooking flower net guardrail.The column is hollow Pipe, is perfused with concrete, to strengthen intensity in pipe.
Further, the thorn rope includes barbed tree-shaped branch, steel wire rope made of plastic, the root of the tree-shaped branch body In the rope strand of the embedded steel wire rope in portion, it is difficult to touch, security is higher.
Further, the elbow is provided with crotch, and the two ends for piercing rope are fixedly connected on crotch.
Further, connected by coupling assembly between the frame and the column, the coupling assembly includes being fixed on Upright post connecting plate on column, the frame connecting plate being fixed on frame and bolt, bolt connects upright post connecting plate and frame Plate is fixed.
Further, the bottom of the column by fixation kit arrange on the ground, the fixation kit include flange and Expansion bolt, it is easy to load and unload.
Further, it is in 7 font connect settings to constitute the point of intersection between the steel wire for hooking flower mesh sheet, and the hook spends the net of mesh sheet Hole assumes diamond in shape setting, and intensity is higher.
Further, the column is pipe, and the frame is arranged using square tube, it is to avoid sharp corner angle are exposed outside, institute The centre for stating frame is additionally provided with support column, it is easy to hook flower mesh sheet connection so that frame is more firm.
Further, the elbow and the angle of the column vertical direction are 30 ° to 60 °, increase and hook climbing for flower net guardrail Climb difficulty.
Further, modeling process, the thickness of surface leaching modeling layer are integrally soaked in the column, frame, hook flower mesh sheet, the surface of elbow 0.4mm is not less than, so that column, frame, the steel substrate and air moisture that hook inside flower mesh sheet, elbow completely cut off completely, it is to avoid Get rusty, the leaching modeling layer color on surface is optional, more attractive in appearance, at the same it is easy to clean, reduce the adhesion of dust.
The technique effect of utility model:(1)The hook flower net guardrail of barbed rope of the present utility model, relative to prior art, Elbow and thorn rope are obliquely installed in the top opposite exterior lateral sides for hooking flower net guardrail, climbing difficulty is increased, hook flower net is effectively increased The security of guardrail;(2)The bottom of column is arranged on the ground by flange and expansion bolt, it is easy to load and unload;(3)Column, side Modeling process is integrally soaked on frame, hook flower mesh sheet, the surface of elbow, it is to avoid got rusty, and the leaching modeling layer color on surface is optional, more attractive in appearance, together When it is easy to clean, reduce dust adhesion;(4)It is in 7 font connect settings to constitute the point of intersection between the steel wire for hooking flower mesh sheet, is hooked The mesh of flower mesh sheet assumes diamond in shape setting, and overall structure is more stable.
Description of the drawings
The utility model is described in further detail with reference to Figure of description:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the left view of Fig. 1;
The A-A of Fig. 3 the utility model connectors is to sectional view;
Fig. 4 is the partial enlarged drawing that B regions hook flower mesh sheet in Fig. 1.
In figure:Column 1, frame 2 is hooked and spends mesh sheet 3, thorn rope 4, hook 5, support column 6, coupling assembly 7, fixation kit 8, Ground 9, elbow 10, upright post connecting plate 11, bolt 12, frame connecting plate 21.
Specific embodiment
As shown in Figures 1 to 4, the hook of the barbed rope of the present embodiment spends net guardrail to embodiment 1, using pipe as column 1, rectangular shaped rim 2 is constituted using 4 square tubes, the flower mesh sheet 3 of the hook with diamond-shaped meshes is connected in rectangular shaped rim 2, constitute and hook Point of intersection between the steel wire of flower mesh sheet 3 is in 7 font connect settings;The centre of rectangular shaped rim 2 is provided with longitudinal support column 6, shape Into protection network, intensity is higher;The top of column 1 is fixedly connected elbow 10, and the elbow 10 to the opposite exterior lateral sides for hooking flower net guardrail incline Tiltedly arrange, the angle between the elbow 10 and vertical direction is 30 °, elbow 10 is provided with crotch 5, thorn rope 4 is arranged on adjacent vertical Between the elbow 10 of post 2, the two ends of thorn rope 2 are fixedly connected on crotch 5;Connected by coupling assembly 7 between frame 2 and column 1, Coupling assembly 7 includes the upright post connecting plate 11 being fixed on column 1, the frame connecting plate 21 being fixed on frame 2 and bolt 12, Bolt 12 is fixed upright post connecting plate 11 and frame connecting plate 21 so that frame 2 be fixedly installed on adjacent two root posts 1 it Between, thorn rope 4 lower section, the bottom of column 1 is arranged on ground 9, easily by the fixation kit 8 being made up of flange and expansion bolt In handling.
Thorn rope 4 includes barbed tree-shaped branch, steel wire rope made of plastic, the embedded steel wire rope of root of tree-shaped branch body In rope strand, it is difficult to touch, security is higher.
Each column 1, frame 2, the surface integral high-temperature leaching modeling process for hooking flower mesh sheet 3, elbow 10, the thickness of surface leaching modeling layer 0.4mm is not less than, so that column 1, frame 2, the steel substrate and air moisture that hook inside flower mesh sheet 3, elbow 10 completely cut off completely, Avoid getting rusty, the leaching modeling layer color on surface is optional, more attractive in appearance, at the same it is easy to clean, reduce the adhesion of dust.
The hook flower net guardrail of barbed rope of the present utility model, in the top opposite exterior lateral sides for hooking flower net guardrail elbow is obliquely installed With thorn rope, climbing difficulty is increased, effectively increase the security for hooking flower net guardrail;The bottom of column is by flange and expanding screw Bolt is arranged on the ground, it is easy to loaded and unloaded;Modeling process is integrally soaked on column, frame, hook flower mesh sheet, the surface of elbow, it is to avoid got rusty, table The leaching modeling layer color in face is optional, more attractive in appearance, at the same it is easy to clean, reduce the adhesion of dust;Constitute hook flower mesh sheet steel wire it Between point of intersection be in 7 font connect settings, the mesh for hooking flower mesh sheet assumes diamond in shape setting, and overall structure is more stable.
Obviously, above-described embodiment is only intended to clearly illustrate the utility model example, and is not to this reality With the restriction of new embodiment.For those of ordinary skill in the field, may be used also on the basis of the above description To make other changes in different forms.There is no need to be exhaustive to all of embodiment.And these Belong to obvious change or change still in protection domain of the present utility model that spirit of the present utility model extends out Among.

Claims (1)

1. a kind of hook of barbed rope spends net guardrail, it is characterised in that include:Column(1), frame(2), hook flower mesh sheet(3), elbow (10)With thorn rope(4), the column(1)Top be fixedly connected elbow(10), the elbow(10)The relative of net guardrail is spent to hooking Outside is obliquely installed, the thorn rope(4)It is arranged on adjacent upright posts(1)Elbow(10)Between;It is described to hook flower mesh sheet(3)It is fixed on The frame of rectangle(2)It is interior;The frame(2)It is fixedly installed on adjacent two root posts(1)Between, thorn rope(4)Lower section;It is described curved Head(10)It is provided with crotch(5), thorn rope(4)Two ends be fixedly connected crotch(5)On;The column(1)For hollow pipe, fill in pipe It is marked with concrete;
The frame(2)With the column(1)Between pass through coupling assembly(7)Connection, the coupling assembly(7)Including being fixed on Column(1)On upright post connecting plate(11), be fixed on frame(2)On frame connecting plate(21)And bolt(12), bolt(12) By upright post connecting plate(11)With frame connecting plate(21)It is fixed;
The column(1), frame(2), hook flower mesh sheet(3), elbow(10)Surface integrally soak modeling process, surface leaching modeling layer thickness Degree is not less than 0.4mm;
The column(1)For pipe, the frame(2)Arranged using square tube, the frame(2)Centre be additionally provided with support column (6).
CN201620504107.4U 2016-05-30 2016-05-30 Rope with thorn collude flower screen guardrail Active CN206127936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620504107.4U CN206127936U (en) 2016-05-30 2016-05-30 Rope with thorn collude flower screen guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620504107.4U CN206127936U (en) 2016-05-30 2016-05-30 Rope with thorn collude flower screen guardrail

Publications (1)

Publication Number Publication Date
CN206127936U true CN206127936U (en) 2017-04-26

Family

ID=58560724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620504107.4U Active CN206127936U (en) 2016-05-30 2016-05-30 Rope with thorn collude flower screen guardrail

Country Status (1)

Country Link
CN (1) CN206127936U (en)

Similar Documents

Publication Publication Date Title
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN103276886B (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN202000684U (en) Outwards extending horizontal safety net system used in construction of main body structure of high-rise building
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN206127936U (en) Rope with thorn collude flower screen guardrail
CN207847033U (en) A kind of scaffold for building convenient for adjusting
CN215631482U (en) Overhanging socket type disc buckle type scaffold mounting structure
CN206279783U (en) Assembled construction safety channel
CN206128849U (en) Sun flower MAG net guardrail
CN205776197U (en) Idle discharge frame is hung in a kind of rock anchorage beam concrete construction
CN206539119U (en) A kind of construction guardrail
CN206110844U (en) Sun flower MAG net guardrail
CN219219401U (en) Temporary protection device for deformation joint in staggered floor construction of tower
CN104612570B (en) What a kind of child of preventing fell waft window type anti-theft net
CN203175151U (en) Convenient multifunctional fence rod frame
CN214615430U (en) Cast-in-situ bay window construction protective cover for steel structure building
CN212078905U (en) Bamboo joint-imitating guardrail
CN216765574U (en) Dual-purpose temporary safety guardrail for bridge construction
CN215859227U (en) Face limit protector
CN216569232U (en) Fence mosquito net for preventing baby from falling
CN201447906U (en) Safe guardrail
CN203320921U (en) Cantilever frame for high-rise building sloping roof outer eave construction and protection at window
CN206091566U (en) Zinc steel guardrail
CN207686257U (en) A kind of civil construction load-bearing hanger
CN201799050U (en) Climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant