CN206127820U - Drainage structures on road road surface - Google Patents

Drainage structures on road road surface Download PDF

Info

Publication number
CN206127820U
CN206127820U CN201621176061.4U CN201621176061U CN206127820U CN 206127820 U CN206127820 U CN 206127820U CN 201621176061 U CN201621176061 U CN 201621176061U CN 206127820 U CN206127820 U CN 206127820U
Authority
CN
China
Prior art keywords
gutter
cover plate
screen pack
edge
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621176061.4U
Other languages
Chinese (zh)
Inventor
叶建兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENZHOU XINGYE MUNICIPAL CONSTRUCTION Co Ltd
Original Assignee
WENZHOU XINGYE MUNICIPAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENZHOU XINGYE MUNICIPAL CONSTRUCTION Co Ltd filed Critical WENZHOU XINGYE MUNICIPAL CONSTRUCTION Co Ltd
Priority to CN201621176061.4U priority Critical patent/CN206127820U/en
Application granted granted Critical
Publication of CN206127820U publication Critical patent/CN206127820U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a drainage structures on road road surface. The utility model discloses a water inlet in escape canal is equipped with the apron, is equipped with the through -hole on the apron, and ponding passes through in the through -hole arranges the escape canal, and the bulky debris of separation still make things convenient for constructor to snatch in entering into the escape canal, the construction installation of being convenient for. Simultaneously, the sky can the effectual people of preventing be stepped on to the apron. The existence of first filter screen can the little debris of separation in ponding enters into the escape canal, prevent that the escape canal from blockking up. The existence at first border and second border prevents that first filter screen breaks away from the step in making the step on the better fixed water inlet of filter screen of winning. Simultaneously the structure setting of first filter screen make constructor the installation at that time, more quick convenience. The existence of second filter screen and spout prevents the jam in the escape canal as far as to and make things convenient for constructor installation second filter screen and cleanup crew to wash the second filter screen.

Description

A kind of discharge structure of pavement of road
Technical field
The utility model is related to a kind of discharge structure, more particularly to a kind of discharge structure of pavement of road.
Background technology
In rainstorm weather, the phenomenon that urban road usually occurs is exactly road ponding, and depth of accumulated water is usually very It is deep, not only make pedestrian be difficult to be walked on road, also frequently resulting in vehicle just normally opened cannot cross.
The setting side of the discharge structure on road surface is particularly important, not only venting ponding, prevents vegetation from being flooded, while also preventing The phenomenon for having stopped traffic jam is produced.But the structure of the drainage arrangement in living is all excessively simple, although play a part of draining, But debris can usually be together discharged, debris may be blocked somewhere, cause last discharge structure normally to make With.
In life, usually need to arrange control device, switch even needs in gutter with good discharge structure Bottom land lay various soil layers so that manufacturing and may require that workmen devotes a tremendous amount of time during construction and installation, making Obtain the engineering construction time very long.
Utility model content
In view of the shortcomings of the prior art, the purpose of this utility model be provide it is a kind of have draining, anti-clogging and It is easy to the road pavement dewatering structure processed and construct.
For achieving the above object, the utility model provides following technical scheme:A kind of discharge structure of pavement of road, bag Include and dig gutter on the ground and several cover plates, gutter is provided with water inlet and delivery port, and water inlet is opened in ground Upper and connection ground and gutter, some cover plate lids are located at the water inlet top in gutter, and delivery port leads to outside drainage sump;Row The water inlet edge in ditch is provided with step, and cover plate lid is located at step top, offers on cover plate and be flowed in gutter for ponding Through hole, be provided with the first screen pack across water inlet between step and cover plate, the first screen pack downside fits with step, on Side fits with cover plate.
Used as further improvement of the utility model, the first screen pack includes guard, offers in guard for collecting rubbish The holding tank of rubbish, the relative both sides of guard are equipped with the first edge for stretching out, and the first edge is erected at the transverse plane of step On, cover plate lid is located at the first edge top and fits with it.
Used as further improvement of the utility model, the side of the first edge dorsad guard is provided with upwardly extending second side Edge, when cover plate is mutually covered with gutter, the both sides at the second edge fit respectively with the upright plane of cover plate and step.
Used as further improvement of the utility model, guard and holding tank are in inverted trapezoidal mesa-shaped.
Used as further improvement of the utility model, through hole is strip through-hole.
As further improvement of the utility model, the second screen pack, the second mistake are provided near water outlet in gutter Filter screen is inclined near a lateral delivery port of water inlet.
As further improvement of the utility model, offer on the inwall of the both sides in gutter 1 two be oppositely arranged and Inclined chute, the angle of inclination of chute is consistent with the angle of inclination and direction of the second screen pack, the second screen pack it is relative Both sides are respectively embedded in sliding in two chutes.
Used as further improvement of the utility model, gutter inside overall structure is in chamfered edge mesa-shaped.
The beneficial effects of the utility model, the ponding for enabling road surface of setting up in gutter is discharged to sluicing by gutter In well, and ponding is discharged to elsewhere, it is therefore prevented that ponding nowhere can be arranged, causes road ponding to hinder pedestrian and vehicle forward, Have a strong impact on traffic to pass through;The presence of the through hole on cover plate and cover plate not only acts as the effect of the water inlet for blocking gutter, Prevent from the case of ponding, due to the situation below the invisible ponding of pedestrian, causing to step on sky, it may occur that injured or more Plus serious consequence.In order that ponding quickly, can be entered into smoothly in gutter, drainage effect is played, the presence of through hole is just Play a role, meanwhile, through hole can also as far as possible intercept rubbish and other debris are punched in gutter, cause gutter to block up Plug.Although through hole serves the effect of certain interception debris, the main purpose of through hole is water is flowed rapidly into gutter Interior, so the stool and urine in the aperture of through hole can be limited, the debris for causing small size can be discharged in gutter by through hole.Jing Cross and pile up for a long time, gutter may be caused to block.The presence of the first screen pack is served and filters out what is passed through from through hole The effect of the debris of small size, it is therefore prevented that small size debris are piled up for a long time in gutter, causes gutter to block.Due to platform The presence of rank so that cover plate will not project ground, it is attractive in appearance to road to have a certain impact.Meanwhile, when cover plate is installed, by cover plate Alignment step is placed, and cover plate can just be engaged with gutter, very convenient quick installing.Meanwhile, when mounted, only First screen pack need to be placed in step, then by cover plate lid, when mounted very simplicity is quick, is workmen Save many times.
Description of the drawings
Fig. 1 is a kind of structural representation of the discharge structure of pavement of road;
Fig. 2 is a kind of side view of the discharge structure of pavement of road;
Fig. 3 is a kind of top view of the discharge structure of pavement of road;
Fig. 4 is the structural representation for arranging gutter on the ground;
Fig. 5 is the structural representation of the first screen pack.
Specific embodiment
The utility model is described in further detail below in conjunction with the embodiment given by accompanying drawing.
Referring to figs. 1 to shown in 5, the discharge structure of a kind of pavement of road of the present embodiment, including the row for digging on the ground Ditch 1 and several cover plates 2, setting up for gutter 1 can make ponding be discharged to outside by it, prevent from causing road ponding, prevent Major structure is not smooth into traffic, the presence of cover plate 2, and the debris such as rubbish can not only be hindered to be flowed in gutter 1, causes gutter 1 Blocking, causes ponding harmless and discharges from gutter 1 so that still product is on road surface and harmless in the deeper people of ponding for ponding When seeing surface conditions clearly, prevent people from sky is stepped on gutter 1, constitute potential safety hazard.Gutter 1 is provided with the He of water inlet 11 Delivery port 12, water inlet 11 opens up on the ground and connects ground and gutter 1, and the lid of some cover plates 2 is located at the water inlet in gutter 1 The top of mouth 11, delivery port 12 leads to outside drainage sump;Setting up for the position in gutter 1 and water inlet 11 and delivery port 12, makes Obtain excess surface water easily to enter in gutter 1 from water inlet 11, while ponding can be exhausted directly to outside by delivery port 12 letting out Well, by drainage sump given place is specially discharged to, and prevents ponding from disorderly arranging.The edge of water inlet 11 in gutter 1 is provided with step 13, lid The lid of plate 2 is located at the top of step 13, due to the presence of step 13 so that cover plate 2 will not project ground, has one so as to attractive in appearance to road Fixed impact.Meanwhile, when cover plate 2 is installed, cover plate 2 is directed at into step 13 and is placed, cover plate 2 can just be engaged with gutter 1, It is very convenient quick installing.The through hole 21 being flowed into for ponding in gutter, step 13 and cover plate are offered on cover plate 2 The first screen pack 3 across water inlet 11 is provided between 2, downside and the step 13 of the first screen pack 3 fit, upside and cover plate 2 fit.In order that ponding quickly, can be entered into smoothly in gutter 1, drainage effect is played, the presence of through hole 21 just rises To effect, meanwhile, through hole 21 can also as far as possible intercept rubbish and other debris are punched in gutter 1, cause gutter 1 to block up Plug.Although through hole 21 serves the effect of certain interception debris, the main purpose of through hole 21 is to make water flow rapidly into row In ditch 1, so the stool and urine in the aperture of through hole 21 can be limited, causing the debris of small size can pass through through hole 21, the row of being discharged to In ditch 1.Debris may cause gutter 1 to block through prolonged accumulation.The presence of the first screen pack 3 serves filtration Fall the effect of the debris of the small size passed through from through hole 21, it is therefore prevented that small size debris long-time in gutter 1 is piled up, and is led Gutter 1 is caused to block.Meanwhile, when mounted, only the first screen pack 3 need to be placed in step 13, then cover plate 2 is covered i.e. Can, it is very easy to be quick when mounted, it is that workmen saves many times.
Used as a kind of improved specific embodiment, the first screen pack 3 includes being offered for receiving in guard 31, guard 31 The holding tank of collection rubbish, the relative both sides of guard 31 are equipped with the first edge 311 for stretching out, and the first edge 311 is erected at On the transverse plane of step 13, the lid of cover plate 2 is located at the top of the first edge 311 and fits with it.Holding tank in guard 31 can Play the small size debris detained and collect in the ponding being drained in gutter 1 so that debris have the space collected, and prevent First screen pack 3 accumulate after a small amount of debris just occur debris pile up cause through hole 21 from the side of gutter 1 be blocked, cause product Water cannot be drained in gutter 1;The presence at the first edge 311, facilitates workmen and installs the first screen pack 311, by the One screen pack 311 is placed on the water inlet in gutter 1, guard 31 through water inlet 11 inside gutter 1, as long as by first Edge 311 fits with step 13, and the first screen pack 3 is just fixed in gutter 1, then covers cover plate 2, makes cover plate 2 and One edge 311 fits, and just can further realize the fixation of the first screen pack 3.When ponding passes through guard 31, ponding can be to net Cover 31 has the power washed away, and causes guard 31 that certain deformation occurs, and makes the first edge 311 start to depart from step 13, and first Screen pack 3 is overall to be started toward the bottom of gutter 1 to fall.At the same time, cover plate 2 also receives scouring force and pressure of the ponding to it, And cover plate 2 pushes down the first edge 311 so that the first screen pack 3 is maintained static.
Used as a kind of improved specific embodiment, the side of the first edge 311 dorsad guard 31 is provided with upwardly extending Second edge 312, when cover plate 2 is mutually covered with gutter 1, the both sides at the second edge 312 are perpendicular with cover plate 2 and step 13 respectively Plane fits.The presence at the second edge 312 causes the fixation of the first screen pack 3 to be further guaranteed, the first screen pack 3 First edge 311 is pushed down by cover plate 2, and the second edge 312 is sandwiched between the cell wall of step 13 and cover plate 2 so that first filters Net 3 cannot be moved.Meanwhile, the lid of cover plate 2 is located at also very convenient on the first screen pack 3 by workmen, quickly, is not interfered with Construction and installation.
Used as a kind of improved specific embodiment, guard 31 and holding tank are in inverted trapezoidal mesa-shaped.Guard 31 is deposited In the certain space that can occupy gutter 1 so that the flow rate of water flow in gutter 1 can be affected, cause row The draining of ditch 1 is not quick enough.But trapezoidal mesa-shaped can as far as possible reduce the space that guard 31 is occupied, meanwhile, reduce as far as possible Impact to flow rate of water flow.
Used as a kind of improved specific embodiment, through hole 21 is strip through-hole.It is quick that strip through-hole is not only convenient for current Flow in gutter 1, prevent large volume of debris from entering in gutter 1 by through hole 21, being also convenient for workmen will Hand passes through strip through-hole so as to reach the effect of crawl cover plate 2, convenient construction human users and construction.
Used as a kind of improved specific embodiment, the second screen pack 41 inclines near one end of water inlet 11 to delivery port 12 Tiltedly and block delivery port 12.Under the washing away of ponding, the debris in guard 31 have unavoidably part and are washed in gutter 1, Through prolonged accumulation, the delivery port 12 that may result in gutter 1 is blocked so that gutter 1 cannot play the effect of draining Really.The presence of the second screen pack 41 enables the debris in gutter 1 to be isolated, and after ponding is excluded, opens near the The screen pack 3 of cover plate 2 and first of two screen packs 41, the second screen pack 41 is taken out and debris will be cleaned out thereon, prevents next time During draining, gutter 1 is unable to draining due to blocking.
As a kind of improved specific embodiment, offer on the inwall of the both sides in gutter 1 two be oppositely arranged and Inclined chute 4, the angle of inclination of chute 4 is consistent with the angle of inclination and direction of the second screen pack 41, the second screen pack 41 Opposite sides be respectively embedded in sliding in two chutes 4.The setting of chute 4 not only convenient construction personnel by the second screen pack 41 It is fixed in gutter 1, while disengaging gutter 1 under the washing away of ponding of second screen pack 41 in gutter 1 is also prevented from, no Only do not have and filter the effect for preventing blocking, the second screen pack 41 may also can be made to become tamper in itself, affect ponding to discharge Gutter 1.
Used as a kind of improved specific embodiment, the inside overall structure of gutter 1 is in chamfered edge mesa-shaped.Due to guard 31 Arrange so that the space up and down in gutter 1 is different, and the structure setting in gutter 1, upper down-flow water space phase is caused as far as possible Together, while increasing the flowing water space in gutter 1 as far as possible, drainage efficiency is accelerated.
To sum up, the water inlet 11 in gutter 1 is provided with cover plate 2, and cover plate 2 is provided with through hole 21, and ponding is discharged to by through hole 21 In gutter 1, the debris for intercepting large volume are entered in gutter 1, go back convenient construction personnel crawl, are easy to construction and installation.Together When, cover plate 2 can effectively prevent people from stepping on sky.The presence of the first screen pack 3 can intercept little debris and enter into along ponding In gutter 1, prevent gutter 1 from blocking.The presence at the first edge 311 and the second edge 312 causes the first screen pack 3 more preferable In step 13 on fixed water inlet 11, prevent the first screen pack 3 from departing from step 13.Simultaneously the structure of the first screen pack 3 sets Put so that workmen install its when, it is more quick and convenient.The presence of the second screen pack 41 and chute 4, prevents as far as possible The second screen pack 41 is installed in the only blocking in gutter 1, and convenient construction personnel and cleanup crew cleans the second screen pack 41.
The above is only preferred embodiment of the present utility model, protection domain of the present utility model is not limited merely to above-mentioned Embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should be pointed out that right For those skilled in the art, some improvements and modifications under the premise of without departing from the utility model principle, These improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (8)

1. a kind of discharge structure of pavement of road, it is characterised in that:Including the gutter for digging on the ground(1)With several lids Plate(2), the gutter(1)It is provided with water inlet(11)And delivery port(12), the water inlet(11)Open up on the ground and connect Logical ground and gutter(1), some cover plates(2)Lid is located at gutter(1)Water inlet(11)Top, the delivery port (12)Lead to outside drainage sump;The gutter(1)Water inlet(11)Edge is provided with step(13), the cover plate(2)Lid sets In step(13)Top, the step(13)And cover plate(2)Between be provided with across water inlet(11)The first screen pack(3), institute State the first screen pack(3)Downside and step(13)Fit, upside and cover plate(2)Fit, the cover plate(2)On offer confession Ponding is flowed into gutter(1)Interior through hole(21).
2. the discharge structure of a kind of pavement of road according to claim 1, it is characterised in that:First screen pack(3) Including guard(31), the guard(31)Inside offer the holding tank for collecting rubbish, the guard(31)Relative both sides It is equipped with the first edge for stretching out(311), first edge(311)It is erected at step(13)Transverse plane on, it is described Cover plate(2)Lid is located at the first edge(311)Top simultaneously fits with it.
3. the discharge structure of a kind of pavement of road according to claim 2, it is characterised in that:First edge(311) Dorsad guard(31)Side be provided with upwardly extending second edge(312), when the cover plate(2)With gutter(1)Mutually cover When, second edge(312)Both sides respectively with cover plate(2)And step(13)Upright plane fit.
4. the discharge structure of a kind of pavement of road according to Claims 2 or 3, it is characterised in that:The guard(31)And Holding tank is in inverted trapezoidal mesa-shaped.
5. the discharge structure of a kind of pavement of road according to claim 1, it is characterised in that:The through hole(21)For bar shaped Through hole.
6. the discharge structure of a kind of pavement of road according to claim 1 or 2 or 3, it is characterised in that:The gutter (1)Interior close delivery port(12)Place is provided with the second screen pack(41), second screen pack(41)Near water inlet(11)One Side water exit mouth(12)Incline.
7. the discharge structure of a kind of pavement of road according to claim 6, it is characterised in that:The gutter(1)Two Offer two on the inwall of side to be oppositely arranged and inclined chute(4), the chute(4)Angle of inclination and the second screen pack (41)Angle of inclination and direction it is consistent, second screen pack(41)Opposite sides be respectively embedded in two chutes(4) Interior sliding.
8. according to claim 1 or 2 or 3 or a kind of discharge structure of described pavement of road, it is characterised in that:The gutter (1)Internal overall structure is in chamfered edge mesa-shaped.
CN201621176061.4U 2016-10-26 2016-10-26 Drainage structures on road road surface Expired - Fee Related CN206127820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621176061.4U CN206127820U (en) 2016-10-26 2016-10-26 Drainage structures on road road surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621176061.4U CN206127820U (en) 2016-10-26 2016-10-26 Drainage structures on road road surface

Publications (1)

Publication Number Publication Date
CN206127820U true CN206127820U (en) 2017-04-26

Family

ID=58576895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621176061.4U Expired - Fee Related CN206127820U (en) 2016-10-26 2016-10-26 Drainage structures on road road surface

Country Status (1)

Country Link
CN (1) CN206127820U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119539A (en) * 2017-06-19 2017-09-01 合肥元康环境科技有限公司 A kind of Quick drainage linear drainage ditch
CN107761924A (en) * 2017-10-03 2018-03-06 江苏联禹智能工程有限公司 A kind of discharge structure based on building intellectualization parking lot
CN108678308A (en) * 2018-07-27 2018-10-19 中国电建集团成都勘测设计研究院有限公司 Drain ladder
CN109353457A (en) * 2018-10-22 2019-02-19 江南造船(集团)有限责任公司 Independent liquid cargo tank insulating layer installation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119539A (en) * 2017-06-19 2017-09-01 合肥元康环境科技有限公司 A kind of Quick drainage linear drainage ditch
CN107119539B (en) * 2017-06-19 2019-01-29 合肥元康环境科技有限公司 A kind of Quick drainage linear drainage ditch
CN107761924A (en) * 2017-10-03 2018-03-06 江苏联禹智能工程有限公司 A kind of discharge structure based on building intellectualization parking lot
CN108678308A (en) * 2018-07-27 2018-10-19 中国电建集团成都勘测设计研究院有限公司 Drain ladder
CN109353457A (en) * 2018-10-22 2019-02-19 江南造船(集团)有限责任公司 Independent liquid cargo tank insulating layer installation method

Similar Documents

Publication Publication Date Title
CN206127820U (en) Drainage structures on road road surface
US7258785B2 (en) Apparatus for separating oil and debris from water run-off
CN211395233U (en) Drainage system for mountain road
CN210421340U (en) Prevent blockking up municipal drainage pipe structure
KR100976852B1 (en) Drain box
CN214783049U (en) Energy-saving drainage structure for road bed
CN111705896B (en) Garden rainwater allocation system and method
CN209276937U (en) A kind of drainage arrangement suitable for express highway pavement
CN207062679U (en) A kind of discharge structure of pavement of road
CN215406125U (en) Ground side slope protective structure
CN216551987U (en) Mountain road greening side slope drainage structure
CN206090799U (en) Municipal administration rainwater retaining system
CN213538598U (en) Town road drainage device
CN212742811U (en) Urban rainwater collection and utilization system
CN215482073U (en) Road with rainwater collecting function
CN210315125U (en) A drainage device for town road
CN107434301B (en) Vegetation filters slot
CN210049040U (en) Road surface road structure
CN207469012U (en) A kind of municipal road construction subgrade drainage structure
CN214613665U (en) Highway culvert structure
CN216041637U (en) Sponge city rainwater shunting hinders dirty anti-reflux discharging equipment
CN213203786U (en) Bridge drainage structures
CN218405740U (en) Prevent ponding's town road structure in road surface
CN218622516U (en) Gutter inlet for separating silt
JP2015081432A (en) Sediment separation device for mud reservoir part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Li Baoshan

Inventor after: Fang Lei

Inventor after: Fang Ming

Inventor after: Duan Shufan

Inventor before: Ye Jianxing

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20181026

CF01 Termination of patent right due to non-payment of annual fee