CN206122654U - Thick liquids preparation facilities - Google Patents

Thick liquids preparation facilities Download PDF

Info

Publication number
CN206122654U
CN206122654U CN201620980986.8U CN201620980986U CN206122654U CN 206122654 U CN206122654 U CN 206122654U CN 201620980986 U CN201620980986 U CN 201620980986U CN 206122654 U CN206122654 U CN 206122654U
Authority
CN
China
Prior art keywords
transfer container
metal
molten condition
preparation device
slurry preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620980986.8U
Other languages
Chinese (zh)
Inventor
张露
沈明明
邓凌曲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Quanfeng Auto Precision Technology Ltd By Share Ltd
Original Assignee
Nanjing Quanfeng Auto Precision Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Quanfeng Auto Precision Technology Ltd By Share Ltd filed Critical Nanjing Quanfeng Auto Precision Technology Ltd By Share Ltd
Priority to CN201620980986.8U priority Critical patent/CN206122654U/en
Application granted granted Critical
Publication of CN206122654U publication Critical patent/CN206122654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses a thick liquids preparation facilities, include: the magazine, the chamber is held to the one -level that is formed with the metal of usefulness storage molten condition, thick liquids preparation facilities still includes: transfer container, the second grade that is formed with the metal that is used for the molten condition that the storage was poured by the magazine holds the chamber, die -casting material jar, the chamber is held to the third grade that is formed with the metal that is used for the molten condition that the storage was poured by transfer container, the drift is penetrated to the pressure, sets up to be arranged in the tertiary metal that holds the molten condition in chamber of extrusion in the chamber is held to the third grade, drive actuating cylinder for the drive is pressed and is penetrated drift along first direction removal, connect the hopper for accept the metal of the molten condition poured by transfer container, connect hopper and third grade to hold the chamber and be linked together, the support column for make the top of the rotatable support of transfer container at die -casting material jar, the utility model discloses simple structure has realized disposable half solid -state rheology on the metal with the molten condition, has shortened operating time, has improved production efficiency.

Description

Slurry preparation device
Technical field
The utility model belongs to metal working technical area, more particularly to a kind of slurry preparation device.
Background technology
At present, the production of Semi-solid Processing Technologies for Aluminum Alloys is prepared based on electromagnetic agitation initially with electromagnetic agitation Semi-solid blank, aluminium ingot is cut into according to part requirements by blank, and aluminium ingot is put into second heating device carries out reheating, portion Divide remelting, when band aluminium ingot returns to semi-solid state, put it into and carry out in the pressure chamber of die casting machine Semi-solid Thixo-Casting.
Utility model content
The utility model provides a kind of slurry preparation device, to solve the problems of the prior art.
To achieve these goals, the utility model is employed the following technical solutions:
A kind of slurry preparation device, including:Magazine, is formed with and is accommodated with the one-level of the metal of storage molten condition Chamber;Slurry preparation device also includes:
Transfer container, is formed with two grades of accommodating chambers for storing the metal of the molten condition poured out by magazine;
Die-casting material cylinder, is formed with the three-level accommodating chamber for storing the metal of the molten condition poured out by transfer container;
Injection punch head, being arranged in three-level accommodating chamber is used for the metal for extruding the molten condition in three-level accommodating chamber;
Drive cylinder, for driving injection punch head to move along the first direction;
Receiving hopper, for accepting the metal of the molten condition poured out by transfer container, receiving hopper is connected with three-level accommodating chamber It is logical;
Support column, for making transfer container rotatably be supported on the top of die-casting material cylinder;
Wherein, magazine is located at the top of transfer container;Transfer one end closing other end setting one is open, in Turn the interlayer filled with cooling water between the cavity wall of two grades of accommodating chambers that container is formed and the outer wall of transfer container.
Further, injection punch head is axially parallel with the rotation of transfer container relative to the first direction that die-casting material cylinder slides In horizontal plane.
Further, injection punch head slides relative to die-casting material cylinder first direction and the axially vertical phase of the rotation of transfer container Hand over.
Further, receiving hopper top forms open, and its bottom connects with die-casting material cylinder.
Further, receiving hopper Inner Constitution conical structure.
Further, drive cylinder is arranged on the top of die-casting material cylinder.
Further, support column is arranged between drive cylinder and receiving hopper.
Further, transfer container also includes:
Corrugated plating, in being arranged on two grades of accommodating chambers;
Corrugated plating is formed with wave or zigzag projection.
Further, corrugated plating is arranged in two grades of accommodating chambers near the side of die-casting material cylinder.
Further, top of the pivot center of transfer container higher than receiving hopper.
The utility model simple structure, realizes the metal semi-solid rheology of molten condition disposably, shortens work Time, improve production efficiency.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is side view of the present utility model;
Wherein:1- magazines, 2- one-level accommodating chambers, 3- transfer containers, bis- grades of accommodating chambers of 4-, 5- die-casting material cylinders, 6- tri- Level accommodating chamber, 7- injection punch heads, 8- drive cylinders, 9- receiving hoppers, 10- support columns, 11- corrugated platings, A- first directions.
Specific embodiment
The utility model is further described with reference to embodiment.
As illustrated in fig. 1 and 2, a kind of slurry preparation device, including:Magazine 1, is formed with the gold with storage molten condition The one-level accommodating chamber 2 of category;Slurry preparation device also includes:Transfer container 3, is formed with what is poured out by magazine 1 for storage Two grades of accommodating chambers 4 of the metal of molten condition;Die-casting material cylinder 5, is formed with for storing the molten condition poured out by transfer container 3 Metal three-level accommodating chamber 6;Injection punch head 7, is arranged in three-level accommodating chamber 6 melting for being used to extrude in three-level accommodating chamber 6 The metal of state;Drive cylinder 8, for driving the A movements in the first direction of injection punch head 8;Receiving hopper 9, for accepting by transfer The metal of the molten condition that container 3 is poured out, receiving hopper 9 is connected with three-level accommodating chamber 6;Support column 10, for making transfer container 3 Rotatably it is supported on the top of die-casting material cylinder 5;Wherein, magazine 1 is located at the top of transfer container 3;The one end of transfer container 3 Closing other end setting one is open, between the cavity wall of two grades of accommodating chambers that transfer container 3 is formed and the outer wall of transfer container Interlayer filled with cooling water.
The rotation of first direction A and transfer container 3 that injection punch head 7 slides relative to die-casting material cylinder 5 is axially each parallel to water Plane, injection punch head 7 axially intersects vertically relative to the first direction A that die-casting material cylinder 5 slides with the rotation of transfer container 3, splicing The top of bucket 9 forms open, and its bottom connects with die-casting material cylinder 3, and the Inner Constitution conical structure of receiving hopper 9, drive cylinder 8 is arranged In the top of die-casting material cylinder 5, support column 10 is arranged between drive cylinder 8 and receiving hopper 9.
Transfer container 3 also includes:Corrugated plating 11, in being arranged on two grades of accommodating chambers 4;Corrugated plating 12 is formed with wave or sawtooth The projection of shape, corrugated plating 11 is arranged in two grades of accommodating chambers 4 near the side of die-casting material cylinder 5, and the pivot center of transfer container 3 is high In the top of receiving hopper 9.
The metal Jing magazines 1 of molten condition pour transfer container 3 in the utility model, then enter 9 entrance by receiving hopper During die-casting material cylinder 5, while the metal Jing cooling water temperatures of molten condition, go out under the obstruction of corrugated plating 11 and interference Existing dendrite fragmentation, and repeatedly sheared and crushed, finally complete die casting into pressure chamber by the injection of injection punch head 7.
Principle of the present utility model:The metal of molten condition is poured in transfer container 3 in magazine 1, and transfer container 3 exists Action of Gravity Field, sinks to blind end, and on the one hand the temperature drop in the presence of cooling water enters liquidus curve to the metal of molten condition, On the other hand obstruction and the interference of steel ripple plate 11 are subject to, dendrite fragmentation is caused;When the metal of the molten condition in transfer container 3 reaches To certain capacity, transfer container 3 starts to be inclined to opening end, and again by steel ripple plate 11, dendrite is obtained the metal of molten condition Shear again, crush, the metal of molten condition gushes connecing quickly through Inner Constitution conical structure from the introversion of transfer container 3 Hopper 9 enters die-casting material cylinder 5, flows into through the Scroll-tupe of receiving hopper 9, and the intrametallic dendrite of molten condition is stirred again Mix, crush;When the metal of molten condition enters die-casting material cylinder 5, the close solidus temperature of temperature, eventually passing injection punch head 7 will The metal injection of molten condition completes press casting procedure into pressure chamber, realizes semi-solid rheological molding.The utility model simple structure Compact, it is easy to fabricate, operation and maintenance is convenient.Semi-solid rheological molding is realized by the utility model, is shortened existing Complicated technological process, improve production efficiency in technology.
The above is only preferred embodiment of the present utility model, it should be pointed out that:For the ordinary skill people of the art For member, on the premise of without departing from the utility model principle, some improvements and modifications can also be made, these improvements and modifications Also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of slurry preparation device, including:Magazine, is formed with the one-level accommodating chamber of the metal with storage molten condition; It is characterized in that:The slurry preparation device also includes:
Transfer container, is formed with two grades of accommodating chambers for storing the metal of the molten condition poured out by the magazine;
Die-casting material cylinder, is formed with the three-level accommodating chamber for storing the metal of the molten condition poured out by the transfer container;
Injection punch head, being arranged in the three-level accommodating chamber is used for the metal for extruding the molten condition in the three-level accommodating chamber;
Drive cylinder, for driving the injection punch head to move along the first direction;
Receiving hopper, for accepting the metal of the molten condition poured out by the transfer container, the receiving hopper holds with the three-level Receiving chamber is connected;
Support column, for making the transfer container rotatably be supported on the top of the die-casting material cylinder;
Wherein, the magazine is located at the top of the transfer container;The transfer one end closing other end arranges one It is individual open, filled with cooling between the outer wall of the cavity wall of two grades of accommodating chambers that the transfer container is formed and the transfer container The interlayer of water.
2. slurry preparation device according to claim 1, it is characterised in that:The relatively described die-casting material cylinder of the injection punch head The first direction of slip is axial with the rotation of the transfer container each parallel to horizontal plane.
3. slurry preparation device according to claim 2, it is characterised in that:The relatively described die-casting material cylinder of the injection punch head The first direction of slip axially intersects vertically with the rotation of the transfer container.
4. slurry preparation device according to claim 1, it is characterised in that:Open, its bottom is formed on the receiving hopper top Portion connects with the die-casting material cylinder.
5. slurry preparation device according to claim 4, it is characterised in that:The receiving hopper Inner Constitution cone knot Structure.
6. slurry preparation device according to claim 1, it is characterised in that:The drive cylinder is arranged on the die-casting material The top of cylinder.
7. slurry preparation device according to claim 1, it is characterised in that:The support column is arranged on the drive cylinder And the receiving hopper between.
8. the slurry preparation device according to claim 1 to 7 any one, it is characterised in that:The transfer container is also wrapped Include:
Corrugated plating, in being arranged on two grades of accommodating chambers;
The corrugated plating is formed with wave or zigzag projection.
9. slurry preparation device according to claim 8, it is characterised in that:The corrugated plating is arranged on two grades of receivings Near the side of the die-casting material cylinder in chamber.
10. the slurry preparation device according to claim 1 to 7 any one, it is characterised in that:The transfer container turn Top of the shaft line higher than the receiving hopper.
CN201620980986.8U 2016-08-30 2016-08-30 Thick liquids preparation facilities Active CN206122654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620980986.8U CN206122654U (en) 2016-08-30 2016-08-30 Thick liquids preparation facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620980986.8U CN206122654U (en) 2016-08-30 2016-08-30 Thick liquids preparation facilities

Publications (1)

Publication Number Publication Date
CN206122654U true CN206122654U (en) 2017-04-26

Family

ID=58565412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620980986.8U Active CN206122654U (en) 2016-08-30 2016-08-30 Thick liquids preparation facilities

Country Status (1)

Country Link
CN (1) CN206122654U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107790668A (en) * 2017-09-01 2018-03-13 东风精密铸造安徽有限公司 A kind of semi-solid-state metal thixo-injection molding equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107790668A (en) * 2017-09-01 2018-03-13 东风精密铸造安徽有限公司 A kind of semi-solid-state metal thixo-injection molding equipment

Similar Documents

Publication Publication Date Title
CN101618450B (en) Method for indirect extrusion casting by utilizing filling of electromagnetic force and device thereof
CN201102062Y (en) Liquid condition processing device of magnesium, aluminum alloy
CN101670425B (en) Method and device thereof for preparing metal semisolid size
CN101342584A (en) Liquid processing technique for magnesium, aluminum and special equipment thereof
CN206122654U (en) Thick liquids preparation facilities
CN108000927A (en) A kind of aluminium skimmings briquetting retracting device
CN1120066C (en) Drum-type apparatus for preparing semi-solid metallic slurry and shaping it
CN103128255A (en) Die and method used for preparing magnesium alloy semisolid blank
CN112916819B (en) Five metals die-casting forming device with eliminate cold shut function
CN107685142A (en) A kind of heat balance method of semi-solid processing automatic assembly line
CN107457386A (en) It is a kind of persistently to cool down serpentine flow path semi-solid rheological die casting equipment
CN209288228U (en) A kind of device of local ultrasound semi-solid state assistant Dual squeeze casting casting
CN106623830A (en) Single-roll production device and method for copper alloy bar
CN207343755U (en) It is a kind of persistently to cool down serpentine flow path semi-solid rheological die casting equipment
CN202655594U (en) In-cavity semi-solid forming device
CN207840076U (en) A kind of structure of cast die with die joint baffle
CN2657923Y (en) Metal chip recovery extruder
CN202779647U (en) Semisolid nonferrous metal continuous casting device
CN215275841U (en) Water-cooled crystallization kettle device for snow-melting agent production
CN1153689A (en) Continuous aluminium-titanium-boron wire casting and extruding process
CN209830233U (en) Extrusion casting part of high-strength and high-toughness aluminum alloy
CN102672142B (en) Semi-solid processing accurate forming system for liquid metal in cavity
CN112024859A (en) Pouring device for automobile aluminum alloy hub casting mold
CN202116632U (en) Magnesium alloy vacuum melting device
CN206677132U (en) A kind of continuous casting device for preparing high-quality aluminum alloy ingot casting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Slurry preparation device

Effective date of registration: 20220629

Granted publication date: 20170426

Pledgee: Bank of Hangzhou Limited by Share Ltd. Nanjing branch

Pledgor: NANJING CHERVON AUTOMOBILE PRECISION TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009367

PE01 Entry into force of the registration of the contract for pledge of patent right