CN206114469U - That simulates different filler cracks moves water slip casting test device - Google Patents

That simulates different filler cracks moves water slip casting test device Download PDF

Info

Publication number
CN206114469U
CN206114469U CN201621143225.3U CN201621143225U CN206114469U CN 206114469 U CN206114469 U CN 206114469U CN 201621143225 U CN201621143225 U CN 201621143225U CN 206114469 U CN206114469 U CN 206114469U
Authority
CN
China
Prior art keywords
water
slip casting
pressure
model casing
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621143225.3U
Other languages
Chinese (zh)
Inventor
石银峰
吴智勇
周世生
马瑞
叶春琳
张春发
王贵和
黄峰
翟相飞
高维兵
蔡玮
王志国
梁红忠
陈雅南
王兴宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Administration Road And Bridge Ltd Co
Beijing Road And Bridge Construction Group Co Ltd
Beijing Municipal Road and Bridge Co Ltd
Original Assignee
Beijing Municipal Administration Road And Bridge Ltd Co
Beijing Road And Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Administration Road And Bridge Ltd Co, Beijing Road And Bridge Construction Group Co Ltd filed Critical Beijing Municipal Administration Road And Bridge Ltd Co
Priority to CN201621143225.3U priority Critical patent/CN206114469U/en
Application granted granted Critical
Publication of CN206114469U publication Critical patent/CN206114469U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a that simulates different filler cracks moves water slip casting test device, belongs to the geotechnical engineering field, and the device is moving diffusion law research of bentonite thick liquid and the experimental study of grouting for water blocking effect in the sand filled opening under the water condition. Carrying out slip casting under the good condition of parameter setting such as head pressure, water injection flow, grouting pressure, having laid purpose -made rubber pad at the test model incasement, corresponding aperture position has set up slip casting pipe and pressure measuring equipment, and water injection device, slip casting device and liquid waste collection device have been connected to its outer end, carries out the thick liquid configuration, carry out the water injection to the device after, carry out slip casting again. This device has carried out one -dimensional slip casting analogue test to pressure distribution condition when this has studied under the seepage flow condition in the filled opening slip casting and along with the change rule of thick liquid diffusion has improved the efficiency of slip casting.

Description

A kind of dynamic water grouting test device in simulation different fillings crack
Technical field
The utility model is related to a kind of dynamic water grouting test device in simulation different fillings crack, belongs to Geotechnical Engineering skill Art field.
Background technology
In current Geotechnical Engineering grouting method, slurries are injected after rock-soil layer by certain pressure, the seepage flow of slurries Hydrodynamic condition and rock soil medium crack, the distribution situation of hole are passively depended on to a great extent, usually cannot be accurate Reach and administer position, so that it cannot assess the effect of sealing after slip casting, in a large number waste and man-hour are delayed to cause material, and slip casting is imitated It is really poor.
Utility model content
At present, the research for ejection for water plugging test in stratum under river channels is little, and the purpose of this utility model is to carry For the grouting method under a kind of river channels.And the stagnant water effect after test is to slip casting is detected.
For achieving the above object, the technical solution adopted in the utility model is a kind of dynamic water in simulation different fillings crack Grouting test device, the device includes water head tank (1), water pressure readout instrument (2), flowmeter (3), inlet valve (4), very heavy Top (5), injected hole (6), glass cover-plate (7), waste collecting device (8), pressure gauge (9), slurry storage tank (10), pressure transmitter are read Number instrument (11), DV video cameras (12), model casing.Model casing is the main body of this experimental rig, and model casing is horizontally disposed, model casing Two ends are supported by jack (5), and bottom is provided with several holes being evenly arranged, and glass cover-plate (7) is stamped at top;One end of model casing Water head tank (1) is connected with, the other end is connected with the connecting line of waste collecting device (8), water head tank (1) and model casing Water pressure readout instrument (2), flowmeter (3), inlet valve (4) are provided with, water pressure readout instrument (2) is arranged on entering for model casing side At the mouth of a river, inlet valve (4) is arranged in the middle of connecting line, and flowmeter (3) is arranged on the side of inlet valve (4);It is several equal In the hole of even arrangement, a hole is elected injected hole (6) as and is connected with slurry storage tank (10), and the injected hole (6) is with slurry storage tank (10) even The pipeline for connecing is provided with pressure gauge (9);Remaining hole is pressure tap, and pressure tap is connected respectively with pressure transmitter readout instrument (11); DV video cameras (12) set up the surface of injected hole (6).
Rational height of the rational height of water head tank (1) more than glass cover-plate (7).
The rubber blanket of simulation fracture width change is provided with model casing.
This experimental rig each interface makees encapsulation process with unsintered tape, preservative film and bentonite mud.
There is provided certain head height using water pipe and water head tank (1) in test, and connect water pressure readout instrument (2) with When monitor the water pressure change of injection model case, hydraulic pressure system takes with simulation box system and is tightly connected, and has valve in water inlet Door switch (4) connects.In order to reduce experimental error, the discharge of injection model case is monitored with flowmeter (3).
Filling system adopts grouting pump, and pressure is controlled using pressure gauge (9), by the reading of observed pressure table (9) By the slurries slurry storage tank (10) for having configured from being injected in model casing.
In test the osmotic pressure during slip casting is supervised using intelligence static state survey monitor data handling system (11) Survey, osmometer is arranged in slip casting main body before test, the osmotic pressure to liquid generation under river channels and during slip casting Change carries out real-time monitored.A hole is selected as injected hole, other holes just can be used to pressure tap.
This device is in addition to the factor such as bentonite ratio is discussed in water injection pressure, grouting pressure and slurries, also The factors such as stratigraphic dip and fracture width are added, result of the test is had more with reference to property.Place very heavy in the side position of model casing two Top (5) carrys out the certain angle of jack-up and comes simulated formation inclination angle;Special rubber blanket is put in model casing and carrys out simulation fracture width Change.Finally, for not test for contamination environment, the water flowed out from delivery port is collected by waste collecting device (8);In slip casting The surface in hole sets up the situation of DV video cameras (12) observation slurries diffusion in time.
Compared with prior art, the utility model has the advantages that:
1st, the utility model device volume is little, lightweight, easy to install.Water injection pressure is easy to control with grouting pressure System, and the slurries spread condition that can observe in time after slip casting of the setting of device for pressure measurement and DV video cameras and sealing Effect, improves the degree of accuracy and the effect of slip casting, material-saving.
2nd, this experimental rig is also added into the factors such as stratigraphic dip and fracture width on the basis of river channels slip casting, makes Result of the test is had more with reference to property.
3rd, the utility model device uses the material can be from market purchasing finished product, and device overall structure is simply without special Structural requirement.
Description of the drawings
Fig. 1 is experimental rig figure of the present utility model.
Fig. 2 is model casing system dimension figure of the present utility model.
Fig. 3 is test model case Angulation changes schematic diagram of the present utility model.
Fig. 4 is that test model case fracture width of the present utility model changes schematic diagram.
In figure:1st, water head tank, 2, water pressure readout instrument, 3, flowmeter, 4, inlet valve, 5, jack, 6, injected hole, 7th, glass cover-plate, 8, waste collecting device, 9, pressure gauge, 10, slurry storage tank, 11, pressure transmitter readout instrument, 12, DV video cameras.
Specific embodiment
A kind of dynamic water grouting test device in simulation different fillings crack, the device includes water head tank (1), water pressure Readout instrument (2), flowmeter (3), inlet valve (4), jack (5), injected hole (6), glass cover-plate (7), waste collecting device (8), pressure gauge (9), slurry storage tank (10), pressure transmitter readout instrument (11), DV video cameras (12), model casing;
Model casing is the main body of this experimental rig, and the sealing for considering casing is needed during experimental design, so test mould Molding box surrounding is cast using steel plate and prevents gas leakage, its size:Long 102cm, width 50cm, thickness 2cm, each 4cm in edge on both sides, mould Hole (6) distribution of molding box and size indication (in units of cm) as shown in Fig. 2 the distance in each hole is at intervals of 10cm, aperture A diameter of 8mm, is provided with the rubber blanket of simulation fracture width change, as shown in Figure 4 in model casing.Additionally, model casing is also equipped with glass Glass cover plate (7), scale is marked with cover plate along aperture distribution arrangement, in order to study Changing Pattern when slurries spread.In model Respectively there is a jack (5) on the both sides of case, for changing the angle of model casing.
There is provided certain head height using water pipe and water head tank (1) in test, and connect water pressure readout instrument (2) with When monitor the water pressure change of injection model case, hydraulic pressure system takes with simulation box system and is tightly connected, and has valve in water inlet Door switch (4) connects.In order to reduce experimental error, the discharge of injection model case is monitored with flowmeter (3).
Filling system adopts grouting pump, pressure to be controlled using pressure gauge (9), will match somebody with somebody by the reading of observed pressure table The slurries slurry storage tank (10) put is from being injected in model casing.
Pressure transmitter readout instrument (11) in test is using intelligence static state survey monitor data handling system to slip casting process In osmotic pressure be monitored, test before osmometer is arranged in slip casting main body, under river channels and during slip casting The osmotic pressure change that liquid is produced carries out real-time monitored.A hole is selected as injected hole, other holes just can be used to measure Pore pressure.
Sealing between model casing and glass plate lid is relatively complicated, is also the difficult point of test.Jing is tested, bentonite mud Good encapsulant, and bentonite mud is thick dilute adjustable, it is easy to clear up, it is simple, effect substantially, especially when with swollen After the native mud of profit has been sealed, screw is installed, then surrounding is rolled in the preservative film bar for having smeared bentonite mud in surrounding.Additionally, being Not test for contamination environment, the water flowed out from delivery port is by waste collecting device (8) collection;Set up in the surface of injected hole The situation of DV video cameras (12) observation slurries diffusion in time.
Certain head height is controlled by water head tank (1), using required during stable water-column simulated test Hydraulic condition, the slurries for configuring different proportion are put in slurry storage tank (10), are monitored by the control of pressure gauge (9), use grouting pump To change grouting pressure, the slip casting in circumstance of flowing water under different affecting factors is realized.
This experimental rig can also change stratigraphic dip to study river channels under slurries Diffusion Law and sealing effect Really, concrete operations are to place jack (5) in the side position of model casing two to carry out the certain angle of jack-up.
This device can make result of the test become relatively reliable to be studied from this influence factor of Fracture Width, Allow grouting test with more reference property, concrete operations are:A block length and model casing are put in the test model case of 2cm thickness It is identical, the rubber blanket of the right-angle triangle of a length of 1.5cm in base, and on rubber blanket, position corresponding with model casing aperture Put and stamp aperture, it is ensured that slip casting and the measurement of pore pressure force, can thus realize the slip casting diffusion under the conditions of different fracture widths The research of rule, the setting of 1.5cm ensures that water can successfully be flowed in and out in model casing, model casing schematic diagram such as Fig. 4 Shown, (a) in Fig. 4 represents that the width along the direction crack of liquid flowing is increasing, and (b) in Fig. 4 represents the width in crack Degree is less and less.
In test the pore water pressure during slip casting is monitored by laying osmometer, is read by pressure transmitter Number instrument (11) reads data, and the situation of change to pore water pressure before and after slip casting is analyzed, and obtains pore water pressure and note Contact between slurry stagnant water effect.Osmometer is laid in respectively Grouting Pipe both sides in test, and adjacent spacing is 10cm, arrangement As aperture arrangement mode, concrete arrangement is shown in Fig. 2.
The implementing procedure of this device is as follows:
S1 selects injected hole (6) in test model case, then will set osmometer for measured hole at remaining aperture Pressure.
S2 injected holes are taped up with 50 mesh non-woven fabrics and width, prevent filler particle from entering injected hole and Grouting Pipe Road, and then block slip casting passage.
S3 is put into as the special good rubber blanket of this test in test model case, then in the remaining space of 2 cm thicks It is interior to be fitted into test filler (all filling in test model case), it is first in model casing to load some fillers, Ran Houyong more One rectangular plate-like thing more little wider than model casing erases filler unnecessary in model casing, it is ensured that model casing inner stuffing Enough fillings, and be unlikely to local and rough and uneven in surface phenomenon occur (test every time needs the weight for weighing filler in model casing).
S4 connects the water inlet and delivery port at model casing two ends, needs to carry out seal operation where sealing, in mould The surrounding of molding box smears last layer bentonite mud, and then glass cover-plate (7) is covered on model casing, and bolt screw is all installed After good.Test first, with injected hole as the origin of coordinates, of ruler and marker pen, the scale designation on work on glass plate lid, make Complete mark, then ready-made scale designation is sealed with wide adhesive tape, prevent from meeting water disappearance during follow-up test.
Tank (1) is arranged to preset height and is filled thereto water by S5, opens inlet valve (4), makes current through mould Flow out from delivery port after molding box, its discharge and hydraulic pressure are determined after current are basicly stable.
S6 connects osmometer with intelligence static state survey monitor data handling system (11), prepares to start data acquisition;Will It is inner that slurries by preparing are added to slurry storage tank (10), connects each device, it is ensured that each pipeline and equipment it is unobstructed and good, Prepare slip casting.
S7 opens inlet valve (4), carries out data acquisition, starts slip casting, and by controlling grouting pressure table (9) voltage stabilizing is kept Slip casting, DV video recorders (12) is mounted on tripod, is placed on fixed position directly over model casing, observes grout spreading range, and And inlet water stream situation of change is observed at any time, treat that slurries diffusion length no longer increases or slurries have diffused into model casing Border, off-test.
S8 off-tests, close each equipment, clean each instrument, and shift design factor, repetition above step is carried out down Battery of tests.
Affecting the factor of slurries diffusion length, grouting amount size and slurries water plugging effect has a lot, such as grouting pressure, Slurries ratio of mud etc., when grouting simulation test is carried out, can also change several factors, such as water pressure and uninterrupted, filling Species, selection of slip casting hole site of thing etc..The advantage of this experimental rig is can also to change inclination angle, the simulation crack of model casing Width.This experimental rig is installed and easy to operate, for test objective, it is considered to certain experimental error factor, as far as possible mould The state of actual formation is drawn up, using the reference as actual mortar depositing construction.
With reference to specific embodiment, the utility model is described in further detail.
Embodiment
Experiment is simulated to slip casting under circumstance of flowing water using this experimental rig, test model case as shown above, is selected Injected hole 6 is selected as injected hole, other apertures are used for measuring pore pressure force, and there is respectively the sky of two 2cm length the both sides of model casing Groove, for arranging water inlet and delivery port and hydraulic gage.This test adopts fine grain quartz sand research experiment, according to Soil test specification carries out indoor basic soil test and obtains testing the physical property index and sand sample particle diameter distribution situation of sand sample, See Tables 1 and 2.
The quartz sand density of table 1 and void ratio
The 300g samples of table 2 quartz sand test sand sample particle diameter distribution table
The adopted grouting serous fluid of test is to be added water to mix together with commercially available sodium bentonite.3 are used in test Plant the bentonite slurry of different ratio.As shown in table 3.
The bentonite slurry of the different ratio of table 3
0.5m, 1.0m and 1.5m are respectively set to according to the difference of kinetic head height;According to the difference of grouting pressure, note Slurry pressure is respectively 10kPa, 20kPa and 40kPa;According to the bentonite slurry of different ratio, water and bentonitic quality score Wei 5:1、4:1 and 3:1, nine groups of tests are carried out altogether.This test three influence factors mainly including slurries the ratio of mud, Head height and grouting pressure.Tested according to above-mentioned test procedure, variable is changed successively and repeats to test, to test As a result it is analyzed.
Test results and analysis
The analysis method of every group of result of the test, uses picture in combination with slurries diffusion length image to divide Analysis.On picture, select among slip casting process that slurries diffusion length is big from starting to occur no longer becoming or slurries are diffused into per group Picture in the time period on model casing border come illustrate slurries spread process;On slurries diffusion length image, one along length Direction, according to water (flow) direction the diffusion length in direction against the current and the downstream diffusion length in direction are divided into, and another is in the width direction (regulation longer coordinate line be length direction) is illustrating that slurries diffusion length is changed over.
The impact of flowing pressure
River channels are respectively the stable head of 0.5m, 1.0m and 1.5m using head height H, and grouting pressure P is 40kPa, water and bentonite mass ratio are 4:1, result of the test is shown in Table 4.
Slurries diffusion effective length when the head height of table 4 is different
Can be seen that in the case where other factors are certain by data in table, with the increase of head height, slurries are inverse In increase, impact of the head pressure to section against the current causes section slurry against the current to the diffusion length of water section and downstream section less than section downstream The increment value of liquid diffusion length is less, and downstream the increment value of section slurries diffusion length is larger, and in the certain situation of head height Under, downstream the diffusion length of section slurries is bigger than section slurries diffusion length against the current.
The impact of grouting pressure
Head height H of flowing pressure is 1.5m, and grouting pressure P is 10kPa, 20KPa and 40kPa, water and swelling soil property Amount is than being 4:1, result of the test is shown in Table 5.
Slurries diffusion effective length when the grouting pressure of table 5 is different
Can be seen that in the case where other factors are certain by data in table, with the increase of grouting pressure, slurries are inverse The diffusion length of water section and downstream section is in increase, against the current section and downstream more apparent, this explanation of section slurries diffusion length increase Grouting pressure affects larger to slurries diffusion length;And in the case of certain grouting pressure, the diffusion length of section slurries downstream It is big than section slurries diffusion length against the current.
The impact of water and bentonite mass ratio
Head height H of flowing pressure is 1.5m, and it is 40KPa that grouting pressure is P, and water and bentonite mass ratio are 5:1、4: 1 and 3:1, result of the test is shown in Table 6.
Slurries diffusion effective length when the water of table 6 is different with bentonite mass ratio
Can be seen that in the case where other factors are certain by data in table, with the increase of bentonite ratio, slurries exist Against the current section and downstream the diffusion length of section reduce, against the current section and downstream section slurries diffusion length reduction it is more apparent, this says Bright bentonite dosage affects larger to slurries diffusion length;And in the case of certain bentonite dosage, the expansion of section slurries downstream Scattered distance is big than section slurries diffusion length against the current.Knowable to result of the test, 5:1 concentration is most beneficial for slurries diffusion velocity and slurry The last diffusion length of liquid, but consider slip casting plugging effect, the depth of test is also needed on concrete engineering with the slurries of what concentration Enter research.
The impact of stratigraphic dip
This experimental rig can also change inclination angle to study river channels under slurries Diffusion Law and stagnant water effect, tool Gymnastics places jack as in the side position of model casing two, and variable incidence is chosen to be 0 °, 15 °, 30 °, is illustrated in fig. 3 shown below.This Head height H of test flowing pressure is 1.5m, and grouting pressure P is 40kPa, and water and bentonite mass ratio are 4:1, from test knot Fruit understands that angle jack-up is bigger, and downstream section slurries diffusion length is bigger, and against the current section slurries diffusion length is less.
The preferred embodiment cited by the utility model is these are only, and is not used to limit protection model of the present utility model Enclose, equivalent modification or change that the those of ordinary skill in art is made with the utility model are same to belong to In scope of patent protection of the present utility model.

Claims (4)

1. a kind of dynamic water grouting test device in simulation different fillings crack, it is characterised in that:The device includes water head tank (1), water pressure readout instrument (2), flowmeter (3), inlet valve (4), jack (5), injected hole (6), glass cover-plate (7), useless Liquor collecting device (8), pressure gauge (9), slurry storage tank (10), pressure transmitter readout instrument (11), DV video cameras (12), model casing; Model casing is the main body of this experimental rig, and model casing is horizontally disposed, and the two ends of model casing are supported by jack (5), and bottom is provided with It is stamped glass cover-plate (7) in several holes being evenly arranged, top;One end of model casing is connected with water head tank (1), other end connection There is waste collecting device (8), in water head tank (1) and the connecting line of model casing water pressure readout instrument (2), flowmeter are provided with (3), inlet valve (4), water pressure readout instrument (2) is arranged on the water inlet of model casing side, inlet valve (4) company of being arranged on In the middle of adapter road, flowmeter (3) is arranged on the side of inlet valve (4);In several holes being evenly arranged, slip casting is elected in a hole as Hole (6) is simultaneously connected with slurry storage tank (10), and the pipeline that the injected hole (6) is connected with slurry storage tank (10) is provided with pressure gauge (9);Remaining Hole is pressure tap, and pressure tap is connected respectively with pressure transmitter readout instrument (11);DV video cameras (12) are setting up injected hole (6) just Top.
2. the dynamic water grouting test device in a kind of simulation different fillings crack according to claim 1, it is characterised in that: Rational height of the rational height of water head tank (1) more than glass cover-plate (7).
3. the dynamic water grouting test device in a kind of simulation different fillings crack according to claim 1, it is characterised in that: The rubber blanket of simulation fracture width change is provided with model casing.
4. the dynamic water grouting test device in a kind of simulation different fillings crack according to claim 1, it is characterised in that: This experimental rig each interface makees encapsulation process with unsintered tape, preservative film and bentonite mud.
CN201621143225.3U 2016-10-20 2016-10-20 That simulates different filler cracks moves water slip casting test device Active CN206114469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621143225.3U CN206114469U (en) 2016-10-20 2016-10-20 That simulates different filler cracks moves water slip casting test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621143225.3U CN206114469U (en) 2016-10-20 2016-10-20 That simulates different filler cracks moves water slip casting test device

Publications (1)

Publication Number Publication Date
CN206114469U true CN206114469U (en) 2017-04-19

Family

ID=58527249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621143225.3U Active CN206114469U (en) 2016-10-20 2016-10-20 That simulates different filler cracks moves water slip casting test device

Country Status (1)

Country Link
CN (1) CN206114469U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106338457A (en) * 2016-10-20 2017-01-18 北京市公路桥梁建设集团锐诚工程试验检测有限公司 Hydrodynamic grouting test device simulating different filler gaps
CN107121371A (en) * 2017-04-20 2017-09-01 山东大学 A kind of simulation laboratory test system and method suitable for layer of sand osmotic grouting
CN108562515A (en) * 2018-03-27 2018-09-21 东北大学 A kind of Grouting Seepage in Rockmass slurries diffusion multifactorial experiment system
CN109142158A (en) * 2018-09-14 2019-01-04 太原理工大学 A kind of experimental provision and method simulated slurries diffusion admittance and detect grouting parameter
CN110927018A (en) * 2019-12-12 2020-03-27 山东科技大学 Simulation model for water-borne microparticle migration process in coal fracture structure and use method
CN111829928A (en) * 2020-07-14 2020-10-27 中勘资源勘探科技股份有限公司 Method for detecting diffusion range of grouting
CN112285332A (en) * 2020-10-20 2021-01-29 上海公路桥梁(集团)有限公司 Simulation test method for antifriction grouting of large-section rectangular jacking pipe
CN112611683A (en) * 2020-12-28 2021-04-06 合肥工业大学 Monitoring devices that solute that adjustable crack gap is wide moved
CN114460281A (en) * 2022-01-09 2022-05-10 三峡大学 Experimental device and method for repairing concrete cracks of film bag by adopting vacuum grouting

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106338457A (en) * 2016-10-20 2017-01-18 北京市公路桥梁建设集团锐诚工程试验检测有限公司 Hydrodynamic grouting test device simulating different filler gaps
CN107121371A (en) * 2017-04-20 2017-09-01 山东大学 A kind of simulation laboratory test system and method suitable for layer of sand osmotic grouting
CN108562515A (en) * 2018-03-27 2018-09-21 东北大学 A kind of Grouting Seepage in Rockmass slurries diffusion multifactorial experiment system
CN108562515B (en) * 2018-03-27 2023-11-28 东北大学 Multi-factor test system for crack rock mass grouting slurry diffusion
CN109142158A (en) * 2018-09-14 2019-01-04 太原理工大学 A kind of experimental provision and method simulated slurries diffusion admittance and detect grouting parameter
CN109142158B (en) * 2018-09-14 2020-08-28 太原理工大学 Experimental device and method for simulating slurry diffusion channel and detecting grouting parameters
CN110927018B (en) * 2019-12-12 2022-08-23 山东科技大学 Simulation model for water-borne microparticle migration process in coal fracture structure and use method
CN110927018A (en) * 2019-12-12 2020-03-27 山东科技大学 Simulation model for water-borne microparticle migration process in coal fracture structure and use method
CN111829928A (en) * 2020-07-14 2020-10-27 中勘资源勘探科技股份有限公司 Method for detecting diffusion range of grouting
CN112285332B (en) * 2020-10-20 2023-04-21 上海公路桥梁(集团)有限公司 Simulation test method for antifriction grouting of large-section rectangular jacking pipe
CN112285332A (en) * 2020-10-20 2021-01-29 上海公路桥梁(集团)有限公司 Simulation test method for antifriction grouting of large-section rectangular jacking pipe
CN112611683A (en) * 2020-12-28 2021-04-06 合肥工业大学 Monitoring devices that solute that adjustable crack gap is wide moved
CN112611683B (en) * 2020-12-28 2023-10-24 合肥工业大学 Device for monitoring solute transport with adjustable gap width
CN114460281A (en) * 2022-01-09 2022-05-10 三峡大学 Experimental device and method for repairing concrete cracks of film bag by adopting vacuum grouting
CN114460281B (en) * 2022-01-09 2023-09-29 温州市文景市政园林有限公司 Experimental device and method for repairing concrete cracks of membrane bags by adopting vacuum grouting

Similar Documents

Publication Publication Date Title
CN206114469U (en) That simulates different filler cracks moves water slip casting test device
CN106338457A (en) Hydrodynamic grouting test device simulating different filler gaps
CN103411751B (en) Water grouting test device is moved in a kind of visual intersection crack
CN203981507U (en) A kind of novel planar strain consolidation testing device
CN102636630A (en) Large unsaturated seepage physical simulator for soil in aerated zone
CN105092798B (en) Recharge system and test method in one kind simulation varying head permeable ground diving stratum room
Bouwer A double tube method for measuring hydraulic conductivity of soil in situ above a water table
CN110470598B (en) Geomembrane leakage simulation tester considering dynamic water pressure and test method thereof
CN104569341A (en) Vacuum preloading and electroosmosis combined testing device and vacuum preloading and electroosmosis combined testing method
US5331847A (en) Soil erodibility testing
CN105651677A (en) Geotechnical parameter and property tester capable of simultaneously testing specific yield and osmotic coefficient
CN111175477B (en) Saturated fine sand layer induced grouting experimental model and experimental method
CN103389260B (en) Pile foundation hinders the simulation laboratory test method of seepage action of ground water
Trautwein IN-SITU HYDRAULIC CONDUCTIVITY TESTS FOR COMPACTED SOIL LINERS AND CAPS REFERENCE: Trautwein, SJ, and Boutwell, GP," In Situ Hydraulic Conductivity Tests for Compacted Soil Liners and Caps," Hydraulic Conductivity and Waste Contaminant Transport in Soil. ASTM STP 1142
CN108118725A (en) The experimental rig and method of base pit dewatering in equivalent material simulating artesian aquifer
CN105136072B (en) A kind of Tunnel Lining Cracks depth measurement method and measurement apparatus
CN113049472A (en) Method for testing vertical permeability of earth and rockfill dam sand gravel damming material
CN103674777A (en) Test method for measuring settlement amount of fully eluviated soil
US5191787A (en) Soil erodibility testing
CN106768153B (en) A kind of slurry consolidation cubical contraction test device and method of testing
CN205404360U (en) But ground parameter nature apparatus of simultaneous determination feedwater degree and osmotic coefficient
CN110907332A (en) Testing device and method for horizontal permeability coefficient of shallow soil
CN211477994U (en) Geomembrane leakage simulation test instrument considering dynamic water pressure
CN115015084A (en) Permeation test device and method
CN109883887B (en) Highway subgrade horizontal grouting injectability testing device and evaluation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant