CN206097557U - High altitude construction simulation console - Google Patents

High altitude construction simulation console Download PDF

Info

Publication number
CN206097557U
CN206097557U CN201620696656.6U CN201620696656U CN206097557U CN 206097557 U CN206097557 U CN 206097557U CN 201620696656 U CN201620696656 U CN 201620696656U CN 206097557 U CN206097557 U CN 206097557U
Authority
CN
China
Prior art keywords
link plate
suspension member
member bar
high above
work high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620696656.6U
Other languages
Chinese (zh)
Inventor
阎忠柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Hailan Junjie Petrochemical Technology Co Ltd
Original Assignee
Tianjin Hailan Junjie Petrochemical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hailan Junjie Petrochemical Technology Co Ltd filed Critical Tianjin Hailan Junjie Petrochemical Technology Co Ltd
Priority to CN201620696656.6U priority Critical patent/CN206097557U/en
Application granted granted Critical
Publication of CN206097557U publication Critical patent/CN206097557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrically Operated Instructional Devices (AREA)

Abstract

The utility model provides an effective training's high altitude construction simulation console is carried out relevant instrument safe handling operating specification among the high altitude construction operating specification, it includes the pedal, the link plate, a workbench, controller and audio frequency report equipment, the pedal level sets up, a pedal lateral part is provided with the link plate perpendicularly, near link plate is provided with the workstation, install on the link plate with link plate fixed connection's fixed pendant pole and with link plate swing joint's movable pendant pole, on the link plate still fixed being provided with a plurality ofly put thing platform and one and put the rope platform, it is provided with and places a recess of hanging the rope to put the rope bench, activity pendant pole, put the thing bench and all be provided with the pressure sensor who is connected with the controller electricity, be provided with in the recess with the electric induction type proximity sensor who is connected of controller. Be provided with the installing zone on the workstation. Through this high altitude construction simulation console, can make relevant personnel use operating specification safely about the instrument among the familiar high altitude construction operating specification effectively fast, have very strong operability.

Description

Work high above the ground simulated operation platform
Technical field
This utility model is related to a kind of pseudo-experience device, more particularly to a kind of work high above the ground simulated operation platform.
Background technology
Work high above the ground is dangerous very big, and in order to ensure personnel and equipment safety, work high above the ground personnel need to strictly observe height Idle job working specification.Work high above the ground has compared with terrestrial operation specification much because of the particularity of its workplace, working specification Difference, for example:During work high above the ground, in order to mitigate operator's burden, instrument is normally applied rope and fastens on firm component, It is inaccurate at will to leave about, to prevent from falling from high altitude;When needing to send instrument back to ground, down hang after being fastened with rope and send, no Standard is thrown directly down, in order to avoid injure lower work personnel or damage other equipment.In order that related personnel skillfully can slap Hold work high above the ground working specification, workmen is carried out it is necessary training be it is requisite, and it is existing training pass through mostly Viewing sound, video data, oral a surname the mode such as lead and carry out, and effect is very undesirable.
Utility model content
For the problems referred to above, this utility model is aimed to provide one kind and is combined with modern intelligent control technology, can be simulated Work high above the ground work state, carries out the height of effective training to relevant instrument safe handling working specification in work high above the ground working specification Idle job simulated operation platform.
What the technical scheme of the work high above the ground simulated operation platform was realized in:
The work high above the ground simulated operation platform, including pedal, link plate, workbench, controller and audio frequency report equipment, Pedal be horizontally disposed with, one sidepiece of pedal is vertically installed with link plate, and workbench is provided near link plate, be provided with link plate with Fixed suspension member bar and the movable suspension member bar being flexibly connected with link plate that link plate is fixedly connected, are further fixedly arranged on link plate some Articles holding table and one put rope platform, to put and be provided with the groove for placing lanyard on rope platform;
The pressure transducer being electrically connected with the controller is provided with movable suspension member bar, articles holding table, be provided with groove with The inductive proximity sensor of controller electrical connection.
Further, installing zone is provided with the workbench, the matching of installing zone interior energy arranges all kinds of aerial lift devices.
Further, the fixed suspension member bar and movable suspension member bar are included the peg being connected with link plate and are arranged at The anti-drop head of peg end.
Further, the fixed suspension member bar, movable suspension member bar and articles holding table are arranged at the side of link plate, put rope platform and set It is placed in the opposite side of link plate.
Further, the link plate side that the installing zone is located near fixed suspension member bar, movable suspension member bar and articles holding table, Away from the link plate side for putting rope platform place.
Further, the fixed suspension member bar and movable suspension member bar interleaved are arranged.
After the related personnel for being simulated operation enters pedal, this work high above the ground simulated operation platform is opened and enters work Operation mode, controller control audio frequency are reported equipment and carry out work high above the ground instruction report, and related personnel is in accordance with instruction on workbench Related aerial lift device operated, after operating time set in advance reaches, controller controls audio frequency again and reports equipment The instrument of carrying out placement or instrument send surface instruction report back to, and related personnel carries out corresponding actions in accordance with instruction, set in advance After time reaches, controller controls audio frequency according to sensor return path signal reports equipment carries out accordingly result report, for instrument For placing instruction, when controller receives pressure sensor signal, controller control audio frequency reports equipment carries out wrong behaviour Make the report of result, it means that no matter whether related personnel fastens instrument using lanyard, as long as instrument has been hung over activity by which On suspension member bar, just illustrate that he does not observe the associative operation specification that high-altitude operations tool is placed, when controller only receives sensing During formula proximity transducer signal, controller control audio frequency reports equipment carries out the report of correct operating result, it means that related Personnel employ the mode that lanyard fastens instrument, and instrument has been hung on fixed suspension member bar, illustrate that he has observed work high above the ground The associative operation specification that instrument is placed;For instrument sends surface instruction back to, it is close to when controller is not received by vicariouss During sensor signal, controller control audio frequency reports equipment carries out the report of faulty operation result, it means that related personnel does not have Have using lanyard fasten instrument down hang again send by the way of the instrument of carrying out send the operation on ground back to, illustrate that he does not make in accordance with high-altitude Industry instrument sends the associative operation specification on ground back to, when controller receives inductive proximity sensor signal, controller control Audio frequency is reported equipment and carries out the report of correct operating result, it means that related personnel employs lanyard and fastens instrument and down hangs again The mode instrument of carrying out for sending sends the operation on ground back to, illustrates that he has observed the associative operation rule that high-altitude operations tool sends ground back to Model.It should be noted that related personnel is when operation is simulated, it is necessary to carry out corresponding operational motion in accordance with instruction, so Just can guarantee that audio frequency is reported equipment and carries out the accuracy of accordingly result report.By this work high above the ground simulated operation platform, can make During related personnel is fast and effeciently familiar with work high above the ground working specification, relevant instrument uses working specification safely, with very strong behaviour The property made.
Description of the drawings
The accompanying drawing for constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used to explain this utility model, does not constitute to improper restriction of the present utility model. In accompanying drawing:
Fig. 1 is this work high above the ground simulated operation platform structural representation.
Description of reference numerals:
In figure:1. pedal, 2. link plate, 3. workbench, 4. fix suspension member bar, 5. movable suspension member bar, 6. articles holding table, 7. put Rope platform, 8. groove, 9. peg, 10. anti-drop head, 11. installing zones.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in this utility model can To be mutually combined.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " horizontal ", " on ", D score, The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " is Based on orientation shown in the drawings or position relationship, it is for only for ease of description this utility model and simplifies description, rather than indicate Or the device or element of hint indication with specific orientation, with specific azimuth configuration and operation, therefore must not be understood that It is to restriction of the present utility model.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating Or hint relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined Feature can express or implicitly include one or more this feature.In description of the present utility model, unless separately It is described, " multiple " are meant that two or more.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " peace Dress ", " being connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly Connection;Can be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, can be by concrete condition understanding State concrete meaning of the term in this utility model.
Below with reference to the accompanying drawings and in conjunction with the embodiments describing this utility model in detail.
Work high above the ground simulated operation platform described in the utility model, as illustrated, including pedal 1, link plate 2, workbench 3, Controller and audio frequency report equipment, and pedal 1 is horizontally disposed with, and 1 one sidepiece of pedal is vertically installed with link plate 2, near link plate 2 Workbench 3 is provided with, the fixed suspension member bar 4 that is fixedly connected with link plate 2 is installed on link plate 2 and is flexibly connected with link plate 2 Movable suspension member bar 5, is further fixedly arranged on some articles holding tables 6 on link plate 2 and one is put rope platform 7, to put and be provided with placement on rope platform 7 The groove 8 of lanyard;
The pressure transducer being electrically connected with the controller is provided with movable suspension member bar 5, articles holding table 6, is provided with groove 8 The inductive proximity sensor being electrically connected with the controller.
In this work high above the ground simulated operation platform, installing zone 11 on the workbench 3, is provided with, the matching of 11 interior energy of installing zone sets Put all kinds of aerial lift devices.
After the related personnel for being simulated operation enters pedal 1, this work high above the ground simulated operation platform is opened and enters work Operation mode, controller control audio frequency are reported equipment and carry out work high above the ground instruction report, and related personnel is in accordance with instruction on workbench 3 Related aerial lift device operated, after operating time set in advance reaches, controller controls audio frequency again and reports equipment The instrument of carrying out placement or instrument send surface instruction report back to, and related personnel carries out corresponding actions in accordance with instruction, set in advance After time reaches, controller controls audio frequency according to sensor return path signal reports equipment carries out accordingly result report, for instrument For placing instruction, when controller receives pressure sensor signal, controller control audio frequency reports equipment carries out wrong behaviour Make the report of result, it means that no matter whether related personnel fastens instrument using lanyard, as long as instrument has been hung over activity by which On suspension member bar 5, just illustrate that he does not observe the associative operation specification that high-altitude operations tool is placed, when controller only receives sensing During formula proximity transducer signal, controller control audio frequency reports equipment carries out the report of correct operating result, it means that related Personnel employ the mode that lanyard fastens instrument, and instrument has been hung on fixed suspension member bar 4, illustrate that he has observed work high above the ground The associative operation specification that instrument is placed;For instrument sends surface instruction back to, it is close to when controller is not received by vicariouss During sensor signal, controller control audio frequency reports equipment carries out the report of faulty operation result, it means that related personnel does not have Have using lanyard fasten instrument down hang again send by the way of the instrument of carrying out send the operation on ground back to, illustrate that he does not make in accordance with high-altitude Industry instrument sends the associative operation specification on ground back to, when controller receives inductive proximity sensor signal, controller control Audio frequency is reported equipment and carries out the report of correct operating result, it means that related personnel employs lanyard and fastens instrument and down hangs again The mode instrument of carrying out for sending sends the operation on ground back to, illustrates that he has observed the associative operation rule that high-altitude operations tool sends ground back to Model.It should be noted that related personnel is when operation is simulated, it is necessary to carry out corresponding operational motion in accordance with instruction, so Just can guarantee that audio frequency is reported equipment and carries out the accuracy of accordingly result report.By this work high above the ground simulated operation platform, can make During related personnel is fast and effeciently familiar with work high above the ground working specification, relevant instrument uses working specification safely, with very strong behaviour The property made.
In order to further optimize and strengthen the training effect of this work high above the ground simulated operation platform, spy is improved as follows:
In this work high above the ground simulated operation platform, the fixed suspension member bar 4 and movable suspension member bar 5 include being connected with link plate 2 The peg 9 for connecing and the anti-drop head 10 for being arranged at 9 end of peg.
In this work high above the ground simulated operation platform, the fixed suspension member bar 4, movable suspension member bar 5 and articles holding table 6 are arranged at extension The side of plate 2, puts the opposite side that rope platform 7 is arranged at link plate 2.
In this work high above the ground simulated operation platform, the installing zone 11 is near fixed suspension member bar 4, movable suspension member bar 5 and puts 2 side of link plate that thing platform 6 is located, away from 2 side of link plate for putting rope platform 7 place.
In this work high above the ground simulated operation platform, the fixed suspension member bar 4 and movable 5 interleaved of suspension member bar are arranged.
Preferred embodiment of the present utility model is the foregoing is only, it is not to limit this utility model, all at this Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in this utility model Protection domain within.

Claims (6)

1. a kind of work high above the ground simulated operation platform, it is characterised in that:Including pedal (1), link plate (2), workbench (3), control Device and audio frequency report equipment, and pedal (1) is horizontally disposed with, and (1) one sidepiece of pedal is vertically installed with link plate (2), link plate (2) Workbench (3) is nearby provided with, the fixed suspension member bar (4) and and link plate being fixedly connected with link plate (2) is installed on link plate (2) (2) the movable suspension member bar (5) being flexibly connected, is further fixedly arranged on some articles holding tables (6) and one is put rope platform on link plate (2) (7), put and on rope platform (7), be provided with the groove (8) for placing lanyard;
It is provided with movable suspension member bar (5), articles holding table (6) in the pressure transducer being electrically connected with the controller, groove (8) and arranges There is the inductive proximity sensor being electrically connected with the controller.
2. work high above the ground simulated operation platform according to claim 1, it is characterised in that:It is provided with the workbench (3) Installing zone (11), the matching of installing zone (11) interior energy arrange all kinds of aerial lift devices.
3. work high above the ground simulated operation platform according to claim 2, it is characterised in that:The fixed suspension member bar (4) and work Dynamic suspension member bar (5) includes the peg (9) being connected with link plate (2) and the anti-drop head (10) for being arranged at peg (9) end.
4. work high above the ground simulated operation platform according to claim 2, it is characterised in that:The fixed suspension member bar (4), activity Suspension member bar (5) and articles holding table (6) are arranged at the side of link plate (2), put the opposite side that rope platform (7) is arranged at link plate (2).
5. the work high above the ground simulated operation platform according to any one of claim 4, it is characterised in that:The installing zone (11) link plate (2) side being located near fixed suspension member bar (4), movable suspension member bar (5) and articles holding table (6), away from putting rope platform (7) link plate (2) side being located.
6. the work high above the ground simulated operation platform according to any one of claim 2, it is characterised in that:The fixed suspension member Bar (4) and movable suspension member bar (5) interleaved are arranged.
CN201620696656.6U 2016-07-01 2016-07-01 High altitude construction simulation console Expired - Fee Related CN206097557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620696656.6U CN206097557U (en) 2016-07-01 2016-07-01 High altitude construction simulation console

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620696656.6U CN206097557U (en) 2016-07-01 2016-07-01 High altitude construction simulation console

Publications (1)

Publication Number Publication Date
CN206097557U true CN206097557U (en) 2017-04-12

Family

ID=58465061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620696656.6U Expired - Fee Related CN206097557U (en) 2016-07-01 2016-07-01 High altitude construction simulation console

Country Status (1)

Country Link
CN (1) CN206097557U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952526A (en) * 2017-04-30 2017-07-14 国网江苏省电力公司职业技能训练基地 A kind of virtual reality circuit running gear

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952526A (en) * 2017-04-30 2017-07-14 国网江苏省电力公司职业技能训练基地 A kind of virtual reality circuit running gear

Similar Documents

Publication Publication Date Title
CN206097557U (en) High altitude construction simulation console
CN204065184U (en) Ammeter sight glass
CN206114586U (en) Steel wire dynamic verification appearance
CN205740005U (en) A kind of steel plate with preventer lifts by crane apparatus
CN207367774U (en) A kind of transformer mounting mechanism
CN205103185U (en) Take X ray detection line of manipulator
CN109850511A (en) Automatic test device
CN206208785U (en) A kind of photography detection device
CN212180509U (en) Traditional chinese medicine stoving fragility detection device
CN107159343A (en) A kind of safety-type lab platform
CN209210229U (en) A kind of display installs case of limiter of moment
CN205854514U (en) Steady support is used in a kind of aircraft carrying
CN208637070U (en) A kind of hydraulic power slid platform experimental bench
CN206596820U (en) A kind of multifunction wardrobe
CN205229170U (en) Portable pesticide residue detector
CN205339923U (en) Subrack formula extinguishing device
CN205786924U (en) High-potting intelligent integrated operating console
CN204882326U (en) Settling amount detection mechanism of institutional advancement on salt atmosphere test equipment
CN207415386U (en) A kind of assistance mechanical arm clamping device being readily transported
CN205565473U (en) Secondary equipment protection machanism
CN205273517U (en) Experimental facilities auxiliary vehicle
CN205333277U (en) Concrete vibrating table
CN109967995A (en) A kind of computer circuit board assembling device
CN205787238U (en) Fiber connector reprocesses tool
CN207473004U (en) A kind of integrated detector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20180701

CF01 Termination of patent right due to non-payment of annual fee