CN206091360U - 一种型钢斜撑基础托换结构 - Google Patents

一种型钢斜撑基础托换结构 Download PDF

Info

Publication number
CN206091360U
CN206091360U CN201621111562.4U CN201621111562U CN206091360U CN 206091360 U CN206091360 U CN 206091360U CN 201621111562 U CN201621111562 U CN 201621111562U CN 206091360 U CN206091360 U CN 206091360U
Authority
CN
China
Prior art keywords
shaped steel
steel
fitting
built
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621111562.4U
Other languages
English (en)
Inventor
李晓勇
顾国荣
王友权
刘冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Survey Design And Research Institute Group Co ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201621111562.4U priority Critical patent/CN206091360U/zh
Application granted granted Critical
Publication of CN206091360U publication Critical patent/CN206091360U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型涉及一种建筑物向下增层施工的辅助托换结构,具体涉及一种型钢斜撑基础托换结构,属于建筑工程技术领域。一种型钢斜撑基础托换结构,包括托换型钢(1)、预埋件(2);所述预埋件(2)固定在原底板(6)和原结构柱(8)上,托换型钢(1)两端通过各自预埋件(2)分别与原底板(6)、原结构柱(8)连接形成稳定的三角形结构。该斜撑托换结构将斜撑型钢、结构柱、底板三者组合成稳定的三角形结构,稳定性好;结构可靠性高,施工方便;能够控制不均匀沉降,降低改扩建施工过程中可能造成的结构内部产生的过大应力,避免出现裂缝或其他灾害。

Description

一种型钢斜撑基础托换结构
技术领域
本实用新型涉及一种建筑物向下增层施工的辅助托换结构,具体涉及一种型钢斜撑基础托换结构,属于建筑工程技术领域。
背景技术
由于周边环境变化、使用要求改变等各方面的原因,需要在既有建筑内部向下开挖增建地下室,开挖之前需对原有基础结构进行托换,以改变原有结构传力路径,使建筑荷载作用于托换结构上,对原有结构柱进行割断时保证既有建筑结构安全。
目前采用的托换结构多为竖向托换结构,适合于对既有建筑基础结构整体托换后向下开挖。但整体凿除原底板向下开挖地下室施工风险较大,较难控制不均匀沉降,改扩建施工过程中可能造成结构内部产生过大应力,导致出现裂缝或其他灾害。
实用新型内容
本实用新型的目的是根据上述现有技术的不足,提供了一种用于地下室向下增层扩建的型钢斜撑托换结构,通过设置斜撑托换体系,跳仓托换开挖,使增层开挖施工过程中施工风险在可控范围内。
本实用新型的有益效果在于:
一种型钢斜撑基础托换结构,包括托换型钢1、预埋件2;所述预埋件2固定在原底板6和原结构柱8上,托换型钢1两端通过各自预埋件2分别与原底板6、原结构柱8连接形成稳定的三角形结构。
进一步的,还包括钢管桩3,所述钢管桩3固定设置在原底板6的下部,钢管桩3桩顶做封桩处理。
进一步的,还包括施工止水帷幕4,所述施工止水帷幕4固定设置在原底板开槽的下方。
更进一步的,所述止水帷幕4是旋喷桩、压密注浆、H型钢、槽钢、钢板桩中的一种或几种,但不限于上述几种型式。
进一步的,一对托换型钢1倾斜固定在同一原结构柱8的两侧。
本实用新型的有益效果在于:
1)该斜撑托换结构将斜撑型钢、结构柱、底板三者组合成稳定的三角形结构,稳定性好。
2)便于跳仓分段凿除底板向下开挖,避免了整体托换开挖可能造成的不均匀沉降、裂缝等结构病害。
3)结构可靠性高,施工方便。
4)能够控制不均匀沉降,降低改扩建施工过程中可能造成的结构内部产生的过大应力,避免出现裂缝或其他灾害。
附图说明
图1是本实用新型型钢斜撑基础托换结构的结构示意图。
图2是向下增层施工前,原有地下室的结构示意图。
图3是地下室原底板开孔,施工锚杆静压钢管桩并封桩的示意图。
图4是在底板和结构柱顶部埋入预埋件,安装斜撑型钢的示意图。
图5是底板开槽,施工止水帷幕,形成托换结构的示意图。
图中,1.托换型钢,2.预埋件,3.钢管桩,4.止水帷幕,5.原工程桩,6.原底板,7.原承台,8.原结构柱。
具体实施方式
下面结合附图和具体实施例对本实用新型进一步说明。
以下结合附图通过实施例对本实用新型特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1所示,图中1~8标记分别为:托换型钢1、预埋件2、钢管桩3、止水帷幕4、原工程桩5、原底板6、原承台7、原结构柱8。
实施例:如图1-5所示,本实施例中的一种型钢斜撑托换结构由托换型钢1、预埋件2、钢管桩3、止水帷幕4组成,托换型钢1通过预埋件2与原底板6、原结构柱8连接形成稳定的三角形结构。本实施例中采用的型钢规格、钢管桩规格、钢管桩位置根据地下室层高、原承台尺寸、上部结构荷载等计算确定。
本实例在具体实施时:首先在原底板6设计位置开孔,施工锚杆静压钢管桩3,所述钢管桩3可兼做临时支撑桩及永久抗拔桩,钢管桩3桩顶做封桩处理;然后在原底板6及原结构柱8顶部埋设预埋件2后,施工托换型钢1,所述托换型钢1两端与预埋件2连接固定;最后在原底板6开槽,施工止水帷幕4,形成斜撑托换结构;所述止水帷幕4包括但不限于旋喷桩、压密注浆、H型钢、槽钢、钢板桩等。
虽然以上述实施例已经参照附图对本实用新型的构思和实施例做了详细说明,但本领域普通技术人员可以认识到,本领域普通技术人员可以对上述实施方式进行各种变换,在不脱离本实用新型总的构思的前提下,这些变换都应当属于本实用新型要求保护的范围之内。如:型钢规格、钢管桩规格、预埋件与底板连接方式等,故在此不一一赘述。

Claims (5)

1.一种型钢斜撑基础托换结构,其特征在于:
包括托换型钢(1)、预埋件(2);
所述预埋件(2)固定在原底板(6)和原结构柱(8)上,托换型钢(1)两端通过各自预埋件(2)分别与原底板(6)、原结构柱(8)连接形成稳定的三角形结构。
2.如权利要求1所述的型钢斜撑基础托换结构,其特征在于:还包括钢管桩(3),所述钢管桩(3)固定设置在原底板(6)的下部,钢管桩(3)桩顶做封桩处理。
3.如权利要求1所述的型钢斜撑基础托换结构,其特征在于:还包括施工止水帷幕(4),所述施工止水帷幕(4)固定设置在原底板开槽的下方。
4.如权利要求3所述的型钢斜撑基础托换结构,其特征在于:所述止水帷幕(4)是旋喷桩、压密注浆、H型钢、槽钢、钢板桩中的一种或几种。
5.如权利要求1所述的型钢斜撑基础托换结构,其特征在于:一对托换型钢(1)倾斜固定在同一原结构柱(8)的两侧。
CN201621111562.4U 2016-10-10 2016-10-10 一种型钢斜撑基础托换结构 Active CN206091360U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621111562.4U CN206091360U (zh) 2016-10-10 2016-10-10 一种型钢斜撑基础托换结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621111562.4U CN206091360U (zh) 2016-10-10 2016-10-10 一种型钢斜撑基础托换结构

Publications (1)

Publication Number Publication Date
CN206091360U true CN206091360U (zh) 2017-04-12

Family

ID=60413537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621111562.4U Active CN206091360U (zh) 2016-10-10 2016-10-10 一种型钢斜撑基础托换结构

Country Status (1)

Country Link
CN (1) CN206091360U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137981A (zh) * 2018-10-10 2019-01-04 长江勘测规划设计研究有限责任公司 地下工程永久结构柱临时托换结构及施工方法
CN109487792A (zh) * 2018-10-19 2019-03-19 中建华东投资有限公司 格构柱托换的临时受力体系转换方法和配套可调节式装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137981A (zh) * 2018-10-10 2019-01-04 长江勘测规划设计研究有限责任公司 地下工程永久结构柱临时托换结构及施工方法
CN109137981B (zh) * 2018-10-10 2023-12-01 长江勘测规划设计研究有限责任公司 地下工程永久结构柱临时托换结构及施工方法
CN109487792A (zh) * 2018-10-19 2019-03-19 中建华东投资有限公司 格构柱托换的临时受力体系转换方法和配套可调节式装置
CN109487792B (zh) * 2018-10-19 2024-01-09 中建华东投资有限公司 格构柱托换的临时受力体系转换方法和配套可调节式装置

Similar Documents

Publication Publication Date Title
CN203145038U (zh) 格构柱式塔吊基础
CN106639346B (zh) 一种利用斜撑托换结构的既有建筑向下增层施工方法
CN103290847A (zh) 超大面积深基坑内斜梁支撑结构及施工方法
CN103938634B (zh) 一种深基坑支护结构及施工方法
CN103103988A (zh) 利用中心岛楼板水平支撑结构的基坑施工方法
WO2017084573A1 (zh) 抗隆支护结构
CN104652444B (zh) 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法
CN110387889B (zh) 一种用于长条形深基坑的连拱式基坑支护方法
CN104947681A (zh) 一种超大超深地下室基坑的施工方法
CN205024712U (zh) 一种组合式塔吊基础
CN103590408A (zh) 一种双排桩梁竖锚新型支护体系及其施工方法
CN103397667A (zh) 既有建筑直接增层基础结构及其施工方法
CN103469803A (zh) 用于基坑支护的桩梁竖锚支护体系及其施工方法
CN206091360U (zh) 一种型钢斜撑基础托换结构
CN103104102A (zh) 一种地下增层改造施工方法
CN101851923B (zh) 一种支撑柱施工安装方法
CN101498133B (zh) 增大地下室逆作法土方开挖空间的方法和支护结构
CN105421477A (zh) 一种塔吊基础的施工方法
CN209509554U (zh) 既有建筑物下新增地下室用托换结构
CN104195956A (zh) 膺架式水域连续梁现浇支架及其搭建方法
CN103924981B (zh) 单拱大跨浅埋暗挖隧道加固体系及其施工方法
CN103215965A (zh) 层板式高桩承台塔吊基础结构及施工方法
CN210002410U (zh) 一种可兼作挡土墙的环框支撑围护系统
CN204851265U (zh) 一种高水压条件下的工作井内支撑结构
CN106193101A (zh) 塔吊钢平台桩基础及其施工方法

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 202150 Xiushan Road 258, Chongming Industrial Park, Chongming County, Shanghai

Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd.

Country or region after: China

Address before: 202150 Xiushan Road 258, Chongming Industrial Park, Chongming County, Shanghai

Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd.

Country or region before: China