CN206091341U - Prefabricated wall body perpendicularity correction device - Google Patents

Prefabricated wall body perpendicularity correction device Download PDF

Info

Publication number
CN206091341U
CN206091341U CN201621131401.1U CN201621131401U CN206091341U CN 206091341 U CN206091341 U CN 206091341U CN 201621131401 U CN201621131401 U CN 201621131401U CN 206091341 U CN206091341 U CN 206091341U
Authority
CN
China
Prior art keywords
wall body
bracket
superimposed sheet
precast wall
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621131401.1U
Other languages
Chinese (zh)
Inventor
夏江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Technology Fuzhou Co Ltd
Original Assignee
China State Construction Technology Fuzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Technology Fuzhou Co Ltd filed Critical China State Construction Technology Fuzhou Co Ltd
Priority to CN201621131401.1U priority Critical patent/CN206091341U/en
Application granted granted Critical
Publication of CN206091341U publication Critical patent/CN206091341U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a prefabricated wall body perpendicularity correction device, including superimposed sheet and many bracing members of taking the superimposed sheet built -in fitting, the bracing member includes solid round bar and drive arrangement, drive arrangement includes pneumatic cylinder and driving hydraulic cylinder's motor, the hydraulic stem of pneumatic cylinder is connected with the one end of solid round bar, the other end and a first seated connection of solid round bar, a first bracket and a pre -buried wall body built -in fitting threaded connection in prefabricated wall body, first bracket level is provided with the level vial sensor, a level vial sensor and a controller communication connection, opening of this controller simultaneous control motor stops, one or seven words are fixed with prefabricated wall body lower extreme on one side, and the another side is fixed with the superimposed sheet, drive arrangement one end is connected with second bracket, second bracket and superimposed sheet built -in fitting threaded connection.

Description

A kind of precast wall body perpendicularity correction equipment
Technical field
This utility model is related to a kind of precast wall body perpendicularity correction equipment, belongs to building machinery field.
Background technology
At present, China's town building is mostly reinforced concrete structure, and the hard execution of building standard is produced with standard A large amount of building wastes.Developed country is increasingly employed building industrialization and building material, and standard element can play with building blocks formula Installation, can recycle after dismounting.Require that national experimental city is current according to the synthesis pilot work of national architectural industrialization Implementing assembled architecture project scale construction, just building and from the point of view of complete assembled engineering, prefabricated component connects Often using sleeve grouting interconnection technique, its principle is inserted in pre-buried metal sleeve in precast concrete for socket part position Reinforcing bar and cement injection base grouting material and the bar connecting mode realized.Therefore more than 20 are often stretched out in bottom prefabricated components Length is 10-20cm reinforcing bars, in correspondence insertion upper strata prefabricated components grout sleeve, because sleeve hole is in member bottom section, it is difficult to Realization is accurately positioned, and deviation reserved steel bar such as occurs and bending displacement occurs, it is difficult to enter sleeve, this just hangs for upper strata prefabricated components Fill and in place cause construction difficult problem.Fully relying on construction operation personnel experience at present is carried out, serious engineering constraint progress and construction matter Amount safety;Also there are problems that dismounting simultaneously it is loaded down with trivial details, be unfavorable for recovery be used in turn, stability and safety and reliability.
Utility model content
In order to solve above-mentioned technical problem, this utility model provides a kind of precast wall body perpendicularity correction equipment, accelerates Project progress and Construction quality and safety coefficient is improved, easy accessibility is conducive to recycling, improves stability and peace Full reliability.
The technical solution of the utility model is as follows:
A kind of precast wall body perpendicularity correction equipment, including the superimposed sheet with superimposed sheet built-in fitting and many hounds Part;Diagonal brace rod member includes solid round rod and driving means;The driving means include the electricity of hydraulic cylinder and driving hydraulic cylinder Machine;The hydraulic stem of the hydraulic cylinder is connected with one end of solid round rod, and the other end of solid round rod is connected with one first bracket;Institute State the first bracket and be threadedly coupled with the wall body built-in fitting being embedded in precast wall body;First bracket is horizontally disposed gas Soaked level sensor;The air-bubble level sensor and a controller are communicated to connect, the controller simultaneously controlled motor Start and stop;One or seven character codes with precast wall body lower end while fix, another side is fixed with superimposed sheet;Described driving means one end is connected with Second bracket, the second bracket is threadedly coupled with superimposed sheet built-in fitting.
A kind of precast wall body perpendicularity correction equipment, also including clamping device;Also include a clamping device;It is described to clamp dress Put and clamp support including the first clamping support and second for being arranged on precast wall body both sides;First clamps pedestal lower end and is arranged First pulley connection on superimposed sheet;Second clamping pedestal lower end is threadedly coupled with the second bracket and superimposed sheet built-in fitting, the Two clamping pedestal upper ends fix the bearing of a strip with slide rail;One clamping cross bar one end is fixed on the first clamping support End, the other end is slidably arranged in bearing top by second pulley;The lower surface slip for clamping cross bar is provided with clamping dry wall First clamp jaw and the second clamp jaw of body, the first clamp jaw is connected with one first cylinder;Second clamp jaw and one second cylinder Connection;First cylinder and the second cylinder are each attached to clamp on cross bar.
Wherein, first clamp jaw and the second clamp jaw inner side are provided with pressure transducer;The pressure transducer It is connected with the controller signal of telecommunication.
This utility model has the advantages that:
1st, a kind of precast wall body perpendicularity correction equipment of this utility model, accelerates project progress and improves construction matter Amount safety coefficient, while environmental-protecting performance is preferably, easy accessibility is conducive to recycling, improves stability and safe and reliable Property.
2nd, a kind of precast wall body perpendicularity correction equipment of this utility model, by the automatization of diagonal brace rod member engineering is accelerated Progress and improve Construction quality and safety coefficient.
3rd, a kind of precast wall body perpendicularity correction equipment of this utility model, is reached by the demountable structure of diagonal brace rod member Preferably, easy accessibility is conducive to recycling to environmental-protecting performance.
4th, a kind of precast wall body perpendicularity correction equipment of this utility model, by setting with superimposed sheet junction in precast wall body It is equipped with seven character codes and improves stability and security reliability.
5th, a kind of precast wall body perpendicularity correction equipment of this utility model, is further increased stable by clamping device Property so that construction is safer.
Description of the drawings
Fig. 1 is a kind of front view of precast wall body perpendicularity correction equipment of this utility model;
Fig. 2 is that a kind of superimposed sheet of precast wall body perpendicularity correction equipment of this utility model is illustrated with the assembling of driving means Figure;
Fig. 3 shows for a kind of precast wall body of precast wall body perpendicularity correction equipment of this utility model with the assembling of solid round rod It is intended to;
Fig. 4 is a kind of air-bubble level sensor and the first bracket of precast wall body perpendicularity correction equipment of this utility model Assembling schematic diagram;
Fig. 5 is a kind of structural representation of the clamp jaw of precast wall body perpendicularity correction equipment of this utility model.
Reference is expressed as in figure:
1- precast wall bodies, 11- wall body built-in fittings, 2- superimposed sheets, 21- superimposed sheet built-in fittings, 3- diagonal brace rod members, 31- are solid Round bar, the bolts of 311- first, the brackets of 312- first, the bolts of 313- second, 314- air-bubble level sensors, the supports of 315- second Seat, the bolts of 316- the 3rd, 32- driving means, 321- hydraulic cylinders, 322- motors, 323- hydraulic stems, the character codes of 4- seven, 5- clamp dress Put, 51- first clamps support, 511- first pulleys, 512- second pulleys, 52- bearings, 53- slide rails, 54- and clamps cross bar, 551- First clamp jaw, the clamp jaws of 552- second, the cylinders of 56- first, the cylinders of 57- second, 58- pressure transducers, 59- second are clamped and propped up Frame.
Specific embodiment
Below in conjunction with the accompanying drawings with specific embodiment being described in detail to this utility model.
Referring to Fig. 1 to Fig. 5, a kind of precast wall body perpendicularity correction equipment, including the superimposed sheet with superimposed sheet built-in fitting 21 2 and many diagonal brace rod members 3;Diagonal brace rod member 3 includes solid round rod 31 and driving means 32;The driving means 32 include The motor 322 of hydraulic cylinder 321 and driving hydraulic cylinder 321;The hydraulic stem 323 of the hydraulic cylinder 321 and the one of solid round rod 31 End connection, the other end of solid round rod 31 is connected by the first bolt 311 with one first bracket 312;First bracket 312 leads to Cross the second bolt 313 and be threadedly coupled with the wall body built-in fitting 11 being embedded in precast wall body 1;The level of first bracket 312 It is provided with air-bubble level sensor 314;The controller of the air-bubble level sensor 314 and is communicated to connect, the controller The start and stop of controlled motor 322 simultaneously;The one side of one or seven character code 4 is fixed with the lower end of precast wall body 1, and another side is fixed with superimposed sheet 2;Institute State the one end of driving means 32 and be connected with the second bracket 315, the second bracket 315 is by the 3rd bolt 316 and superimposed sheet built-in fitting 21 Threaded connection.
Referring to Fig. 1, Fig. 4, a kind of precast wall body perpendicularity correction equipment, also including clamping device 5;The clamping device 5 Support 59 is clamped including the first clamping support 51 and second for being arranged on the both sides of precast wall body 1;First clamp the lower end of support 51 with One first pulley 511 being arranged on superimposed sheet 2 connects;Second clamps the lower end of support 59 by the 3rd bolt 316 and the second support Seat 315 and superimposed sheet built-in fitting 21 are threadedly coupled, and the bearing 52 of a strip with slide rail 53 is fixed on the second clamping support 59; One clamping cross bar 54 one end is fixed on the upper end of the first clamping support 51, and the other end is slidably arranged in bearing by second pulley 512 52 tops;The relative slip of lower surface for clamping cross bar 54 is provided with the first clamp jaw 551 and the second clamp jaw 552, and first clamps Pawl 551 is connected with the first cylinder 56;Second clamp jaw 552 is connected with the second cylinder 57;First cylinder 56 and the second cylinder 57 are equal It is fixed on clamping cross bar 54, by the driving of the first cylinder 56 and the second cylinder 57 so that the first clamp jaw 551 and the second folder Tight pawl 552 clamps precast wall body 1.
Wherein, referring to Fig. 5, the inner side of 551 and second clamp jaw of the first clamp jaw 552 is provided with pressure transducer 58;The pressure transducer 58 is connected with the controller signal of telecommunication.
Operation principle of the present utility model:
The method is installed on air-bubble level sensor 314 in first bracket 312, and by bubble position dry wall is judged The perpendicularity that body 1 is installed, so as to send the signal of telecommunication to controller, controller controlled motor 322 drives hydraulic stem 323 to work, gas The offset direction of bubble is the regulation direction of diagonal brace rod member 3;Diagonal brace rod member 3 is carried out micro- by driving means 32 to solid round rod 31 Adjust, adjustment terminates, and first fixes seven character codes 4, seven character codes 4 are arranged on into the bottom of precast wall body 1, seven sides of character code 4 two and dry wall Body 1 and superimposed sheet 2 connect, and play primary fixed precast wall body 1 and act on, and then clamping device 5 brings into operation, by clamping cross bar 54 move when the top center of precast wall body 1, and the first clamp jaw 551 and the second clamp jaw 552 are started working, and now first The clamp jaw 552 of clamp jaw 551 and second is clamped action toward the direction of precast wall body 1 simultaneously, reaches when clamping with precast wall body 1 During certain pressure, pressure transducer 58 sends signal to controller, and clamp jaw 55 quits work.
Embodiment of the present utility model is the foregoing is only, the scope of the claims of the present utility model is not thereby limited, it is every The equivalent structure made using this utility model description and accompanying drawing content or equivalent flow conversion, or be directly or indirectly used in Other related technical fields, are included in the same manner in scope of patent protection of the present utility model.

Claims (3)

1. a kind of precast wall body perpendicularity correction equipment, it is characterised in that:Including band superimposed sheet built-in fitting(21)Superimposed sheet(2) And many diagonal brace rod members(3);Diagonal brace rod member(3)Including solid round rod(31)And driving means(32);The driving means (32)Including hydraulic cylinder(321)And driving hydraulic cylinder(321)Motor(322);The hydraulic cylinder(321)Hydraulic stem (323)With solid round rod(31)One end connection, solid round rod(31)The other end and one first bracket(312)Connection;It is described First bracket(312)Be embedded in precast wall body(1)An interior wall body built-in fitting(11)Threaded connection;First bracket (312)It is horizontally disposed to have air-bubble level sensor(314);The air-bubble level sensor(314)Communicate with a controller Connection, the controller is while controlled motor(322)Start and stop;One or seven character codes(4)One side and precast wall body(1)Lower end is fixed, separately One side and superimposed sheet(2)It is fixed;The driving means(32)One end is connected with the second bracket(315), the second bracket(315)With it is folded Plywood built-in fitting(21)Threaded connection.
2. a kind of precast wall body perpendicularity correction equipment as claimed in claim 1, it is characterised in that:Also include clamping device (5);The clamping device (5) clamps support including the first clamping support (51) and second for being arranged on precast wall body (1) both sides (59);First clamping support (51) lower end is connected with the first pulley (511) that is arranged on superimposed sheet (2);Second clamping Frame (59) lower end is threadedly coupled with the second bracket (315) and superimposed sheet built-in fitting (21), and the second clamping support (59) upper end is fixed The bearing (52) of one strip with slide rail (53);One clamping cross bar (54) one end is fixed on the first clamping support (51) upper end, The other end is slidably arranged in bearing (52) top by second pulley (512);The lower surface slip for clamping cross bar (54) is provided with Clamp precast wall body(1)The first clamp jaw (551) and the second clamp jaw (552), the first clamp jaw (551) and one first cylinder (56) connect;Second clamp jaw (552) is connected with one second cylinder (57);First cylinder (56) and the second cylinder (57) are fixed On cross bar (54) is clamped.
3. a kind of precast wall body perpendicularity correction equipment as claimed in claim 2, it is characterised in that:First clamp jaw (551) and on the inside of the second clamp jaw (552) it is provided with pressure transducer (58);The pressure transducer (58) and controller electricity Signal connects.
CN201621131401.1U 2016-10-18 2016-10-18 Prefabricated wall body perpendicularity correction device Active CN206091341U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621131401.1U CN206091341U (en) 2016-10-18 2016-10-18 Prefabricated wall body perpendicularity correction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621131401.1U CN206091341U (en) 2016-10-18 2016-10-18 Prefabricated wall body perpendicularity correction device

Publications (1)

Publication Number Publication Date
CN206091341U true CN206091341U (en) 2017-04-12

Family

ID=59975313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621131401.1U Active CN206091341U (en) 2016-10-18 2016-10-18 Prefabricated wall body perpendicularity correction device

Country Status (1)

Country Link
CN (1) CN206091341U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019105022A1 (en) * 2017-11-29 2019-06-06 上海建工五建集团有限公司 System and method applicable to automatically adjusting elevation of horizontal prefabricated component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019105022A1 (en) * 2017-11-29 2019-06-06 上海建工五建集团有限公司 System and method applicable to automatically adjusting elevation of horizontal prefabricated component

Similar Documents

Publication Publication Date Title
CN106193282B (en) Assembling frame girder construction based on 3D printing
CN103321654A (en) Method for managing roof collapse of coal mine roadway by aid of flexible air bags
CN105544984A (en) Large-span steel structure jig frame integrity slip construction process
CN110259184A (en) Column construction method is pulled out based on Removing Columns combined support jack-up system
CN206091341U (en) Prefabricated wall body perpendicularity correction device
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
AU2013203319A1 (en) Lifting a structure
CN201321720Y (en) Ring-beam no-putlog-hole template erecting device in brick and concrete structure construction
CN202925975U (en) Steel funnel for coal blending bunker
CN206053370U (en) A kind of prefabrication lifting component supports corner brace instrument
CN113089918B (en) Construction method for mounting abutted seam filler of prefabricated composite floor slab
CN201746830U (en) Long screw bored concrete pile post-inserted cage tool
CN111236683B (en) Column body reinforcing and pile body static pressure construction device under shearing damage and construction method
CN111379265B (en) High-precision zero-interference weir die integrated structure with stable periphery and construction method thereof
CN113802569A (en) Steel sleeve node for connecting inner support-enclosure structure of steel pipe
CN112359888A (en) Static pile reaction frame jacking system for carbon filter tank body deviation rectifying and reinforcing construction and construction method
CN210713535U (en) Auxiliary device for manufacturing grouting sleeve-steel bar connecting piece sample
CN214090936U (en) Simple and easy platform bearing structure of girder steel structure construction
CN217812322U (en) Unilateral formwork system with adjustable split bolt mechanism
CN217561156U (en) Sleeve grouting material detection test device
CN216381404U (en) Top bracing frame for tunnel drilling
CN215671235U (en) High-strength assembly type steel structure support
CN216893492U (en) Be used for reinforced connection structure of concrete beam template
CN219887568U (en) High-altitude adjustable formwork support