CN206091294U - Structure hole mouth concrete alley secondary pouring template construction structures - Google Patents

Structure hole mouth concrete alley secondary pouring template construction structures Download PDF

Info

Publication number
CN206091294U
CN206091294U CN201620921752.6U CN201620921752U CN206091294U CN 206091294 U CN206091294 U CN 206091294U CN 201620921752 U CN201620921752 U CN 201620921752U CN 206091294 U CN206091294 U CN 206091294U
Authority
CN
China
Prior art keywords
steel plate
groove
pouring template
steel sheet
template construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620921752.6U
Other languages
Chinese (zh)
Inventor
吴迪
赵劲
周小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201620921752.6U priority Critical patent/CN206091294U/en
Application granted granted Critical
Publication of CN206091294U publication Critical patent/CN206091294U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a structure hole mouth concrete alley secondary pouring template construction structures. It includes two steel sheets of establishing entrance to a cave department on floor concrete structure, and the steel sheet is L shape, the middle groove that accords with the dimension of opening for the width, the steel sheet between to have three groups to strengthen welded steel fixed, the positions of three group's stiffeners are in prelude, middle part corner, the afterbody of two blocks of steel sheets respectively, on the three strengthening rib middle zone's of group steel sheet, welds two U -shapeds and shake hands, the groove be no kerve, the degree of depth in groove is the height of steel sheet. The utility model discloses simple structure, construction convenience is swift, and is firm, does not need the plank sheathing to strut, can prevent concrete alley surface and sunken, ballooning unevenness defect appear, improves the shaping quality to need not subsequent processing.

Description

A kind of little hole concrete ground ridge second pouring template construction structure of structure
Technical field
The utility model is related to technical field of building construction, is related specifically to a kind of little hole concrete ground ridge of structure secondary Cast template constructing structure.
Background technology
Second pouring generally refers to the second pouring of Equipment Foundations, and the joint filling of such as bolt hole, surface of base and equipment room is steady Gu etc., typically it is already annotated with design drawing(Usually 50mm thickness pea gravel concretens).Such case is poured from secondary It is doomed volume specific item, the such as corresponding specific item of set of other non-Equipment Foundations, post-cast strip.But this mode is commonly used in gap On, it is generally unsuitable for the structure at similar hole.
At present, known building trade due to can stay on structure floor during the concreting of various odjective causes as Structure little hole of some areas such as floss hole, exhaust passage mouth less than 1 ㎡, for floss hole, exhaust passage mouth concrete Alley second pouring method typically carries out concrete alley by the way of plank sheathing formwork, step fastener reinforcing, lumps of wood diagonal brace Second pouring, the narrow wood template support of little tunnel opening area is difficult, template both sides diagonal brace lumps of wood length needs constantly adjustment, and And be susceptible to cause concrete alley surface depression, bulging out-of-flatness defect occur because support top is insecure, affect perception matter Amount, after-treatment is relatively difficult.
The content of the invention
Technical problem to be solved in the utility model is the defect for overcoming prior art, there is provided a kind of simple structure, is applied Work is convenient and swift, and it is firm to consolidate, it is not necessary to wood template support, prevents concrete alley surface and depression, bulging injustice occurs Whole defect, improves Forming Quality, without the need for the little hole concrete ground ridge second pouring template construction structure of structure of subsequent treatment.
To achieve these goals, the utility model is employed the following technical solutions:
The little hole concrete ground ridge second pouring template construction structure of a kind of structure, it is characterised in that it includes two pieces The steel plate at hole in floorslab concrete structure is located at, steel plate is L shape, centre meets the groove of dimension of opening for width;It is described Steel plate between have three groups of stiffeners to be welded and fixed, the position of three groups of stiffeners be respectively at the stem of two blocks of steel plates, in Portion corner, afterbody, on the steel plate of three groups of reinforcement zone lines, two U-shaped handles of welding;Described groove be without kerve, The depth of groove is the height of steel plate.
In such scheme, described U-shaped handle is bascule, can prop or put down.
In such scheme, described stiffener is welded on position of the steel plate near top, the steel at welding position Aperture is provided with plate, stiffener passes through aperture and firm welding.
The utility model has the advantages that as a result of above-mentioned technical proposal:
The utility model simple structure, convenient and quick construction, it is firm to consolidate, it is not necessary to wood template support, is prevented from sending out There is depression, bulging out-of-flatness defect in growing concrete alley surface, improves Forming Quality, and without the need for subsequent treatment.
Description of the drawings
Fig. 1 is the overall structure figure of the utility model embodiment;
In figure:1- steel plates, 2-U shapes handle, 3- stiffeners.
Specific embodiment
In order that content of the present utility model is readily apparent understood, below according to specific embodiment and with reference to attached Figure, is described in further detail to the utility model.
The little hole concrete ground ridge second pouring template construction structure of structure as shown in Figure 1, it includes that two pieces are located at building Steel plate 1 in board concrete structure at hole, steel plate 1 is L shape, and centre meets the groove of dimension of opening for width;Described steel Have three groups of stiffeners 3 to be welded and fixed between plate 1, the position of three groups of stiffeners 3 be respectively at the stem of two blocks of steel plates 1, in Portion corner, afterbody, on the steel plate 1 of three groups of zone lines of reinforcement 3, two U-shaped handles 2 of welding;Described groove is bottomless Groove, the depth of groove is the height of steel plate.
In the present embodiment, described U-shaped handle 2 is bascule, can prop or put down.
In the present embodiment, described stiffener 3 is welded on position of the steel plate 1 near top, at welding position Aperture is provided with steel plate 1, stiffener 3 passes through aperture and firm welding.
Particular embodiments described above, the technical problem solved to the utility model, technical scheme and beneficial effect are entered Go further description, should be understood that and the foregoing is only specific embodiment of the utility model, and without It is all within spirit of the present utility model and principle in the utility model is limited, any modification, equivalent substitution and improvements done Deng should be included within protection domain of the present utility model.

Claims (3)

1. the little hole concrete ground ridge second pouring template construction structure of a kind of structure, it is characterised in that it is installed including two pieces Steel plate at hole in floorslab concrete structure, steel plate is L shape, and centre meets the groove of dimension of opening for width;Described There are three groups of stiffeners to be welded and fixed between steel plate, the position of three groups of stiffeners is respectively at the stem of two blocks of steel plates, middle part Corner, afterbody, on the steel plate of three groups of reinforcement zone lines, two U-shaped handles of welding;Described groove is without kerve, groove Depth for steel plate height.
2. the little hole concrete ground ridge second pouring template construction structure of structure as claimed in claim 1, it is characterised in that institute The U-shaped handle stated is bascule, can prop or put down.
3. the little hole concrete ground ridge second pouring template construction structure of structure as claimed in claim 1, it is characterised in that institute The stiffener stated is welded on position of the steel plate near top, and aperture is provided with the steel plate at welding position, and stiffener is worn Small holes and firm welding.
CN201620921752.6U 2016-08-23 2016-08-23 Structure hole mouth concrete alley secondary pouring template construction structures Expired - Fee Related CN206091294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620921752.6U CN206091294U (en) 2016-08-23 2016-08-23 Structure hole mouth concrete alley secondary pouring template construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620921752.6U CN206091294U (en) 2016-08-23 2016-08-23 Structure hole mouth concrete alley secondary pouring template construction structures

Publications (1)

Publication Number Publication Date
CN206091294U true CN206091294U (en) 2017-04-12

Family

ID=58469830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620921752.6U Expired - Fee Related CN206091294U (en) 2016-08-23 2016-08-23 Structure hole mouth concrete alley secondary pouring template construction structures

Country Status (1)

Country Link
CN (1) CN206091294U (en)

Similar Documents

Publication Publication Date Title
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN107023160A (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN108797638A (en) Integrated assembled piping lane based on composite bottom board and its construction method
CN106677520A (en) Beam, floor and corner uptight column composite structure of building aluminium alloy templates
CN108625591A (en) One kind is prefabricated to be exempted to tear beam forms open
CN108643553A (en) A kind of dual-purpose connection template in the negative and positive angle of adjustable angle
CN206538910U (en) The curtain wall construction column template reinforcement system of horn mouth formula
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN206844138U (en) A kind of bar construction of domatic isolated footing
CN108867398A (en) A kind of construction method of bridge construction super-small space double limb pier stud
CN206091294U (en) Structure hole mouth concrete alley secondary pouring template construction structures
CN206873914U (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN107700531B (en) A kind of erection method of chamfering set shaped steel formwork
CN106012808B (en) A kind of Wavelike steel webplate profiled sheet combination beam and its construction method
CN205654082U (en) Half tunnel formwork
CN212506641U (en) Drainage ditch regularization mould
CN206189449U (en) Soleplate with lead integrated plank sheathing system of wall
CN210002585U (en) post-cast strip aluminum cover plate
CN207813014U (en) It can turnover type multi-ribbed plate plastics putamina joint treatment device
CN107143137A (en) Cast-in-situ template structure and construction method at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure
CN209837479U (en) Upper supporting and positioning device for concrete beam reinforcing steel bar
CN208586890U (en) A kind of concrete circular arc type formwork structure
CN208088821U (en) The cast-in-place anti-waterproof tongue and groove cast template of concrete exterior wall
CN207673351U (en) A kind of tunnel lining trolley end mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20190823

CF01 Termination of patent right due to non-payment of annual fee