CN206090685U - Integrated valves of pilot control system for excavator - Google Patents

Integrated valves of pilot control system for excavator Download PDF

Info

Publication number
CN206090685U
CN206090685U CN201621133430.1U CN201621133430U CN206090685U CN 206090685 U CN206090685 U CN 206090685U CN 201621133430 U CN201621133430 U CN 201621133430U CN 206090685 U CN206090685 U CN 206090685U
Authority
CN
China
Prior art keywords
valve
pile
joint
dipper
scraper bowl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621133430.1U
Other languages
Chinese (zh)
Inventor
王宾
陈凯
夏金玲
张玮
刘文婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lovol Heavy Industry Group Co ltd
Original Assignee
QINGDAO LEIWO EXCAVATOR Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO LEIWO EXCAVATOR Co Ltd filed Critical QINGDAO LEIWO EXCAVATOR Co Ltd
Priority to CN201621133430.1U priority Critical patent/CN206090685U/en
Application granted granted Critical
Publication of CN206090685U publication Critical patent/CN206090685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an integrated valves of pilot control system for excavator, including pile -up valve, pressure sensor, shuttle valve and joint and hose, place in the pile -up valve in the shuttle valve, pressure sensor has 7, and the side setting of all facing the pile -up valve of every pressure sensor's connector mouth, and be connected to on the pile -up valve about swivel joint, dipper excavate joints, dipper discharging connector, big arm rise connect, joints falls in big underarm, the scraper bowl excavates the joint and scraper bowl discharging connector one end all is connected with each pressure sensor's connector mouth in proper order, the other end is all and the hose connection, the required guide's oil of each action on the pile -up valve is all gathered the signal through corresponding pressure sensor and is passed to the controller. The utility model provides an overall dimension reduction, weight loss, and solved pressure sensor connector mouth department's ponding and then made ponding spatter pressure sensor and upward caused the technical problem who hinders and damage for signal transmission.

Description

A kind of excavator integrated valve group of pilot control system
Technical field
This utility model is related to technical field of engineering machinery, more particularly to a kind of excavator is integrated with pilot control system Valve.
Background technology
At present, positive flow control excavator pilot system is required to install each action pilot signal of pressure transducer collection, Main pump changes in flow rate is controlled with this, the precise control needed for reaching traffic income i.e., and then energy saving.
Fig. 1 is the structural representation of existing pilot control system transition valve group.As shown in figure 1, existing pilot control system Transition valve group includes transition valve 1, pressure transducer 2, shuttle valve 3 and joint and flexible pipe;Wherein pressure transducer 2 has 9, and often The connector mouth of individual pressure transducer 2 is arranged on transition valve 1 upward;And it is connected to each action joint of transition valve 1 I.e. left and right swivel coupling 11, dipper excavation joint 12, dipper discharging joint 13, left lateral are walked joint 14, right lateral and walk joint 15, large arm Rise downspout connector 17, scraper bowl under joint 16, large arm excavate joint 18 and 19 one end of scraper bowl discharging joint successively with each pressure The connector mouth connection of sensor 2, the other end are all connected with flexible pipe;Each action on transition valve 1 (left and right revolution, dipper excavate, Dipper discharging, left lateral are walked, right lateral is walked, large arm rises, large arm declines, scraper bowl is excavated, scraper bowl discharging) guide oil will pass through phase The collection signal of pressure transducer 2 answered passes to controller;Left and right revolution action gathers a revolution letter by an external shuttle valve 3 Number, dipper excavation, dipper discharging, left lateral is walked, right lateral is walked, large arm rises, large arm declines, scraper bowl is excavated, scraper bowl discharging action is each Signal is gathered by a pressure transducer 2, totally 9 pressure transducers complete the collection of pilot system pressure signal.
The shortcoming of above-mentioned existing pilot control system transition valve group is:
1) transition valve overall dimensions 500mmX50mmX45mm (long X width X is high) is long, takes up room big, bad arrangement;
2) the external shuttle valve of collection revolution signal, needs certain space arrangement pipeline connection, increased trouble point and not beautiful See;
3) upward, easy hydrops produce failure to the connector mouth of pressure transducer, cause action bad.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of excavator pilot control system System pile-up valve.
For achieving the above object, this utility model adopts following technical proposals:
A kind of excavator integrated valve group of pilot control system, including pile-up valve, pressure transducer, shuttle valve and joint and Flexible pipe;Wherein described shuttle valve is built in pile-up valve;The pressure transducer has 7, and the connector of each pressure transducer Mouth is arranged towards a side of pile-up valve;And be connected to the left and right swivel coupling on pile-up valve, dipper and excavate joint, dipper discharging Joint, large arm rise joint, under large arm downspout connector, scraper bowl excavate joint and scraper bowl discharging joint one end successively with each pressure Sensor connector mouth connection, the other end with it is hose connection;Left and right revolution, dipper excavation, dipper discharging on pile-up valve, Large arm rises, large arm declines, scraper bowl is excavated, the guide oil needed for scraper bowl discharging action is gathered by corresponding pressure transducer Signal passes to controller;Left and right revolution action gathers a revolution signal by shuttle valve, dipper excavation, dipper discharging, in large arm Rise, large arm declines, scraper bowl is excavated, scraper bowl discharging action respectively gathers signal by a pressure transducer.
Preferably, a kind of excavator integrated valve group of pilot control system, also including walking pilot valve, the walking guide Two pressure transducers are provided with valve, and one, the connector mouth of the two pressure transducers is walked joint with left lateral and is connected, separately Joint is walked with right lateral for one to be connected, and then the collection to left and right walk signal is completed by the two pressure transducers.
Preferably, a kind of excavator integrated valve group of pilot control system, also including sensor guard plate, the sensor Protective plate is fixed on pile-up valve, and be positioned close to the lateral edges that pile-up valve is provided with pressure transducer connector mouth.
Preferably, the shuttle valve includes positioned at integrated valve surface, the interior hexagonal plug being arranged at shuttle valve opening and is located at Steel ball, O-ring and the shuttle valve plug for setting gradually inside pile-up valve, from the bottom up.
Preferably, the pile-up valve adopts aluminum material.
The beneficial effects of the utility model are, the excavator integrated valve group of pilot control system that this utility model is provided Size is 285mmX85mmX75mm (long X width X is high), and with respect to existing pilot control system transition valve group, overall dimension reduces significantly ;In addition, pile-up valve adopts aluminum material, overall weight is alleviated, improve the reliability of mounting bracket;Furthermore, pile-up valve On pressure transducer be horizontally set at pile-up valve side, and be provided with sensor guard plate and protected, effectively prevent At pressure transducer connector mouth, hydrops further make hydrops splash on pressure transducer and interfere destruction to signal transmission.
Description of the drawings
Fig. 1 is the structural representation of existing pilot control system transition valve group;
Fig. 2,3 for the integrated valve group of this utility model pilot control system structural representation;
Fig. 4 is the structural representation of this utility model walking pilot valve;
It is pile-up valve shuttle valve connection sectional view that Fig. 5 is the sectional view of E-E in Fig. 3.
Wherein:1. transition valve, 2. pressure transducer, 3. shuttle valve, 11. or so swivel couplings, 12. dippers excavate joint, and 13. Dipper discharging joint, 14. left lateral walk joint, and 15. right laterals walk joint, and 16. large arm rise joint, downspout connector under 17. large arm, and 18. Scraper bowl excavates joint, 19. scraper bowl discharging joints, and 1 '. pile-up valve, 2 '. pressure transducer, 3 '. shuttle valve, 4. sensor guard plate, 5. walk pilot valve, 6. in hexagonal plug, 7. shuttle valve plug, 8.O type valves, 9. steel ball, 11 '. left and right swivel coupling, 12 '. dipper Excavate joint, 13 '. dipper discharging joint, 14 '. left lateral walks joint, and 15 '. right lateral walks joint, and 16 '. large arm rises joint, and 17 '. Downspout connector under large arm, 18 '. scraper bowl excavation joint, 19 '. scraper bowl discharging joint.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further illustrated.
Fig. 2,3 for the integrated valve group of this utility model pilot control system structural representation.As Figure 2-3, it is a kind of to dig The pick machine integrated valve group of pilot control system, including pile-up valve 1 ', pressure transducer 2 ', shuttle valve 3 ', sensor guard plate 4 and connect Head and flexible pipe;Wherein to be built in pile-up valve 1 ' interior for shuttle valve 3 ';Pressure transducer 2 ' has 7, and each pressure transducer 2 ' Connector mouth is arranged towards a side of pile-up valve 1 ';Sensor guard plate 4 be fixed on pile-up valve 1 ' it is upper, and near pile-up valve 1 ' The lateral edges for being provided with 2 ' connector mouth of pressure transducer are arranged, and so can more thoroughly prevent pressure transducer connector Mouth hydrops further make hydrops splash on pressure transducer and interfere destruction to signal transmission;And be connected to every on pile-up valve 1 ' One action joint is that left and right swivel coupling 11 ', dipper excavates joint 12 ', dipper discharging joint 13 ', large arm rising joint 16 ', downspout connector 17 ' under large arm, scraper bowl excavate joint 18 ' and 19 ' one end of scraper bowl discharging joint successively with each pressure sensing Device 2 ' connector mouth connection, the other end with it is hose connection;Upper each action of pile-up valve 1 ' (left and right is turned round, dipper is excavated, Dipper discharging, large arm rise, large arm decline, scraper bowl excavate, scraper bowl discharging) needed for guide oil will be passed by corresponding pressure The collection signal of sensor 2 ' passes to controller;Left and right revolution action gathers a revolution signal by shuttle valve 3 ', and dipper is excavated, dipper Discharging, large arm rise, large arm declines, scraper bowl is excavated, scraper bowl discharging action respectively gathers signal by pressure transducer 2 ', and totally 7 Individual pressure transducer completes the collection of pilot system pressure signal.
Fig. 4 is the structural representation of this utility model walking pilot valve.As shown in figure 4, the 2 of the left and right walk signal of collection Individual pressure transducer 2 ' is installed into walking on pilot valve 5, i.e., a kind of excavator integrated valve group of pilot control system also includes Walking pilot valve 5, is provided with 2 pressure transducers 2 ', and the connector mouth of the two pressure transducers 2 ' on walking pilot valve 5 Joint 14 ' is walked with left lateral for one to be connected, another is walked joint 15 ' with right lateral and is connected, and then complete by the two pressure transducers 2 ' The collection of left and right walk signal in pairs.
It is pile-up valve shuttle valve connection sectional view that Fig. 5 is the sectional view of E-E in Fig. 3.As shown in figure 5, it is interior to be built in pile-up valve 1 ' Shuttle valve 3 ' include positioned at 1 ' surface of pile-up valve, the interior hexagonal plug 6 being arranged at 1 ' opening of shuttle valve and be located at pile-up valve 1 ' it is interior Portion, the steel ball 9 for setting gradually from the bottom up, O-ring 8 and shuttle valve plug 7.
The size of the integrated valve group of excavator pilot control system that this utility model is provided is 285mmX85mmX75mm (long X width X is high), with respect to existing pilot control system transition valve group, overall dimension is greatly reduced;In addition, pile-up valve adopts aluminum Prepared material, alleviates overall weight, improves the reliability of mounting bracket;Furthermore, the pressure transducer on pile-up valve is horizontal Pile-up valve side is arranged at, and is provided with sensor guard plate and protected, be effectively prevent at pressure transducer connector mouth Hydrops further make hydrops splash on pressure transducer and interfere destruction to signal transmission.
It is although the above-mentioned accompanying drawing that combines is described to specific embodiment of the present utility model, not new to this practicality The restriction of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Various modifications or deform still in protection model of the present utility model that field technique personnel are made by need not paying creative work Within enclosing.

Claims (5)

1. a kind of excavator integrated valve group of pilot control system, is characterized in that, including pile-up valve, pressure transducer, shuttle valve and Joint and flexible pipe;Wherein described shuttle valve is built in pile-up valve;The pressure transducer has 7, and each pressure transducer Connector mouth towards pile-up valve a side arrange;And be connected to the left and right swivel coupling on pile-up valve, dipper excavate joint, Dipper discharging joint, large arm rise joint, under large arm downspout connector, scraper bowl excavate joint and scraper bowl discharging joint one end successively with Each pressure transducer connector mouth connection, the other end with it is hose connection;Left and right on pile-up valve is turned round, dipper is excavated, Dipper discharging, large arm rise, large arm declines, scraper bowl is excavated, the guide oil needed for scraper bowl discharging action passes through corresponding pressure Sensor acquisition signal passes to controller;Left and right revolution action gathers a revolution signal by shuttle valve, and dipper is excavated, dipper is unloaded Material, large arm rise, large arm declines, scraper bowl is excavated, scraper bowl discharging action respectively gathers signal by a pressure transducer.
2. the excavator as claimed in claim 1 integrated valve group of pilot control system, is characterized in that, also including walking guide Valve, is provided with two pressure transducers, and one, the connector mouth of the two pressure transducers and a left side on the walking pilot valve Walking joint connection, another is walked joint with right lateral and is connected, and then is completed to left and right walk signal by the two pressure transducers Collection.
3. the excavator as claimed in claim 1 or 2 integrated valve group of pilot control system, is characterized in that, also including sensor Protective plate, the sensor guard plate is fixed on pile-up valve, and be positioned close to pile-up valve and be provided with pressure transducer patch One lateral edges of part mouth.
4. the excavator as claimed in claim 1 integrated valve group of pilot control system, is characterized in that, the shuttle valve includes being located at Integrated valve surface, the interior hexagonal plug being arranged at shuttle valve opening and inside pile-up valve, the steel that sets gradually from the bottom up Ball, O-ring and shuttle valve plug.
5. the excavator as claimed in claim 1 integrated valve group of pilot control system, is characterized in that, the pile-up valve adopts aluminum Prepared material.
CN201621133430.1U 2016-10-18 2016-10-18 Integrated valves of pilot control system for excavator Active CN206090685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621133430.1U CN206090685U (en) 2016-10-18 2016-10-18 Integrated valves of pilot control system for excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621133430.1U CN206090685U (en) 2016-10-18 2016-10-18 Integrated valves of pilot control system for excavator

Publications (1)

Publication Number Publication Date
CN206090685U true CN206090685U (en) 2017-04-12

Family

ID=59976060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621133430.1U Active CN206090685U (en) 2016-10-18 2016-10-18 Integrated valves of pilot control system for excavator

Country Status (1)

Country Link
CN (1) CN206090685U (en)

Similar Documents

Publication Publication Date Title
CN207436126U (en) Dredger dust-extraction unit
CN107830296A (en) A kind of gas feedback device for preventing water hammer valve module for colliery
CN203808133U (en) Underwater secondary ditching device
CN203393766U (en) Drag head for drag suction dredger
CN206090685U (en) Integrated valves of pilot control system for excavator
CN208441839U (en) A kind of U-shaped shield machine
CN207331794U (en) A kind of intelligence silt remover
CN204960869U (en) Simple and easy wellhead assembly of clamp formula
CN208792399U (en) A kind of plow-in cable ditch excavation equipment
CN203594060U (en) Excavator used safely
CN112878405B (en) Application of excavating depth measurement of trailing suction hopper dredger
CN106592549B (en) A kind of flexibility cyanobacteria enclosure device
CN209197845U (en) The long continuation of the journey monitoring device of water level on the outside of a kind of construction of structures based on BIM
CN202157339U (en) Concrete inspection well chamber with flexible-joint connecting branch pipe
CN221195058U (en) Pressure relief slurry discharge auxiliary device for preventing shield from gushing
CN205576997U (en) Special dull and stereotyped flexible arm of excavator
CN210002359U (en) novel wash port drainage structure for protecting flood discharge tunnel bottom plate flow surface concrete
CN215857933U (en) Novel drag head of drag suction dredger
CN104934920A (en) Protection method and protection structure for collecting submarine cable in offshore wind farm after penetrating out of I/J-shaped pipe
CN213016354U (en) A pull throughs for shield constructs quick-witted foam pipeline
CN107725960A (en) A kind of valve module for preventing water hammer for colliery
CN209211519U (en) Install dust device and excavator at back shovel excavator
CN209568491U (en) A kind of waters dredging pipeline of high reliability
CN203057983U (en) Farmland underground irrigator
CN210660183U (en) Low negative pressure gas accumulation prevention gas collecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 266599 the Yellow River East Road, Huangdao District, Shandong, China, No. 75, No.

Patentee after: QINGDAO LOVOL ENGINEERING MACHINERY Co.,Ltd.

Address before: 266599 the Yellow River East Road, Huangdao District, Shandong, China, No. 75, No.

Patentee before: QINGDAO LOVOL EXCAVATOR Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 266500 No. 75 East Huanghe Road, Huangdao District, Qingdao City, Shandong Province

Patentee after: LOVOL Engineering Machinery Group Co.,Ltd.

Address before: 266599 No. 75 east the Yellow River Road, Huangdao District, Shandong, Qingdao

Patentee before: QINGDAO LOVOL ENGINEERING MACHINERY Co.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: 266500 No. 75 East Huanghe Road, Huangdao District, Qingdao City, Shandong Province

Patentee after: Lovol Heavy Industry Group Co.,Ltd.

Address before: 266500 No. 75 East Huanghe Road, Huangdao District, Qingdao City, Shandong Province

Patentee before: LOVOL Engineering Machinery Group Co.,Ltd.

CP01 Change in the name or title of a patent holder