CN206089772U - Copper melting equipment - Google Patents

Copper melting equipment Download PDF

Info

Publication number
CN206089772U
CN206089772U CN201620801646.4U CN201620801646U CN206089772U CN 206089772 U CN206089772 U CN 206089772U CN 201620801646 U CN201620801646 U CN 201620801646U CN 206089772 U CN206089772 U CN 206089772U
Authority
CN
China
Prior art keywords
furnace
copper making
heater
making equipment
equipment according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620801646.4U
Other languages
Chinese (zh)
Inventor
尉克俭
蒋继穆
李东波
张海鑫
李兵
黎敏
陆金忠
吴金财
李锋
颜杰
曹珂菲
张振民
崔大韡
唐续龙
许欣
孙晓峰
李海春
李晓霞
李建辉
吴玲
李栋
周钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201620801646.4U priority Critical patent/CN206089772U/en
Application granted granted Critical
Publication of CN206089772U publication Critical patent/CN206089772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model discloses a copper melting equipment, copper melting equipment includes: the bottom blowing smelting furnace, the converting furnace, the converting furnace with the bottom blowing smelting furnace links to each other and lies in on process direction is smelted to copper the rear of bottom blowing smelting furnace, the converting furnace includes furnace body and a plurality of spray gun, furnace has in the furnace body, and it is a plurality of the spray gun is established the top of furnace body and stretching into under to from last furnace. According to the utility model discloses copper melting equipment has the furnace body high -usage, need not frequently to examine and repair advantages such as maintenance, whole operation rate height and productivity height.

Description

Copper making equipment
Technical field
This utility model is related to metallurgical technology field, in particular to a kind of Copper making equipment.
Background technology
Copper making equipment in correlation technique, including smelting furnace and converting furnace, the hot copper matte regulus quilt after smelting stove melting It is delivered to converting furnace to be blown.Wherein, converting furnace generally adopts top blast converting furnace, and molten bath is shallower compared with depth for burner hearth, body of heater Utilization rate is relatively low, also, repair and maintenance is frequently, need to stop production when spray gun is safeguarded in replacing, cause overall operation rate relatively low.This Outward, due to dimension-limited, the maximum production capacity of top blast converting furnace only has 100,000 tons of copper/years.
Utility model content
This utility model is intended at least to solve to a certain extent one of above-mentioned technical problem in correlation technique.For this purpose, The utility model proposes a kind of Copper making equipment, the Copper making equipment have body of heater utilization rate it is high, without the need for frequent repair and maintenance, whole The advantages of body operating rate is high high with production capacity.
For achieving the above object, a kind of Copper making equipment is proposed according to embodiment of the present utility model, the Copper making sets It is standby to include:Bottom-blown smelting stove;Converting furnace, the converting furnace are connected with the bottom-blown smelting stove and upper in Copper making process orientation In the rear of the bottom-blown smelting stove, the converting furnace includes thering is burner hearth, Duo Gesuo in body of heater and multiple spray guns, the body of heater State spray gun to be located at the top of the body of heater and stretch into the burner hearth from top to bottom.
According to the Copper making equipment of this utility model embodiment have body of heater utilization rate it is high, without the need for frequent repair and maintenance, whole The advantages of body operating rate is high high with production capacity.
In addition, can also have following additional technical characteristic according to the Copper making equipment of this utility model embodiment:
According to one embodiment of the present utility model, the bottom-blown smelting stove is located above the converting furnace and passes through chute It is connected with the converting furnace.
According to one embodiment of the present utility model, the Copper making equipment also includes sedimentation electric furnace, the sedimentation electric furnace It is connected between the bottom-blown smelting stove and the converting furnace and the bottom-blown smelting is located on the Copper making process orientation Between stove and converting furnace.
According to one embodiment of the present utility model, the body of heater is horizontal body of heater.
According to one embodiment of the present utility model, the height of the burner hearth is respectively smaller than the width of the burner hearth and described The length of burner hearth.
According to one embodiment of the present utility model, the cross-sectional area of the burner hearth is from top to bottom gradually reduced.
According to one embodiment of the present utility model, multiple spray guns are respectively along the length direction and width of the body of heater Direction is arranged in rows and columns.
According to one embodiment of the present utility model, the rows and columns spray gun is respectively in the length direction of the body of heater With the center on width positioned at the body of heater.
According to one embodiment of the present utility model, the burner hearth includes the spray gun region for arranging in the horizontal direction and non-spray Rifle region, multiple spray guns are located in the spray gun region.
According to one embodiment of the present utility model, the non-spray gun region is arranged around the spray gun region.
According to one embodiment of the present utility model, the spray gun is water cooled lance or non-water cooled lance.
According to one embodiment of the present utility model, the body of heater is fixed body of heater.
According to one embodiment of the present utility model, the body of heater includes:Elastic skeleton;Furnace body, the furnace body set On the elastic skeleton and the burner hearth is formed in the furnace body, multiple spray guns are arranged on the elastic skeleton On.
According to one embodiment of the present utility model, the side wall of the furnace body is outward-dipping from the bottom to top.
Description of the drawings
Fig. 1 is the structural representation of the Copper making equipment according to this utility model embodiment.
Fig. 2 is the structural representation of the Copper making equipment according to this utility model another embodiment.
Fig. 3 is the front sectional view of the converting furnace of the Copper making equipment according to this utility model embodiment.
Fig. 4 is the side view cutaway drawing of the converting furnace shown in Fig. 3.
Fig. 5 is the top view of the converting furnace shown in Fig. 3.
Reference:
Copper making equipment 1000,
Bottom-blown smelting stove 2, chute 3, sedimentation electric furnace 4,
Converting furnace 1,
Body of heater 100, elastic skeleton 110, furnace body 120, burner hearth 121, spray gun region 122, non-spray gun region 123,
Spray gun 200.
Specific embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein ad initio Same or similar element or the element with same or like function are represented to same or similar label eventually.Below by ginseng The embodiment for examining Description of Drawings is exemplary, it is intended to for explaining this utility model, and it is not intended that to this utility model Restriction.
This utility model is that the discovery based on present inventor to following facts and problem is made:
Top blast converting furnace in correlation technique, such as Ausmelt furnace or Isa furnace, body of heater are vertical cylinder shape, using single rifle top Blow form.
The air-supply of single rifle, air quantity are big, and stirring is violent, and melt splash is serious, therefore to be arranged higher of burner hearth, while in molten bath The depth of melt needs shallower, and one is that excessive Melt Stirring is violent, momentum is big, easily causes body of heater to rock, design it is bad also Factory Building resonance is easily caused, two is that spray gun is not easy to blow through, and the speed of technological reaction will be impacted.Therefore, burner hearth molten bath deeply It is shallow, cause the utilization rate of whole body of heater relatively low.
Also, as single rifle air output is big and splash serious, spray gun abrasion and ablation situation are serious, the service life of spray gun It is universal not long, even water-cooling welding torch there is also the problem of pipette tips blocking and scaling loss, it is therefore desirable to frequently repair and maintenance and replacing, and When maintenance spray gun is changed, needs stop sending technique wind, stop sending material, it is meant that top blast stove will stop production, be only incubated Operation, as spray gun changes frequent, causes the overall operation rate of top blast stove relatively low.
Further, since the maximum tolerance sent by single rifle has certain restriction, only cause the maximum production capacity of top blast converting furnace There are 100,000 tons of copper/years.
Thus, the top blast converting furnace in correlation technique exist body of heater utilization rate is relatively low, repair and maintenance frequently, overall operation Rate is relatively low and the low deficiency of production capacity.
For this purpose, a kind of Copper making equipment 1000 is proposed according to embodiment of the present utility model, below with reference to the accompanying drawings root is described According to the Copper making equipment 1000 of this utility model embodiment.
As Figure 1-Figure 5, bottom-blown smelting stove 2 is included according to the Copper making equipment 1000 of this utility model embodiment and is blown Furnace 1.
Converting furnace 1 includes body of heater 100 and multiple spray guns 200.There is in body of heater 100 burner hearth 121 and body of heater 100 is provided with point Charge door, discharge port and the outlet flue not connected with burner hearth 121.Multiple spray guns 200 are located at the top of body of heater 100 and from top to bottom Stretch into burner hearth 121.The charge door of converting furnace 1 is connected with bottom-blown smelting stove 2, and on Copper making process orientation, converting furnace 1 is located at The rear of bottom-blown smelting stove 2.
It will be appreciated by those skilled in the art that ground is that bottom-blown smelting stove 2 is referred to, spray gun is located at the bottom of melting body of heater, From bottom to up into body of heater spray oxygen and air etc..The Copper making process orientation refers to, in the whole technological process of Copper making In, the priority orientation of each processing step.
According to the Copper making equipment 1000 of this utility model embodiment, its converting furnace 1 is by arranging at the top of body of heater 100 Multiple spray guns 200, constitute multiple gun top blast structure, so as to advantages below:
Multiple gun blows, and injection is distributed in whole molten bath than more uniform, it is not necessary to stir whole by single spray gun Molten bath, therefore the injecting velocity of every spray gun is low, single spray gun 200 to send technique air quantity arrange less.Single rifle injection Speed is low, and jet amount is few, and splash also with regard to very little, can be deepened so as to burner hearth 121 need not arrange melt in higher and molten bath, and then The utilization rate of body of heater 100 can be improved.
Also, as the air output of every spray gun 200 is relatively small, splash is little, and injecting velocity is relatively low, therefore spray gun 200 abrasion and ablation situation are lighter, long service life, without the need for frequent repair and maintenance and replacing, and safeguard spray gun 200 in replacing When, need to only stop the spray gun 200 for needing to change, and the spray gun 200 that other need not be changed can continue blowing, therefore converting furnace 1 need not stop material, and production persistently can be carried out, and then improve the overall operation rate of converting furnace 1.
Additionally, converting furnace 1 can need to arrange the spray gun 200 of varying number according to scale, therefore production capacity is unrestricted, example Such as, 400,000 tons of copper/years or more high productive capacity be can reach.
Therefore, there is body of heater utilization rate height, frequently need not examines according to the Copper making equipment 1000 of this utility model embodiment The advantages of repairing maintenance, high overall operation rate and high production capacity.
Below with reference to the accompanying drawings Copper making equipment 1000 according to this utility model specific embodiment described.
As Figure 1-Figure 5, bottom-blown smelting stove 2 is included according to the Copper making equipment 1000 of this utility model embodiment and is blown Furnace 1.
Wherein, as depicted in figs. 1 and 2, bottom-blown smelting stove 2 is located above converting furnace 1, and bottom-blown smelting stove 2 passes through chute 3 It is connected with converting furnace 1, converting furnace 1 is fallen into by chute 3 under gravity by the hot copper matte regulus etc. of 2 output of bottom-blown smelting stove, it is real Existing conveying of the material between bottom-blown smelting stove 2 and converting furnace 1, and additional energy source need not be consumed.
Alternatively, as shown in Fig. 2 Copper making equipment 1000 also includes sedimentation electric furnace 4, sedimentation electric furnace 4 is connected to bottom blowing and melts Between furnace 2 and converting furnace 1, sedimentation electric furnace 4 be located on the Copper making process orientation bottom-blown smelting stove 2 and converting furnace 1 it Between.For example, settle electric furnace 4 to be connected with bottom-blown smelting stove 2, chute 3 is connected with sedimentation electric furnace 4 and converting furnace 1 respectively.It is possible thereby to Enter row buffering and sedimentation point before into converting furnace 1 using sedimentation 4 pairs of hot copper matte regulus by 2 output of bottom-blown smelting stove of electric furnace etc. From.
In some specific embodiments of the present utility model, as shown in Figure 3 and Figure 4, body of heater 100 is horizontal body of heater.For example, The height in the vertical direction of burner hearth 121 is respectively smaller than the width in the horizontal direction of burner hearth 121 and length.
Thus, burner hearth 121 compare the single rifle top blast converting furnace in correlation technique burner hearth it is shorter, only in correlation technique The even a quarter of 1/3rd of the height of the burner hearth of single rifle top blast converting furnace, so when replacing is safeguarded, spray gun 200 is extracted The stroke of burner hearth 121 is shorter, such that it is able to reduce the height of Factory Building, and then reduces overall construction cost.
Also, as burner hearth 121 is shorter, charging system is very high without the need for being lifted, and reduce further construction cost.
Additionally, the hot copper matte regulus of 2 output of bottom-blown smelting stove can flow directly into burner hearth 121 by chute 3, it is to avoid packaging is fallen The low vacancy pollution that fortune is brought, is conducive to distributing rationally, reduction such as cooling, the again intermediate step such as broken, takes full advantage of melt Heat, be conducive to energy-saving and emission-reduction.
In some specific examples of the present utility model, as shown in figure 5, multiple spray guns 200 are respectively along the length of body of heater 100 Direction and width are arranged in rows and columns, the rows and columns spray gun 200 respectively body of heater 100 length direction and Positioned at the center of body of heater 100 on width.
Further, as shown in figure 5, burner hearth 121 includes the spray gun region 122 for arranging in the horizontal direction and non-spray gun region 123, multiple spray guns 200 are located in spray gun region 122, and for example, non-spray gun region 123 is arranged around spray gun region 122.Thus may be used It is beneficial to the separation of metal and slag in stove such that it is able to improve the response rate of valuable metal.
Alternatively, spray gun 200 is water cooled lance, so as to the life-span length of spray gun 200, changes easy.Certainly, spray gun 200 Can be non-aqueous cold spray gun, it is easy so as to manufacture production, while being designed to rotatable, it is to avoid bond with the bell of body of heater 100.
In some specific embodiments of the present utility model, body of heater 100 is that fixed body of heater, i.e. body of heater 100 be not rotatable, It is possible thereby to convenient arrange discharge port, outlet flue and charge door etc., and good airproof performance.
Specifically, as shown in Figure 3-Figure 5, body of heater 100 includes elastic skeleton 110 and furnace body 120.Furnace body 120 sets On elastic skeleton 110, furnace body 120 has bell and burner hearth 121 is formed in furnace body 120, and multiple spray guns 200 are arranged on On elastic skeleton 110 and it is passed down through bell and stretches into burner hearth 121.Elastic skeleton 110 is used to support furnace body 120, and can be right Furnace body 120 plays a part of damping, buffering.
Advantageously, as shown in Figure 3-Figure 5, the cross-sectional area of burner hearth 121 is from top to bottom gradually reduced, for example, body of heater 100 Each side wall is outward-dipping from the bottom to top.
Alternatively, converting furnace 1 can carry out Cooling Design and refractory design for different positions, to ensure converting furnace 1 Service life, and can need flexibly to add anode scrap and other cold copper materials according to thermal balance.
According to the Copper making equipment 1000 of this utility model embodiment, converting furnace 1 adopts horizontal multiple gun top blast, with body of heater Utilization rate is high, without the need for frequent repair and maintenance, overall operation rate is high, production capacity is high, construction cost is low, beneficial to the advantages of energy-saving and emission-reduction.
Other according to the Copper making equipment 1000 of this utility model embodiment are constituted and are operated common for this area All it is known for technical staff, is not detailed herein.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " horizontal ", " length ", " width Degree ", " thickness ", " on ", D score, "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outward ", " suitable The orientation or position relationship of the instruction such as hour hands ", " counterclockwise " is based on orientation shown in the drawings or position relationship, merely to just In description this utility model and simplified description, rather than indicate or imply that the device or element of indication there must be specifically side Position, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.
Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or implying relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Implicitly include one or more this feature.In description of the present utility model, " multiple " are meant that at least two, example Such as two, three etc., unless otherwise expressly limited specifically.
In this utility model, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection ", " Gu It is fixed " etc. term should be interpreted broadly, it is for example, it may be fixedly connected, or be detachably connected or integral;Can be It is mechanically connected, or electrically connects;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two The connection of element internal or the interaction relationship of two elements.For the ordinary skill in the art, can basis Concrete condition understands concrete meaning of the above-mentioned term in this utility model.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show Example ", or the description of " some examples " etc. mean specific features with reference to the embodiment or example description, structure, material or spy Point is contained at least one embodiment of the present utility model or example.In this manual, the schematic table to above-mentioned term State.And, the specific features of description, structure, material or feature can be with Combined in one or more any embodiment or example in an appropriate manner.Additionally, those skilled in the art can be by Different embodiments or example described in this specification are engaged and are combined.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is Exemplary, it is impossible to it is interpreted as to restriction of the present utility model, one of ordinary skill in the art is in scope of the present utility model It is interior above-described embodiment to be changed, be changed, being replaced and modification.

Claims (14)

1. a kind of Copper making equipment, it is characterised in that include:
Bottom-blown smelting stove;
Converting furnace, the converting furnace are connected with the bottom-blown smelting stove and the bottom-blown smelting are located on Copper making process orientation The rear of stove, the converting furnace include thering is burner hearth in body of heater and multiple spray guns, the body of heater, and multiple spray guns are located at described The top of body of heater and the burner hearth is stretched into from top to bottom.
2. Copper making equipment according to claim 1, it is characterised in that the bottom-blown smelting stove is located on the converting furnace It is connected just and with the converting furnace by chute.
3. Copper making equipment according to claim 1, it is characterised in that also including sedimentation electric furnace, the sedimentation electric furnace connects It is connected between the bottom-blown smelting stove and the converting furnace and the bottom-blown smelting stove is located on the Copper making process orientation And converting furnace between.
4. the Copper making equipment according to any one of claim 1-3, it is characterised in that the body of heater is horizontal body of heater.
5. Copper making equipment according to claim 4, it is characterised in that the height of the burner hearth is respectively smaller than the burner hearth Width and the burner hearth length.
6. the Copper making equipment according to any one of claim 1-3, it is characterised in that the cross-sectional area of the burner hearth by Up to it is gradually reduced down.
7. the Copper making equipment according to any one of claim 1-3, it is characterised in that multiple spray guns are respectively along institute The length direction and width for stating body of heater is arranged in rows and columns.
8. Copper making equipment according to claim 7, it is characterised in that the rows and columns spray gun is respectively in the stove Positioned at the center of the body of heater on the length direction and width of body.
9. the Copper making equipment according to any one of claim 1-3, it is characterised in that the burner hearth is included along level side To the spray gun region and non-spray gun region of arrangement, multiple spray guns are located in the spray gun region.
10. Copper making equipment according to claim 9, it is characterised in that the non-spray gun region surrounds the spray gun area Domain is arranged.
The 11. Copper making equipment according to any one of claim 1-3, it is characterised in that the spray gun is water cooled lance Or non-water cooled lance.
The 12. Copper making equipment according to any one of claim 1-3, it is characterised in that the body of heater is fixed stove Body.
The 13. Copper making equipment according to any one of claim 1-3, it is characterised in that the body of heater includes:
Elastic skeleton;
Furnace body, the furnace body is located on the elastic skeleton and the burner hearth is formed in the furnace body, multiple described Spray gun is arranged on the elastic skeleton.
14. Copper making equipment according to claim 13, it is characterised in that the side wall of the furnace body is outside from the bottom to top Incline.
CN201620801646.4U 2016-07-27 2016-07-27 Copper melting equipment Active CN206089772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620801646.4U CN206089772U (en) 2016-07-27 2016-07-27 Copper melting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620801646.4U CN206089772U (en) 2016-07-27 2016-07-27 Copper melting equipment

Publications (1)

Publication Number Publication Date
CN206089772U true CN206089772U (en) 2017-04-12

Family

ID=58467200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620801646.4U Active CN206089772U (en) 2016-07-27 2016-07-27 Copper melting equipment

Country Status (1)

Country Link
CN (1) CN206089772U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106048252A (en) * 2016-07-27 2016-10-26 中国恩菲工程技术有限公司 Copper smelting equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106048252A (en) * 2016-07-27 2016-10-26 中国恩菲工程技术有限公司 Copper smelting equipment

Similar Documents

Publication Publication Date Title
CN105603135A (en) High-temperature liquid-state slag dry type centrifugation and granulation waste heat recycling system and method
CN202195692U (en) Oxygen-enrichment side-blowing continuous fuming furnace
CN202482409U (en) Oxygen-rich side-blow reduction molten pool smelting furnace applicable to tin smelting by tin-rich complex materials
CN102796875B (en) Zinc leaching residue treatment unit and treatment process
CN111321272A (en) Steelmaking device and process for continuously preheating scrap steel
JP5726614B2 (en) Refractory brick cooling structure and method for converter
CN206089769U (en) Copper melting equipment
CN108707714A (en) A kind of steel scrap and iron content solid waste multi-functional melt furnace
CN104848682B (en) Bath smelting furnace
CN102899497A (en) Zinc leaching slag treatment device and treatment process
CN205980803U (en) Metallurgical furnace
CN206089772U (en) Copper melting equipment
CN204301511U (en) Smelting furnace
CN206089771U (en) Copper melting equipment
WO2017193704A1 (en) Metallurgical furnace
CN204301488U (en) For the cleaning plant of smelting furnace
CN106048253A (en) Copper smelting equipment
CN105823342A (en) Metallurgical furnace
CN206089770U (en) Copper melting equipment
CN208155036U (en) Produce the furnace cupola of rock wool
CN105603208A (en) Metallurgical furnace
CN104894390A (en) Method of adopting oxygen-enriched vortex bath smelting furnace for treatment of jamesonite
CN202558907U (en) Continuous blowing furnace for blowing water quenched matte
CN211854867U (en) Quick aluminum melting furnace capable of continuously discharging aluminum
CN106048252A (en) Copper smelting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant