CN206089394U - River course heavy metal bed mud adsorption column - Google Patents

River course heavy metal bed mud adsorption column Download PDF

Info

Publication number
CN206089394U
CN206089394U CN201621067108.3U CN201621067108U CN206089394U CN 206089394 U CN206089394 U CN 206089394U CN 201621067108 U CN201621067108 U CN 201621067108U CN 206089394 U CN206089394 U CN 206089394U
Authority
CN
China
Prior art keywords
adsorption column
heavy metal
river course
bed mud
metal bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621067108.3U
Other languages
Chinese (zh)
Inventor
唐奇军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Environmental Protection Ltd By Share Ltd
Original Assignee
Hunan Environmental Protection Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Environmental Protection Ltd By Share Ltd filed Critical Hunan Environmental Protection Ltd By Share Ltd
Priority to CN201621067108.3U priority Critical patent/CN206089394U/en
Application granted granted Critical
Publication of CN206089394U publication Critical patent/CN206089394U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Solid-Sorbent Or Filter-Aiding Compositions (AREA)

Abstract

River course heavy metal bed mud adsorption column includes that the countersunk head that is located the lower part is held and the absorption end on upper portion, the countersunk head end is the metal point form body for the cartridge is fixed in river sediment, and adsorb and hold the shaping in the countersunk head portion of serving, including casing and the adsorption column of shaping in the casing, the casing is ceramic shell and at surperficial equipartition micropore, in addition, still is provided with the clearance intermediate layer between casing and adsorption column, from the casing to having set gradually micropore filtration membrane, porous adsorbed particle filling layer and graphene film layer the adsorption column in this clearance intermediate layer. The utility model is used for adsorb heavy metal and partial organic matter in the river course heavy metal bed mud, it is low, with low costs to have the energy consumption, and application scope is wide, and the treatment effeciency is high, advantages such as easy operation.

Description

River course heavy metal bed mud adsorption column
Technical field
This utility model is related to the recovery technique field of heavy metal soil, specially a kind of river course heavy metal bed mud absorption Post.
Background technology
With the development of social economy, all can produce large amount of sewage during daily productive life and moisture content is higher Sludge, hydrolyzed solution and other waste liquids etc..Containing substantial amounts of heavy metal substance and the difficult Organic substance for decomposing in these pollutant Deng harmful substance, even if some pollutant are processed, but the heavy metal ion for containing still has greatly by direct Or indirectly mode is entered in the middle of ambient soil, greatly harm is caused to human body.
In the prior art, for by heavy metal pollution river bottom mud administering method mainly include activated sludge process, Change water law, soil replacement method, landfill method, biological restoration etc., but big multi-method is the drawbacks of have certain:Activated sludge process operating procedure Complexity, and the culture of activated sludge has certain difficulty:Change water law and soil replacement method quantities is excessively great, invest higher;Landfill Method is not thoroughly processed pollutant, but by pollution transportation, does not meet the demand for development of environmental friendliness society;Biological restoration Method is time-consuming longer, and efficiency is low so that its practicality is had a greatly reduced quality.
Utility model content
The technical problem that this utility model is solved is to provide a kind of river course heavy metal bed mud adsorption column, above-mentioned to solve Shortcoming in background technology.
The technical problem that this utility model is solved employs the following technical solutions to realize:
River course heavy metal bed mud adsorption column, including the countersunk head end positioned at bottom and the absorption end on top, wherein, it is described heavy Head end is the pointed body of metal, to insert and is fixed in river bottom mud, and the absorption end is molded over countersunk head end top, including Housing and molding adsorption column in the housing, the housing is ceramic shell and in the uniform micropore in surface, in addition, housing with And gap interlayer is additionally provided between adsorption column, from housing to being disposed with microporous filter adsorption column in this gap interlayer Film, porous adsorption particle packed layer and Graphene film layer.
It is to reduce the impact that turbulent water works adsorption column in this utility model, the housing cross-sectional is rhombus, And the long-diagonal of rhombus:The ratio of short diagonal is 3: 1.
In this utility model, the micropore size of the surface of shell is 3~5mm.
In this utility model, the adsorption column is in salicylide modification of chitosan, attapulgite or monkey grass A kind of compaction moulding.
In this utility model, the porous adsorption particle material filled in porous adsorption particle packed layer is glass fibre One kind in silk, meerschaum, modified zeolite.
In this utility model, the Graphene film layer has 2~3 layers of monatomic Graphene to stack molding, and outsourcing is being inhaled On attached column outer surface.
Beneficial effect:Adsorption column of the present utility model can carry out gridding arrangement in river bottom mud, using each absorption Post adsorbs the heavy metal near inserting point in number square meter in sludge, and it is little to river course disturbance, and water body is had no side effect, and also will not Affect the original ecosystem of water body, the adsorption column after absorption directly can move out heavy metal by way of extracting, and also can pass through The adsorption effect of heavy metal, improves heavy metal-polluted in repeatedly changing adsorption column and increasing adsorption column consumption to strengthen river bottom mud The treatment effeciency of dye.
Description of the drawings
Fig. 1 is the schematic diagram of this utility model preferred embodiment.
Fig. 2 is the Section A-A schematic diagram of this utility model preferred embodiment.
Wherein:1st, end is adsorbed;2nd, countersunk head end;3rd, housing;4th, micropore filtering film;5th, porous adsorption particle packed layer;6th, stone Black alkene film layer;7th, adsorption column.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that this utility model is realized are easy to understand, under Face combines and is specifically illustrating, and this utility model is expanded on further.
Referring to the preferred embodiment of the river course heavy metal bed mud adsorption column of Fig. 1, Fig. 2, in the present embodiment, river course heavy metal Bed mud adsorption column includes absorption end 1 and countersunk head end 2, and countersunk head end 2 makes to insert and be fixed on river course for stainless steel material In bed mud, and adsorb end 1 and be molded over the top of countersunk head end 2, including housing 3 made by ceramic material and be molded in housing 3 Composite adsorbing material.
Wherein, housing 3 is hollow diamond-shaped cross-section post, and the micropore that aperture is 5mm is evenly equipped with its outer surface, and cross section is Long-diagonal:The ratio of short diagonal is 3: 1 rhombus, during assembling, the long-diagonal of housing 3 is adjusted to and is put down with water (flow) direction OK, it is inserted in river bottom mud, so arranges and coordinate the structure of housing 3 effectively to reduce turbulent water to adsorption column work The impact of work.
Composite adsorbing material in housing 3 includes being located at the adsorption column 7 in centre position in housing 3, and this adsorption column 7 is bigcatkin willow Aldehyde modification of chitosan compaction moulding, outside is enclosed with the Graphene film layer 6 that three layers of monatomic Graphene stack molding, and in housing 3 inner side is then pasted with micropore filtering film 4, and meerschaum filler is then filled between micropore filtering film 4 and Graphene film layer 6 As porous adsorption particle packed layer 5 as porous adsorption particle packed layer.
Ultimate principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description Simply illustrate principle of the present utility model, on the premise of without departing from this utility model spirit and scope, this utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed this utility model.This utility model Claimed scope is by appending claims and its equivalent thereof.

Claims (6)

1. river course heavy metal bed mud adsorption column, including the countersunk head end positioned at bottom and the absorption end on top, it is characterised in that institute Countersunk head end is stated for the pointed body of metal, to insert and is fixed in river bottom mud, and the absorption end is molded over countersunk head end top, Including housing and molding adsorption column in the housing, the housing is ceramic shell and in the uniform micropore in surface, in addition, in shell Gap interlayer is additionally provided between body and adsorption column, from housing to being disposed with micropore adsorption column in this gap interlayer Filter membrane, porous adsorption particle packed layer and Graphene film layer.
2. heavy metal bed mud adsorption column in river course according to claim 1, it is characterised in that the housing cross-sectional is Pedicellus et Pericarpium Trapae Shape, and the long-diagonal of rhombus:The ratio of short diagonal is 3: 1.
3. heavy metal bed mud adsorption column in river course according to claim 1, it is characterised in that the micropore hole of the surface of shell Footpath is 3~5mm.
4. heavy metal bed mud adsorption column in river course according to claim 1, it is characterised in that the adsorption column changes for salicylide A kind of compaction moulding in property shitosan, attapulgite or monkey grass.
5. heavy metal bed mud adsorption column in river course according to claim 1, it is characterised in that in porous adsorption particle packed layer The porous adsorption particle material of filling is the one kind in glass fiber, meerschaum, modified zeolite.
6. heavy metal bed mud adsorption column in river course according to claim 1, it is characterised in that the Graphene film layer has 2~3 The monatomic Graphene of layer stacks molding, and outsourcing is on absorption outer surface of column.
CN201621067108.3U 2016-09-01 2016-09-01 River course heavy metal bed mud adsorption column Active CN206089394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621067108.3U CN206089394U (en) 2016-09-01 2016-09-01 River course heavy metal bed mud adsorption column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621067108.3U CN206089394U (en) 2016-09-01 2016-09-01 River course heavy metal bed mud adsorption column

Publications (1)

Publication Number Publication Date
CN206089394U true CN206089394U (en) 2017-04-12

Family

ID=58480120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621067108.3U Active CN206089394U (en) 2016-09-01 2016-09-01 River course heavy metal bed mud adsorption column

Country Status (1)

Country Link
CN (1) CN206089394U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108394954A (en) * 2018-05-11 2018-08-14 佛山市金净创环保技术有限公司 Water tank purification device and preparation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108394954A (en) * 2018-05-11 2018-08-14 佛山市金净创环保技术有限公司 Water tank purification device and preparation method

Similar Documents

Publication Publication Date Title
CN206083401U (en) A pre -buried device of slowly -releasing for soil restoration agent
Kong et al. Two-dimensional material-based functional aerogels for treating hazards in the environment: Synthesis, functional tailoring, applications, and sustainability analysis
CN103663601A (en) Method for absorptively separating low-concentration heavy-metal ions by utilizing graphene oxide colloid
CN206089394U (en) River course heavy metal bed mud adsorption column
Ling et al. Facile preparation of polyurethane sponge decorated with polydopamine/BiVO4 for dye photocatalytic degradation under visible light and oil–water separation
CN110510705B (en) Portable efficient membrane separation water purifying device and assembly method thereof
CN206624712U (en) A kind of water sample pretreatment rapid filter device for environmental monitoring laboratory
CN206692482U (en) A kind of Portable water purifying bottle
CN206083400U (en) Absorption ceramic pipe of multiple hole soil heavy metal
CN202536099U (en) Cigarette composite filter tip rod
CN206645859U (en) A kind of sewage-treatment plant for stirring Joint adsorption
CN206553284U (en) A kind of compound flow constructed wetland structure for handling waste-water from coal mine
CN201395237Y (en) Bamboo-mattress adsorbing raft applied in the emergency treatment of burst polluted rivers
CN206325295U (en) A kind of sewage water filtration bucket
CN207537244U (en) A kind of nanoparticle filter plant
CN205115163U (en) Sewage filter
CN205549884U (en) Filter screen air purifier
CN206328179U (en) A kind of utilization modified Nano iron particle removes the device of Cr VI in water removal
CN205917062U (en) Biofilm carrier jar that sewage treatment used
CN205463594U (en) Repair system is synthesized to high fluorine area groundwater
CN111533202A (en) Heavy metal adsorption transfer device for water body restoration
CN204865124U (en) Oil recovery contaminated water filtration apparatus
CN106499473B (en) A kind of vehicle exhaust film purifying device
CN110451686A (en) A kind of oxidation-absorbing synergic purifier
CN105668683B (en) One kind filtering purifier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: River heavy metal sediment adsorption column

Effective date of registration: 20220302

Granted publication date: 20170412

Pledgee: China Everbright Bank Co.,Ltd. Changsha Wanjiali road sub branch

Pledgor: ZHONGXIANG ENVIRONMENTAL PROTECTION CO.,LTD.

Registration number: Y2022430000014

PE01 Entry into force of the registration of the contract for pledge of patent right