A kind of installation fixed structure of ventilation terminal
Technical field
This utility model is related to the installation fixed structure of the ventilation terminal at ship deck.
Background technology
Ventilation terminal is installed on ship, for air-conditioning, the installation fixed structure of current ventilation terminal is included with matrix
Form is installed on four angle steel 102 on deck 101, and four companies for being installed on 103 upper surface of ventilation terminal in the matrix form
Lug 104,102 lower end of angle steel are bolted fixation with corresponding engaging lug 104, as shown in figure 1, due to deck surface not
Level(When especially deck is domed), therefore, the apparent height which arrives ventilation terminal is inconsistent, is to ensure that ventilation terminal installs water
It is flat, then the length of accurate angle steel is needed, this results in needs the length for being accurate to every angle steel, it is seen then that angle steel length value is not marked
It is accurate, it is impossible to realize batch production, production efficiency is reduced, and the angle steel for machining is needed when welded and installed is in deck surface
It is welded and fixed fully according to preassigned position, can otherwise causes angle steel connect with corresponding engaging lug, or
Make angle steel length long, so that ventilation terminal is installed do not measure up, once angle steel installation site mistake, then need to remove and pacify again
Dress, increases workload, reduces work efficiency;And work as after angle steel installs, when ventilation terminal is installed, once ventilation terminal and pipeline,
Cable and interior Xi parts are interfered, due to position it is non-adjustable, therefore, angle steel can only be removed and re-replaced so that workload is significantly increased,
Reduce work efficiency;Further, since in ship's space, can arrange the space of pipeline and electric wire be mainly variola and deck it
Between, and taking up room for angle steel is larger, therefore, cause the effective rate of utilization in space low.
Utility model content
It is adjustable that this utility model aims to provide a kind of ventilation terminal installation level, and reduce installation workload, improve work
The installation fixed structure of the ventilation terminal of efficiency.
A kind of installation fixed structure of ventilation terminal described in the utility model, including multiple mounting seats, the plurality of peace
Deck bottom surface is fixed in the arrangement that is square of dress base, and mounting seat concave surface forms inner groovy, sets on the bottom surface of inner groovy
Screwed hole is equipped with, the multiple and one-to-one connecting plate of mounting seat, connecting plate upper end on the ventilation terminal side surface, is fixed with
Horizontal buckling forms engaging lug, and screw rod one end passes through engaging lug, the other end to wear through the screwed hole in correspondence mounting seat, screw rod
Enter end and nut.
A kind of installation fixed structure of ventilation terminal described in the utility model, its mounting seat can be installed on specified in advance
Deck position, when needing to install fixed ventilation terminal, then can be in the indent groove bottom auger shell pit of mounting seat, so as to pass through spiral shell
Bar one end is screwed in screwed hole, the other end through the engaging lug on ventilation terminal, and nut, to fix ventilation terminal, due to spiral shell
Bar can be rotated relative to the screwed hole in mounting seat, so as to drive ventilation terminal to move up and down, therefore, in processing, as long as spiral shell
Pole length and its move up and down in height allowed band of the distance between deck and ceiling, then can be accurate to per root
The length of screw rod, so as to simplify the workload of screw rod processing, produces in batches screw rod, improves work efficiency, meanwhile, lead to
Rotary screw is crossed, then the levelness of conveniently adjusted ventilation terminal;And as mounting seat can be pre-installed, therefore, the later stage installs
During ventilation terminal, it is only necessary in the inner groovy internal drilling of mounting seat, to eliminate room hot job industry in advance, it is ensured that room
Insulation and paint application progress and construction period, shorten ship building period;When install ventilation terminal during, ventilation terminal with pipe
When road, cable are interfered, then screw thread hole site can be reselected on the bottom surface of the inner groovy of mounting seat, then can make ventilation terminal
Installation site is moved a certain distance, and so as to complete the mounting and adjusting of ventilation terminal, reduces installation workload, improves work effect
Rate;Further, since screw rod and mounting seat take up room it is little, it is, therefore, possible to provide more space arrangement pipeline, cable and its
His outfititem, improves space availability ratio.
Description of the drawings
Fig. 1 is prior art construction schematic diagram.
Fig. 2 is this utility model structural representation.
Specific embodiment
The installation fixed structure of a kind of ventilation terminal, as shown in Fig. 2 including multiple mounting seats 1, the plurality of mounting seat
Deck bottom surface is fixed in 1 arrangement that is square, and 1 concave surface of mounting seat forms inner groovy 2, arranges on the bottom surface of inner groovy 2
There is screwed hole 3, multiple and 1 one-to-one connecting plate 5 of mounting seat is fixed with 4 side surface of the ventilation terminal, on connecting plate 5
End horizontal buckling forms engaging lug 6, and 7 one end of screw rod passes through engaging lug 6, and the other end is through the screwed hole in correspondence mounting seat 1
3,7 penetrating end of screw rod is and nut.
6 surface of the engaging lug is provided with cross bore 8, and 7 one end of screw rod passes through through correspondence cross bore 8 and nut
Cross bore 8 is set, when ventilation terminal 4 occurs slight interference with pipeline, cable and other outfititems, the spiral shell of 7 bottom of screw rod is unclamped
Mother, all around moves relative to cross bore 8 such that it is able to adjusting screw rod 7, to readjust the position of ventilation terminal 4, it is to avoid with which
He interferes at installing component, it is to avoid drill in 2 bottom surface of inner groovy of mounting seat 1 again, reduces workload, only in ventilation terminal 4
When interfering slightly larger with other installing components, connected by the 2 bottom surface redrilling of inner groovy in mounting seat 1, and screw rod 7 relatively
The cross bore 8 of ear 6 is moved, so that 4 installation site of ventilation terminal is readjusted, it is to avoid interfere.
The nut includes the clamp nut 10 for pushing against nut 9 and 7 end of screw rod screw-in being enclosed within screw rod 7, by supporting
Tight nut 9 is engaged with clamp nut 10, makes screw rod 7 be connected more firm with mounting seat 1 with engaging lug 6 and screw rod 7.