CN206083432U - Discharging machine frame of steel pipe - Google Patents
Discharging machine frame of steel pipe Download PDFInfo
- Publication number
- CN206083432U CN206083432U CN201621066905.XU CN201621066905U CN206083432U CN 206083432 U CN206083432 U CN 206083432U CN 201621066905 U CN201621066905 U CN 201621066905U CN 206083432 U CN206083432 U CN 206083432U
- Authority
- CN
- China
- Prior art keywords
- buffer board
- vertical rod
- steel pipe
- sub
- prong
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Prostheses (AREA)
Abstract
The utility model discloses a discharging machine frame of steel pipe, prong constitutes by a plurality of, a plurality of prong structure is the same to along the equidistant range of same horizontal direction on same horizontal plane, all strengthen to connect poles through a plurality of on a plurality of prong's the up end and connect and form holistic frame construction, every prong by back pole setting, preceding pole setting, go up branch, down branch, down tube form, every prong still is provided with upper buffering plate, lower buffering plate and a plurality of expander on the same position, every expander becomes by two semi -circles or the half rectangle PPR nest of tubes, a plurality of prong's preceding pole setting lower extreme passes through the stiffener and links as an organic wholely, form the steel tube groove passageway between stiffener and a plurality of prong's the lower branch, a plurality of prong's bottom sets up a steel tube groove. The utility model discloses it is rational in infrastructure, realized the automatic ejection of compact, intensity of labour greatly reduced has improved discharging efficiency and ejection of compact quality that the base was managed simultaneously.
Description
【Technical field】
The utility model is related to the technical field of pipe-mill, the discharging frame of more particularly to a kind of steel pipe.
【Background technology】
With the development of steel and iron industry, technology is also constantly advancing, and is the good and fast development of China's steel and iron industry
There is provided guarantee, the rapid growth of economy is promoted.With the continuous improvement of China's economic level, China is for the demand of iron and steel
Amount will become increasing, and the stable development of steel industry is the basis for improving China's level of economic development.
At present, steel pipe is less efficient from the discharging from main frame, and needs human assistance to discharge, into next process,
Labour intensity is higher, and automaticity is relatively low, in order to solve the above problems, reduces improving the production of steel pipe while labour intensity
Efficiency, it is necessary to propose a kind of discharging frame of steel pipe.
【Utility model content】
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of discharging frame of steel pipe, its
Aim to solve the problem that steel pipe discharging efficiency is low in prior art, the high technical problem of labour intensity.
For achieving the above object, the utility model proposes a kind of discharging frame of steel pipe, is made up of several sub-stents,
Several described sub-stent structures are identical, and equidistantly arrange along same level direction in same level, described
Strengthen connecting rod by some on the upper surface of several sub-stents to connect to form holistic frame structure, each branch
Frame is also set by rear vertical rod, front vertical rod, upper rack posts, lower fulcrum bar, brace composition, each described sub-stent on identical position
Buffer board, lower buffer board and several deploying devices are equipped with, each deploying device is by two semicircles or half rectangle PPR pipe
Composition, the front vertical rod lower end of several described sub-stents is connected as a single entity by bracing piece, described bracing piece and several points
Chamfer putting steel tube passage is formed between the lower fulcrum bar of support, the bottom of several described sub-stents arranges a chamfer putting steel tube, described steel
The rear wall of tube seat is connected with the push rod head end of some cylinders, and described some cylinders are fixedly mounted on the rear vertical rod of respective branches frame
On.
Preferably, the quantity of described sub-stent is 5~7, the spacing of contiguous branch frame is 80~100cm, described
Chamfer putting steel tube upper surface highly less than bracing piece lower surface height.
Preferably, described rear vertical rod, front vertical rod, upper rack posts and lower fulcrum bar form opening frame in same perpendicular
Type structure, described rear vertical rod lower end is vertical with the rear end of lower fulcrum bar to be connected, and rear vertical rod upper end is vertical with upper rack posts rear end to be connected,
Described front vertical rod upper end is vertical with upper rack posts front end to be connected, and described upper buffer board is arranged on the lower surface of upper rack posts, institute
The upper rack posts lower surface stated is provided with several deploying devices in the both sides of upper buffer board, described front vertical rod and upper rack posts
Junction is provided with lower buffer board, and described rear vertical rod is connected with the junction of upper rack posts with one end of brace, brace it is another
End is positioned at the top of chamfer putting steel tube.
Preferably, described upper rack posts lower surface is provided with 2 deploying devices, difference position in the both sides of upper buffer board
The top of top, lower buffer board top and brace epimere in upper buffer board rear and front end.
Preferably, the rear and front end of described upper buffer board respectively forwardly lower section, the back lower place incline identical angle, institute
The lower buffer board stated inclined downward backward, and being fixedly connected with front vertical rod by support bar, described brace is in bending, epimere
Forward downward is inclined, and the angle of inclination of the epimere of upper buffer board rear and front end, lower buffer board and brace is identical, be 55 °~
60°。
Preferably, the upper surface of the rear and front end of described upper buffer board, the upper surface of lower buffer board and brace is upper
Surface is coated with elastic protection layer.
Preferably, two semicircles or half rectangle PPR pipe on described deploying device are by brake apparatus and control
Device connects, and realizes opening and closes.
Preferably, described some are strengthened connecting rod and are equidistantly uniformly distributed on the upper surface of sub-stent.
Preferably, the quantity of described reinforcement connecting rod is 2~6.
Preferably, the bottom of described chamfer putting steel tube is provided with some rollers, described roller can be along respective branches frame
On lower fulcrum bar on slot rolling scroll forward and backward, realize the release and propulsion of chamfer putting steel tube.
The beneficial effects of the utility model:Compared with prior art, the discharging machine of a kind of steel pipe that the utility model is provided
Frame, it is rational in infrastructure, the discharging frame of a frame structure is combined into by several sub-stents, by brake apparatus and control device
4 deploying devices of connection are capable of achieving the holding of the base pipe exported from pipe-mill and automatic order blanking, while can also protect
Shield base pipe prevents scratch abrasion;By base pipe of the epimere of upper buffer board two ends, lower buffer board and brace to correspondence position blanking
Buffer protection is carried out, is tumbled automatically finally along brace, in falling into chamfer putting steel tube, neat superposition, when the steel pipe amount in chamfer putting steel tube reaches
During to certain amount, cylinder action is successfully released chamfer putting steel tube by roller, then by staff by the steel pipe in chamfer putting steel tube
Hang out, reduce the problem that base pipe causes abrasion and deformation during discharging due to leaving, while high degree of automation, greatly
Labour intensity is reduced greatly, improves the discharging efficiency and discharging quality of base pipe.
Feature of the present utility model and advantage will combine accompanying drawing and be described in detail by embodiment.
【Description of the drawings】
Fig. 1 is a kind of structural representation of the discharging frame of steel pipe of the utility model embodiment;
Fig. 2 is a kind of left view of the discharging frame of steel pipe of the utility model embodiment.
【Specific embodiment】
To make the purpose of this utility model, technical scheme and advantage of greater clarity, below by accompanying drawing and implementing
Example, is further elaborated to the utility model.However, it should be understood that specific embodiment described herein only to
The utility model is explained, scope of the present utility model is not limited to.Additionally, in the following description, eliminate to known knot
The description of structure and technology, to avoid unnecessarily obscuring concept of the present utility model.
Refering to Fig. 1 and Fig. 2, the utility model embodiment provides a kind of discharging frame of steel pipe, by 1 group of several sub-stents
Into several described structures of sub-stent 1 are identical, and equidistantly arrange along same level direction in same level, institute
Strengthen the connection of connecting rod 2 by some on the upper surface of several sub-stents 1 stated and form holistic frame structure, often
Individual sub-stent 1 is constituted by rear vertical rod 11, front vertical rod 12, upper rack posts 13, lower fulcrum bar 14, brace 15, each described sub-stent 1
Be additionally provided with buffer board 3, lower buffer board 4 and several deploying devices 5 on identical position, each deploying device 5 by
Two semicircles or half rectangle PPR pipe 51 are constituted, and the lower end of front vertical rod 12 of several described sub-stents 1 is connected by bracing piece 7
It is integrated, forms chamfer putting steel tube passage 6 between described bracing piece 7 and the lower fulcrum bar 14 of several sub-stents 1, described several
The bottom of sub-stent 1 arranges a chamfer putting steel tube 8, and the described rear wall of chamfer putting steel tube 8 is connected with the push rod head end of some cylinders 9, described
Some cylinders 9 be fixedly mounted in the rear vertical rod 11 of respective branches frame 1.
Wherein, the quantity of described sub-stent 1 is 5~7, and the spacing of contiguous branch frame 1 is 80~100cm, described
Strengthen connecting rod 2 for some to be equidistantly uniformly distributed on the upper surface of sub-stent 1, the described upper surface of chamfer putting steel tube 8 is highly low
In the lower surface height of bracing piece 7.
Further, the quantity of described reinforcement connecting rod 2 is 2~6.
Further, the bottom of described chamfer putting steel tube 8 is provided with some rollers 81, and described roller 81 can be along correspondence point
The slot rolling scroll forward and backward on lower fulcrum bar 14 on support 1, realizes the release and propulsion of chamfer putting steel tube 8.
Specifically, described rear vertical rod 11, front vertical rod 12, upper rack posts 13 and lower fulcrum bar 14 are formed in same perpendicular
Opening frame-type structure, the described lower end of rear vertical rod 11 is vertical with the rear end of lower fulcrum bar 14 to be connected, the upper end of rear vertical rod 11 and upper rack posts
13 rear ends are vertically connected, and the described upper end of front vertical rod 12 is vertical with the front end of upper rack posts 13 to be connected, and described upper buffer board 3 is arranged on
On the lower surface of upper rack posts 13, the described lower surface of upper rack posts 13 is provided with several and opens dress in the both sides of upper buffer board 3
Put 5, described front vertical rod 12 and the junction of upper rack posts 13 are provided with lower buffer board 4, described rear vertical rod 11 and upper rack posts 13
Junction be connected with one end of brace 15, the other end of brace 15 is located at the top of chamfer putting steel tube 8.
Further, the described lower surface of upper rack posts 13 is provided with 2 deploying devices 5 in the both sides of upper buffer board 3, point
The top of the top, the top of lower buffer board 4 and the epimere of brace 15 of the rear and front end of buffer board 3 Wei Yu not gone up.
Further, the rear and front end of described upper buffer board 3 respectively forwardly lower section, the back lower place incline identical angle,
Described lower buffer board 4 inclined downward backward, and be fixedly connected with front vertical rod 12 by support bar 41, described brace 15 is in
Bending, epimere forward downward is inclined, the angle of inclination phase of the epimere of the rear and front end of upper buffer board 3, lower buffer board 4 and brace 15
Together, it is 55 °~60 °, the upper surface of the rear and front end of described upper buffer board 3, the upper surface of lower buffer board 4 and brace 15
Upper surface is coated with elastic protection layer.
Further, two semicircles on described deploying device 5 or half rectangle PPR pipe 51 by brake apparatus with
Control device connects, and realizes opening and closes.
In the utility model embodiment, the quantity of sub-stent 1 is 7, and the spacing of contiguous branch frame 1 is 100cm.It is upper slow
The angle of inclination of the epimere of the rear and front end of punching 3, lower buffer board 4 and brace 15 is 57 °, and the quantity for strengthening connecting rod 2 is 4
Root.
Utility model works process:
In the course of the work, the base pipe output on main frame is transported to and closes a kind of discharging frame of steel pipe of the utility model
In the deploying device 5 of conjunction, after base pipe conveys finish to the end, control device realizes the orderly of deploying device 5 by brake apparatus
Open, base pipe drops in order, and the buffering of the epimere by the corresponding rear and front end of upper buffer board 3, lower buffer board 4 and brace 15
Effect, tumbles into chamfer putting steel tube 8 in order automatically along brace 15, can shift to an earlier date and tying up for entire bundle steel pipe is laid in chamfer putting steel tube 8
Band, when the steel pipe quantity in chamfer putting steel tube 8 reaches a certain amount of, cylinder 9 promotes chamfer putting steel tube 8 to release forward by push rod, and work people
Member's entire bundle steel pipe simultaneously hangs out, and then the push rod of cylinder 9 is return drive chamfer putting steel tube 8 and advanced, and the steel pipe into next round discharges.This practicality
The elastic protection layer of new middle setting reduces the problem that base pipe causes abrasion and deformation during discharging due to leaving, and prevents
Shield effect is strong, while high degree of automation, greatly reduces labour intensity, improves the discharging efficiency and discharging quality of base pipe.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
Any modification, equivalent or improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (10)
1. the discharging frame of a kind of steel pipe, it is characterised in that:It is made up of several sub-stents (1), several described sub-stents
(1) structure is identical, and equidistantly arranges along same level direction in same level, several described sub-stents (1)
Upper surface on by some strengthen connecting rod (2) connection form holistic frame structure, each sub-stent (1) by
Afterwards vertical rod (11), front vertical rod (12), upper rack posts (13), lower fulcrum bar (14), brace (15) are constituted, each described sub-stent (1)
Buffer board (3), lower buffer board (4) and several deploying devices (5), each deploying device are additionally provided with identical position
(5) constituted by two semicircles or half rectangle PPR pipe (51), front vertical rod (12) lower end of described several sub-stents (1)
It is connected as a single entity by bracing piece (7), between described bracing piece (7) and the lower fulcrum bar (14) of several sub-stents (1) steel is formed
Tube seat passage (6), the bottom of described several sub-stents (1) arranges a chamfer putting steel tube (8), the rear wall of described chamfer putting steel tube (8)
It is connected with the push rod head end of some cylinders (9), described some cylinders (9) are fixedly mounted on the rear vertical rod of respective branches frame (1)
(11) on.
2. the discharging frame of a kind of steel pipe as claimed in claim 1, it is characterised in that:The quantity of described sub-stent (1) is 5
~7, the spacing of contiguous branch frame (1) is 80~100cm, and described chamfer putting steel tube (8) upper surface is highly less than bracing piece (7)
Lower surface height.
3. the discharging frame of a kind of steel pipe as claimed in claim 1, it is characterised in that:Described rear vertical rod (11), front vertical rod
(12), upper rack posts (13) and lower fulcrum bar (14) form opening frame-type structure, described rear vertical rod (11) in same perpendicular
Lower end is vertical with the rear end of lower fulcrum bar (14) to be connected, and rear vertical rod (11) upper end is vertical with upper rack posts (13) rear end to be connected, described
Front vertical rod (12) upper end is vertical with upper rack posts (13) front end to be connected, and described upper buffer board (3) is arranged under upper rack posts (13)
On end face, described upper rack posts (13) lower surface is provided with several deploying devices (5), institute in the both sides of upper buffer board (3)
The front vertical rod (12) stated and the junction of upper rack posts (13) are provided with lower buffer board (4), described rear vertical rod (11) and upper rack posts
(13) junction is connected with the one end of brace (15), and the other end of brace (15) is located at the top of chamfer putting steel tube (8).
4. the discharging frame of a kind of steel pipe as claimed in claim 3, it is characterised in that:Described upper rack posts (13) lower surface exists
The both sides of upper buffer board (3) are provided with 2 deploying devices (5), top respectively positioned at upper buffer board (3) rear and front end, under
Buffer board (4) top and the top of brace (15) epimere.
5. the discharging frame of a kind of steel pipe as claimed in claim 3, it is characterised in that:Before and after described upper buffer board (3)
Respectively forwardly lower section, the back lower place incline identical angle at two ends, described lower buffer board (4) inclined downward backward, and by
Strut (41) is fixedly connected with front vertical rod (12), and in bending, epimere forward downward is inclined described brace (15), upper buffer board
(3) angle of inclination of the epimere of rear and front end, lower buffer board (4) and brace (15) is identical, is 55 °~60 °.
6. the discharging frame of a kind of steel pipe as claimed in claim 1, it is characterised in that:Before and after described upper buffer board (3)
The upper surface of the upper surface at two ends, the upper surface of lower buffer board (4) and brace (15) is coated with elastic protection layer.
7. the discharging frame of a kind of steel pipe as claimed in claim 1, it is characterised in that:On described deploying device (5) two
Individual semicircle or half rectangle PPR pipe (51) is connected by brake apparatus with control device, is realized opening and is closed.
8. the discharging frame of a kind of steel pipe as claimed in claim 1, it is characterised in that:Some described reinforcement connecting rods
(2) equidistantly it is uniformly distributed on the upper surface of sub-stent (1).
9. the discharging frame of a kind of steel pipe as claimed in claim 8, it is characterised in that:The number of described reinforcement connecting rod (2)
Measure as 2~6.
10. the discharging frame of a kind of steel pipe as claimed in claim 1, it is characterised in that:The bottom peace of described chamfer putting steel tube (8)
Equipped with some rollers (81), described roller (81) can be along before and after the slot rolling on the lower fulcrum bar (14) on respective branches frame (1)
Roll, realize the release and propulsion of chamfer putting steel tube (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621066905.XU CN206083432U (en) | 2016-09-20 | 2016-09-20 | Discharging machine frame of steel pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621066905.XU CN206083432U (en) | 2016-09-20 | 2016-09-20 | Discharging machine frame of steel pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206083432U true CN206083432U (en) | 2017-04-12 |
Family
ID=58479137
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621066905.XU Withdrawn - After Issue CN206083432U (en) | 2016-09-20 | 2016-09-20 | Discharging machine frame of steel pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206083432U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106311768A (en) * | 2016-09-20 | 2017-01-11 | 浙江义腾特种钢管有限公司 | Steel tube discharging machine frame |
-
2016
- 2016-09-20 CN CN201621066905.XU patent/CN206083432U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106311768A (en) * | 2016-09-20 | 2017-01-11 | 浙江义腾特种钢管有限公司 | Steel tube discharging machine frame |
CN106311768B (en) * | 2016-09-20 | 2018-06-22 | 浙江义腾特种钢管有限公司 | A kind of discharging rack of steel pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206083432U (en) | Discharging machine frame of steel pipe | |
CN206050928U (en) | A kind of carrying implement for panel in battenboard | |
CN206940071U (en) | A kind of lamination compensator device for improving crust leather flange | |
CN205537027U (en) | Automatic room of drying of slab | |
CN106311768B (en) | A kind of discharging rack of steel pipe | |
CN207441275U (en) | One kind six into six goes out accelerator irradiation technique system | |
CN207510466U (en) | A kind of construction site transport device that gas cylinder is facilitated to store | |
CN207453461U (en) | Supporting frame | |
CN206087556U (en) | Take steel pipe discharge mechanism of tally function | |
CN204895808U (en) | L type hangs foot hand support | |
CN207191790U (en) | A kind of drawing and pulling type auto panel places transport utensil | |
CN208065670U (en) | Collective's draw frame after a kind of marathon | |
CN206662216U (en) | Die head laying rack | |
CN207208916U (en) | Circulate storage rack | |
CN107155803B (en) | Support tree steel pipe support | |
CN203814281U (en) | Anti-typhoon agricultural greenhouse | |
CN205767583U (en) | A kind of adjustable core rod stopping means | |
CN107571895A (en) | A kind of display screen storage rack | |
CN204453702U (en) | Copper alloy tube rolling automatic charging device | |
CN207208920U (en) | One kind deposits board device online | |
CN202067612U (en) | Wiring harness sorting frame | |
CN209493030U (en) | Automatic arrangement mechanism for battery shells | |
CN207240165U (en) | A kind of aluminum alloy plate materials magazine | |
CN208346219U (en) | The railroad that frame is held in quenching is entered and left when a kind of large aluminium-board quenches | |
CN207524568U (en) | A kind of novel pipe carriage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170412 Effective date of abandoning: 20180622 |
|
AV01 | Patent right actively abandoned |