CN106311768B - A kind of discharging rack of steel pipe - Google Patents

A kind of discharging rack of steel pipe Download PDF

Info

Publication number
CN106311768B
CN106311768B CN201610834420.9A CN201610834420A CN106311768B CN 106311768 B CN106311768 B CN 106311768B CN 201610834420 A CN201610834420 A CN 201610834420A CN 106311768 B CN106311768 B CN 106311768B
Authority
CN
China
Prior art keywords
several
buffer board
sub
upright bar
stents
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610834420.9A
Other languages
Chinese (zh)
Other versions
CN106311768A (en
Inventor
朱则军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Special Steel Tube Co Ltd
Original Assignee
Zhejiang Special Steel Tube Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Special Steel Tube Co Ltd filed Critical Zhejiang Special Steel Tube Co Ltd
Priority to CN201610834420.9A priority Critical patent/CN106311768B/en
Publication of CN106311768A publication Critical patent/CN106311768A/en
Application granted granted Critical
Publication of CN106311768B publication Critical patent/CN106311768B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B39/00Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B39/02Feeding or supporting work; Braking or tensioning arrangements, e.g. threading arrangements

Abstract

The invention discloses a kind of discharging racks of steel pipe, it is made of several sub-stents, several described sub-stent structures are identical, and it is equidistantly arranged along same level direction in same level, strengthen connecting rod by several on the upper surface of several sub-stents and connect the integral frame structure of shape, each sub-stent is by rear upright bar, preceding upright bar, upper rack posts, lower fulcrum bar, brace forms, each sub-stent is additionally provided with buffer board on identical position, lower buffer board and several deploying devices, each deploying device is made of two semicircles or half rectangle PPR pipe, the preceding upright bar lower end of several sub-stents is connected as a single entity by bracing piece, chamfer putting steel tube channel is formed between the bracing piece and the lower fulcrum bar of several sub-stents, the bottom of several sub-stents sets a chamfer putting steel tube.The present invention is rational in infrastructure, realizes automation discharging, and labor intensity substantially reduces, while improves the discharging efficiency of base pipe and discharging quality.

Description

A kind of discharging rack of steel pipe
【Technical field】
The present invention relates to the technical field of pipe-mill, the discharging rack of more particularly to a kind of steel pipe.
【Background technology】
With the development of steel and iron industry, technology is also constantly advancing, and is the good and fast development of China's steel and iron industry Guarantee is provided, promotes economic rapid growth.With the continuous improvement of China's economic level, China is for the demand of steel Amount will become increasing, and the stable development of steel industry is to improve the basis of China's level of economic development.
At present, steel pipe is from less efficient from the discharging on host, and human assistance is needed to discharge, into next process, Labor intensity is higher, and the degree of automation is relatively low, to solve the above-mentioned problems, the production of steel pipe is improved while reducing labor intensity Efficiency, it is necessary to propose a kind of discharging rack of steel pipe.
【Invention content】
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, a kind of discharging rack of steel pipe is provided, is intended to Solve the technical issues of steel pipe discharging efficiency in the prior art is low, and labor intensity is high.
To achieve the above object, the present invention proposes a kind of discharging rack of steel pipe, is made of several sub-stents, described Several sub-stent structures it is identical, and equidistantly arranged along same level direction in same level, described is several Strengthen connecting rod by several on the upper surface of a sub-stent and connect the integral frame structure of shape, each sub-stent is equal It is made of rear upright bar, preceding upright bar, upper rack posts, lower fulcrum bar, brace, each sub-stent is additionally provided on identical position Upper buffer board, lower buffer board and several deploying devices, each deploying device is by two semicircles or half rectangle PPR pipe group Into the preceding upright bar lower end of several sub-stents is connected as a single entity by bracing piece, the bracing piece and several branches Chamfer putting steel tube channel is formed between the lower fulcrum bar of frame, the bottom of several sub-stents sets a chamfer putting steel tube, the steel pipe The rear wall of slot and the push rod head end of several cylinders are connected, and several cylinders are fixedly mounted on the rear upright bar of respective branches frame On.
Preferably, the quantity of the sub-stent is 5~7, the spacing of contiguous branch frame is 80~100cm, described Chamfer putting steel tube upper surface height be less than bracing piece lower face height.
Preferably, the rear upright bar, preceding upright bar, upper rack posts and lower fulcrum bar form opening frame in same perpendicular Type structure, the rear upright bar lower end is vertical with the rear end of lower fulcrum bar to be connected, and rear upright bar upper end is vertical with upper rack posts rear end to be connected, The preceding upright bar upper end is vertical with upper rack posts front end to be connected, and the upper buffer board is arranged on the lower face of upper rack posts, institute The upper rack posts lower face stated is both provided with several deploying devices in the both sides of upper buffer board, the preceding upright bar and upper rack posts Junction is provided with lower buffer board, one end connection of the junction and brace of the rear upright bar and upper rack posts, brace it is another End is positioned at the top of chamfer putting steel tube.
Preferably, the upper rack posts lower face is both provided with 2 deploying devices, difference position in the both sides of upper buffer board Above the top of upper buffer board rear and front end, lower buffer board and the top of brace epimere.
Preferably, respectively forwardly lower section, the back lower place tilt identical angle, institute for the rear and front end of the upper buffer board The lower buffer board stated inclined downward, and pass through supporting rod and be fixedly connected with preceding upright bar backward, the brace is in bending, epimere Forward downward tilts, and the angle of inclination of the epimere of upper buffer board rear and front end, lower buffer board and brace is identical, be 55 °~ 60°。
Preferably, the upper surface of the rear and front end of the upper buffer board, the upper surface of lower buffer board and brace it is upper Surface is coated with elastic protection layer.
Preferably, two semicircles or half rectangle PPR pipe on the deploying device pass through brake apparatus and control Device connects, and realizes and opens and be closed.
Preferably, described several are strengthened connecting rod and are equidistantly uniformly distributed on the upper surface of sub-stent.
Preferably, the quantity of the reinforcement connecting rod is 2~6.
Preferably, the bottom of the chamfer putting steel tube is equipped with several idler wheels, the idler wheel can be along respective branches frame On lower fulcrum bar on slot rolling scroll forward and backward, realize the release and propulsion of chamfer putting steel tube.
Beneficial effects of the present invention:Compared with prior art, the discharging rack of a kind of steel pipe provided by the invention, structure are closed Reason is combined into the discharging rack of a frame structure, 4 connect by brake apparatus with control device by several sub-stents Deploying device can realize the holding of the base pipe exported from pipe-mill and automatic order blanking, while base pipe can also be protected to prevent Scratch abrasion;The base pipe of corresponding position blanking is protected into row buffering by the epimere of upper buffer board both ends, lower buffer board and brace Shield, finally along brace tumbles, falls into chamfer putting steel tube automatically, neat to be superimposed, when the steel pipe amount in chamfer putting steel tube reaches certain amount When, chamfer putting steel tube by idler wheel is successfully released, is then hung out the steel pipe in chamfer putting steel tube by staff, reduced by cylinder action Base pipe due to leaving cause abrasion and deformation the problem of during discharging, while high degree of automation, greatly reduces Labor intensity improves the discharging efficiency of base pipe and discharging quality.
The feature and advantage of the present invention will be described in detail by embodiment combination attached drawing.
【Description of the drawings】
Fig. 1 is a kind of structure diagram of the discharging rack of steel pipe of the embodiment of the present invention;
Fig. 2 is a kind of left view of the discharging rack of steel pipe of the embodiment of the present invention.
【Specific embodiment】
Understand to make the object, technical solutions and advantages of the present invention clearer, it is right below by attached drawing and embodiment The present invention is further elaborated.However, it should be understood that specific embodiment described herein is only used to explain this hair Range that is bright, being not intended to restrict the invention.In addition, in the following description, the description to known features and technology is omitted, with Avoid unnecessarily obscuring idea of the invention.
Refering to Fig. 1 and Fig. 2, the embodiment of the present invention provides a kind of discharging rack of steel pipe, is made of several sub-stents 1, Several described 1 structures of sub-stent are identical, and are equidistantly arranged along same level direction in same level, described Strengthen connecting rod 2 by several on the upper surface of several sub-stents 1 and connect the integral frame structure of shape, Mei Gefen Stent 1 is made of rear upright bar 11, preceding upright bar 12, upper rack posts 13, lower fulcrum bar 14, brace 15, and each sub-stent 1 is in phase Buffer board 3, lower buffer board 4 and several deploying devices 5 are additionally provided on same position, each deploying device 5 is by two Semicircle or half rectangle PPR pipe 51 forms, and 12 lower end of preceding upright bar of several sub-stents 1 is linked as one by bracing piece 7 Body forms chamfer putting steel tube channel 6, several described branches between the bracing piece 7 and the lower fulcrum bar 14 of several sub-stents 1 The bottom of frame 1 sets a chamfer putting steel tube 8, and the rear wall of the chamfer putting steel tube 8 and the push rod head end of several cylinders 9 are connected, if described Dry gas cylinder 9 is fixedly mounted in the rear upright bar 11 of respective branches frame 1.
Wherein, the quantity of the sub-stent 1 is 5~7, and the spacing of contiguous branch frame 1 is 80~100cm, described Strengthen connecting rod 2 for several to be equidistantly uniformly distributed on the upper surface of sub-stent 1,8 upper surface of chamfer putting steel tube height is low In the lower face height of bracing piece 7.
Further, the quantity of the reinforcement connecting rod 2 is 2~6.
Further, the bottom of the chamfer putting steel tube 8 is equipped with several idler wheels 81, and the idler wheel 81 can be along corresponding point The slot rolling scroll forward and backward on lower fulcrum bar 14 on stent 1 realizes the release and propulsion of chamfer putting steel tube 8.
Specifically, the rear upright bar 11, preceding upright bar 12, upper rack posts 13 and lower fulcrum bar 14 are formed in same perpendicular Be open frame-type structure, and 11 lower end of rear upright bar is vertical with the rear end of lower fulcrum bar 14 to be connected, rear 11 upper end of upright bar and upper rack posts 13 rear ends are vertically connected, and 12 upper end of preceding upright bar is vertical with 13 front end of upper rack posts to be connected, and the upper buffer board 3 is arranged on On the lower face of upper rack posts 13,13 lower face of upper rack posts is both provided with several in the both sides of upper buffer board 3 and opens dress Put 5, the junction of the preceding upright bar 12 and upper rack posts 13 is provided with lower buffer board 4, the rear upright bar 11 and upper rack posts 13 Junction connect with one end of brace 15, the other end of brace 15 is located at the top of chamfer putting steel tube 8.
Further, 13 lower face of upper rack posts is both provided with 2 deploying devices 5 in the both sides of upper buffer board 3, point Not Wei Yu the top of upper 3 rear and front end of buffer board, 4 top of lower buffer board and 15 epimere of brace top
Further, respectively forwardly lower section, the back lower place tilt identical angle for the rear and front end of the upper buffer board 3, The lower buffer board 4 inclined downward, and pass through supporting rod 41 and be fixedly connected with preceding upright bar 12 backward, the brace 15 is in curved Shape is rolled over, epimere forward downward tilts, the angle of inclination phase of the epimere of upper 3 rear and front end of buffer board, lower buffer board 4 and brace 15 Together, it is 55 °~60 °, the upper surface of the rear and front end of the upper buffer board 3, the upper surface of lower buffer board 4 and brace 15 Upper surface is coated with elastic protection layer.
Further, two semicircles on the deploying device 5 or half rectangle PPR pipe 51 by brake apparatus with Control device connects, and realizes and opens and be closed.
In embodiments of the present invention, the quantity of sub-stent 1 is 7, and the spacing of contiguous branch frame 1 is 100cm.Upper buffer board The angle of inclination of the epimere of 3 rear and front ends, lower buffer board 4 and brace 15 is 57 °, and the quantity for strengthening connecting rod 2 is 4.
The course of work of the present invention:
During the work time, the base pipe output on host is transported to closure to a kind of discharging rack of steel pipe of the present invention In deploying device 5, after treating that base pipe conveys to the end, control device realizes the orderly unlatching of deploying device 5 by brake apparatus, Base pipe is orderly fallen, and the cushioning effect of the epimere by corresponding upper 3 rear and front end of buffer board, lower buffer board 4 and brace 15, It is orderly tumbled automatically into chamfer putting steel tube 8 along brace 15, the bandage being laid in chamfer putting steel tube 8 for entire bundle steel pipe can be shifted to an earlier date, treated When steel pipe quantity in chamfer putting steel tube 8 reaches a certain amount of, cylinder 9 pushes chamfer putting steel tube 8 to release forward by push rod, staff's entire bundle Steel pipe is simultaneously hung out, and then 9 push rod of cylinder, which is retracted, drives chamfer putting steel tube 8 to promote, and the steel pipe into next round discharges.It is set in the present invention Elastic protection layer reduce base pipe and causing abrasion during discharging due to leaving and the problem of deformation, protective action is strong, High degree of automation simultaneously, greatly reduces labor intensity, improves the discharging efficiency of base pipe and discharging quality.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modification, equivalent replacement or improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of discharging rack of steel pipe, it is characterised in that:It is made of several sub-stents (1), several described sub-stents (1) structure is identical, and is equidistantly arranged along same level direction in same level, several described sub-stents (1) Upper surface on strengthen connecting rods (2) by several and connect the integral frame structure of shape, each sub-stent (1) by Upright bar (11), preceding upright bar (12), upper rack posts (13), lower fulcrum bar (14), brace (15) composition afterwards, each sub-stent (1) Buffer board (3), lower buffer board (4) and several deploying devices (5), each deploying device are additionally provided on identical position (5) it is made of two semicircles or half rectangle PPR pipe (51), preceding upright bar (12) lower end of several sub-stents (1) It is connected as a single entity by bracing piece (7), steel is formed between the lower fulcrum bar (14) of the bracing piece (7) and several sub-stents (1) Tube seat channel (6), the bottom of several sub-stents (1) set a chamfer putting steel tube (8), the rear wall of the chamfer putting steel tube (8) It is connected with the push rod head end of several cylinders (9), several cylinders (9) are fixedly mounted on the rear upright bar of respective branches frame (1) (11) on.
2. a kind of discharging rack of steel pipe as described in claim 1, it is characterised in that:The quantity of the sub-stent (1) is 5 ~7, the spacing of contiguous branch frame (1) is 80~100cm, and the chamfer putting steel tube (8) upper surface height is less than bracing piece (7) Lower face height.
3. a kind of discharging rack of steel pipe as described in claim 1, it is characterised in that:The rear upright bar (11), preceding upright bar (12), upper rack posts (13) and lower fulcrum bar (14) form opening frame-type structure, the rear upright bar (11) in same perpendicular Lower end is vertical with the rear end of lower fulcrum bar (14) to be connected, and rear upright bar (11) upper end is vertical with upper rack posts (13) rear end to be connected, described Preceding upright bar (12) upper end is vertical with upper rack posts (13) front end to be connected, and the upper buffer board (3) is arranged under upper rack posts (13) On end face, the upper rack posts (13) lower face is both provided with several deploying devices (5), institute in the both sides of upper buffer board (3) The preceding upright bar (12) stated and the junction of upper rack posts (13) are provided with lower buffer board (4), the rear upright bar (11) and upper rack posts (13) junction is connect with the one end of brace (15), and the other end of brace (15) is located at the top of chamfer putting steel tube (8).
4. a kind of discharging rack of steel pipe as claimed in claim 3, it is characterised in that:Described upper rack posts (13) lower face exists The both sides of upper buffer board (3) are both provided with 2 deploying devices (5), respectively positioned at the top of upper buffer board (3) rear and front end, under Above buffer board (4) and the top of brace (15) epimere.
5. a kind of discharging rack of steel pipe as claimed in claim 3, it is characterised in that:The upper buffer board (3) it is front and rear Respectively forwardly lower section, the back lower place tilt identical angle, lower buffer board (4) inclined downward, and pass through branch backward at both ends Strut (41) is fixedly connected with preceding upright bar (12), and the brace (15) is tilted in bending, epimere forward downward, upper buffer board (3) angle of inclination of the epimere of rear and front end, lower buffer board (4) and brace (15) is identical, is 55 °~60 °.
6. a kind of discharging rack of steel pipe as described in claim 1, it is characterised in that:The upper buffer board (3) it is front and rear The upper surface of the upper surface at both ends, the upper surface of lower buffer board (4) and brace (15) is coated with elastic protection layer.
7. a kind of discharging rack of steel pipe as described in claim 1, it is characterised in that:Two on the deploying device (5) A semicircle or half rectangle PPR pipe (51) is connect by brake apparatus with control device, is realized and is opened and be closed.
8. a kind of discharging rack of steel pipe as described in claim 1, it is characterised in that:Several reinforcement connecting rods (2) it is equidistantly uniformly distributed on the upper surface of sub-stent (1).
9. a kind of discharging rack of steel pipe as claimed in claim 8, it is characterised in that:The number of the reinforcement connecting rod (2) Measure is 2~6.
10. a kind of discharging rack of steel pipe as described in claim 1, it is characterised in that:The bottom peace of the chamfer putting steel tube (8) Equipped with several idler wheels (81), before and after the idler wheel (81) can be along the slot rolling on the lower fulcrum bar (14) on respective branches frame (1) It rolls, realizes the release and propulsion of chamfer putting steel tube (8).
CN201610834420.9A 2016-09-20 2016-09-20 A kind of discharging rack of steel pipe Active CN106311768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610834420.9A CN106311768B (en) 2016-09-20 2016-09-20 A kind of discharging rack of steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610834420.9A CN106311768B (en) 2016-09-20 2016-09-20 A kind of discharging rack of steel pipe

Publications (2)

Publication Number Publication Date
CN106311768A CN106311768A (en) 2017-01-11
CN106311768B true CN106311768B (en) 2018-06-22

Family

ID=57787973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610834420.9A Active CN106311768B (en) 2016-09-20 2016-09-20 A kind of discharging rack of steel pipe

Country Status (1)

Country Link
CN (1) CN106311768B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000128355A (en) * 1998-10-27 2000-05-09 Kubota Corp Pipe shockless transfer device
CN203652717U (en) * 2013-12-12 2014-06-18 唐敏 Device for collecting materials
CN204021284U (en) * 2014-06-25 2014-12-17 天津名唐环保科技有限公司 A kind of welding rod Auto-counting boxing apparatus
CN104290972A (en) * 2014-09-01 2015-01-21 徐州德坤电气科技有限公司 Automatic sorting and counting device for plastic tubes
CN204137934U (en) * 2014-09-01 2015-02-04 徐州德坤电气科技有限公司 Be applicable to the charging feed bin of plastic pipe number system
CN206083432U (en) * 2016-09-20 2017-04-12 浙江义腾特种钢管有限公司 Discharging machine frame of steel pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000128355A (en) * 1998-10-27 2000-05-09 Kubota Corp Pipe shockless transfer device
CN203652717U (en) * 2013-12-12 2014-06-18 唐敏 Device for collecting materials
CN204021284U (en) * 2014-06-25 2014-12-17 天津名唐环保科技有限公司 A kind of welding rod Auto-counting boxing apparatus
CN104290972A (en) * 2014-09-01 2015-01-21 徐州德坤电气科技有限公司 Automatic sorting and counting device for plastic tubes
CN204137934U (en) * 2014-09-01 2015-02-04 徐州德坤电气科技有限公司 Be applicable to the charging feed bin of plastic pipe number system
CN206083432U (en) * 2016-09-20 2017-04-12 浙江义腾特种钢管有限公司 Discharging machine frame of steel pipe

Also Published As

Publication number Publication date
CN106311768A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN106311768B (en) A kind of discharging rack of steel pipe
CN206083432U (en) Discharging machine frame of steel pipe
CN206693017U (en) A kind of mesopore kerbstone installation tool
CN209142938U (en) A kind of transfer car(buggy) storing dedicated side storehouse with transhipment
CN207256185U (en) A kind of reinforcing bar storing unit
CN207837277U (en) A kind of section space-efficient express delivery storage rack
CN206692685U (en) A kind of novel thermal process bin frock
CN207329762U (en) Glass bracket
CN107571895A (en) A kind of display screen storage rack
CN106276034B (en) A kind of mechanical feed discharging polishing machine with tally function
CN205150737U (en) Glass frame
CN205552306U (en) Membrane structure bicycle shed shotblaster stores pylon
CN207765902U (en) A kind of cable bearer set up for electric power
CN108095500A (en) A kind of clothes hanger structure of adjustable opening angle
CN105346921B (en) Solar panel transports backrest
CN209306548U (en) A kind of glass self-unloading operating device
CN209535724U (en) A kind of polyethylene pipe post-process treatment storing unit
CN207553568U (en) A kind of barrel structure for wall construction
CN207985588U (en) A kind of evaporative pattern storing unit with protection
CN203145329U (en) Reinforcing steel bar supporting rib
CN208065670U (en) Collective's draw frame after a kind of marathon
CN208307239U (en) A kind of aluminium ingot barrow
CN207465191U (en) Right side front wheel cover rack
CN203727432U (en) Lattice apron circulation trolley
CN206927282U (en) It is easy to the device of batch can blanking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant