CN206070717U - A kind of draining double-edged fine-toothed comb - Google Patents
A kind of draining double-edged fine-toothed comb Download PDFInfo
- Publication number
- CN206070717U CN206070717U CN201621035548.0U CN201621035548U CN206070717U CN 206070717 U CN206070717 U CN 206070717U CN 201621035548 U CN201621035548 U CN 201621035548U CN 206070717 U CN206070717 U CN 206070717U
- Authority
- CN
- China
- Prior art keywords
- substrate
- draining
- toothed comb
- edged fine
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Drying Of Solid Materials (AREA)
Abstract
A kind of draining double-edged fine-toothed comb, belongs to field of mechanical technique.Channel-section steel and substrate connection, the both sides of substrate connect channel-section steel respectively, and the surrounding of substrate is distributed the first expansion bolt installing hole, channel-section steel is distributed the second expansion bolt installing hole, draining hole is distributed on substrate, and I-steel connects on the bottom surface of the substrate, and I-steel connects for cross.Substrate is that monoblock is strengthened thickening steel plate.Channel-section steel is distributed in the both sides of substrate, and the channel-section steel of side is more than 2.First expansion bolt installing hole is more than 2, and the second expansion bolt installing hole is more than 2.Draining hole is more than 2.The utility model has the advantages that the cleaning cycle of double-edged fine-toothed comb by original two weeks once, once cleaning difficulty is also greatly reduced within big 3 months up till now for prolongation, effectively solves the problems, such as that garbage pool draining is difficult, the quality that our factory waste incineration enters stove is reduced, the burning of refuse furnace is stabilized.
Description
Technical field
This utility model is related to a kind of draining double-edged fine-toothed comb, belongs to field of mechanical technique.
Background technology
The stock of garbage power plant garbage pool is normally 7 times of daily handling ability, and the normal front of garbage pool draining double-edged fine-toothed comb is held
More than hundred tons are pressed in, therefore original grating type draining double-edged fine-toothed comb front bearing capacity is not enough, easily deforms and comes off.
The complicated component of garbage pool draining double-edged fine-toothed comb institute draining, Many times are the mixture such as water, rubbish, mud, and contain ferrum
Silk, packaging bag etc., easily produce winding in grid surface, and blocking easily occurs.
Rubbish easily produces the slip of front or side, grating type draining in windrow because the moisture content of rubbish is higher
Double-edged fine-toothed comb is arranged on the surface of the body of wall of garbage pool, when rubbish produces sideslip, is easily caused grid double-edged fine-toothed comb and installs expansion bolt stress mistake
Greatly, cause expansion bolt to be extracted, or shear stress is excessive, cause regulation expansion bolt to rupture, draining double-edged fine-toothed comb comes off.
Garbage pool draining double-edged fine-toothed comb is applied in garbage burning factory garbage pool, stores in garbage pool for primary house refuse
Garbage pool hydrops are discharged in dehydration;Incineration of Household Refuse is risen at home the eighties in 20th century, from south
City pilot conversion be suitable for, exchanged by the site visit of early stage, from the rubbish on the ground such as Shanghai, Guangzhou, Shenzhen, Zhuhai, Suzhou
From the point of view of rubbish power plant, the draining of garbage pool in the industry of waste incineration is always a big difficult point, does not have very good solution
Method;And the draining of garbage pool is related to and burns away the refuse the stablizing of quality into stove, the height of calorific value;Concerning burning power plant
Economy and environmental benefit;From inside industry, garbage pool draining double-edged fine-toothed comb typically all uses traditional grid draining double-edged fine-toothed comb, using swollen
Swollen bolt is fixed in garbage pool body of wall side, and this draining double-edged fine-toothed comb drainage effect is not good, easily deforms, and make after being extruded by rubbish
It is not long with the life-span, easily fall off.
The content of the invention
In order to overcome the deficiencies in the prior art, this utility model to provide a kind of draining double-edged fine-toothed comb.
A kind of draining double-edged fine-toothed comb, channel-section steel and substrate connection, the both sides of substrate connect channel-section steel, the surrounding distribution first of substrate respectively
Expansion bolt installing hole, channel-section steel are distributed the second expansion bolt installing hole, and draining hole is distributed on substrate, and I-steel is connected to base
On the bottom surface of plate, I-steel connects for cross.
Substrate is that monoblock is strengthened thickening steel plate.Channel-section steel is distributed in the both sides of substrate, and the channel-section steel of side is more than 2.First
Expansion bolt installing hole is more than 2, and the second expansion bolt installing hole is more than 2.Draining hole is more than 2.
The utility model has the advantages that the cleaning cycle of double-edged fine-toothed comb by original two weeks once, extend it is big 3 months up till now
Once, clearing up difficulty also greatly reduces, and effectively solves the problems, such as that garbage pool draining is difficult, reduces waste incineration and enter stove
Quality, stabilize the burning of refuse furnace, change the present situation that garbage pool draining easily occurs to block, make garbage pool draining more suitable
Freely, extend the cleaning cycle of draining double-edged fine-toothed comb;Change front insufficient strength, the present situation easily deformed by rubbish extruding, can be effective
The front that produces from dumping of resistance, side extruding force prevents the deformation of draining double-edged fine-toothed comb from coming off.Change expansion bolt to fix
During the inadequate lateral forces of installation strength, expansion bolt is easy to fall off, or affected bolt fracture by shearing force, and causes double-edged fine-toothed comb to take off
Fall, service life was up to more than 3 years.
Description of the drawings
When considered in conjunction with the accompanying drawings, by referring to detailed description below, can more completely more fully understand that this practicality is new
Type and easily learn the adjoint advantage of many of which, but accompanying drawing described herein be used for providing to it is of the present utility model enter one
Step understands that constitute a part of the present utility model, schematic description and description of the present utility model is used to explain this practicality
It is new, do not constitute to improper restriction of the present utility model, such as scheme wherein:
Fig. 1 is positive structure schematic of the present utility model.
Fig. 2 is structure schematic diagram of the present utility model.
Fig. 3 is side structure schematic diagram of the present utility model.
With reference to the accompanying drawings and examples this utility model is further illustrated.
Specific embodiment
Obviously, those skilled in the art belong to this practicality based on many modifications and variations done by objective of the present utility model
New protection domain.
Those skilled in the art of the present technique are appreciated that unless expressly stated, singulative " " used herein, "
It is individual ", " described " and " being somebody's turn to do " may also comprise plural form.It is to be further understood that used in description of the present utility model
Wording " including " refer to there is the feature, integer, step, operation, element and/or component, but it is not excluded that exist or
Add one or more other features, integer, step, operation, element, component and/or their group.It should be understood that first when claiming
When part, component are "connected" to another element, component, it can be directly connected to other elements or component, or can also
There is intermediary element or component.Wording "and/or" used herein includes one or more associated listing appointing for item
Unit one and all combination.
Those skilled in the art of the present technique are appreciated that unless otherwise defined all terms used herein (include technology art
Language and scientific terminology) with art of the present invention in those of ordinary skill general understanding identical meaning.Should also
It is understood by, those terms defined in such as general dictionary are should be understood that with the meaning in the context with prior art
The consistent meaning of justice, and unless defined as here, will not be with idealizing or excessively formal implication is explaining.
Embodiment 1:As shown in Figure 1, Figure 2, Figure 3 shows, a kind of draining double-edged fine-toothed comb, substrate 5 are that monoblock is strengthened thickening steel plate.Channel-section steel 3
It is connected with substrate 5, the both sides of substrate 5 connect channel-section steel 3 respectively, and channel-section steel 3 is distributed in the both sides of substrate 5, and the channel-section steel 3 of side is 2
More than, the surrounding of substrate 5 is distributed the first expansion bolt installing hole 4, and the first expansion bolt installing hole 4 is more than 2,3 points of channel-section steel
The second expansion bolt of cloth installing hole 6, the second expansion bolt installing hole 6 is more than 2, and draining hole 2 is distributed on the substrate 5, row
Water hole hole 2 is more than 2, and I-steel 1 is connected on the bottom surface of substrate 5, and I-steel 1 connects for cross.
First expansion bolt installing hole 4, the second expansion bolt installing hole 6 have installation fixation, and draining hole 2 has discharge
Percolate is acted on, and I-steel 1 strengthens double-edged fine-toothed comb intensity, prevents front compressive deformation.
This utility model draining double-edged fine-toothed comb can effectively solve draining double-edged fine-toothed comb by rubbish front or side pressure, prevent double-edged fine-toothed comb from becoming
Shape comes off failure, while the cleaning cycle of draining double-edged fine-toothed comb can be extended.
The embedded wall-body that is installed as of this utility model garbage pool double-edged fine-toothed comb is installed,
The making of this utility model draining double-edged fine-toothed comb:
Be substrate 5 from the high intensity integral plate for strengthening thickening, the thickness of substrate 5 should in more than 10mm, with specific reference to
The quantity in stock of garbage pool determines;
The size of substrate 5 with garbage pool it is reserved osculum is correspondingly sized is advisable, the installation side of reserved 10cm of periphery or so.
Make the draining hole 2 of circle on the substrate 5 of the mode of cutting, (must be circular) to draining hole 2
Hole periphery polishing, should not leave burr, and the size of perforate is advisable (determined according to garbage pool rubbish situation) with 80-150mm, perforate
Interval is in the same size with osculum.
In 5 back side of substrate welding (centre position) I-steel 1 of draining double-edged fine-toothed comb, in the model and draining hole 2 of I-steel 1
Between interval it is consistent, the intensity of reinforced platoon's leaf grating for down pipe.
Welding this face of draining double-edged fine-toothed comb (side view) auxiliary channel-section steel 3, the model width of channel-section steel 3 are advisable with osculum size, groove
The length of steel 3 is advisable with garbage pool wall thickness.
Drilling:Fixed expansion bolt mounting holes are made on draining double-edged fine-toothed comb and auxiliary channel-section steel, pore size is according to double-edged fine-toothed comb
Size determines.
As described above, embodiment of the present utility model is explained, but as long as essentially without disengaging
Inventive point of the present utility model and effect can have many deformations, and this is apparent to one skilled in the art
's.Therefore, such variation is also integrally incorporated within protection domain of the present utility model.
Claims (5)
1. a kind of draining double-edged fine-toothed comb, it is characterised in that channel-section steel and substrate connection, the both sides of substrate connect channel-section steel, the surrounding of substrate respectively
The first expansion bolt installing hole is distributed, channel-section steel is distributed the second expansion bolt installing hole, and draining hole is distributed on substrate, I-steel
On the bottom surface of the substrate, I-steel connects for cross for connection.
2. a kind of draining double-edged fine-toothed comb according to claim 1, it is characterised in that substrate is that monoblock is strengthened thickening steel plate.
3. a kind of draining double-edged fine-toothed comb according to claim 1, it is characterised in that channel-section steel is distributed in the both sides of substrate, the groove of side
Steel is more than 2.
4. a kind of draining double-edged fine-toothed comb according to claim 1, it is characterised in that the first expansion bolt installing hole is more than 2,
Second expansion bolt installing hole is more than 2.
5. a kind of draining double-edged fine-toothed comb according to claim 1, it is characterised in that draining hole is more than 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621035548.0U CN206070717U (en) | 2016-08-31 | 2016-08-31 | A kind of draining double-edged fine-toothed comb |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621035548.0U CN206070717U (en) | 2016-08-31 | 2016-08-31 | A kind of draining double-edged fine-toothed comb |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206070717U true CN206070717U (en) | 2017-04-05 |
Family
ID=58436894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621035548.0U Active CN206070717U (en) | 2016-08-31 | 2016-08-31 | A kind of draining double-edged fine-toothed comb |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206070717U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729536A (en) * | 2018-06-25 | 2018-11-02 | 常州市排水管理处 | A kind of drainage pipeline grid and system |
-
2016
- 2016-08-31 CN CN201621035548.0U patent/CN206070717U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729536A (en) * | 2018-06-25 | 2018-11-02 | 常州市排水管理处 | A kind of drainage pipeline grid and system |
CN108729536B (en) * | 2018-06-25 | 2024-05-17 | 常州市排水管理处 | Drainage pipeline grid and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102329062B (en) | Electroosmosis method and device for dehydrating energy-containing sludge | |
CN204769829U (en) | Domestic waste hydraulic pressure hydroextractor | |
CN206070717U (en) | A kind of draining double-edged fine-toothed comb | |
CN209397475U (en) | A kind of novel plate-purlin bondbeam | |
CN103669336A (en) | Geothermal air conditioner preformed pile | |
CN208983364U (en) | The charging dehydration device of garbage pyrolysis furnace | |
CN101539346B (en) | Hybrid solar vacuum hot water thermal insulating residual water pipe | |
CN203922796U (en) | Six grades of full-automatic oil removal lifting integrated equipments of separate type | |
CN203272127U (en) | Wear-resisting device of rotor pump | |
CN206071100U (en) | Energy-saving type mobile kitchen | |
CN201434151Y (en) | Solar-energy vacuum hot-water heat-insulation delivery pipe | |
CN204898785U (en) | Tower crane sprays water supply system | |
CN208058857U (en) | A kind of double width structure row dynamic formula garbage incinerator fire grate | |
CN202561422U (en) | Rib anti-corrosion anti-seepage plate | |
CN208186370U (en) | A kind of broken coke installation of steam | |
CN205777643U (en) | The reinforcement node that a kind of steel beam web plate punches | |
CN205999432U (en) | Self adaptation dreg removing system | |
CN101748924A (en) | Inner drum tilling chimney of reinforced concrete inner drum and outer drum and construction method thereof | |
CN211118716U (en) | Water-saving device for recovering condensate of steam pipeline steam trap | |
CN201540023U (en) | Ring shaped stove bottom preventing material merging | |
CN203999295U (en) | Glass toughening manure pit | |
CN204436954U (en) | One is drained the oil hydraulic press thoroughly | |
CN211690724U (en) | A intelligence is blocked and is erodeed shield for municipal drainage pipe network | |
CN215259770U (en) | Flue gas baffle structure of waste boiler superheater | |
CN211228834U (en) | Prefabricated assembled filter beam for filter tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |